This federal solicitation seeks construction services for a Visitor's Center building at the Herbert R. Temple Jr. Army National Guard Readiness Center in Arlington, Virginia. The requirement includes civil, architectural, security, structural, plumbing, mechanical, and electrical work. Offerors will have 425 calendar days from notice to proceed to complete the project, estimated to cost between $1 million and $5 million. The primary NAICS code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The Department of the Army National Guard Readiness Center issued the solicitation with attached specifications and drawings.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETAIL SECTION BUBBLE
x.xx
A
DRAINAGE AREA LABEL
XX
CALLOUT BUBBLE
# REVISION TRIANGLE
XX
NAD 83
NORTH ARROW AND DATUM
SCALE 1"=10'
20'10'
PLAN VIEW GRAPHIC SCALE
PROFILE SCALE
PROFILE VIEW GRAPHIC SCALE
GENERAL ANNOTATION
ADA PARKING SPACE
PARKING SPACE COUNT
CONCRETE WHEELSTOP
SITE FEATURES
SIGN
DOUBLE POST SIGN
BOLLARD
AERIAL UTILITY POLE
UTILITIES
TV
C
CABLE TELEVISION MANHOLE
CABLE TELEVISION PEDESTAL
SATELLITE DISH
T
T
TELECOMM MANHOLE
TELECOMM PEDESTAL
LIGHT POLE
E
E
ELECTRIC METER
ELECTRIC MANHOLE
GUY POLE
ELECTRIC PEDESTAL
GUY ANCHOR
S SANITARY SEWER MANHOLE
XX
SANITARY SEWER CLEANOUT
SANITARY MANHOLE IDENTIFICATION
WATERLINE PLUG
DOUBLE DETECTOR CHECK ASSEMBLY
FITTING
FIRE HYDRANT ASSEMBLY
W
WATER MANHOLE
WATER METER
POST INDICATOR VALVE
REDUCER
FIRE DEPARTMENT CONNECTION
W
SPIGOT
WATER VALVE
WELL
NATURAL GAS VALVE
STORM DRAINAGE
STORM SEWER CLEANOUT
D STORM SEWER MANHOLE
1-1
STORM SEWER IDENTIFICATION
STORM SEWER ENDWALL
STORM SEWER WINGWALL
STORM SEWER END SECTION
DOWNSPOUT / ROOF DRAIN
SURVEY BENCHMARK LOCATION
SURVEY CONTROL
SURVEY CONTROL POINT
SOIL BORING IDENTIFICATION
XX
SOILS
EXISTING ADA PARKING
SITE FEATURES
AC
D
EXISTING SIGN
EXISTING DOUBLE POST SIGN
EXISTING AIR CONDITIONING UNIT
EXISTING BOLLARD
EXISTING DUMPSTER
EXISTING FLAG POLE
EXISTING HEADSTONE
EXISTING MAILBOX
EXISTING LIGHTED BOLLARD
U
EXISTING AERIAL UTILITY POLE
EXISTING UTILITY MANHOLE
EXISTING UTILITY VAULT
UTILITIES
TV
C
EXISTING CABLE TELEVISION MANHOLE
EXISTING CABLE TELEVISION PEDESTAL
EXISTING SATELLITE DISH
T
T
EXISTING TELECOMM MANHOLE
EXISTING TELECOMM PEDESTAL
EXISTING YARD LIGHT
EXISTING GROUND LIGHT
E
EXISTING LIGHT POLE
EXISTING ELECTRIC METER
EXISTING ELECTRIC MANHOLE
EXISTING GUY POLE
EXISTING GUY ANCHOR
EXISTING ELECTRIC BOX
S EXISTING SANITARY MANHOLE
EXISTING SANITARY CLEANOUT
EXISTING SANITARY FLOW DIRECTION
W
W
EXISTING FIRE HYDRANT
EXISTING FIRE DEPARTMENT
CONNECTION
EXISTING SPIGOT
EXISTING WATER METER
EXISTING WATER MANHOLE
EXISTING WATER VALVE
EXISTING POST INDICATOR VALVE
EXISTING WELL
EXISTING GAS METER
EXISTING DRIP VALVE
EXISTING GAS VALVE
D EXISTING STORM MANHOLE
EXISTING STORM CATCH BASIN
EXISTING DOWNSPOUT / ROOF DRAIN
EXISTING STORM FLOW DIRECTION
STORM DRAINAGE
EXISTING TRAFFIC SIGNAL POLE
TC EXISTING TRAFFIC SIGNAL BOX
SV
EXISTING SPRINKLER BOX
EXISTING SPRINKLER VALVE
EXISTING SPRINKLER HEAD
GENERAL ANNOTATION
CURB INLET
REVISION CLOUD
CREEK/STREAM CENTERLINE
CREAK/STREAM EDGE OF WATER
RCA
RESOURCE CONSERVATION AREA
RPA
RESOURCE PROTECTION AREA
GRADING AND DRAINAGE
DITCH CENTERLINE
MAJOR DRAINAGE AREA BOUNDARY
MINOR DRAINAGE AREA BOUNDARY
TIME OF CONCENTRATION
HYDROLOGY
FLOODPLAIN
X
FENCE
SITE FEATURES
POND EDGE OF WATER
PROPERTY LINE
PROPERTY SETBACKS
PROPERTY ZONE
