223400 SF - FUEL-FIRED DOMESTIC-WATER HEATERS.DOC
DOC document 51 KB Posted
- Attached to
- Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC)
- Solicitation number
- W91364-12-R-0005
About this file
223400
View the file
Other files
Show 40 more
Latest 50 of 168 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT TRAINING EQUIPMENT SITE ADD/ALT
Copyright 2010 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERS
Revise this Section by deleting and inserting text to meet Project-specific requirements.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Commercial, power-burner, gas-fired, storage, domestic-water heaters.
2. Domestic-water heater accessories.
1.2 ACTION SUBMITTALS
A. Product Data: For each type and size of domestic-water heater indicated.
Retain first paragraph below and "ASHRAE/IESNA 90.1 Compliance" Paragraph in "Quality Assurance" Article if required for fuel-fired, domestic-water heaters.
Retain first paragraph below for domestic-water heaters that require electrical power.
B. Shop Drawings:
1. Wiring Diagrams: For power, signal, and control wiring.
1.3 INFORMATIONAL SUBMITTALS
Retain first paragraph below if required by seismic criteria applicable to Project. Coordinate with Sections specifying mechanical vibration, supports, and seismic controls. See ASCE/SEI 7 for certification requirements for equipment and components.
A. Seismic Qualification Certificates: For fuel-fired, domestic-water heaters, accessories, and components, from manufacturer.
B. Product certificates.
Retain first paragraph below if plumbing codes for Project area require domestic-water heaters to be independent-testing-agency certified. Verify availability for units retained.
C. Domestic-Water Heater Labeling: Certified and labeled by testing agency acceptable to authorities having jurisdiction.
D. Source quality-control reports.
E. Field quality-control reports.
F. Warranty: Sample of special warranty.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.5 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
Compliance with ASHRAE/IESNA 90.1 may be required even when not applying for LEED certification. Retain "ASHRAE/IESNA Compliance" Paragraph below if required for LEED Prerequisite EA 2, which requires that domestic-water heaters comply with ASHRAE/IESNA 90.1, including equipment efficiency indicated in its table titled "Performance Requirements for Water Heating Equipment."
B. ASHRAE/IESNA Compliance: Fabricate and label fuel-fired, domestic-water heaters to comply with ASHRAE/IESNA 90.1.
C. ASME Compliance:
1. Where ASME-code construction is indicated, fabricate and label commercial, domestic-water heater storage tanks to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
D. NSF Compliance: Fabricate and label equipment components that will be in contact with potable water to comply with NSF 61, "Drinking Water System Components - Health Effects."
1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of fuel-fired, domestic-water heaters that fail in materials or workmanship within specified warranty period.
Verify available warranties and warranty periods for units and components with manufacturers listed in Part 2 articles.
1. Warranty Periods: From date of Substantial Completion.
a. Commercial, Gas-Fired, Storage, Domestic-Water Heaters:
1) Storage Tank: Five years.
2) Controls and Other Components: Two years.
b. Compression Tanks: Five years.
PART 2 - PRODUCTS
2.1 COMMERCIAL, GAS-Fired, STORAGE, domestic-WATER HEATERS
A. Commercial, Power-Burner, Gas-Fired, Storage, Domestic-Water Heaters:
See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers. Retain one of first two subparagraphs and list of manufacturers below. See Section 016000 "Product Requirements."
Retain option in first subparagraph below if manufacturer's name and model number are indicated in schedules or plans on Drawings; delete option and insert manufacturer's name and model number if not included on Drawings.
1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on Drawings or comparable product by one of the following:
a. Bradford White
b. Laars Heating Systems Company.
c. Lochinvar.
2. Standard: ANSI Z21.10.3/CSA 4.3.
3. Storage-Tank Construction: ASME-code steel with 150-psig working-pressure rating.
a. Tappings: Factory fabricated of materials compatible with tank. Attach tappings to tank before testing.
1) NPS 2 and Smaller: Threaded ends according to ASME B1.20.1.
Retain one of first two subparagraphs below. Retain first subparagraph for manufacturer's standard lining or second subparagraph for a specific lining; verify availability.
b. Interior Finish: Comply with NSF 61 barrier materials for potable-water tank linings, including extending finish into and through tank fittings and outlets.
c. Lining: [Glass complying with NSF 61 barrier materials for potable-water tank linings, including extending lining into and through tank fittings and outlets.
