Major Repair price information.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG
- Solicitation number
- W91QVN24R0008
About this file
This document appears to be a detailed price list for major repair items related to Army Family Housing at USAG Humphreys in South Korea. The list includes over 150 line items spanning a wide range of maintenance, repair, and upgrade services for residential buildings, elevators, HVAC systems, parking lots, landscaping, and other infrastructure. The pricing information covers the period from October 2019 through June 2024, with individual line item costs ranging from $2,400,000 to $22,854,000.
The associated federal contract opportunity is for "Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys (South Korea)". It is a solicitation issued by the Department of the Army Materiel Command Army Contracting Command. The contract will likely involve a contractor providing comprehensive maintenance, repair, and cleaning services for the Army Family Housing units and related facilities located on the USAG Humphreys installation.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Major Repair List for Army Family Housing
| As of 24 April 24 | ||||||||
| NO | ORDER DATE | ORDER | ||||||
| DATE | DELIVERY | |||||||
| DATE | WORK DESCRIPTION | QTY | UNIT | AMOUNT | ||||
| 8 | 2019.10.04 | Elevator Inverter Replace (5102 #4) | 1 | EA | 6,874,000 | |||
| 9 | 2019.10.04 | Elevator Roller Guided Replace (5101 #1) | 1 | EA | 2,460,000 | |||
| 10 | 2019.10.04 | Elevator Roller Guided Replace (5101 #2) | 1 | EA | 2,460,000 | |||
| 11 | 2019.10.15 | Elevator Replace of Governor (5102 #4) | 1 | EA | 3,500,000 | |||
| 14 | 2019.10.29 | Elevator Main Ropes Replace(5103 #6) | 1 | EA | 12,700,000 | |||
| 15 | 2019.10.29 | Elevator Main Ropes Replace(5103 #5) | 1 | EA | 12,700,000 | |||
| 17 | 2020.03.03 | 2 Domestic hot water circulation pumps (5102,5103) | 1 | EA | 9,292,000 | |||
| 18 | 2020.03.03 | 3 hot water circulation pumps for the building (5101-1EA/5102-1EA/5103-1EA) | 1 | EA | 9,744,000 | |||
| 24 | 2020.03.03 | CCTV Replacement for 5101 | 1 | EA | 3,070,000 | |||
| 19 | 2020.03.05 | Replace Main Rope (BLDG 5101 #1) | 1 | EA | 12,950,000 | |||
| 20 | 2020.03.05 | Replace Main Rope (BLDG 5101 #2) | 1 | EA | 12,950,000 | |||
| 21 | 2020.03.05 | Replace Main Rope (BLDG 5102 #3) | 1 | EA | 12,950,000 | |||
| 22 | 2020.03.05 | Replace Main Rope (BLDG 5102 #4) | 1 | EA | 12,950,000 | |||
| 23 | 2020.03.05 | Replacement of nameplate for 5800, 5600 | 1 | EA | 6,880,000 | |||
| 25 | 2020.03.05 | Generator inspection & repair (511,512) 300KW | 1 | EA | 2,484,300 | |||
| 26 | 2020.03.05 | Generator inspection & repair (5101,5102,5103) 500KW | 1 | EA | 2,993,300 | |||
| 12 | 2020.03.25 | Lead block painting works of gas pipes 5101~5103 (210 houses), 2020년도분 | 1 | EA | 22,854,000 | |||
| 29 | 2020.05.11 | Replace Door Control Boards (BLDG 512 #6) | 1 | EA | 3,950,000 | |||
| 30 | 2020.05.19 | Attatchment building nameplate (P510~512) | 1 | EA | 10,430,000 | |||
| 31 | 2020.05.19 | Attatchment building nameplate (P5101~5103) | 1 | EA | 5,420,000 | |||
| 32 | 2020.05.19 | Attatchment building nameplate (P5171~5173) | 1 | EA | 5,200,000 | |||
| 33 | 2020.05.26 | Lead Block Painting Works of Fire Pipes in Emergency Stair BLDG (510) | 1 | EA | 2,660,000 | |||
| 35 | 2020.06.01 | Elevator rope replacement BLDG511 #1 | 1 | EA | 4,500,000 | |||
| 36 | 2020.06.01 | Elevator rope replacement BLDG511 #2 | 1 | EA | 4,500,000 | |||
| 37 | 2020.06.01 | Elevator rope replacement BLDG511 #3 | 1 | EA | 4,500,000 | |||
| 38 | 2020.06.01 | Elevator rope replacement BLDG512 #4 | 1 | EA | 4,320,000 | |||
| 39 | 2020.06.01 | Elevator rope replacement BLDG512 #5 | 1 | EA | 4,320,000 | |||
| 40 | 2020.06.01 | Elevator rope replacement BLDG512 #6 | 1 | EA | 4,320,000 | |||