RAILWAY
ROAD CENTERLINE
HANDRAIL
EDGE OF GRAVEL
SIGHT DISTANCE
EDGE OF UNPAVED SURFACE
EDGE OF SHRUB
EDGE OF TREES
MAJOR CONTOUR
MINOR CONTOUR
UD
STORM SEWER UNDERDRAIN
WETLANDS BOUNDARY
OCATV
OVERHEAD CABLE TV
UCATV
UNDERGROUND CABLE TV
OFO
OVERHEAD FIBER OPTIC
UFO
UNDERGROUND FIBER OPTIC
OHT
OVERHEAD TELECOMM
UGT
UNDERGROUND TELECOMM
BAS
BUILDING AUTOMATION SYSTEM
G
NATURAL GAS SERVICE
OHP
OVERHEAD POWER
UGP
UNDERGROUND POWER
OH P/C
OVERHEAD POWER + CABLE
OH P/T/C
OVERHEAD POWER + TELECOMM + CABLE
OH P/T
OVERHEAD POWER + TELECOMM
OH T/C
OVERHEAD TELECOMM + CABLE
UG P/C
UNDERGROUND POWER + CABLE
UG P/T/C
UNDERGROUND POWER + TELECOMM + CABLE
UG P/T
UNDERGROUND POWER + TELECOMM
UG T/C
UNDERGROUND TELECOMM + CABLE
FM
SANITARY SEWER FORCE MAIN
SAN
SANITARY SEWER PIPE
6''SAN
SANITARY SEWER PIPE WITH SIZE
W
WATER SERVICE
F
FIRE PROTECTION SERVICE
6''W
WATER SERVICE WITH SIZE
6''F
FIRE PROTECTION SERVICE WITH SIZE
EXISTING CREEK/STREAM CENTERLINE
EXISTING DITCH CENTERLINE
GRADING AND DRAINAGE
EXISTING FLOODPLAIN
EXISTING INUNDATION ZONE
EXISTING POND EDGE OF WATER
EXISTING STORM SEWER PIPE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
X X EXISTING FENCE
SITE FEATURES
EXISTING EDGE OF SHRUB
EXISTING EDGE OF TREES
EXISTING ADJOINING PROPERTY LINE
EXISTING PROPERTY LINE
EXISTING PROPERTY LOTS
EXISTING PROPERTY SETBACKS
EXISTING RAILWAY
EXISTING RIGHT-OF-WAY
EXISTING EDGE OF ASPHALT
EXISTING ROAD CENTERLINE
EXISTING GUARDRAIL
EXISTING EDGE OF GRAVEL
EXISTING EDGE OF UNPAVED SURFACE
UTILITIES
UFO FIBER OPTIC PAINT MARKING
OFO EXISTING OVERHEAD FIBER OPTIC
UGT TELECOMM PAINT MARKING
OHT EXISTING OVERHEAD TELECOMM
G NATURAL GAS SERVICE PAINT MARKING
UGP POWER PAINT MARKING
OHP EXISTING OVERHEAD POWER
SANITARY SEWER PAINT MARKINGSAN
EXISTING SANITARY SEWER PIPE WITH SIZE6'' SAN
UNKNOWN UTILITY PAINT MARKINGUTL
WATER SERVICE PAINT MARKINGW
EXISTING WATER SERVICE WITH SIZE6'' W
CIVIL SYMBOL LEGEND CIVIL LINETYPE LEGEND
A
A/C UNIT AIR CONDITIONING UNIT
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS
AC ACRE
ACP ASBESTOS CONCRETE PIPE
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJACENT
ADV ADVANCE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AMR AUTOMATIC METER READING
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPR APPROXIMATE
APPROX APPROXIMATE
ARCH ARCHITECT or ARCHITECTURAL
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASSY ASSEMBLY
AST ABOVE GROUND STORAGE TANK
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AT/FP ANTI-TERRORISM / FORCE PROTECTION
AVO AUTHORIZED VEHICLES ONLY
AWWA AMERICAN WATER WORKS ASSOCIATION
B
BC BACK OF CURB
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTOR
BL BASE LINE
BLDG BUILDING
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICE
BOS BOTTOM OF SLOPE
BOV BLOW OFF VALVE
BV BUTTERFLY VALVE
BW BOTTOM OF WALL
C
CATV CABLE TELEVISION
CB CATCH BASIN
CBR CALIFORNIA BEARING RATIO
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CG CURB AND GUTTER
CHH COMMUNICATION HANDHOLE
CI CAST IRON
CL CLASS
CLF CHAINLINK FENCE
CLS CENTERLINE SWALE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
COE CORPS OF ENGINEERS
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
CY CUBIC YARD
D
DB DEED BOOK
DE DOMINION ENERGY
DEPT DEPARTMENT
DET DETAIL
DEQ VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DIR DIRECTION
DMH DOGHOUSE MANHOLE
DNE DO NOT ENTER
DOM DOMINION ENERGY
DR DRIVE
DS DOWNSPOUT
