311000 - SITE CLEARING.DOC

DOC document 41 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC)
Solicitation number
W91364-12-R-0005
Issued by

About this file

SECTION 311000

View the file

Other files

File Type Posted
amendment three OHIO MATOC 2012.pdf PDF
amendment two OHIO MATOC 2012.pdf PDF
334600 - SUBDRAINAGE.DOC DOC document
330500 - COMMON WORK RESULTS FOR UTILITIES.DOC DOC document
site visit information.pdf PDF
proposal questions and answers MATOC.pdf PDF
amendment one OHIO MATOC 2012.pdf PDF
Ohio MATOC Division 1-2012.pdf PDF
334100 - STORM UTILITY DRAINAGE PIPING.DOC DOC document
329200 - TURF AND GRASSES.DOC DOC document
312000 - EARTH MOVING.DOC DOC document
283111 - DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM.DOC DOC document
315000 - EXCAVATION SUPPORT AND PROTECTION.DOC DOC document
12-R-0005-0001.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.DOC DOC document
321373 - CONCRETE PAVING JOINT SEALANTS.DOC DOC document
412213 BRIDGE CRANES.doc DOC document
321313 - CONCRETE PAVING.DOC DOC document
Table of Contents.doc DOC document
12-R-0005.doc DOC document
MATOC-EXHIBIT-E-14FEB12.docx DOCX document
T002.pdf PDF
S-102.PDF PDF
S-101.PDF PDF
235216 SF - CONDENSING BOILERS.DOC DOC document
271500 - COMMUNICATIONS HORIZONTAL CABLING.DOC DOC document
Spill Procedure.doc DOC document
260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS.DOC DOC document
014000 - QUALITY REQUIREMENTS.DOC DOC document
088000 - GLAZING.DOC DOC document
C-101.PDF PDF
235100 SF - BREECHINGS CHIMNEYS AND STACKS.DOC DOC document
221116 SF - DOMESTIC WATER PIPING.DOC DOC document
UTES Material Submittal.xls XLS spreadsheet
221513 SF - GENERAL-SERVICE COMPRESSED-AIR PIPING.DOC DOC document
221113 - FACILITY WATER DISTRIBUTION PIPING.DOC DOC document
017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.DOC DOC document
033000 - CAST IN PLACE CONCRETE.doc DOC document
071800 - TRAFFIC COATINGS.DOC DOC document
A302.pdf PDF
233113 FL - METAL DUCTS.DOC DOC document
017700 - CLOSEOUT PROCEDURES.DOC DOC document
A600.pdf PDF
223400 SF - FUEL-FIRED DOMESTIC-WATER HEATERS.DOC DOC document
230529 SF - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT.DOC DOC document
220719 SF - PLUMBING PIPING INSULATION.DOC DOC document
E-102.pdf PDF
A201.pdf PDF
A303.pdf PDF
221119 SF - DOMESTIC WATER PIPING SPECIALTIES.DOC DOC document
Show 40 more

Latest 50 of 168 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT TRAINING EQUIPMENT SITE ADD/ALT

Copyright 2009 by The American Institute of Architects (AIA)

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION 311000 - SITE CLEARING

Revise this Section by deleting and inserting text to meet Project-specific requirements.

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Removing above- and below-grade site improvements.

6. Disconnecting, capping or sealing site utilities.

7. Temporary erosion- and sedimentation-control measures.

1.2 MATERIAL OWNERSHIP

A. Except for salvageable timber (trees that have been sold for harvest by the buyer), stripped topsoil and other materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

1.3 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

B. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated.

C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-control and plant-protection measures are in place.

E. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

PART 2 - PRODUCTS

2.1 MATERIALS

Retain this article if soil backfill is required in below-grade areas after site clearing.

A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Division 31 Section "Earth Moving."

1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated.

C. Salvage 8” diameter or larger trees for Owner. Remove stumps. Contractor may disperse wood chips on site.

D. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

Retain this article if erosion- and sedimentation-control measures are not included in Division 01 Section "Temporary Facilities and Controls."

Insert specific procedures or installation requirements for temporary soil protection and stabilization, erosion controls, stormwater runoff controls, and sedimentation controls.

A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.

B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

D. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

3.3 TREE AND PLANT PROTECTION

Retain this article if required. If retaining, Drawings should show tree- and plant-protection zones and protection-zone fencing.

A. General: Protect trees and plants remaining on-site according to requirements in Division 01 Section "Temporary Tree and Plant Protection."

B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Architect.

3.4 EXISTING UTILITIES

A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.

1. Arrange with utility companies to shut off indicated utilities.

Generally retain first paragraph below unless there are no existing utilities. Coordinate with requirements in Division 01 Section "Temporary Facilities and Controls" for temporary utilities.

B. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

Revise subparagraphs below to suit Project.

1. Notify Architect not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Architect's written permission.

C. Removal of underground utilities is included in Division 33 Sections.

3.5 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.

1. Grind down stumps and remove roots, obstructions, and debris to a depth of 18 inches (450 mm) below exposed subgrade.

2. Use only hand methods for grubbing within protection zones.

Retain paragraph below if required. Coordinate with Division 31 Section "Earth Moving."

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground.

3.6 TOPSOIL STRIPPING

A. Remove sod and grass before stripping topsoil.

Retain one option for topsoil depth in first paragraph below if depth is known. Delete options if Contractor will identify and determine depth of existing topsoil.

B. Strip topsoil to depth indicated on Drawings in a manner to prevent intermingling with underlying subsoil or other waste materials.

Revise paragraph below if topsoil is to be removed from site.

C. Stockpile topsoil away from edge of excavations without intermixing with subsoil. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.

3.7 SITE IMPROVEMENTS

Revise paragraph below and add specific items to suit Project.

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.

3.8 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

Retain paragraph below where recycling programs exist and recycling facilities can accept materials such as concrete or asphalt paving.

B. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.

END OF SECTION 311000

Project No: 390265 SITE CLEARING
311000 - 1

File details come from the government source that posted it. Updated .