315000 - EXCAVATION SUPPORT AND PROTECTION.DOC

DOC document 38 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC)
Solicitation number
W91364-12-R-0005
Issued by

About this file

SECTION 315000

View the file

Other files

File Type Posted
amendment three OHIO MATOC 2012.pdf PDF
amendment two OHIO MATOC 2012.pdf PDF
334600 - SUBDRAINAGE.DOC DOC document
330500 - COMMON WORK RESULTS FOR UTILITIES.DOC DOC document
site visit information.pdf PDF
proposal questions and answers MATOC.pdf PDF
amendment one OHIO MATOC 2012.pdf PDF
311000 - SITE CLEARING.DOC DOC document
Ohio MATOC Division 1-2012.pdf PDF
334100 - STORM UTILITY DRAINAGE PIPING.DOC DOC document
329200 - TURF AND GRASSES.DOC DOC document
312000 - EARTH MOVING.DOC DOC document
283111 - DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM.DOC DOC document
12-R-0005-0001.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.DOC DOC document
321373 - CONCRETE PAVING JOINT SEALANTS.DOC DOC document
412213 BRIDGE CRANES.doc DOC document
321313 - CONCRETE PAVING.DOC DOC document
Table of Contents.doc DOC document
12-R-0005.doc DOC document
MATOC-EXHIBIT-E-14FEB12.docx DOCX document
T002.pdf PDF
S-102.PDF PDF
S-101.PDF PDF
235216 SF - CONDENSING BOILERS.DOC DOC document
271500 - COMMUNICATIONS HORIZONTAL CABLING.DOC DOC document
Spill Procedure.doc DOC document
260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS.DOC DOC document
014000 - QUALITY REQUIREMENTS.DOC DOC document
088000 - GLAZING.DOC DOC document
C-101.PDF PDF
235100 SF - BREECHINGS CHIMNEYS AND STACKS.DOC DOC document
221116 SF - DOMESTIC WATER PIPING.DOC DOC document
UTES Material Submittal.xls XLS spreadsheet
221513 SF - GENERAL-SERVICE COMPRESSED-AIR PIPING.DOC DOC document
221113 - FACILITY WATER DISTRIBUTION PIPING.DOC DOC document
017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.DOC DOC document
033000 - CAST IN PLACE CONCRETE.doc DOC document
071800 - TRAFFIC COATINGS.DOC DOC document
A302.pdf PDF
233113 FL - METAL DUCTS.DOC DOC document
017700 - CLOSEOUT PROCEDURES.DOC DOC document
A600.pdf PDF
223400 SF - FUEL-FIRED DOMESTIC-WATER HEATERS.DOC DOC document
230529 SF - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT.DOC DOC document
220719 SF - PLUMBING PIPING INSULATION.DOC DOC document
E-102.pdf PDF
A201.pdf PDF
A303.pdf PDF
221119 SF - DOMESTIC WATER PIPING SPECIALTIES.DOC DOC document
Show 40 more

Latest 50 of 168 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT TRAINING EQUIPMENT SITE ADD/ALT

Copyright 2009 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 315000 - EXCAVATION SUPPORT AND PROTECTION

Revise this Section by deleting and inserting text to meet Project-specific requirements.

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes temporary excavation support and protection systems.

1.2 PERFORMANCE REQUIREMENTS

A. Design, furnish, install, monitor, and maintain excavation support and protection system capable of supporting excavation sidewalls and of resisting soil and hydrostatic pressure and superimposed and construction loads.

Retain option in paragraph above and retain subparagraph below if Contractor is required to assume responsibility for design. If necessary, revise subparagraph to meet requirements of authorities having jurisdiction or to follow customary practice in Project's location.

1. Delegated Design: Design excavation support and protection system, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

1.3 ACTION SUBMITTALS

Retain first paragraph below if Contractor is not required to assume responsibility for design.

A. Shop Drawings: For excavation support and protection system.

Retain paragraph above or below; do not retain both.