DVP DOMINION VIRGINIA POWER
DWG DRAWING
E
E ELECTRIC
EA EACH
EG EXISTING GRADE
EHH ELECTRIC HANDHOLE
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATION
EMH ELECTRIC MANHOLE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
ES END SECTION
ESMT EASEMENT
EUE EXISTING UNDERGROUND ELECTRIC
EUT EXISTING UNDERGROUND TELEPHONE
EW ENDWALL
EW EXISTING WATER
EVO EMERGENCY VEHICLES ONLY
EX EXISTING
E&SC EROSION AND SEDIMENT CONTROL
F
FC FACE OF CURB
FDC FIRE DEPARTMENT CONNECTION
FEV FUEL EFFICIENT VEHICLES
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FIG FIGURE
FL FIRE LANE
FL FLOW LINE
FM FORCE MAIN
FOMKR FIBER OPTIC MARKER
FT FOOT
FVO FIRE VEHICLES ONLY
G
G GAS
GIS GEOGRAPHIC INFORMATION SYSTEM
GM GAS METER
GND GROUND
GPIN GEOGRAPHIC PARCEL IDENTIFICATION NUMBER
GPS GLOBAL POSITION SYSTEM
GRVL GRAVEL
GSA GENERAL SERVICES ADMINISTRATION
GTI GRATE TOP INLET
GTS GAS TEST STATION
GV GATE VALVE
H
HD HEAVY DUTY
HDPE HIGH DENSITY POLYETHYLENE
HH HANDHOLE
HORIZ HORIZONTAL
HOV HIGH OCCUPANCY VEHICLES
HP HIGH POINT
I
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IFC INTERNATIONAL FIRE CODE
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IPF IRON PIPE FOUND
IRF IRON ROD FOUND
ISO INSURANCE SERVICES OFFICE, INC
L
LD LIGHT DUTY
LEV LOW EMISSION VEHICLES
LF LINEAR FEET
LOC LOCATION
LOC LIMITS OF CONSTRUCTION
LOD LIMITS OF DISTURBANCE
LOW LIMITS OF WORK
LP LIGHT POLE
LP LOW POINT
LS LUMP SUM
M
MAX MAXIMUM
MB MAILBOX
MDE MARYLAND DEPARTMENT OF THE ENVIRONMENT
MECH MECHANICAL
MG MATCH GRADE
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
N
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN VERTICAL DATUM
NAVFAC NAVAL FACILITIES ENGINEERING COMMAND
N/F NOW OR FORMERLY
NFF NEEDED FIRE FLOW
NFV NOT FIELD VERIFIED
NGS NATIONAL GEODETIC SURVEY
NIC NOT IN CONTRACT
NO NUMBER
NPZ NO PARKING ZONE
NTS NOT TO SCALE
NWI NATIONAL WETLANDS INVENTORY
O
OC ON CENTER
OD OUTSIDE DIAMETER
OHE OVERHEAD ELECTRIC
OHP OVERHEAD POWER
OHT OVERHEAD TELEPHONE
OS&Y OUTSIDE STEM AND YOKE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OVHD OVERHEAD
P
PB PLAT BOOK
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PCC PORTLAND CEMENT CONCRETE
PED PEDESTAL
PG PAGE
PH PHASE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POA POINT OF ANALYSIS
POI POINT OF INTEREST
POL PETROLEUM, OIL, & LUBRICANTS
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PRV PRESSURE REDUCING VALVE
PT POINT OF TANGENT
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVO POLICE VEHICLES ONLY
PWR POWER
Q
QLx QUALITY LEVEL [A, B, C, D]
R
R/W RIGHT-OF-WAY
RCA RESOURCE CONSERVATION AREA
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REQ REQUIRED
RJ RESTRAINED JOINT
RMA RESOURCE MANAGEMENT AREA
ROW RIGHT-OF-WAY
RPA RESOURCE PROTECTION AREA
RPZ REDUCED PRESSURE ZONE
RR RAILROAD
S
S SLOPE
SAN SANITARY SEWER
SCH SCHEDULE
SDR STANDARD DIMENSION RATIO
SF SILT FENCE
SF SQUARE FEET
SMH STANDARD MANHOLE
SPT SPOT GRADE
SRF SPLIT RAIL FENCE
SSMH SANITARY SEWER MANHOLE
STA STATION
STD STANDARD
STM STORM
STMH STORM SEWER MANHOLE
SUE SUBSURFACE UTILITY ENGINEERING
SWK SIDEWALK
SWL SWALE
SY SQUARE YARDS
T
T TELEPHONE / TELECOMM
TB TOP OF BOX
TBD TO BE DETERMINED
TBM TELEPHONE BENCHMARK
TC TOP OF CURB
TCM TELECOMMUNICATIONS MANHOLE
TCP TERRACOTTA CLAY PIPE
TEL TELEPHONE
TEMP TEMPORARY
THH TELEPHONE HANDHOLE
TMH TELEPHONE MANHOLE
TMKR TELEPHONE MARKER
TOB TOP OF BANK
TOS TOE OF SLOPE
TP TREE PROTECTION