| 27 | 2020.06.08 | Patio Deck Stain Painting Works in GFOQ (5801~5809, 9EA) | 1 | EA | 7,200,000 | |||
| 28 | 2020.06.08 | Patio Deck Stain Painting Works in GFOQ (5816~5826, 10EA) | 1 | EA | 8,000,000 | |||
| 41 | 2020.07.01 | Dead Trees Removal and Sodding (070) | 1 | EA | 3,346,400 | |||
| 42 | 2020.07.01 | Dead Trees Removal and Sodding (5100,510) | 1 | EA | 8,083,300 | |||
| 34 | 2020.07.15 | Underground Parking Lot Lights Replacement (Bldg 5100,19EA) | 1 | EA | 11,070,000 | |||
| 44 | 2020.07.15 | Replace Elevator Inverter (BLDG 5103 #6) | 1 | EA | 6,874,000 | |||
| 16 | 2020.07.29 | Replace Pump VFD At Bldg 5101, 5102 | 1 | EA | 20,080,000 | |||
| 45 | 2020.09.01 | Repair of Bicycle Parking Lot (507) | 1 | EA | 12,410,000 | |||
| 46 | 2020.09.01 | Repair of Bicycle Parking Lot (508) | 1 | EA | 15,598,000 | |||
| 47 | 2020.09.01 | Repair of Shelter (509) | 1 | EA | 13,170,000 | |||
| 54 | 2020.09.04 | Repair for Rain-gutter & Rain-pipe in (bldg-5817) | 1 | EA | 3,920,000 | |||
| 55 | 2020.09.15 | Repair for Rain-gutter & Rain-pipe in (bldg-5802) | 1 | EA | 3,920,000 | |||
| 56 | 2020.09.15 | Repair for Rain-gutter & Rain-pipe in (bldg-5806) | 1 | EA | 3,920,000 | |||
| 57 | 2020.09.15 | Repair for Rain-gutter & Rain-pipe in (bldg-5824) | 1 | EA | 3,920,000 | |||
| 73 | 2020.11.04 | Replace elevator brake solenoid (Bldg 5101 #2) | 1 | EA | 5,150,000 | |||
| 79 | 2020.11.12 | Interior Painting Latax-2 Coats (5100 underground parking lot) | 1 | EA | 5,261,296 | |||
| 81 | 2020.11.17 | HVAC leaking issue Repairs (5651B), duct part | 1 | EA | 6,850,000 | |||
| 74 | 2020.11.19 | Repair brake solenoid & Replace brake pad (Bldg 5101 #1) | 1 | EA | 2,650,000 | |||
| 75 | 2020.11.19 | Repair brake solenoid & Replace brake pad (Bldg 5102 #3) | 1 | EA | 2,650,000 | |||
| 76 | 2020.11.19 | Repair brake solenoid & Replace brake pad (Bldg 5102 #4) | 1 | EA | 2,650,000 | |||
| 77 | 2020.11.19 | Repair brake solenoid & Replace brake pad (Bldg 5103 #5) | 1 | EA | 2,650,000 | |||
| 78 | 2020.11.19 | Repair brake solenoid & Replace brake pad (Bldg 5103 #6) | 1 | EA | 2,650,000 | |||
| 80 | 2020.12.09 | Interior Painting Latax-2 Coats (513 underground parking lot) | 1 | EA | 4,508,808 | |||
| 84 | 2021.02.18 | Replacement of elevator Door Hanger Rollers(BLDG. 5101, #1,#2) | 1 | EA | 2,880,000 | |||
| 85 | 2021.03.12 | Replacement of elevator Door Hanger Rollers(BLDG. 5103, #5,#6) | 1 | EA | 2,880,000 | |||
| 94 | 2021.03.04 | Repair for emergency generator in Bldg 5811, 5812 | 1 | EA | 8,100,000 | |||
| 95 | 2021.03.04 | Test of air balance (511-604) | 1 | EA | 3,020,000 | |||
| 82 | 2021.03.09 | Replacement of Cooling Tower Pump & Motor (Bldg 510) | 1 | EA | 9,500,000 | |||
| 83 | 2021.03.16 | Repair works of damaged Chiller Pump (Bldg 510) | 1 | EA | 15,785,000 | |||
| 43 | 2021.03.26 | Fence installation around Generator & T/R (Bldg 5812) | 1 | EA | 5,755,000 | |||
| 58 | 2021.03.30 | Building exterior window silicon work (Bldg 510) | 1 | EA | 11,330,000 | |||
| 86 | 2021.03.13 | Roof Repair Works (5612A) | 1 | EA | 4,625,000 | |||
| 96 | 2021.04.01 | Replace Elevator Second Sheave(BLDG 5102, #3) | 1 | EA | 3,500,000 | |||
| 100 | 2021.04.08 | Test, Adjustment & Balance (511-604) (for 1 apartment unit including service opening) | 1 | EA | 3,426,000 | |||
| 59 | 2021.04.12 | Building exterior window silicon work (Bldg 511) | 1 | EA | 10,690,000 | |||
| 60 | 2021.04.12 | Building exterior window silicon work (Bldg 512) | 1 | EA | 10,390,000 | |||
| 61 | 2021.04.12 | Building exterior window silicon work (Bldg 5101) | 1 | EA | 16,200,000 | |||
| 62 | 2021.04.12 | Building exterior window silicon work (Bldg 5102) | 1 | EA | 16,200,000 | |||
| 63 | 2021.04.12 | Building exterior window silicon work (Bldg 5103) | 1 | EA | 14,960,000 | |||
