Exhibit 12 Daily Contract Inspection Report.docx

DOCX document 23 KB Posted

Attached to
Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG
Solicitation number
W91QVN24R0008
Issued by

About this file

This document is a Daily Contract Inspection Report template used by contractors to provide daily updates on the status of a federal contract. The template includes instructions for contractors on how to properly fill out the report, including details such as the contract number, work description, number of workers, weather conditions, difficulties encountered, and estimated completion date. The report also includes sections for the government inspector to evaluate the contractor's work and provide any additional comments. This report is likely used to monitor and document the progress of a federal contract for services related to Army Family Housing at USAG Humphreys in South Korea.

View the file

Other files

File Type Posted
Amd 03 W91QVN-24-R-0008.pdf PDF
Amd 02 W91QVN-24-R-0008.pdf PDF
Minor Repair Information.xls XLS spreadsheet
Amd 01 W91QVN-24-R-0008.pdf PDF
Major Repair price information.xlsx XLSX spreadsheet
Exhibit 7 Change of Occupany Cleaning Check List.xlsx XLSX spreadsheet
Exhibit 16 Heavy Equipment Check Lists.docx DOCX document
Exhibit 18 Sample NCIR.docx DOCX document
Exhibit 29 AFH Area Site for bldgs 510 511 and 512.pptx PPTX presentation
Exhibit 25 Red Cloud Circle Map( O6 Housing).pptx PPTX presentation
Exhibit 27 Macarthur Circle Map(GFOQ) (1).pptx PPTX presentation
Exhibit 24 Parking Lot floor Plan 5101 5102 5103 5171 5172 5173 Area.pdf PDF
Exhibit 30 AFH Room Information.xlsx XLSX spreadsheet
Exhibit 13 Customer Complaint.docx DOCX document
Exhibit 15 COM Monthly Report.xlsx XLSX spreadsheet
Exhibit 19 AFH bldg 513 Garage plan.pdf PDF
Exhibit 1 PRS v1.docx DOCX document
Exhibit 2 Deliverables(Data Requirements) v2.docx DOCX document
Exhibit 17 Contract Discepancy Report CDR.docx DOCX document
Exhibit 14 GFOQ Monthly Report.docx DOCX document
Exhibit 5 Change of Occupancy Monthly Report.docx DOCX document
Exhibit 11 Estimated Service Frequency.docx DOCX document
Exhibit 23 Building 5101 5102 5103 5171 5172 5173 Flr Plans.pdf PDF
Exhibit 6 Quality and Standards of Work.docx DOCX document
Exhibit 26 Duplex floor plan in Red Cloud Circle(O6 housing).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans 2 bedrooms.pptx PPTX presentation
Exhibit 10 Historical Vacate Quarters data_.docx DOCX document
Exhibit 3 Scheduled Services 1.docx DOCX document
Exhibit 9 Change of Occupany Maintenance Checklist.docx DOCX document
W91QVN-24-R-0008 (2 May 24).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans.pptx PPTX presentation
Exhibit 8 Change of Occupany Painting Check List.docx DOCX document
Exhibit 4 Monthly Service Order Report.docx DOCX document
Exhibit 21 AFH Area Site for bldgs 511 and 512.pptx PPTX presentation
Exhibit 28 GFOQ Duplex Floor Plan Single floor Type and duplex.pdf PDF
Exhibit 22 Plans for Area Site 5101 5102 5103 5171 5172 5173.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY CONTRACT INSPECTION REPORT

(INSTRUCTIONS ON REVERSE SIDE)

1. CONTRACT NUMBER

3. ABBREVIATED CONTRACT NAME
4. NAME OF CONTRACTOR (COMPANY NAME)

2. SPECIFICATION NUMBER

5. NOTICE TO PROCEED DATE
7. WEATHER AND TEMPERATURE
0800 HOURS
1200 HOURS
1500 HOURS

6. ACTUAL DATE STARTED

8a. CONTRACTOR DESCRIBE WORK BEING PERFORMED (INCLUDE LOCATION OF WORK)

8b. NUMBER OF WORKERS ON JOB

8c. NAME OF CONTRACTOR’S REPRESENTATIVE

9b. CONTRACTOR RECORD GOVERNMENT REPRESENTATIVE’S INSTRUCTIONS (IF ANY)

10. CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED (INCLUDE DELAYS, DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, CORRECTIVE ACTIONS, ETC.)