TRANS TRANSFORMER
TW TOP OF WALL
TYP TYPICAL
U
UD UNDERDRAIN
UFO UNDERGROUND FIBER OPTIC
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UGP UNDERGROUND POWER
UGT UNDERGROUND TELECOMM
UNK UNKNOWN
UNO UNLESS NOTED (INDICATED) OTHERWISE
USACE UNITED STATES ARMY CORP OF ENGINEERS
USGS UNITED STATES GEOLOGICAL SURVEY
UTL UTILITY
V
VA VIRGINIA
VAR VARIABLE
VCP VITRIFIED CLAY PIPE
VDH VIRGINIA DEPARTMENT OF HEALTH
VDOT VIRGINIA DEPARTMENT OF TRANSPORTATION
VEPCO VIRGINIA ELECTRIC POWER COMPANY
VERT VERTICAL
VESCH VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK
VESCP VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM
W
W WATER
W/ WITH
W/L WATERLINE
W/O WITHOUT
WAT WATER'
WB WILL BOOK
WLK WALKWAY
WM WATER METER
WSEL WATER SURFACE ELEVATION
WUS WATERS OF THE US
WV WATER VALVE
X
X-ING CROSSING
XSEC CROSS SECTION
SYMBOLS
Ø DIAMETER
≈ APPROXIMATELY EQUAL
≠ NOT EQUAL
± PLUS/MINUS
℄ CENTERLINE
⅊ PROPERTY LINE
BASE LINE
Δ DELTA (DIFFERENCE)
@ AT
CIVIL ABBREVIATIONS
UTILITIES
DROP INLET / GRATE TOP INLET
VEGETATION TREE (SYMBOL VARIES)
STORM PIPE
COLUMN GRID AND IDENTIFICATION
[REFER TO ARCHITECTURAL DRAWINGS]
CHWR
CHILLED/HOT WATER RETURN
CHWS
CHILLED/HOT WATER SERVICE
CWR
CHILLED WATER RETURN
CWS
CHILLED WATER SERVICE
HWR
HOT WATER RETURN
HWS
HOT WATER SERVICE
FLAG POLE
SECURITY FENCE
SLOPE % TAG
GRADE TAG
-5.00%
2.5:1
SITE GRADING
EXISTING GRADE SPOT ELEVATION
SPOT DESCRIPTION
SPOT ELEVATION
SITE GRADING
EX
+/- 389.84'
SWK
389.84'
VEGETATION EXISTING TREE (SYMBOL VARIES)
EXISTING SHRUB
SUBSURFACE UTILITY ENGINEERING QUALITY LEVELS PER ASCE 38-02*
· QUALITY LEVEL D: QLD IS THE MOST BASIC LEVEL OF INFORMATION FOR UTILITY LOCATIONS.
IT COMES SOLELY FROM EXISTING UTILITY RECORDS OR VERBAL RECOLLECTIONS, BOTH
TYPICALLY UNRELIABLE SOURCES. IT MAY PROVIDE AN OVERALL "FEEL" FOR THE
CONGESTION OF UTILITIES, BUT IS OFTEN HIGHLY LIMITED IN TERMS OF
COMPREHENSIVENESS AND ACCURACY. QL-D IS USEFUL PRIMARILY FOR PROJECT PLANNING
AND ROUTE SELECTION ACTIVITIES.
· QUALITY LEVEL C: QLC IS PROBABLY THE MOST COMMONLY USED LEVEL OF INFORMATION. IT
INVOLVES SURVEYING VISIBLE UTILITY FACILITIES (E.G., MANHOLES, VALVE BOXES, ETC.) AND
CORRELATING THIS INFORMATION WITH EXISTING UTILITY RECORDS (QL-D INFORMATION).
WHEN USING THIS INFORMATION, IT IS NOT UNUSUAL TO FIND THAT MANY UNDERGROUND
UTILITIES HAVE BEEN EITHER OMITTED OR ERRONEOUSLY PLOTTED. ITS USEFULNESS,
THEREFORE, IS PRIMARILY ON RURAL PROJECTS WHERE UTILITIES ARE NOT PREVALENT, OR
ARE NOT TOO EXPENSIVE TO REPAIR OR RELOCATE.
· QUALITY LEVEL B: QLB INVOLVES THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL
METHODS TO DETERMINE THE EXISTENCE AND HORIZONTAL POSITION OF VIRTUALLY ALL
UTILITIES WITHIN THE PROJECT LIMITS. THIS ACTIVITY IS CALLED "DESIGNATING". THE
INFORMATION OBTAINED IN THIS MANNER IS SURVEYED TO PROJECT CONTROL. IT
ADDRESSES PROBLEMS CAUSED BY INACCURATE UTILITY RECORDS, ABANDONED OR
UNRECORDED FACILITIES, AND LOST REFERENCES. THE PROPER SELECTION AND
APPLICATION OF SURFACE GEOPHYSICAL TECHNIQUES FOR ACHIEVING QLB DATA IS CRITICAL.
INFORMATION PROVIDED BY QLB CAN ENABLE THE ACCOMPLISHMENT OF PRELIMINARY
ENGINEERING GOALS. DECISIONS REGARDING LOCATION OF STORM DRAINAGE SYSTEMS,
FOOTERS, FOUNDATIONS AND OTHER DESIGN FEATURES CAN BE MADE TO SUCCESSFULLY
AVOID CONFLICTS WITH EXISTING UTILITIES. SLIGHT ADJUSTMENTS IN DESIGN CAN PRODUCE
SUBSTANTIAL COST SAVINGS BY ELIMINATING UTILITY RELOCATIONS.