| 98 | 2021.04.12 | Repair works of damaged Chiller Oil-Pump & Chemical- washing pipe (Bldg 510) | 1 | EA | 7,832,000 | |||
| 101 | 2021.04.14 | Replacement of Door motor in basement of Bldg 5171 | 1 | EA | 2,550,000 | |||
| 13 | 2021.04.22 | Lead block painting works of gas pipes 5101~5103 (210 houses), 2021년도분 | 1 | EA | 14,766,011 | |||
| 48 | 2021.04.22 | Painting on facilities (bldg.S-517, Gazebo) | 1 | EA | 2,960,000 | |||
| 49 | 2021.04.22 | Painting on facilities (bldg.S-518, Gazebo) | 1 | EA | 2,960,000 | |||
| 50 | 2021.04.22 | Painting on facilities (bldg.S-519, Gazebo) | 1 | EA | 2,960,000 | |||
| 51 | 2021.04.22 | Painting on facilities (bldg.S-505, Gazebo & Handrail Near Bldg.512) | 1 | EA | 3,570,000 | |||
| 52 | 2021.04.22 | Painting on facilities (bldg.S-5111, Gazebo) | 1 | EA | 2,580,000 | |||
| 53 | 2021.04.22 | Painting on facilities (bldg.S-5112, Gazebo) | 1 | EA | 2,580,000 | |||
| 67 | 2021.04.26 | Roof waterproofing and Crack repair (Bldg 510) | 1 | EA | 19,435,000 | |||
| 68 | 2021.04.26 | Roof waterproofing and Crack repair (Bldg 511) | 1 | EA | 21,270,000 | |||
| 69 | 2021.04.26 | Roof waterproofing and Crack repair (Bldg 512) | 1 | EA | 21,270,000 | |||
| 99 | 2021.04.26 | Remove and Reinstall Temporary Hot water Heater at Bldg 510 | ||||||
| user: 임시 보일러 설치용 | 1 | EA | 17,975,000 | |||||
| 102 | 2021.04.26 | Card key for the door lock in Bldg 5101, 5102, 5103 | 1 | EA | 4,000,000 | |||
| 70 | 2021.04.13 | Roof waterproofing and Crack repair (Bldg 5101) | 1 | EA | 5,955,000 | |||
| 71 | 2021.04.13 | Roof waterproofing and Crack repair (Bldg 5102) | 1 | EA | 5,955,000 | |||
| 72 | 2021.04.13 | Roof waterproofing and Crack repair (Bldg 5103) | 1 | EA | 5,955,000 | |||
| 87 | 2021.04.23 | Roof Repair Works (5612B) | 1 | EA | 4,625,000 | |||
| 88 | 2021.04.23 | Roof Repair Works (5633B) | 1 | EA | 4,625,000 | |||
| 89 | 2021.04.23 | Roof Repair Works (5634B) | 1 | EA | 4,625,000 | |||
| 90 | 2021.04.23 | Roof Repair Works (5636A) | 1 | EA | 4,625,000 | |||
| 91 | 2021.04.23 | Roof Repair Works (5639B) | 1 | EA | 4,625,000 | |||
| 92 | 2021.04.23 | Roof Repair Works (5643B) | 1 | EA | 4,625,000 | |||
| 93 | 2021.04.23 | Roof Repair Works (5645A) | 1 | EA | 4,625,000 | |||
| 103 | 2021.06.08 | Replacement of VFD in Cooling-tower (Bldg 5101) | 1 | EA | 10,850,000 | |||
| 104 | 2021.06.09 | Replacement the Elevator Communication Board & Photo Sensor(BLDG. 512 #6) | 1 | EA | 4,250,000 | |||
| 105 | 2021.06.09 | Replacement the Elevator Main Board & Door Control Board(BLDG. 512 #4) | 1 | EA | 7,950,000 | |||
| 107 | 2021.07.01 | Replacement of Door motor in first floor of Bldg 5172 | 1 | EA | 2,550,000 | |||
| 108 | 2021.07.01 | Replacement of Door motor in basement of Bldg 5173 | 1 | EA | 2,550,000 | |||
| 106 | 2021.07.02 | Reattaching construction of Exterior Wall Dryvit (BLDG. 5102) | 1 | EA | 12,600,000 | |||
| 109 | 2021.08.10 | Installation stone work (bldg 5813) | 1 | EA | 2,590,000 | |||
| 117 | 2021.08.20 | Replacement of elevator door control board (Bldg 511, #2) | 1 | EA | 4,030,000 | |||
| 110 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5101 | 1 | EA | 3,780,000 | |||
| 111 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5102 | 1 | EA | 3,780,000 | |||
| 112 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5103 | 1 | EA | 3,780,000 | |||
| 113 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5171 | 1 | EA | 3,780,000 | |||
| 114 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5172 | 1 | EA | 3,780,000 | |||
| 115 | 2021.09.07 | Installation of duct ventilator at rooftop rangehood in BLDG 5173 | 1 | EA | 3,780,000 | |||
| 119 | 2021.09.16 | Replacement of elevator input, output communication board (Bldg 512, #4) | 1 | EA | 4,040,000 | |||
