Existing Conditions Photography (Information Only).pdf

PDF 3 MB Posted

Attached to
Construction of a Visitor's Center at the Herbert R. Temple Jr. Army National Guard Readiness Center (TARC)
Solicitation number
W9133L-21-B-4000
Issued by

About this file

This solicitation is for the construction of a Visitor's Center building at the Herbert R. Temple Jr. Army National Guard Readiness Center in Arlington, Virginia. The project involves civil, architectural, security, structural, plumbing, mechanical, and electrical work. The performance period is 425 calendar days from notice to proceed, with an estimated value between $1-5 million. The primary NAICS code is 236220. The Department of the Army National Guard Readiness Center is the contracting agency. Contractors must submit responses in accordance with the written solicitation, specifications, and drawings attached to the posting.

View the file

Other files

File Type Posted
20210820 OF 1419 Abstract of Offers (Signed).pdf PDF
Correction to Zip Code for Bid Package.pdf PDF
20210816 RFIs and Responses.pdf PDF
RFI 62 - Updated Pedestrian Gate Spec 11 14 13.pdf PDF
RFI 60 - Sketch - Door 1a Auto Door Actuator.pdf PDF
20210812 RFIs and Responses.pdf PDF
20210810 RFIs and Responses.pdf PDF
Geotechnical Report TARC.pdf PDF
20210810 W9133L-21-B-4000-0002.pdf PDF
Irrigation drawings from ESPC project.pdf PDF
RFIs and Responses - W9133L-21-B-4000 5 Aug 21.pdf PDF
RFI 001 - Eight Event Liquid Crystal Display Module.pdf PDF
20210803 Pre-Proposal Site Visit Slides.pdf PDF
W9133L-21-B-4000 - Amendment 1.pdf PDF
Stamped TARC DRAWINGS Amendment 1.pdf PDF
20210803 Site Visit Attendance Sheet.pdf PDF
Attachment 10 Visitors Center Specs.pdf PDF
Attachment 05 Security Drawings.pdf PDF
W9133L-21-B-4000.pdf PDF
Attachment 02 Life Safety Drawings.pdf PDF
Attachment 08 Mechanical Drawings.pdf PDF
Attachment 07 Plumbing Drawings.pdf PDF
AF 66 Visitors Center.xls XLS spreadsheet
Attachment 01 General Drawings.pdf PDF
Attachment 06 Structural Drawings.pdf PDF
Attachment 03 Civil Drawings.pdf PDF
Attachment 09 Electrical Drawings.pdf PDF
Attachment 04 Architectural Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H.R.T. JR. ARNG READINESS CENTER (TARC) VISITOR’S CENTER; ARLINGTON, VA

Army National Guard (ARNG) & National Guard Bureau (NGB)

Project Code: VAFM PN 19-0007

EXISTING CONDITIONS PHOTOGRAPY PIC–1 (AD-01)

EXISTING CONDITIONS PHOTOGRAPHY (AD-01)

The following are images of the existing site conditions. Please refer to the plans below for the approximate camera locations from which the images were taken. Any camera locations not located on a plan include descriptions to ascertain their approximate location.

Exterior Camera Locations

EXISTING CONDITIONS PHOTOGRAPY PIC–2 (AD-01)

Interior Camera Locations – Ground Floor

Interior Camera Locations – Lower Level Part 1 – Note the location of the Corridor at the bottom of the plan adjacent to camera location 29. This Corridor is also noted in Lower Level Part 2.

EXISTING CONDITIONS PHOTOGRAPY PIC–3 (AD-01)

Interior Camera Locations – Lower Level Part 2 – Note the location of the Corridor at the top of the plan adjacent to camera location 29. This corridor continues in Lower Level Part 1.

EXISTING CONDITIONS PHOTOGRAPY PIC–4 (AD-01)

Image 01

Image 02

EXISTING CONDITIONS PHOTOGRAPY PIC–5 (AD-01)

Image 03

Image 04

EXISTING CONDITIONS PHOTOGRAPY PIC–6 (AD-01)

Image 05

Image 06

EXISTING CONDITIONS PHOTOGRAPY PIC–7 (AD-01)

Image 07

Image 08

EXISTING CONDITIONS PHOTOGRAPY PIC–8 (AD-01)

Image 09

Image 10

EXISTING CONDITIONS PHOTOGRAPY PIC–9 (AD-01)

Image 11

Image 12

Image 13 – Courtyard. Refer to image 28 for additional information.

EXISTING CONDITIONS PHOTOGRAPY PIC–10 (AD-01)

Image 14

Image 15

EXISTING CONDITIONS PHOTOGRAPY PIC–11 (AD-01)

Image 16

Image 17

EXISTING CONDITIONS PHOTOGRAPY PIC–12 (AD-01)

Image 18 – Refer to Image 30. Conduit shall come up to first floor within a cavity, and cross the corridor within the bulkhead. Cavity shall be on the left side of the stair (note the stair handrail at the right side of the image.)

EXISTING CONDITIONS PHOTOGRAPY PIC–13 (AD-01)

Image 19 – Refer to image 18. Conduit runs within bulkhead and enters Security Room. The corner of the security room is prominently featured at the center of the image.

Image 20 – Within Security Room

Image 21 – Within Security Room

EXISTING CONDITIONS PHOTOGRAPY PIC–14 (AD-01)

Image 22

Image 23 – Utilize the descriptions of Image 24-25 to locate camera.

EXISTING CONDITIONS PHOTOGRAPY PIC–15 (AD-01)

Image 24 – Follows conduit shown in Image 23 as it turns to the left.

EXISTING CONDITIONS PHOTOGRAPY PIC–16 (AD-01)

Image 25 –Follows conduit shown in Image 24 as it turns to the right. The photographer of this image would be centered in Image 15, in front of the gray door. The conduit penetration at the far wall in this image is seen in Image 16.

Image 26 – The approximate location of the gray conduit box, to the left of the words “Assembly Area,” is noted on the plans.

EXISTING CONDITIONS PHOTOGRAPY PIC–17 (AD-01)

Image 27 – Mechanical Room housing switch gear. The black portion of the wall appears as a louver on the exterior. Conduit provided within this contract will cross the courtyard underground and enter this room at this wall. It will then proceed through the building at the ceiling.

Image 28 – The rock wall at the bottom of the image continues to the left in Image 13. The mechanical room with the switch gear is behind the louvers to the right. A mechanical room with a generator is behind the louvers to the left, penetrated with a large exhaust pipe.

EXISTING CONDITIONS PHOTOGRAPY PIC–18 (AD-01)

Image 29 – Indicates the condition of the basement corridor. Conduit to run at the ceiling.

Image 30 – Refer to the electrical drawings. Conduit will penetrate existing slab from basement to first floor within this room. Approximate location indicated with a red arrow and circle below.

EXISTING CONDITIONS PHOTOGRAPY PIC–19 (AD-01)

Image 31 – Basement Electrical Closet. The Classified Processing room is through the rear wall.

Image 32 – Turned back toward the location of camera in Image 31. The same door is visible in both.

END OF SECTION