11. INSPECTOR EVALUATE CONTRACTOR’S INPUT TO ITEMS 8, 9, AND 10

WAS A SITE INSPECTION PERFORMED OF THE WORK IDENTIFIED IN BLOCKS? ____YES ____ NO ____ N/A ________________________

(DATE OF INSPECTION)

12. ESTIMATED COMPLETION

DATE

13. PERCENT COMPLETE
14. CONTRACTOR’S SIGNATURE AND DATE

15. INSPECTOR’S SIGNATURE AND DATE

16. ENGINEERING REVIEW (SIGNATURE AND DATE)

17. CONTRACTING ADMINISTRATOR’S SIGNATURE AND DATE

18. REPORT IS FOR DATE(S)
19. REPORT SERIAL NUMBER

INSTRUCTIONS FOR FILLING OUT DAILY CONTRACT INSPECTION REPORTS

A. CONTRACTOR’S INSTRUCTIONS.

1. Fill out a report when you are working, one each day, and not less than one each week when you are not working. Give the report to the inspector or deliver it to the Contrating Officers Representative, HFB. If you are not working for a long period, waiting on materials, or waiting on a modification, fill out the report once a week.

2. Fill in Blocks 1 through 10, 14, and 19 daily or not less than once a week when no work is proceeding. Fill in Blocks 12 and 13 each Thursday and more often when appropriate. Government representatives will fill in the balance of the blanks.

3. Block 1 - Write in the Contract Number. The last two number groups are sufficient (i.e., 00-P-0000 for W91QVN-00-P-0000). The Inspector will show you this if you have any questions.

4. Block 2 - Write in the Contact Specifications (Spec) Number.

5. Block 3 - Write in the Contract Short Title from the front page of the Specifications.

6. Block 4 - Write in your company’s name.

7. Block 5 - Write in the date you were given the “Notice to Proceed” by the Contracting Officer.

8. Block 6 - Write in the date you started working on the contract.

9. Block 7 - If the weather affects your contract, record it here. If you are working indoors, leave it blank.

10. Block 8a - Write in what you’ve been doing, what you’ve been working on, location of the work, and facility/building number if it applies.

11. Block 8b - Write in the number of workers on the job consistent with the work described in Block 8a.

12. Block 8c - Write in the name of the contractor’s representative on the job at the time the work described in Block 8a was being performed.

13. Block 9 - Write in any instructions given to you by the Inspector, Contracting Officer’s Representative (COR) , or Project Manager.

14. Block 10 - Write in any problems you may have encountered. Read the instructions in this block.

15. Block 12 - Write in the estimated completion date of contract.

16. Block 13 - Fill in on Thursday’s report (see instruction 2); estimate percent of work completed.

17. Block 14 - The employee who makes the report, signs and dates here.

18. Block 18 - Write in the date(s) or period(s) covered by the report. This is NOT the day you turn it in.

19. Block 19 - This is a sequential report number (Example: If it’s the eleventh report you are turning in, write in “11”).

20. If you have any questions about the Daily Contract Inspection Report, call the HFB 753-6605, 753-7663. He/She is usually at this number Monday through Friday at the following times: 8:00 a.m. - 11:30 a.m. - 12:30 p.m. - 4:30 p.m.

21. If you want to hand-deliver the inspection reports, give them to the Inspector when he visits the job site or deliver them to Building 309.

B. INSPECTOR’S INSTRUCTIONS.

1. Block 11 - Inspector evaluate the input given by the contractor. Read the instructions in this block. If you have performed an inspection of the work identified by the contractor in Block 8, indicate this by checking “YES”; record the date of inspection. If no, check “NO”. If the work involved does not require inspection, check “N/A”. Provide any input, comments, etc., which are or may be relevant to the evaluation of the contractor’s work. Coordinate input with the COR, Contract Administrator, and/or Contractor, if required.

2. Block 15 - Sign and date the report. This date must be consistent with the date of your signature; do not backdate.

3. Forward the report to the COR for review and additional evaluation or instructions.

C. COR INSTRUCTIONS.

1. Engineering review report; add and/or attach comments. Coordinate input with Contracting Office, and/or Inspection, if required.

2. Block 16 - Sign and date report.