SECTION 315000
View the file
Other files for this federal contract opportunity
Show all 50
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT TRAINING EQUIPMENT SITE ADD/ALT
Copyright 2009 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 315000 - EXCAVATION SUPPORT AND PROTECTION
Revise this Section by deleting and inserting text to meet Project-specific requirements.
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes temporary excavation support and protection systems.
1.2 PERFORMANCE REQUIREMENTS
A. Design, furnish, install, monitor, and maintain excavation support and protection system capable of supporting excavation sidewalls and of resisting soil and hydrostatic pressure and superimposed and construction loads.
Retain option in paragraph above and retain subparagraph below if Contractor is required to assume responsibility for design. If necessary, revise subparagraph to meet requirements of authorities having jurisdiction or to follow customary practice in Project's location.
1. Delegated Design: Design excavation support and protection system, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
1.3 ACTION SUBMITTALS
Retain first paragraph below if Contractor is not required to assume responsibility for design.
A. Shop Drawings: For excavation support and protection system.
Retain paragraph above or below; do not retain both.
Paragraph below is defined in Division 01 Section "Submittal Procedures" as a "Delegated-Design Submittal." Retain if Work of this Section is required to withstand specific design loads and design responsibilities have been delegated to Contractor or if structural data are required as another way to verify compliance with performance requirements.
B. Delegated-Design Submittal: For excavation support and protection system indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1.4 QUALITY ASSURANCE
A. Preinstallation Conference: Conduct conference at Project site.
1.5 PROJECT CONDITIONS
A. Survey Work: Engage a qualified land surveyor or professional engineer to survey adjacent existing buildings, structures, and site improvements; establish exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record existing elevations.
1. During installation of excavation support and protection systems, regularly resurvey benchmarks, maintaining an accurate log of surveyed elevations and positions for comparison with original elevations and positions. Promptly notify Architect if changes in elevations or positions occur or if cracks, sags, or other damage is evident in adjacent construction.
PART 2 - PRODUCTS
2.1 MATERIALS
Delete this article if Contractor selects temporary excavation support and protection. Revise materials if prescribing excavation support and protection system requirements.
A. General: Provide materials that are either new or in serviceable condition.
Paragraphs below are examples of materials commonly used.
B. Structural Steel: ASTM A 36/A 36M, ASTM A 690/A 690M, or ASTM A 992/A 992M.
C. Steel Sheet Piling: ASTM A 328/A 328M, ASTM A 572/A 572M, or ASTM A 690/A 690M; with continuous interlocks.
D. Wood Lagging: Lumber, mixed hardwood, nominal rough thickness of size and strength required for application.
E. Cast-in-Place Concrete: ACI 301, of compressive strength required for application.
F. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Soldier Piles: Install steel soldier piles before starting excavation. Extend soldier piles below excavation grade level to depths adequate to prevent lateral movement. Space soldier piles at regular intervals not to exceed allowable flexural strength of wood lagging. Accurately align exposed faces of flanges to vary not more than 2 inches (50 mm) from a horizontal line and not more than 1:120 out of vertical alignment.
1. Install wood lagging within flanges of soldier piles as excavation proceeds. Trim excavation as required to install lagging. Fill voids behind lagging with soil, and compact.
2. Install wales horizontally at locations indicated on Drawings and secure to soldier piles.
Retain first paragraph below if driven sheet piling is required.
B. Sheet Piling: Before starting excavation, install one-piece sheet piling lengths and tightly interlock to form a continuous barrier. Accurately place the piling, using templates and guide frames unless otherwise recommended in writing by the sheet piling manufacturer. Limit vertical offset of adjacent sheet piling to 60 inches (1500 mm). Accurately align exposed faces of sheet piling to vary not more than 2 inches (50 mm) from a horizontal line and not more than 1:120 out of vertical alignment. Cut tops of sheet piling to uniform elevation at top of excavation.
Bracing of wales may be required for soldier piles and lagging systems and for sheet piling.
C. Bracing: Locate bracing to clear columns, floor framing construction, and other permanent work. If necessary to move brace, install new bracing before removing original brace.
1. Do not place bracing where it will be cast into or included in permanent concrete work unless otherwise approved by Architect.
2. Install internal bracing, if required, to prevent spreading or distortion of braced frames.
3. Maintain bracing until structural elements are supported by other bracing or until permanent construction is able to withstand lateral earth and hydrostatic pressures.
3.2 REMOVAL AND REPAIRS
Retain first paragraph below if removal of excavation support and protection systems is required.
A. Remove excavation support and protection systems when construction has progressed sufficiently to support excavation and bear soil and hydrostatic pressures. Remove in stages to avoid disturbing underlying soils or damaging structures, pavements, facilities, and utilities.
Retain subparagraph below if required. Some jurisdictions require removing excavation support and protection systems within 48 inches (1200 mm) of finish grade.
1. Remove excavation support and protection systems to a minimum depth of 48 inches (1200 mm) below overlaying construction and abandon remainder.
Retain paragraph below if excavation support and protection systems, on which support or stability of existing buildings or site improvements depends, must be left in place.
B. Leave excavation support and protection systems permanently in place.
END OF SECTION 315000