· QUALITY LEVEL A: QLA, ALSO KNOWN AS "LOCATING", IS THE HIGHEST LEVEL OF ACCURACY
PRESENTLY AVAILABLE AND INVOLVES THE FULL USE OF THE SUBSURFACE UTILITY
ENGINEERING SERVICES. IT PROVIDES INFORMATION FOR THE PRECISE PLAN AND PROFILE
MAPPING OF UNDERGROUND UTILITIES THROUGH THE NONDESTRUCTIVE EXPOSURE OF
UNDERGROUND UTILITIES, AND ALSO PROVIDES THE TYPE, SIZE, CONDITION, MATERIAL AND
OTHER CHARACTERISTICS OF UNDERGROUND FEATURES.
* DESCRIPTIONS TAKEN FROM THE USDOT FHWA SUBSURFACE UTILITY ENGINEERING WEBPAGE
<https://www.fhwa.dot.gov/programadmin/sueindex.cfm>
PROJECT NO:DATE:
A
M
S
G
E O
R G
E
M
A S
O N
D
R
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
U
V
I S
I O
N
A
C H
I E V
T H
R O
U G
H
O
U R
S
27 MAY 2020
GENERAL CIVIL
LEGEND
GC001
217.47
CP R&C SET GPS
TC
U
15" RCP
A S
P H
A L T
S. GEORGE MASON DR.
(VAR. WIDTH)
C O
N C
S
W
L S
A
G R
A S
S
ELEC. BOX
ELEC. BOX
TRAFFIC
GATE ARM
L
S
A
G
R
A
S
S
ASPHALT
E
HVAC UNIT
CONC. MARKER
ROOF
OVERHANG
A S
P H
A L T
A S
P H
A L T
CONC.
PAVERS
CONC. S/W
ASPHALT
C O
N C
. S /W
HC RAMP
HC RAMP
GRANITE
SIGN
BUS
STOP
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
ASPHALT S/W
C O
N C
P
A V
E R
S
ASPHALT
HC RAMP
HC RAMP
STONE RET. WALL
STONE
RET. WALL
TRAFFIC
GATE ARM
TRAFFIC
GATE ARM
TRAFFIC
GATE ARM
BLDG
LSA
LSA
LSA
HC RAMP
HC RAMP
VEHICLE
BARRIER
VEHICLE
BARRIER
VEHICLE
BARRIER
VEHICLE
BARRIER
GUARD
SHACK
C O
N C
2-STORY GARAGE
(VISIBLE ABOVE GROUND)
GATE
ELEC. BOX
C
P
P
P
P
R
C
P
P
V C
R
C
P
6" P
VC
P
C
15" RCP
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
S
A
N
S
A
N
S
A
N
BLDG COLUMN
(1'X1' TYP)
BENCH
ELEC. BOX
ELEC. BOX
APPROX. DIR.
E
E
U
APPROX. DIR.
APPROX. DIR.
APPROX.
DIR.
EX01
EX02
EX03
EX04
EX05
EX06
EX07
EX11
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
NO ACCESS
FF ELEV.
= 220.16'
D
D
S
D
D
D
D
D
S
B
C
U G
P
U G
P
UGP
U
G
P
U
G
P
UGP
U G
P
UGP
U
G
P
UGP
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U
G
P
U G
P
UGP
U G
P
U
G
P
UGP
UGP
UGP
UGP
U
G
P
UGP
UGP UGP
U G
P
U G
P
U G
T
UGT
UGT
U
G
T
U
G
T
U
G
T
U
G
T
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U G
P
U
G
T
U
G
T
U G
T
UGT
UGT
U
G
T
U
G
T
U G
T
UGT
UGT
U
G
P
U
G
P
U
G
P
U G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
UGP UGP
UGP UGP
UGP
UGP
U G
P
U
G
P
U
G
P
U G
P
UGP
UGP UGP
UGP
U G
P
U
G
P
U G
P
U G
P
U
G
P
U G
P
U
G
P
U
G
P
U
G
P
UGP
UGP
UGP
UGP
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U G
P
U G
P
U G
P
U G
P
UGP
U G
P
U
G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U
G
P
U
G
P
U
G
P
UG
P
U
G
P
U
G
P
U G
P
U
G
T
U G
T
U G
T
U G
T
UGT
W
W
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U G
P
W
W
W
W
W W
W
WW
W
W
W
X
U G
P
UGP
U G
P
X
X
X
X
X
X
X
X
X
X
RIGHT OF WAY TAKEN FROM
ARLINGTON GIS DATA DATED
10/11/2019
EX01
EX. CURB INLET
TOP = 218.84'
18" RCP INV. OUT= 214.10'
EX02
EX. CURB INLET
TOP = 218.36'
18" RCP INV. IN = 213.61'
18" RCP INV. OUT= 213.11'
EX03
EX. CURB INLET
TOP = 217.88'
15" RCP INV. OUT= 213.82'
EX04
EX. STORM MANHOLE
TOP = 217.96'
15" RCP INV. IN = 213.42'
18" RCP INV. IN = 211.83'
54" RCP INV. IN = 204.66'
6" PVC INV. IN = 212.22'
