This document is a Nonconformance Inspection Report (NCIR) related to a contract for change of occupancy cleaning and painting services for Army Family Housing (AFH) at USAG Humphreys in South Korea. The NCIR identifies nonconformance issues with the contractor's performance and specifies the required corrective actions, including referencing the relevant contract specifications. It outlines the process for the contractor to address the nonconformance items and return the completed NCIR within a specified timeframe. The NCIR also includes instructions for the inspector and the Contracting Officer's Representative (COR) on follow-up inspection and review. The related federal contract opportunity is for total preventive maintenance, repair, and cleaning services for AFH at USAG Humphreys, issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
Amd 03 W91QVN-24-R-0008.pdf PDF
Amd 02 W91QVN-24-R-0008.pdf PDF
Minor Repair Information.xls XLS spreadsheet
Amd 01 W91QVN-24-R-0008.pdf PDF
Major Repair price information.xlsx XLSX spreadsheet
Exhibit 7 Change of Occupany Cleaning Check List.xlsx XLSX spreadsheet
Exhibit 16 Heavy Equipment Check Lists.docx DOCX document
Exhibit 29 AFH Area Site for bldgs 510 511 and 512.pptx PPTX presentation
Exhibit 25 Red Cloud Circle Map( O6 Housing).pptx PPTX presentation
Exhibit 27 Macarthur Circle Map(GFOQ) (1).pptx PPTX presentation
Exhibit 24 Parking Lot floor Plan 5101 5102 5103 5171 5172 5173 Area.pdf PDF
Exhibit 30 AFH Room Information.xlsx XLSX spreadsheet
Exhibit 13 Customer Complaint.docx DOCX document
Exhibit 15 COM Monthly Report.xlsx XLSX spreadsheet
Exhibit 19 AFH bldg 513 Garage plan.pdf PDF
Exhibit 1 PRS v1.docx DOCX document
Exhibit 2 Deliverables(Data Requirements) v2.docx DOCX document
Exhibit 17 Contract Discepancy Report CDR.docx DOCX document
Exhibit 14 GFOQ Monthly Report.docx DOCX document
Exhibit 5 Change of Occupancy Monthly Report.docx DOCX document
Exhibit 11 Estimated Service Frequency.docx DOCX document
Exhibit 23 Building 5101 5102 5103 5171 5172 5173 Flr Plans.pdf PDF
Exhibit 6 Quality and Standards of Work.docx DOCX document
Exhibit 26 Duplex floor plan in Red Cloud Circle(O6 housing).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans 2 bedrooms.pptx PPTX presentation
Exhibit 10 Historical Vacate Quarters data_.docx DOCX document
Exhibit 3 Scheduled Services 1.docx DOCX document
Exhibit 12 Daily Contract Inspection Report.docx DOCX document
Exhibit 9 Change of Occupany Maintenance Checklist.docx DOCX document
W91QVN-24-R-0008 (2 May 24).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans.pptx PPTX presentation
Exhibit 8 Change of Occupany Painting Check List.docx DOCX document
Exhibit 4 Monthly Service Order Report.docx DOCX document
Exhibit 21 AFH Area Site for bldgs 511 and 512.pptx PPTX presentation
Exhibit 28 GFOQ Duplex Floor Plan Single floor Type and duplex.pdf PDF
Exhibit 22 Plans for Area Site 5101 5102 5103 5171 5172 5173.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NONCONFORMANCE INSPECTION REPORT (SEE INSTRUCTIONS ON REVERSE)

PAGE____1____OF___1__PAGES

1. REPORT NUMBER

00001

2. CONTRACT NUMBER
3. DELIVERY ORDER NUMBER
4. BUILDING/FACILITY NUMBER
5. CONTRACT NAME
6. CONTRACTOR
W91QVN-00-P-0000
P00001
512

Apt 705

Change of Occupancy Cleaning and Painting of (AFH), USAG Humphreys
Korean Construction Co. Ltd
7. SPECIFICATION NUMBER
8. SERVICE ORDER NUMBER
9. LOCATION

COP/COC

N/A USAG Humphreys DPW, Housing Div

10. DESCRIPTION OF NONCONFORMANCE CONDITION(S) OR ITEM(S)

(Reference the specifications, page, para, drawing number, as applicable)

14. CONTRACTOR CORRECTIVE ACTION

(Identify date/time of completion; initial each item)

11.

