RFIs and Responses - W9133L-21-B-4000 5 Aug 21.pdf

PDF 72 KB Posted

Attached to
Construction of a Visitor's Center at the Herbert R. Temple Jr. Army National Guard Readiness Center (TARC)
Solicitation number
W9133L-21-B-4000
Issued by

About this file

This document contains responses to requests for information regarding solicitation number W9133L-21-B-4000 from the Department of the Army National Guard Readiness Center. The solicitation is for the construction of a Visitor's Center at the Herbert R. Temple Jr. Army National Guard Readiness Center in Arlington, Virginia, involving work in civil, architectural, security, structural, plumbing, mechanical, and electrical disciplines. The period of performance is 425 calendar days from notice to proceed, with an estimated construction magnitude between $1 million and $5 million. Responses provided include details on the existing fire alarm panel, casework certification requirements, responsibilities of the quality control plan supervisor, provisions for material cost escalation, plans for a separate security system contract, clarification that fire protection is included, and a requirement to coordinate with Siemens for HVAC controls due to system compatibility.

View the file

Other files

File Type Posted
20210820 OF 1419 Abstract of Offers (Signed).pdf PDF
Correction to Zip Code for Bid Package.pdf PDF
20210816 RFIs and Responses.pdf PDF
RFI 62 - Updated Pedestrian Gate Spec 11 14 13.pdf PDF
RFI 60 - Sketch - Door 1a Auto Door Actuator.pdf PDF
20210812 RFIs and Responses.pdf PDF
20210810 RFIs and Responses.pdf PDF
Geotechnical Report TARC.pdf PDF
20210810 W9133L-21-B-4000-0002.pdf PDF
Irrigation drawings from ESPC project.pdf PDF
RFI 001 - Eight Event Liquid Crystal Display Module.pdf PDF
20210803 Pre-Proposal Site Visit Slides.pdf PDF
Existing Conditions Photography (Information Only).pdf PDF
W9133L-21-B-4000 - Amendment 1.pdf PDF
Stamped TARC DRAWINGS Amendment 1.pdf PDF
20210803 Site Visit Attendance Sheet.pdf PDF
Attachment 10 Visitors Center Specs.pdf PDF
Attachment 05 Security Drawings.pdf PDF
W9133L-21-B-4000.pdf PDF
Attachment 02 Life Safety Drawings.pdf PDF
Attachment 08 Mechanical Drawings.pdf PDF
Attachment 07 Plumbing Drawings.pdf PDF
AF 66 Visitors Center.xls XLS spreadsheet
Attachment 01 General Drawings.pdf PDF
Attachment 06 Structural Drawings.pdf PDF
Attachment 03 Civil Drawings.pdf PDF
Attachment 09 Electrical Drawings.pdf PDF
Attachment 04 Architectural Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFIs) as of 5 August 2021 Solicitation W9133L-21-B-4000, TARC Visitors Center

RFI 1: What is the make and model of the existing fire alarm control panel?

RFI 1 Answer: The existing TARC1 fire alarm panel is Edwards Eight Event Liquid Crystal Display Module 3-LCDXL1. (See separate attachment)

RFI 2: The specification table of contents lists specification section 01 21 10 site work allowance. That specification section is missing from the documents. Please provide.

RFI 2 Answer: This is an oversight left in the table of contents. There is no Section 01 21 100 Site Work Allowance for this project.

RFI 3: Does the casework manufacturer need to be AWI certified? If so, would you entertain a VE option for a non-AWI certified manufacturer?

RFI 3 Answer: Casework manufacturer will need to be AWI Certified.

RFI 4: Can the general contractor site supervisor also perform duties of QCP per page 70 section 1.11.4 of solicitation?

RFI 4 Answer: Yes – A Quality Control Plan is required for the contractor who receives the award. The Quality Control Plan has to meet the minimum requirements as outlined in the SOW.

RFI 5: Due to daily price increases in material costs, is there any provision in the specification for escalation?

RFI 5 Answer: There is no Economic Price Adjustment (EPA) for this project – Each vendor should price their bids accordingly.

RFI 6: In the security specs and drawings; it refers to an “access controls contractor” and the card readers, cameras, etc., are “NIC”. Is there another specific contract that NGB will be putting out for that portion and when would that be released?

RFI 6 Answer: Yes, there will be a separate contract that will not be handled by the National Guard Bureau, A-E and Construction Division. The plan is to have the Security Contract requirements after the construction portion is completed.

RFI 7: Can you please confirm there is no Fire Protection on this project?

RFI 7 Answer: Fire protection is noted in the Statement of Work (SOW) and Drawings (fire extinguishers).

RFI 8: This project was previously solicited a year ago and specification section 01 10 00 Summary, paragraph 1.3 “Work Under Separate Contracts”, included a company and point of contact to reach out to for the “owner-assigned subcontract” for “building automation/HVAC controls”. Is the intent for this current solicitation to include the same language?

RFI 8 Answer: The current paragraph 1.3 “Work Under Separate Contracts” states that the contractor will “coordinate with the owner’s separate security control system contractor for conduit, wire, and cabling requirements”. The National Guard Bureau will award this contract separately, it will not be a part of this project as answered above in RFI 6.

RFI 9: In specification, section 011000 Summary – 1.3 states:

OWNER ASSIGNED SUBCONTRACT

A. General: Owner has negotiated a contracted amount with suppliers of material and equipment to be incorporated into the Work as a subcontract. Owner will assign this subcontract to the Contractor and the subcontract cost shall be included as a lump sum amount in the base bid. All other costs to the Contractor for coordination and supervision of the assigned subcontracts, for full compliance with the Contract Documents, shall be included in the base bid amount.

B. Owner-Assigned Subcontract:

1. Building Automation/HVAC Controls Subcontract: Siemens Industry, Inc. Refer to Mechanical Drawings and Division 23 Specifications for scope of work to be provided by the assigned subcontract.

RFI 9 Answer: Contractor’s should contact Siemens directly as part of their base bid. Siemens will need to be used due to compatibility with the existing system.

There is no pre-negotiated set price for this requirement from the National Guard.