54" RCP INV. OUT= 203.63'
EX05
EX. CURB INLET
TOP = 218.62'
15" RCP OUT = 214.90'
EX06
EX. CURB INLET
TOP = 218.27'
15" RCP INV. IN (NW) = 213.82
15" RCP INV. IN (W) = 213.85'
15" RCP INV. OUT = 213.79'
EX07
EX. CURB INLET
TOP = 218.08'
15" RCP INV. IN (NW) = 211.43'
12" RCP INV. IN (NE) = 211.57'
6" PVC INV. IN = 211.33'
15" RCP INV. OUT= 207.39'
EX08
EX. YARD INLET
TOP = 204.68'
8" DIP INV. IN = 201.59'
8" DIP INV. OUT= 201.59'
EX09
EX. YARD INLET
TOP = 204.24'
18" DIP INV. IN = 200.63'
18" RCP INV. OUT= 200.52'
EX10
EX. STORM MANHOLE
TOP = 207.26'
15" RCP INV. IN = 201.47'
16" DIP INV. IN = 201.21'
18" RCP INV. IN = 200.55'
27" RCP INV. OUT= 200.42'
EX11
EX. GRATE INLET
TOP = 220.94'
6" PVC OUT
BOTTOM OF STRUC. = 219.42'
EX12
EX. GRATE INLET
TOP = 205.59'
3" ABS INV. OUT= 204.99'
STORM
SEWER TABLE
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND
RESPONSIBLE CHARGE OF JOHN H. GENTHNER FROM AN ACTUAL
GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE ORIGINAL
DATA WAS OBTAINED ON THE FOLLOWING DATES: OCTOBER 21 THRU
NOVEMBER 6, 2019. THIS PLAT, MAP AND DIGITAL GEOSPATIAL DATA
INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS
OTHERWISE NOTED.
HORIZONTAL DATUM: VIRGINIA STATE COORDINATE SYSTEM NAD83
(2011), NORTH ZONE, AS DETERMINED BY GPS OBSERVATIONS.
VERTICAL DATUM: NAVD88, AS DETERMINED BY GPS OBSERVATIONS.
SUBSURFACE UTILITIES WERE LOCATED ON OCTOBER 15, 2019 BY
INFRAMAP CORP.
NO TITLE REPORT WAS FURNISHED.
TOPOGRAPHICAL FIELDWORK WAS COMPLETED NOVEMBER 6, 2019.
EX. SANITARY MH
TOP = 222.95'
8" DIP INV. IN =
214.73'
8" DIP INV. OUT=
214.79'
EX. SANITARY MH
TOP = 217.32'
8" DIP INV. IN =
208.67'
8" DIP INV. OUT=
208.57'
EX. SANITARY MH
TOP = 216.11'
8" DIP INV. IN =
206.93'
8" DIP INV. OUT=
206.88'
EX. SANITARY MH
TOP = 219.24'
6" PVC INV. IN (NW)
= 216.9'±
(PIPE RECESSED -
UNKNOWN ORIGIN)
6" PVC INV. IN (NE)
= 214.24'
12" PVC INV. OUT=
213.09'
EX. SANITARY MH
TOP = 219.08'
8" PVC INV. IN =
207.18'
(UNKNOWN ORIGIN)
12" PVC INV. IN =
198.53'
12" PVC INV. OUT =
198.18'
SANITARY
SEWER TABLE
E
D
C
B
A
PROJECT NO:DATE:
A
M
O
R G
E
M
A S
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
S
I O
N
A
C H
I E V
R O
U G
H
O
U R
S
27 MAY 2020
EXISTING
CONDITIONS
VF1010
SCALE 1"=10'
20'10'
N
A
CP R&C SET GPS
TC
U
15" RCP
A S
P H
A L T
S. GEORGE MASON DR.
(VAR. WIDTH)
C O
N C
S
W
L S
A
G R
A S
S
ELEC. BOX
ELEC. BOX
TRAFFIC
GATE ARM
L
S
A
G
R
A
S
S
ASPHALT
E
HVAC UNIT
CONC. MARKER
ROOF
OVERHANG
A S
P H
A L T
A S
P H
A L T
CONC.
PAVERS
CONC. S/W
ASPHALT
C O
N C
. S /W
HC RAMP
HC RAMP
GRANITE
SIGN
BUS
STOP
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
ASPHALT S/W
C O
N C
P
A V
E R
S
ASPHALT
HC RAMP
HC RAMP
STONE RET. WALL
STONE
RET. WALL
TRAFFIC
GATE ARM
TRAFFIC
GATE ARM
TRAFFIC
GATE ARM
BLDG
LSA
LSA
LSA
HC RAMP
HC RAMP
VEHICLE
BARRIER
VEHICLE
BARRIER
VEHICLE
BARRIER
VEHICLE
BARRIER
GUARD
SHACK
C O
N C
2-STORY GARAGE
(VISIBLE ABOVE GROUND)
GATE
ELEC. BOX
P
P
P
P
R
C
P
P
V C
R
C
P
6" P
VC
C
15" RCP
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
8'' SAN
S
A
N
S
A
N
S
A
N
BLDG COLUMN
(1'X1' TYP)
BENCH
ELEC. BOX
ELEC. BOX
APPROX. DIR.