| 116 | 2021.09.28 | Replacement of A.H.U-UPC Boards (Bldg 5603 B) | 1 | EA | 5,300,000 | |||
| 120 | 2021.09.28 | Repair works of garage door in BLDG 5824 | 1 | EA | 2,900,000 | |||
| 140 | 2021.09.29 | Replacement of Door motor in first floor of Bldg 5173 | 1 | EA | 2,550,000 | |||
| 141 | 2021.09.29 | Repair work on the floor (Bldg 5172-602) | 1 | EA | 2,550,000 | |||
| 118 | 2021.09.13 | Replacement of elevator main board & control board (Bldg 5171, #1) | 1 | EA | 18,180,000 | |||
| 97 | 2021.10.14 | Replace Elevator Second Sheave bearing (BLDG 5101 #2, BLDG 5103 #6) | 1 | EA | 7,000,000 | |||
| 121 | 2021.10.14 | Replacement of elevator door control board (Bldg 5101, #1) | 1 | EA | 4,030,000 | |||
| 122 | 2021.10.29 | Flattening work in (Bldg 5802 Backyard) | 1 | EA | 3,800,000 | |||
| 124 | 2021.11.29 | Repair of coolling tower (Bldg 5173) | 1 | EA | 13,840,000 | |||
| 123 | 2021.11.30 | Repair of coolling tower (Bldg 5171) | 1 | EA | 13,840,000 | |||
| 125 | 2021.12.15 | Replacement of elevator input, output communication board (Bldg 512, #5) | 1 | EA | 4,600,000 | |||
| 126 | 2022.01.14 | Water-pressure gauge replacement work (070, 060) | 1 | EA | 5,015,800 | |||
| 128 | 2022.02.14 | Deep Cleaning work of Main Drain Pipe at basement (bldg 5101) | 1 | EA | 4,980,000 | |||
| 129 | 2022.02.14 | Deep Cleaning work of Main Drain Pipe at basement (bldg 5102) | 1 | EA | 4,980,000 | |||
| 130 | 2022.02.14 | Deep Cleaning work of Main Drain Pipe at basement (bldg 5103) | 1 | EA | 4,980,000 | |||
| 131 | 2022.02.17 | Mechanical room recovering work (bldg 5617A,B) | 1 | EA | 8,180,000 | |||
| 133 | 2022.03.07 | Rooftop waterproof repair work (bldg 5171) | 1 | EA | 8,895,000 | |||
| 134 | 2022.03.07 | Rooftop waterproof repair work (bldg 5172) | 1 | EA | 8,895,000 | |||
| 135 | 2022.03.07 | Rooftop waterproof repair work (bldg 5173) | 1 | EA | 8,895,000 | |||
| 136 | 2022.03.14 | Repair of stair cover (Bldg 511) | 1 | EA | 5,400,000 | |||
| 137 | 2022.03.14 | Repair of stair cover (Bldg 512) | 1 | EA | 5,320,000 | |||
| 139 | 2022.04.08 | Replacement of elevator door control board (bldg 5102 #4) | 1 | EA | 3,470,000 | |||
| 138 | 2022.04.11 | Replacement of gas detector (bldg 5101, 5102, 5103) | 1 | EA | 13,566,000 | |||
| 146 | 2022.04.18 | Replacement of gas detector (bldg 5171) | 1 | EA | 4,844,800 | |||
| 127 | 2022.04.11 | Repair works of fire duct at rooftop(bldg 5171, 5172, 5173) | 1 | EA | 4,340,000 | |||
| 144 | 2022.05.04 | Replacement of elevator Governor (bldg 5102 #3) | 1 | EA | 2,550,000 | |||
| 145 | 2022.05.04 | Replacement of elevator Governor (bldg 5102 #4) | 1 | EA | 2,550,000 | |||
| 142 | 2022.05.10 | Thermostat guard(5070 Complex) | 1 | EA | 11,100,000 | |||
| 66 | 2022.05.16 | Building exterior window silicon work (Bldg 5173) | 1 | EA | 19,270,000 | |||
| 132 | 2022.05.27 | Mound removal work around dead tree (050,060,070) | 1 | EA | 5,816,000 | |||
| 147 | 2022.05.31 | Replacement the Elevator Main Board (bldg 511 #3) | 1 | EA | 4,050,000 | |||
| 148 | 2022.05.31 | Replacement of elevator motor encoder (Bldg 512 #5) | 1 | EA | 3,320,000 | |||
| 149 | 2022.06.02 | Repair of exterior floor stone in the backyard (Bldg 5605B) | 1 | EA | 3,126,000 | |||
| 150 | 2022.06.02 | Installation of new entrance parking system (GFOQ) | 1 | EA | 10,040,000 | |||
| 143 | 2022.06.09 | Repair of sliding Door (bldg 5102) | 1 | EA | 2,920,000 | |||
| 65 | 2022.06.15 | Building exterior window silicon work (Bldg 5172) | 1 | EA | 19,270,000 | |||
| 151 | 2022.06.24 | Installation of new entrance parking system (Red Cloud Circle) | 1 | EA | 9,990,000 | |||
| 155 | 2022.06.24 | Replacement of elevator inverter (Bldg 5103 #5) | 1 | EA | 4,240,000 | |||
| 154 | 2022.07.01 | Temporary hot water boiler installation (bldg 512) | 1 | EA | 6,130,000 | |||