Paragraph below is defined in Division 01 Section "Submittal Procedures" as a "Delegated-Design Submittal." Retain if Work of this Section is required to withstand specific design loads and design responsibilities have been delegated to Contractor or if structural data are required as another way to verify compliance with performance requirements.

B. Delegated-Design Submittal: For excavation support and protection system indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.4 QUALITY ASSURANCE

A. Preinstallation Conference: Conduct conference at Project site.

1.5 PROJECT CONDITIONS

A. Survey Work: Engage a qualified land surveyor or professional engineer to survey adjacent existing buildings, structures, and site improvements; establish exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record existing elevations.

1. During installation of excavation support and protection systems, regularly resurvey benchmarks, maintaining an accurate log of surveyed elevations and positions for comparison with original elevations and positions. Promptly notify Architect if changes in elevations or positions occur or if cracks, sags, or other damage is evident in adjacent construction.

PART 2 - PRODUCTS

2.1 MATERIALS

Delete this article if Contractor selects temporary excavation support and protection. Revise materials if prescribing excavation support and protection system requirements.

A. General: Provide materials that are either new or in serviceable condition.

Paragraphs below are examples of materials commonly used.

B. Structural Steel: ASTM A 36/A 36M, ASTM A 690/A 690M, or ASTM A 992/A 992M.

C. Steel Sheet Piling: ASTM A 328/A 328M, ASTM A 572/A 572M, or ASTM A 690/A 690M; with continuous interlocks.

D. Wood Lagging: Lumber, mixed hardwood, nominal rough thickness of size and strength required for application.

E. Cast-in-Place Concrete: ACI 301, of compressive strength required for application.

F. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Soldier Piles: Install steel soldier piles before starting excavation. Extend soldier piles below excavation grade level to depths adequate to prevent lateral movement. Space soldier piles at regular intervals not to exceed allowable flexural strength of wood lagging. Accurately align exposed faces of flanges to vary not more than 2 inches (50 mm) from a horizontal line and not more than 1:120 out of vertical alignment.

1. Install wood lagging within flanges of soldier piles as excavation proceeds. Trim excavation as required to install lagging. Fill voids behind lagging with soil, and compact.

2. Install wales horizontally at locations indicated on Drawings and secure to soldier piles.

Retain first paragraph below if driven sheet piling is required.

B. Sheet Piling: Before starting excavation, install one-piece sheet piling lengths and tightly interlock to form a continuous barrier. Accurately place the piling, using templates and guide frames unless otherwise recommended in writing by the sheet piling manufacturer. Limit vertical offset of adjacent sheet piling to 60 inches (1500 mm). Accurately align exposed faces of sheet piling to vary not more than 2 inches (50 mm) from a horizontal line and not more than 1:120 out of vertical alignment. Cut tops of sheet piling to uniform elevation at top of excavation.

Bracing of wales may be required for soldier piles and lagging systems and for sheet piling.

C. Bracing: Locate bracing to clear columns, floor framing construction, and other permanent work. If necessary to move brace, install new bracing before removing original brace.

1. Do not place bracing where it will be cast into or included in permanent concrete work unless otherwise approved by Architect.

2. Install internal bracing, if required, to prevent spreading or distortion of braced frames.

3. Maintain bracing until structural elements are supported by other bracing or until permanent construction is able to withstand lateral earth and hydrostatic pressures.

3.2 REMOVAL AND REPAIRS

Retain first paragraph below if removal of excavation support and protection systems is required.

A. Remove excavation support and protection systems when construction has progressed sufficiently to support excavation and bear soil and hydrostatic pressures. Remove in stages to avoid disturbing underlying soils or damaging structures, pavements, facilities, and utilities.

Retain subparagraph below if required. Some jurisdictions require removing excavation support and protection systems within 48 inches (1200 mm) of finish grade.

1. Remove excavation support and protection systems to a minimum depth of 48 inches (1200 mm) below overlaying construction and abandon remainder.

Retain paragraph below if excavation support and protection systems, on which support or stability of existing buildings or site improvements depends, must be left in place.

B. Leave excavation support and protection systems permanently in place.

END OF SECTION 315000