E
E
U
APPROX. DIR.
APPROX. DIR.
APPROX.
DIR.
EX01
EX02
EX03
EX04
EX05
EX06
EX07
EX11
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
'' S
A N
NO ACCESS
FF ELEV.
= 220.16'
D
D
S
D
D
D
D
D
S
B
C
U G
P
U G
P
UGP
U
G
P
U
G
P
UGP
U G
P
UGP
U
G
P
UGP
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U
G
P
U G
P
UGP
U G
P
U
G
P
UGP
UGP
UGP
UGP
U
G
P
UGP
UGP UGP
U G
P
U G
P
U G
T
UGT
UGT
U
G
T
U
G
T
U
G
T
U
G
T
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U G
P
U
G
T
U
G
T
U G
T
UGT
UGT
U
G
T
U
G
T
U G
T
UGT
UGT
U
G
P
U
G
P
U
G
P
U G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
UGP UGP
UGP UGP
UGP
UGP
U G
P
U
G
P
U
G
P
U G
P
UGP
UGP UGP
UGP
U G
P
U
G
P
U G
P
U G
P
U
G
P
U G
P
U
G
P
U
G
P
U
G
P
UGP
UGP
UGP
UGP
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U G
P
U G
P
U G
P
U G
P
UGP
U G
P
U
G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U
G
P
U
G
P
U
G
P
UG
P
U
G
P
U
G
P
U G
P
U
G
T
U G
T
U G
T
U G
T
UGT
W
W
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
U
G
P
UGP
U
G
P
U G
P
W
W
W
W
W W
W
WW
W
W
W
X
U G
P
UGP
U G
P
X
X
X
X
X
X
X
X
X
X
RIGHT OF WAY TAKEN FROM
ARLINGTON GIS DATA DATED
10/11/2019
REMOVE EXISTING
BOLLARDS
REMOVE EXISTING TREES
AND LANDSCAPING
REMOVE EXISTING
LIGHTING
REMOVE EXISTING
UTILITIES
REMOVE EXISTING LANDSCAPING,
IRRIGATION, AND BOLLARDS
REMOVE EXISTING
ASPHALT SIDEWALK
REMOVE EXISTING IRRIGATION
FIXTURES
REMOVE EXISTING
GUARD SHACK
REMOVE EXISTING
LIGHTING
CLEAR AND STRIP TOPSOIL AND
REMOVE ANY EXISTING FEATURES.
SAW CUT ALONG EXISTING ASPHALT PATH.
DEMOLITION LEGEND
REMOVE
REMOVE
SAW CUT PAVEMENT
GENERAL DEMOLITION NOTES
1. REFER TO EROSION AND SEDIMENT CONTROL PLANS FOR CONSTRUCTION SEQUENCING AND INSTALLATION OF
APPROPRIATE EROSION CONTROL PRACTICES PRIOR TO ANY DEMOLITION ACTIVITIES.
2. RESTORE ANY DAMAGED OR REMOVED ITEM NOT INDICATED FOR DEMOLITION TO PRECONSTRUCTION CONDITION OR
BETTER.
3. ALL PAVEMENT SAW CUTS SHALL BE CONTINUOUS STRAIGHT LINES AND SMOOTH ARCS. REFER TO VDOT STANDARD
DETAIL WP-2, SHOWN ON DRAWING CS001, FOR PAVEMENT OVERLAY METHOD.
4. REMOVAL OF FENCING INCLUDES, BUT NOT LIMITED TO: FENCING, POSTS, GATES, FOOTERS, AND ANY RELATED ITEMS.
5. REMOVAL OF PAVEMENT INCLUDES FULL DEPTH OF PAVEMENT AND SUBBASE.
6. FOR ALL UNDERGROUND UTILITY DEMOLITION OR ABANDONMENT, COORDINATE WITH UTILITY OWNER FOR PROPER
REMOVAL AND CAPPING OR ABANDONMENT.
PROJECT NO:DATE:
A
M
O
R G
E
M
A S
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
S
I O
N
A
C H
I E V
R O
U G
H
O
U R
S
27 MAY 2020
DEMOLITION
PLAN
CD1010
SCALE 1"=10'
20'10'
N
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
EXISTING SITE CONDITIONS DESCRIPTION
ADJACENT PROPERTY DESCRIPTION
SOILS DESCRIPTION
CRITICAL EROSION AREAS
EROSION AND SEDIMENT CONTROL MEASURES
STRUCTURAL PRACTICES
THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW VISITOR'S
CENTER FOR THE NATIONAL GUARD'S ARMY READINESS CENTER. THE
PROJECT IS LOCATED AT 111 SOUTH GEORGE MASON DRIVE,
ARLINGTON, VA 22204.
DISTURBED SITE AREA: 0.2283 ACRES (VISITOR'S CENTER)
THE EXISTING SITE CONSISTS OF A SMALL GRASSED AREA NEXT TO A
PARKING GARAGE WITH AN ASPHALT PATH RUNNING THROUGH IT IN
ADDITION TO LANDSCAPING. THE SITE FOR THE VISITORS CENTER WILL
BE IMPROVED BY CONSTRUCTING THE NEW BUILDING AND
REMOVING/REPAIRING SECTIONS OF SIDEWALK.