| 64 | 2022.07.18 | Building exterior window silicon work (Bldg 5171) | 1 | EA | 19,270,000 | |||
| 189 | 2022.07.21 | Air Conditioner Filter (bldg 5070) | 1 | EA | 8,373,500 | |||
| 156 | 2022.07.28 | Cooling Tower Electrical Connection Work (bldg 5103) | 1 | EA | 2,656,000 | |||
| 152 | 2022.08.05 | Installation of new entrance parking system (Complex 5100) | 1 | EA | 4,905,000 | |||
| 153 | 2022.08.05 | Installation of new entrance parking system (Complex 5170) | 1 | EA | 3,835,000 | |||
| 158 | 2022.08.29 | Replacement of Elevator Inverter (BLDG 5172 #2) | 1 | EA | 6,500,000 | |||
| 159 | 2022.09.08 | Wood Single Door Replacement Work (BLDG 5171-506) | 1 | EA | 2,657,000 | |||
| 160 | 2022.09.14 | purchasing RF Card for Paring system (Complex 5100) | 1 | EA | 5,460,000 | |||
| 161 | 2022.09.14 | purchasing RF Card for Paring system (Complex 5170) | 1 | EA | 5,616,000 | |||
| 157 | 2022.09.20 | Replacment Door Lock (Complex 050) | 1 | EA | 19,061,900 | |||
| 166 | 2022.09.27 | Elevator inverter spare part (complex 5070) | 1 | EA | 4,800,000 | |||
| 167 | 2022.10.18 | Replace Elevator Main Rope & Second Sheave (BLDG 5103 #5) | 1 | EA | 15,700,000 | |||
| 165 | 2022.10.26 | 12th Floor waterproofing work (BLDG 5101) | 1 | EA | 2,556,000 | |||
| 162 | 2022.10.27 | Emergency exit roof waterproofing work (BLDG 5171) | 1 | EA | 4,100,000 | |||
| 163 | 2022.10.27 | Emergency exit roof waterproofing work (BLDG 5172) | 1 | EA | 4,100,000 | |||
| 164 | 2022.10.27 | Emergency exit roof waterproofing work (BLDG 5173) | 1 | EA | 4,100,000 | |||
| 168 | 2022.11.22 | cleaning/removal of wax for the whole floor in the house (bldg 5071-602) | 1 | EA | 3,300,000 | |||
| 169 | 2023.01.02 | Replacement of Elevator DPC Board & Differential transformer (BLDG 511 #3) | 1 | EA | 4,130,000 | |||
| 172 | 2023.01.18 | Replace of DPC-121 Board (Bldg 512 #4) | 1 | EA | 2,800,000 | |||
| 173 | 2023.02.07 | Replacement of gas detector and controller system, 11set (bldg 5100, 5170) | 1 | EA | 6,779,000 | |||
| 177 | 2023.02.10 | Parking Control System Installation (bldg 5070) | 1 | EA | 10,625,000 | |||
| 174 | 2023.02.16 | Replacement of Elevator DCL Board (Bldg 511, #3) | 1 | EA | 3,100,000 | |||
| 175 | 2023.02.16 | Replacement of basement storage door lock (Complex 5100) | 1 | EA | 3,979,000 | |||
| 178 | 2023.03.21 | Replacement of gas detector (bldg 5172) | 1 | EA | 4,844,800 | |||
| 179 | 2023.03.21 | Replacement of gas detector (bldg 5173) | 1 | EA | 4,844,800 | |||
| 5 | 2023.03.22 | Rooftop steel door installation work (Bldg 5101) | 1 | EA | 3,860,000 | |||
| 6 | 2023.03.22 | Rooftop steel door installation work (Bldg 5102) | 1 | EA | 3,860,000 | |||
| 7 | 2023.03.22 | Rooftop steel door installation work (Bldg 5103) | 1 | EA | 3,860,000 | |||
| 1 | 2023.03.23 | Chiller general repair works (Bldg 510) | 1 | EA | 5,942,000 | |||
| 2 | 2023.03.24 | Relocate Cooling Tower Control Panel (blgd 5101) | 1 | EA | 9,960,000 | |||
| 176 | 2023.03.30 | Replacement of Elevator CCTV cable (Bldg 5171, #2) | 1 | EA | 3,265,000 | |||
| 183 | 2023.03.30 | Replacement of elevator car guide roller (bldg 512 #4) | 1 | EA | 4,800,000 | |||
| 180 | 2023.04.03 | Rooftop Waterproofing Work (bldg 5171) | 1 | EA | 7,700,000 | |||
| 181 | 2023.04.03 | Rooftop Waterproofing Work (bldg 5172) | 1 | EA | 7,700,000 | |||
| 182 | 2023.04.03 | Rooftop Waterproofing Work (bldg 5173) | 1 | EA | 7,700,000 | |||
| 3 | 2023.04.04 | Relocate Cooling Tower Control Panel (blgd 5102) | 1 | EA | 9,960,000 | |||
| 170 | 2023.04.04 | Damaged rain gutter removal and new rain gutter installation work (Bldg 5072) | 1 | EA | 4,586,000 | |||
| 184 | 2023.04.06 | Remove and install heating/cooling circulation pump in Bldg 5101 | 1 | EA | 6,060,000 | |||
| 185 | 2023.04.06 | Remove and install heating/cooling circulation pump in Bldg 5102 | 1 | EA | 6,060,000 | |||