4. Factory-Installed Storage-Tank Appurtenances:
a. Anode Rod: Replaceable magnesium.
b. Dip Tube: Required unless cold-water inlet is near bottom of tank.
c. Drain Valve: Corrosion-resistant metal complying with ASSE 1005.
d. Insulation: Comply with ASHRAE/IESNA 90.1. Surround entire storage tank except connections and controls.
e. Jacket: Steel with enameled finish.
f. Burner: UL 795 for power-burner, gas-fired, domestic-water heaters and natural-gas fuel.
g. Automatic Ignition: ANSI Z21.20/CSA C22.2 No. 199, electric, automatic, gas-ignition system.
h. Temperature Control: Adjustable thermostat.
i. Safety Controls: Automatic, high-temperature-limit and low-water cutoff devices or systems.
j. Combination Temperature-and-Pressure Relief Valves: ANSI Z21.22/CSA 4.4-M. Include one or more relief valves with total relieving capacity at least as great as heat input, and include pressure setting less than domestic-water heater working-pressure rating. Select one relief valve with sensing element that extends into storage tank.
Retain first subparagraph below if domestic-water heater is required for foodservice equipment. Verify that NSF compliance is available for selected domestic-water heater.
5. Special Requirements: NSF 5 construction.
If more than one commercial, finned-tube, gas-fired, domestic-water heater is required on Project, delete paragraph below and schedule commercial, finned-tube, gas-fired, domestic-water heaters on Drawings.
B. Capacity and Characteristics:
1. See drawings.
2.2 domestic-WATER HEATER ACCESSORIES
Retain first paragraph below only if small, non-ASME-code, diaphragm tanks with a capacity of 25 gal. (95 L) or less are required. Small tanks are usually available with 150-psig (1035-kPa) working-pressure rating. Large tanks are usually available with 100-psig (690-kPa) working-pressure rating. A multiple small-tank arrangement may be used to match system pressure and volume requirements. Other compression tanks are specified in Section 221223 "Facility Indoor Potable-Water Storage Tanks."
A. Domestic-Water Compression Tanks:
See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers. Retain one of first two subparagraphs and list of manufacturers below. See Section 016000 "Product Requirements."
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following]:
Retain option in first subparagraph below if manufacturer's name and model number are indicated in schedules or plans on Drawings; delete option and insert manufacturer's name and model number if not included on Drawings.
a. AMTROL Inc.
b. Flexcon Industries.
c. Honeywell International Inc.
2. Description: Steel, pressure-rated tank constructed with welded joints and factory-installed butyl-rubber diaphragm. Include air precharge to minimum system-operating pressure at tank.
3. Construction:
a. Tappings: Factory-fabricated steel, welded to tank before testing and labeling. Include ASME B1.20.1 pipe thread.
b. Interior Finish: Comply with NSF 61 barrier materials for potable-water tank linings, including extending finish into and through tank fittings and outlets.
c. Air-Charging Valve: Factory installed.
If more than one domestic-water compression tank is required on Project, delete subparagraph below and schedule domestic-water compression tanks on Drawings.
4. Capacity and Characteristics:
a. See drawings.
B. Piping-Type Heat Traps: Field-fabricated piping arrangement according to ASHRAE/IESNA 90.1.
C. Heat-Trap Fittings: ASHRAE 90.2.
D. Gas Shutoff Valves: ANSI Z21.15/CSA 9.1-M, manually operated. Furnish for installation in piping.
Retain first paragraph below, for a gas pressure regulator to reduce gas supply pressure to pressure required at the domestic-water heater, if the specified water heater does not have the correct regulator.
E. Gas Pressure Regulators: ANSI Z21.18/CSA 6.3, appliance type. Include 1/2-psig pressure rating as required to match gas supply.
F. Automatic Gas Valves: ANSI Z21.21/CSA 6.5, appliance, electrically operated, on-off automatic valve.
Relief valves in first three paragraphs below are for installation in piping or where no relief valve is specified with the domestic-water heater.
G. Combination Temperature-and-Pressure Relief Valves: Include relieving capacity at least as great as heat input, and include pressure setting less than domestic-water heater working-pressure rating. Select relief valves with sensing element that extends into storage tank.
1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.
2. Oil-Fired, Domestic-Water Heaters: ASME rated and stamped.
H. Pressure Relief Valves: Include pressure setting less than domestic-water heater working-pressure rating.
1. Gas-Fired, Domestic-Water Heaters: ANSI Z21.22/CSA 4.4-M.
2. Oil-Fired, Domestic-Water Heaters: ASME rated and stamped.
I. Vacuum Relief Valves: ANSI Z21.22/CSA 4.4-M.
Indicate on Drawings where each type of domestic-water heater support in two paragraphs below is required. Delete support types not required. Domestic-water heaters can also be installed at or above ceilings on suspended platforms or brackets.
2.3 SOURCE QUALITY CONTROL
Retain first paragraph below for factory-assembled domestic-water heaters and storage tanks. Factory tests are an added cost option and may not be available from some manufacturers. Verify requirement with Owner.
A. Factory Tests: Test and inspect assembled domestic-water heaters specified to be ASME-code construction, according to ASME Boiler and Pressure Vessel Code.
Retain options in first paragraph below if testing of only commercial domestic-water heaters and storage tanks is required.
