014200 - REFERENCES.DOC

DOC document 32 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC)
Solicitation number
W91364-12-R-0005
Issued by

About this file

REFERENCES

View the file

Other files

File Type Posted
amendment three OHIO MATOC 2012.pdf PDF
amendment two OHIO MATOC 2012.pdf PDF
334600 - SUBDRAINAGE.DOC DOC document
330500 - COMMON WORK RESULTS FOR UTILITIES.DOC DOC document
site visit information.pdf PDF
proposal questions and answers MATOC.pdf PDF
amendment one OHIO MATOC 2012.pdf PDF
311000 - SITE CLEARING.DOC DOC document
Ohio MATOC Division 1-2012.pdf PDF
334100 - STORM UTILITY DRAINAGE PIPING.DOC DOC document
329200 - TURF AND GRASSES.DOC DOC document
312000 - EARTH MOVING.DOC DOC document
283111 - DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM.DOC DOC document
315000 - EXCAVATION SUPPORT AND PROTECTION.DOC DOC document
12-R-0005-0001.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.DOC DOC document
321373 - CONCRETE PAVING JOINT SEALANTS.DOC DOC document
412213 BRIDGE CRANES.doc DOC document
321313 - CONCRETE PAVING.DOC DOC document
Table of Contents.doc DOC document
12-R-0005.doc DOC document
MATOC-EXHIBIT-E-14FEB12.docx DOCX document
T002.pdf PDF
S-102.PDF PDF
S-101.PDF PDF
235216 SF - CONDENSING BOILERS.DOC DOC document
271500 - COMMUNICATIONS HORIZONTAL CABLING.DOC DOC document
Spill Procedure.doc DOC document
260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS.DOC DOC document
014000 - QUALITY REQUIREMENTS.DOC DOC document
088000 - GLAZING.DOC DOC document
C-101.PDF PDF
235100 SF - BREECHINGS CHIMNEYS AND STACKS.DOC DOC document
221116 SF - DOMESTIC WATER PIPING.DOC DOC document
UTES Material Submittal.xls XLS spreadsheet
221513 SF - GENERAL-SERVICE COMPRESSED-AIR PIPING.DOC DOC document
221113 - FACILITY WATER DISTRIBUTION PIPING.DOC DOC document
017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.DOC DOC document
033000 - CAST IN PLACE CONCRETE.doc DOC document
071800 - TRAFFIC COATINGS.DOC DOC document
A302.pdf PDF
233113 FL - METAL DUCTS.DOC DOC document
017700 - CLOSEOUT PROCEDURES.DOC DOC document
A600.pdf PDF
223400 SF - FUEL-FIRED DOMESTIC-WATER HEATERS.DOC DOC document
230529 SF - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT.DOC DOC document
220719 SF - PLUMBING PIPING INSULATION.DOC DOC document
E-102.pdf PDF
A201.pdf PDF
A303.pdf PDF
Show 40 more

Latest 50 of 168 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT TRAINING EQUIPMENT SITE ADD/ALT

Copyright 2010 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 014200 - REFERENCES

Revise this Section by deleting and inserting text to meet Project-specific requirements.

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

Retain or delete this article in all Sections of Project Manual.

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 DEFINITIONS

Terms defined in this article are not defined in the General Conditions. See Evaluations for discussion on whether definitions are necessary and whether they should be included here or in the Supplementary Conditions.

Retain this article or paragraphs in article if definitions below are not included elsewhere in Project Manual.

A. General: Basic Contract definitions are included in the Conditions of the Contract.

When using terms such as those in "Approved" and "Directed" paragraphs below, do not extend Architect's responsibility into Contractor's area of means, methods, and techniques of construction. See Evaluations.

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract.

C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed."

D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

Avoid revising "Furnish," "Install," and "Provide" paragraphs below because of widespread acceptance and understanding of these terms as defined.

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

H. "Provide": Furnish and install, complete and ready for the intended use.

Generally retain "Project Site" Paragraph below; revise to suit Project. See Evaluations.

I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

Retain "Publication Dates" Paragraph below unless Specifications are revised to insert dates (which is not recommended). Unreferenced standards are not applicable. Revise effective date of the standard established below to suit Project.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

Retain "Copies of Standards" Paragraph below on projects where copies of standards are needed. A requirement to retain many standards on a project site could become expensive. See Evaluations.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 014200

Project No: 390265 REFERENCES
014200 - 2

File details come from the government source that posted it. Updated .