| 186 | 2023.04.06 | Remove and install heating/cooling circulation pump in Bldg 5103 | 1 | EA | 6,060,000 | |||
| 187 | 2023.04.14 | Replacement of closet light with LED (Complex 5100, 5170) | 1 | EA | 8,000,000 | |||
| 188 | 2023.04.18 | Replace air filter (Bldg 5070, 5071, 5072) | 1 | EA | 4,320,000 | |||
| 190 | 2023.04.21 | Air Conditioner Filter (bldg 5071) | 1 | EA | 9,531,500 | |||
| 191 | 2023.04.21 | Air Conditioner Filter (bldg 5072) | 1 | EA | 9,531,500 | |||
| 192 | 2023.04.21 | Spare RF card(Complex GFOQ, Red Cloud, 517X, 510X, 507X, 51X) | 1 | EA | 2,450,000 | |||
| 244 | 2023.04.26 | Wooden fence staining (bldg 5811) | 1 | EA | 2,580,000 | |||
| 245 | 2023.04.26 | Wooden fence staining (bldg 5824) | 1 | EA | 2,580,000 | |||
| 171 | 2023.04.28 | Repair of garage floor (bldg 5640B) | 1 | EA | 2,400,000 | |||
| 217 | 2023.05.03 | Installation of the assembling outdoor floor mat(Complex GFOQ) | 1 | EA | 8,800,000 | |||
| 4 | 2023.05.04 | Relocate Cooling Tower Control Panel (blgd 5103) | 1 | EA | 9,960,000 | |||
| 198 | 2023.05.04 | Replacement Elevator Second Sheave(bldg 5103, #6) | 1 | EA | 4,100,000 | |||
| 246 | 2023.05.08 | Wooden fence staining (bldg 5804) | 1 | EA | 2,580,000 | |||
| 247 | 2023.05.08 | Wooden fence staining (bldg 5816) | 1 | EA | 2,580,000 | |||
| 248 | 2023.05.08 | Wooden fence staining (bldg 5817) | 1 | EA | 2,580,000 | |||
| 249 | 2023.05.08 | Wooden fence staining (bldg 5819) | 1 | EA | 2,580,000 | |||
| 214 | 2023.05.11 | Repair of exterior floor flagstone (BLDG 5605A) | 1 | EA | 2,540,000 | |||
| 250 | 2023.05.15 | Wooden fence staining (bldg 5810) | 1 | EA | 2,580,000 | |||
| 215 | 2023.05.18 | Replacement of elevator inverter (bldg 5171, #2) | 1 | EA | 5,600,000 | |||
| 251 | 2023.05.18 | Wooden fence staining (bldg 5808) | 1 | EA | 2,580,000 | |||
| 252 | 2023.05.19 | Wooden fence staining (bldg 5806) | 1 | EA | 2,580,000 | |||
| 253 | 2023.05.19 | Wooden fence staining (bldg 5812) | 1 | EA | 2,580,000 | |||
| 195 | 2023.05.25 | Upgrade Elevator Communication System(bldg 5101 #1,#2) | 1 | EA | 9,560,000 | |||
| 196 | 2023.05.25 | Upgrade Elevator Communication System(bldg 5102 #3,#4) | 1 | EA | 9,560,000 | |||
| 197 | 2023.05.25 | Upgrade Elevator Communication System(bldg 5103 #5,#6) | 1 | EA | 9,110,000 | |||
| 221 | 2023.05.25 | Installation of emblem board (GFOQ) | 1 | EA | 2,740,000 | |||
| 222 | 2023.05.25 | Installation of emblem board (AFH 060) | 1 | EA | 9,864,000 | |||
| 255 | 2023.05.25 | Wooden fence staining (bldg 5802) | 1 | EA | 2,580,000 | |||
| 254 | 2023.05.27 | Wooden fence staining (bldg 5813) | 1 | EA | 2,580,000 | |||
| 193 | 2023.05.28 | Floor Coating Removal Work (bldg 5811) | 1 | EA | 2,550,000 | |||
| 194 | 2023.06.01 | Demolition of Dumpster and Waterproof coating work (Bldg 5608, 5621, 5637) | 1 | EA | 4,860,000 | |||
| 199 | 2023.06.01 | Installation of duct support base plate for con'c crack prevention (bldg 5173) | 1 | EA | 12,212,000 | |||
| 206 | 2023.06.01 | Filling the gaps between posts and the fence (GFOQ) | 1 | EA | 7,460,000 | |||
| 256 | 2023.06.09 | Wooden fence staining (bldg 5801) | 1 | EA | 2,580,000 | |||
| 257 | 2023.06.09 | Wooden fence staining (bldg 5805) | 1 | EA | 2,580,000 | |||
| 258 | 2023.06.23 | Wooden fence staining (bldg 5821) | 1 | EA | 2,580,000 | |||
| 208 | 2023.06.28 | Replacing and Cleaning of sewage pipes (Bldg 5101) | 1 | EA | 6,300,000 | |||
| 209 | 2023.06.28 | Replacing and Cleaning of sewage pipes (Bldg 5102) | 1 | EA | 6,300,000 | |||
| 210 | 2023.06.28 | Replacing and Cleaning of sewage pipes (Bldg 5103) | 1 | EA | 6,300,000 | |||
| 219 | 2023.06.28 | Replacement of Toilet (Complex 5070) | 1 | EA | 10,700,000 | |||
| 224 | 2023.06.28 | Balance test of supply air amount (bldg 5103-304) | 1 | EA | 3,676,000 | |||