This nonconformance report is issued to you on ________13 Sep 12_________. Contractor to repair Non-conformance items identified in “10”. Return this form to Family Housing, Facilities Management

15. CONTRACTOR REPRESENTATIVE (QC) SIGN AND DATE

Branch, DPW Housing, Building 309.

18/19. INSPECTOR’S SIGNATURE
DATE
by ____14 Sep 12_____________per contract specifications, page no.__234____, para no.____2b(1)_____.
Follow up Inspection

20. COR COMMENTS

12. INSPECTED BY

DATE/TIME
13. TYPE OF INSPECTION

17. REVIEWED BY

DATE
16. DATE/TIME RETURNED
21. COR’S SIGNATURE
DATE

INSTRUCTIONS FOR COMPLETING NONCONFORMANCE INSPECTION REPORT

INSPECTOR’S INSTRUCTIONS (when issuing Nonconformance Report to contractor).

BLOCK 1-9-Fill out all information in these blocks. Mark N/A in blocks which do not apply.
BLOCK 10-Identify and list all nonconformance conditions of inspection. If additional sheets are needed use another Nonconformance Inspection Report and identify as next page. Reference the paragraph (para), page, and drawing number to the nonconformance condition, if applicable. Record any additional remarks pertinent to your inspection.
BLOCK 11-Fill in the date and time you issued the Nonconformance Report to the contractor. Indicate the date and time the contractor has to repair the nonconformance conditions and to return the report to the Housing, Facilities Management Branch. Reference the contact specifications page and paragraph number as it applies to time limit for repairing and/or re-performing service.
BLOCK 12-Sign and date the report.
BLOCK 13-Identify the type of inspection (i.e., Final, Re-Inspection, Change of Occupancy Cleaning (COC), Flooring, Change of Occupancy Painting (COP) etc.

CONTRACTOR’S INSTRUCTIONS (when correcting nonconformance items).

BLOCK 14-Correct nonconformance items. Indicate the date and time that each item/condition listed in Block 10 was corrected. Remark on any condition related to the repair such as extenuating circumstances which may prevent you from performing the corrective action.
BLOCK 15-Contractor Q.C. representative sign and date after the repairs are made. Return the completed report to the Housing, Facilities Management Branch, within the time frame identified in the referenced contract specifications. The Housing, Facilities Management Branch is located at USAG Humphreys, Building 309, telephone (DSN) 753-5798.

INSPECTOR’S INSTRUCTIONS (when receiving Nonconformance Report from contractor).

BLOCK 16-Identify the date and time the contractor returned the form or when the form was received at DPW Housing, Facilities Management Branch.
BLOCK 17-This block is for supervisory review after the form is returned from contractor.

INSPECTOR’S INSTRUCTIONS

BLOCK 18-Perform follow up inspection on rejected items. Indicate date and time of re-inspection (if applicable). Comment on any circumstances. If no follow up inspection is made, indicate not re-inspected.
BLOCK 19-Sign and date. Forward to the COR.

COR’S INSTRUCTIONS

BLOCK 20-Review this report. Add or attach comments. Coordinate input with Contracting Office if required.
BLOCK 21-Sign and date the report. Forward this copy to 411th, CSB, Humphrey’s office, Contract Administrator if required.
-Retain this copy in the COR, Facilities Management Branch files.

ATTACHMENT 10A

File details come from the government source that posted it. Updated .