Exhibit 8 Change of Occupany Painting Check List.docx

DOCX document 20 KB Posted

Attached to
Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG
Solicitation number
W91QVN24R0008
Issued by

About this file

The document provided is an exhibit titled "Exhibit 8 Change of Occupancy Painting Checklist" that outlines the requirements for completing interior painting services during a change of occupancy for military family housing. The checklist covers items such as ensuring complete hiding, uniform surface texture and color, clean interior window glass, proper operation of doors and windows, and final cleanup and restoration. This checklist appears to be related to the federal contract opportunity for "Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys (South Korea)," solicitation number W91QVN24R0008, issued by the Department of the Army Materiel Command Army Contracting Command. The contract opportunity is for the provision of comprehensive maintenance, repair, and cleaning services for Army family housing at the USAG Humphreys location in South Korea.

View the file

Other files

File Type Posted
Amd 03 W91QVN-24-R-0008.pdf PDF
Amd 02 W91QVN-24-R-0008.pdf PDF
Minor Repair Information.xls XLS spreadsheet
Amd 01 W91QVN-24-R-0008.pdf PDF
Major Repair price information.xlsx XLSX spreadsheet
Exhibit 7 Change of Occupany Cleaning Check List.xlsx XLSX spreadsheet
Exhibit 16 Heavy Equipment Check Lists.docx DOCX document
Exhibit 18 Sample NCIR.docx DOCX document
Exhibit 29 AFH Area Site for bldgs 510 511 and 512.pptx PPTX presentation
Exhibit 25 Red Cloud Circle Map( O6 Housing).pptx PPTX presentation
Exhibit 27 Macarthur Circle Map(GFOQ) (1).pptx PPTX presentation
Exhibit 24 Parking Lot floor Plan 5101 5102 5103 5171 5172 5173 Area.pdf PDF
Exhibit 30 AFH Room Information.xlsx XLSX spreadsheet
Exhibit 13 Customer Complaint.docx DOCX document
Exhibit 15 COM Monthly Report.xlsx XLSX spreadsheet
Exhibit 19 AFH bldg 513 Garage plan.pdf PDF
Exhibit 1 PRS v1.docx DOCX document
Exhibit 2 Deliverables(Data Requirements) v2.docx DOCX document
Exhibit 17 Contract Discepancy Report CDR.docx DOCX document
Exhibit 14 GFOQ Monthly Report.docx DOCX document
Exhibit 5 Change of Occupancy Monthly Report.docx DOCX document
Exhibit 11 Estimated Service Frequency.docx DOCX document
Exhibit 23 Building 5101 5102 5103 5171 5172 5173 Flr Plans.pdf PDF
Exhibit 6 Quality and Standards of Work.docx DOCX document
Exhibit 26 Duplex floor plan in Red Cloud Circle(O6 housing).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans 2 bedrooms.pptx PPTX presentation
Exhibit 10 Historical Vacate Quarters data_.docx DOCX document
Exhibit 3 Scheduled Services 1.docx DOCX document
Exhibit 12 Daily Contract Inspection Report.docx DOCX document
Exhibit 9 Change of Occupany Maintenance Checklist.docx DOCX document
W91QVN-24-R-0008 (2 May 24).pdf PDF
Exhibit 20 AFH bldg 510 Floor Plans.pptx PPTX presentation
Exhibit 4 Monthly Service Order Report.docx DOCX document
Exhibit 21 AFH Area Site for bldgs 511 and 512.pptx PPTX presentation
Exhibit 28 GFOQ Duplex Floor Plan Single floor Type and duplex.pdf PDF
Exhibit 22 Plans for Area Site 5101 5102 5103 5171 5172 5173.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHIBIT 8

Change of Occupancy Painting COP: Complete Interior Painting Checklists

Quarters No. Date In

Required Additional Time Work Yes No Date Out

Contractor's Signature

(Comment on Additional Work in the Remarks Section)

Checklist Item Item Description

1. Complete hiding is achieved.

2.Surface
a. Clean and non-chalking.
b. No runs or paint edges.
c. No peeling or non-adhesion.
d. Uniform in texture, color andreflectance.
e. Dry to touch.
f. Repairs and patches are finished.
g. Overspray, previous paint, etc.,removed from appliances, rubber,glass, electrical fixtures,
switch plates, receptacles,covers, screens, hardware andwindow runners.

3. Clean interior window glass.

4. Doors and windows operate freely.

5. Natural, stained and revarnished finish are uniform in color and reflectance.

6.All light bulbs installed and
working.

7. Cleanup and restoration.

Remarks:

File details come from the government source that posted it. Updated .