| 218 | 2023.07.06 | Calibration work for CO detectors(500, 5100, 5170 Complex) | 1 | EA | 3,630,034 | |||
| 259 | 2023.07.09 | Wooden fence staining (bldg 5803) | 1 | EA | 2,580,000 | |||
| 260 | 2023.07.09 | Wooden fence staining (bldg 5807) | 1 | EA | 2,580,000 | |||
| 261 | 2023.07.09 | Wooden fence staining (bldg 5809) | 1 | EA | 2,580,000 | |||
| 262 | 2023.07.09 | Wooden fence staining (bldg 5818) | 1 | EA | 2,580,000 | |||
| 263 | 2023.07.09 | Wooden fence staining (bldg 5820) | 1 | EA | 2,580,000 | |||
| 264 | 2023.07.09 | Wooden fence staining (bldg 5822) | 1 | EA | 2,580,000 | |||
| 265 | 2023.07.09 | Wooden fence staining (bldg 5823) | 1 | EA | 2,580,000 | |||
| 266 | 2023.07.09 | Wooden fence staining (bldg 5826) | 1 | EA | 2,580,000 | |||
| 229 | 2023.07.14 | Repair of High Blast Resistant Door (bldg 5171 - Basement) | 1 | EA | 3,500,000 | |||
| 233 | 2023.07.20 | Replacement of Elevator Motor Encoder(Bldg. 5103 #5) | 1 | EA | 3,500,000 | |||
| 207 | 2023.07.28 | Repairing the Dog Park Fence (bldg 510, 511, 512) | 1 | EA | 11,000,000 | |||
| 220 | 2023.07.28 | Purchase of toilet spares(Complex 500, 5100, 5170) | 1 | EA | 10,700,000 | |||
| 228 | 2023.07.28 | Install Cleanout and High pressure cleaning work (bldg 5817) | 1 | EA | 6,800,000 | |||
| 300 | 2023.07.28 | Replacement of kitchen faucet(Complex 5070) | 1 | EA | 10,800,000 | |||
| 301 | 2023.07.28 | Replacement of kitchen faucet(Complex 5170) | 1 | EA | 10,800,000 | |||
| 302 | 2023.07.28 | Replacement of kitchen faucet(Complex 500) | 1 | EA | 10,800,000 | |||
| 230 | 2023.08.01 | Brick Installation at main extrance (bldg 5070) | 1 | EA | 9,800,000 | |||
| 231 | 2023.08.01 | Brick Installation at main extrance (bldg 5071) | 1 | EA | 9,800,000 | |||
| 232 | 2023.08.01 | Brick Installation at main extrance (bldg 5072) | 1 | EA | 9,800,000 | |||
| 225 | 2023.08.10 | Replacement of elevator machine room air conditioner (bldg 5101) | 1 | EA | 4,750,000 | |||
| 226 | 2023.08.10 | Replacement of elevator machine room air conditioner (bldg 5102) | 1 | EA | 4,750,000 | |||
| 227 | 2023.08.10 | Replacement of elevator machine room air conditioner (bldg 5103) | 1 | EA | 4,750,000 | |||
| 236 | 2023.08.10 | Installation of dehumidifier drain device in basement storage for | ||||||
| Bldg 5070, 5071, 5072 | 1 | EA | 2,665,000 | |||||
| 234 | 2023.08.11 | Replacement of elevator T-cable (BLDG 5103, #5) | 1 | EA | 7,500,000 | |||
| 235 | 2023.08.11 | Replacement of elevator T-cable (BLDG 5103, #6) | 1 | EA | 7,500,000 | |||
| 211 | 2023.08.25 | Replacing and Cleaning of sewage pipes (Bldg 5171) | 1 | EA | 6,300,000 | |||
| 212 | 2023.08.25 | Replacing and Cleaning of sewage pipes (Bldg 5172) | 1 | EA | 6,300,000 | |||
| 213 | 2023.08.25 | Replacing and Cleaning of sewage pipes (Bldg 5173) | 1 | EA | 6,300,000 | |||
| 237 | 2023.08.25 | Roof Repair Works (5642B) | 1 | EA | 4,625,000 | |||
| 238 | 2023.08.25 | Mound removal work around dead tree (GFOQ) | 1 | EA | 7,934,300 | |||
| 239 | 2023.08.25 | Mound removal work around dead tree (Red Cloud Circle) | 1 | EA | 9,817,300 | |||
| 241 | 2023.08.25 | Replacement of elevator main board & door controller (bldg. 511, #1) | 1 | EA | 7,555,000 | |||
| 216 | 2023.09.19 | Replacement of elevator inverter (bldg 5173, #1 ) | 1 | EA | 5,600,000 | |||
| 240 | 2023.09.21 | Repair of coolling tower (Bldg 5171), stopgap solution | 1 | EA | 6,780,200 | |||
| 242 | 2023.09.21 | Air conditioner motor (Complex 5100) | 1 | EA | 11,200,000 | |||
| 243 | 2023.09.21 | Air conditioner motor (Complex 5170) | 1 | EA | 11,200,000 | |||
| 200 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5101) | 1 | EA | 3,448,600 | |||
| 201 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5102) | 1 | EA | 3,448,600 | |||
