MATOC-EXHIBIT-E-14FEB12.docx
DOCX document 19 KB Posted
- Attached to
- Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC)
- Solicitation number
- W91364-12-R-0005
About this file
MATOC EXHIBIT E
View the file
Other files
Show 40 more
Latest 50 of 168 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ MATOC RFP W91364-12-R-0005
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, SOLICITATION
Date: 14 February 2012
PROJECT TITLE AND NO.: Add/Alt UTES, #390265
PROJECT DESCRIPTION: Add/Alter a 6,484 SF Addition to UTES Building, Camp Ravenna Joint Military Training Center, Newton Falls, Ohio 44444
All work shall be in strict accordance with the (X ) Plans/drawings and Specifications dated 30Sep2011 ( ) SOW, Technical provisions & Drawings and Basic Contract Master Specifications ( ) SOW (insert title) dated ____________and Basic Contract Master Specifications
MAGNITUDE OF PROJECT: ( ) Less than $25,000; ( ) $25,000-$100,000; ( ) $100,000-$250,000; ( ) $250,000-$500,000; ( )$500,000 - $1,000,000; ( X)$1,000,000 - $5,000,000.
PERFORMANCE PERIOD: 365 Days, after receipt of Notice to Proceed
SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx
WAGE DETERMINATION: Currently, General Decision Number OH120001 Modification No. 2 dated 01/27/2012 is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/OH.html However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.
THIS PROTOTYPICAL PROJECT IS FOR EVALUATION PURPOSES ONLY AND WILL NOT BE AWARDED.
EXHIBIT E MATOC PROPOSAL FORM
Include this form completed with your proposal
PROJECT NO. #390265
Add/Alt UTES
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to construct 6,484 SF Addition to UTES building #6530 at Camp Ravenna Joint Military Training Center, Newton Falls, Ohio 44444 in accordance with the task order requirements for “Add/Alter UTES”. This project is for a Firm Fixed Task Order against the MATOC IDIQ Contract.
Item Number Description Quantity Unit Amount
| 0001 | Project #390265 | ||
| Add/Alt UTES | |||
| 1 JOB | Lump Sum $______ |
0001 Replace Existing Boiler
OPTION
1 JOB Lump Sum $______
0002 Provide Basket Tray
OPTION
1 JOB Lump Sum $______
SIGNATURE: COMPANY NAME
Name and title of person authorized to sign
File details come from the government source that posted it. Updated .