B. Hydrostatically test commercial domestic-water heaters to minimum of one and one-half times pressure rating before shipment.
C. Domestic-water heaters will be considered defective if they do not pass tests and inspections.
D. Prepare test and inspection reports.
PART 3 - EXECUTION
3.1 domestic-WATER HEATER INSTALLATION
A. Commercial, Domestic-Water Heater Mounting: Install commercial domestic-water heaters on concrete base.
1. Exception: Omit concrete bases for commercial domestic-water heaters if installation on stand, bracket, suspended platform, or directly on floor is indicated.
2. Maintain manufacturer's recommended clearances.
3. Arrange units so controls and devices that require servicing are accessible.
4. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor.
5. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
6. Install anchor bolts to elevations required for proper attachment to supported equipment.
7. Anchor domestic-water heaters to substrate.
Retain second or third option in first paragraph below if domestic-water heaters (possible source of ignition) will be installed in a location where hazardous fumes can accumulate.
B. Install domestic-water heaters level and plumb, according to layout drawings, original design, and referenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls and devices needing service are accessible.
1. Install shutoff valves on domestic-water-supply piping to domestic-water heaters and on domestic-hot-water outlet piping. Comply with requirements for shutoff valves specified in Section 220523 "General-Duty Valves for Plumbing Piping."
C. Install gas-fired, domestic-water heaters according to NFPA 54.
1. Install gas shutoff valves on gas supply piping to gas-fired, domestic-water heaters without shutoff valves.
2. Install gas pressure regulators on gas supplies to gas-fired, domestic-water heaters without gas pressure regulators if gas pressure regulators are required to reduce gas pressure at burner.
3. Install automatic gas valves on gas supplies to gas-fired, domestic-water heaters if required for operation of safety control.
4. Comply with requirements for gas shutoff valves, gas pressure regulators, and automatic gas valves specified in Section 231123 "Facility Natural-Gas Piping."
Retain first paragraph below if domestic-water heaters are required to withstand seismic design loads. Insert special requirements for seismic restraints here or detail on Drawings.
D. Install combination temperature-and-pressure relief valves in top portion of storage tanks. Use relief valves with sensing elements that extend into tanks. Extend commercial-water-heater relief-valve outlet, with drain piping same as domestic-water piping in continuous downward pitch, and discharge by positive air gap onto closest floor drain.
E. Install combination temperature-and-pressure relief valves in water piping for domestic-water heaters without storage. Extend commercial-water-heater relief-valve outlet, with drain piping same as domestic-water piping in continuous downward pitch, and discharge by positive air gap onto closest floor drain.
F. Install water-heater drain piping as indirect waste to spill by positive air gap into open drains or over floor drains. Install hose-end drain valves at low points in water piping for domestic-water heaters that do not have tank drains.
G. Install thermometer on outlet piping of domestic-water heaters. Comply with requirements for thermometers specified in Section 220519 "Meters and Gages for Plumbing Piping."
H. Install piping-type heat traps on inlet and outlet piping of domestic-water heater storage tanks without integral or fitting-type heat traps.
I. Fill domestic-water heaters with water.
Retain paragraph below only if domestic-water compression tanks are specified in this Section. Compression tanks are often installed in the hot-water supply piping downstream from water heaters. Small, non-ASME, domestic-water compression tanks are included in this Section. Larger steel, precharged, potable-water storage tanks are specified in Section 221223 "Facility Indoor Potable-Water Storage Tanks."
J. Charge domestic-water compression tanks with air.
3.2 CONNECTIONS
Coordinate piping installations and specialty arrangements with schematics on Drawings and with requirements specified in piping systems. If Drawings are explicit enough, these requirements may be reduced or omitted.
A. Comply with requirements for domestic-water piping specified in Section 221116 "Domestic Water Piping."
B. Comply with requirements for gas piping specified in Section 231123 "Facility Natural-Gas Piping."
C. Drawings indicate general arrangement of piping, fittings, and specialties.
D. Where installing piping adjacent to fuel-fired, domestic-water heaters, allow space for service and maintenance of water heaters. Arrange piping for easy removal of domestic-water heaters.
3.3 IDENTIFICATION
A. Identify system components. Comply with requirements for identification specified in Section 220553 "Identification for Plumbing Piping and Equipment."
3.4 FIELD QUALITY CONTROL
A. Perform tests and inspections.
Retain first subparagraph below to require a factory-authorized service representative to assist Contractor with inspections, tests, and adjustments.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.
2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.
3. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
B. Domestic-water heaters will be considered defective if they do not pass tests and inspections.
C. Prepare test and inspection reports.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain commercial, gas-fired, storage, domestic-water heaters.
END OF SECTION 223400
Project No: 390265
FUEL-FIRED, DOMESTIC-WATER HEATERS
223400 - 7