| 202 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5103) | 1 | EA | 3,448,600 | |||
| 203 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5171) | 1 | EA | 3,448,600 | |||
| 204 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5172) | 1 | EA | 3,448,600 | |||
| 205 | 2023.09.25 | Reinforcement duct support at rooftop (Bldg 5173) | 1 | EA | 3,448,600 | |||
| 269 | 2023.09.26 | Ceiling plasterboard and pipe insulation work (Bldg 5803) | 1 | EA | 3,840,000 | |||
| 270 | 2023.09.26 | Ceiling plasterboard and pipe insulation work (Bldg 5819) | 1 | EA | 4,480,000 | |||
| 271 | 2023.09.26 | Ceiling plasterboard and pipe insulation work (Bldg 5826) | 1 | EA | 3,840,000 | |||
| 267 | 2023.10.23 | Programmed UPC Board (17X578-05) (Complex Red Cloud Circle, GFOQ) | 1 | EA | 12,400,000 | |||
| 272 | 2023.10.23 | Ceiling plasterboard and pipe insulation work (Bldg 5805) | 1 | EA | 3,495,000 | |||
| 273 | 2023.10.23 | Ceiling plasterboard and pipe insulation work (Bldg 5821) | 1 | EA | 5,935,000 | |||
| 274 | 2023.10.23 | Ceiling plasterboard and pipe insulation work (Bldg 5816) | 1 | EA | 5,935,000 | |||
| 268 | 2023.11.14 | Replace the 4-Way Valve & Compressor in A.H.U Room (Bldg 5101-106) | 1 | EA | 4,064,000 | |||
| 275 | 2023.11.14 | Replacement and reprogramming of elevator inverter (Bldg 5101 #1) | 1 | EA | 5,100,000 | |||
| 276 | 2023.11.15 | Roof silicon repair work (Complex 5100, 5170) | 1 | EA | 9,900,000 | |||
| 277 | 2023.11.24 | Repair booster pump (bldg 5101, 5102, 5103, 514) | 1 | EA | 11,428,000 | |||
| 279 | 2023.11.24 | replacement of generator fuel injection system (Bldg 514) | 1 | EA | 2,950,000 | |||
| 278 | 2023.12.08 | Install dog clean up sign | 1 | EA | 3,300,000 | |||
| 280 | 2023.12.13 | Replace of DPC-121 Board (Bldg 512 #6) | 1 | EA | 2,800,000 | |||
| 283 | 2023.12.13 | Replacement of door control board (Bldg 5172, #2) | 1 | EA | 4,500,000 | |||
| 281 | 2023.12.14 | Replacement of Elevator Brake plunger (Bldg 5102 #3) | 1 | EA | 8,000,000 | |||
| 282 | 2023.12.14 | Replacement of Elevator Brake plunger (Bldg 5103 #5) | 1 | EA | 8,000,000 | |||
| 223 | 2024.01.03 | Removing Dead Trees and Planting New Trees (bldg 5812) | 1 | EA | 5,935,000 | |||
| 284 | 2024.01.08 | Ceiling plasterboard and pipe insulation work (Bldg 5818) | 1 | EA | 6,435,000 | |||
| 285 | 2024.01.12 | Replacement of elevator inverter (Bldg 5103 #5) | 1 | EA | 6,200,000 | |||
| 286 | 2024.01.12 | Repair of elevator inverter (Bldg 5103 #5) | 1 | EA | 2,950,000 | |||
| 293 | 2024.02.01 | Front Door Replacement Work (Bldg 5812) - Double Door Type | 1 | EA | 9,600,000 | |||
| 287 | 2024.02.14 | Repair of elevator inverter (Bldg 5100, 5170) | 1 | EA | 6,300,000 | |||
| 288 | 2024.02.21 | Replacement of entrace door motor in 1st floor (Bldg 5102) | 1 | EA | 2,900,000 | |||
| 290 | 2024.03.13 | Flooring replacement work (Bldg 512-102) | 1 | EA | 15,998,000 | |||
| 289 | 2024.03.26 | Purchase of thermostat guard (5050 Complex) | 1 | EA | 13,800,000 | |||
| 295 | 2024.03.26 | Replacement of CCTV Camera (Bldg 5813) | 1 | EA | 3,800,000 | |||
| 291 | 2024.03.27 | Purchase of E.R.V(Energy Recovery Ventilation system) filter assembly (Bldg 5072) | 1 | EA | 20,880,000 | |||
| 296 | 2024.04.03 | KOCOM system replacement (complex 5100) | 1 | EA | 12,750,000 | |||
| 294 | 2024.04.05 | Front Door Replacement Work (Bldg 5811) - Double Door Type | 1 | EA | 10,960,000 | |||
| 292 | 2024.04.15 | Installation of shower booth (Bldg 511-204) | 1 | EA | 9,070,000 | |||
| 298 | 2024.04.22 | Replacement of Elevator Hanger Rollers (Bldg 5102 #1, #2) | 1 | EA | 3,000,000 | |||
| 299 | 2024.04.22 | Replacement of Elevator Brake plunger (Bldg 5101 #1) | 1 | EA | 8,200,000 | |||
| 297 | 2024.04.23 | Replacement of Cooling tower fan motor (Bldg 510) | 1 | EA | 21,010,000 |