THE SITE IS LOCATED AT 111 SOUTH GEORGE MASON DRIVE, AT THE
ENTRANCE TO THE NATIONAL GUARD COMPOUND ON A STRIP OF LAND
BETWEEN THE PARKING GARAGE AND ENTRANCE ON A FLAT GRASS
COVERED YARD.
ON-SITE SOILS FOR THE AREA ARE WELL DRAINED WITH GRADUAL
SLOPES. ALL AREAS OF WORK FOR THE VISITOR'S CENTER OCCUR ON
IMPERVIOUS AREAS OF THE EXISTING SITE.
OFF-SITE AREAS DESCRIPTION
NO OFF-SITE AREAS ARE TO BE UTILIZED FOR THIS PROJECT.
EARLY ESTABLISHMENT AND PROPER MAINTENANCE OF PERIMETER
CONTROLS WILL PROVIDE SEDIMENTATION CONTROL. STABILIZE AND
MAINTAIN DITCHES AND FILL SLOPES THROUGH ALL CONSTRUCTION
PHASES TO CONTROL ANY EROSION ON-SITE. SLOPE IN FRONT OF
AND AROUND THE VISITORS CENTER IS CRITICAL. THESE SLOPES ARE
BETWEEN 4% AND 7%.
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL
EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE
CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM
STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE
VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR
APPROVED BY A VARIANCE OF THE LOCAL AUTHORITY HAVING
JURISDICTION
SAFETY FENCE
A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF
AN EROSION CONTROL MEASURE.
3.01
TEMPORARY STONE CONSTRUCTION ENTRANCE
A STONE PAD, LOCATED AT POINTS OF VEHICULAR INGRESS AND
EGRESS ON A CONSTRUCTION SITE, TO REDUCE SOIL TRANSPORTED
ONTO PUBLIC ROADS AND OTHER PAVED AREAS.
3.02
SILT FENCE
A TEMPORARY SEDIMENT BARRIER CONSTRUCTED OF POSTS, FILTER
FABRIC, AND, IN SOME CASES, A WIRE SUPPORT FENCE; PLACED
ACROSS OR AT THE TOE OF A SLOPE OR IN A MINOR DRAINAGE WAY TO
INTERCEPT AND DETAIN SEDIMENT AND DECREASE FLOW VELOCITIES
FROM DRAINAGE AREAS OF LIMITED SIZE. APPLICABLE WHERE SHEET
AND RILL EROSION OR SMALL CONCENTRATED FLOWS MAY BE A
PROBLEM. MAXIMUM EFFECTIVE LIFE OF 6 MONTHS.
3.05
STORM DRAIN INLET PROTECTION
THE INSTALLATION OF VARIOUS KINDS OF SEDIMENT TRAPPING
MEASURES AROUND DROP INLET OR CURB INLET STRUCTURES PRIOR
TO PERMANENT STABILIZATION OF THE DISTURBED AREA; LIMITED TO
DRAINAGE AREAS NOT EXCEEDING ONE ACRE, AND NOT INTENDED TO
CONTROL LARGE, CONCENTRATED STORMWATER FLOWS
3.07
TEMPORARY DIVERSION DIKE
A RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF
A SLOPE DISTURBING AREA WHICH DIVERTS OFF-SITE RUNOFF AWAY
FROM UNPROTECTED SLOPES AND TO A STABILIZED OUTLET, OR TO
DIVERT SEDIMENT-LADEN RUNOFF TO A SEDIMENT TRAPPING
STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS.
3.09
TEMPORARY SLOPE DRAIN
A FLEXIBLE TUBING OR CONDUIT, USED BEFORE PERMANENT
DRAINAGE STRUCTURES ARE INSTALLED, INTENDED TO CONDUCT
CONCENTRATED RUNOFF SAFELY FROM THE TOP TO THE BOTTOM OF
A DISTURBED SLOPE WITHOUT CAUSING EROSION ON OR BELOW THE
SLOPE.
3.15
DEWATERING STRUCTURE
A TEMPORARY SETTLING AND FILTERING DEVICE FOR WATER WHICH IS
DISCHARGED FROM DEWATERING ACTIVITIES.
3.26
TEMPORARY SEEDING
PRESERVING AND USING TOPSOIL TO PROVIDE A SUITABLE GROWTH
MEDIUM FOR VEGETATION USED TO STABILIZE DISTURBED AREAS.
APPLICABLE WHERE PRESERVATION OR IMPORTATION OF TOPSOIL IS
THE MOST COST-EFFECTIVE METHOD OF PROVIDING A SUITABLE
GROWTH MEDIUM; NOT RECOMMENDED FOR SLOPES STEEPER THAN
2:1 UNLESS OTHER MEASURES ARE TAKEN TO PREVENT EROSION AND
SLOUGHING.
3.31
PERMANENT SEEDING
ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING
SEED ON ROUGH-GRADED AREAS THAT WILL NOT BE BROUGHT TO
FINAL GRADE FOR A YEAR OR MORE OR WHERE PERMANENT,
LONG-LIVED VEGETATIVE COVER IS NEEDED ON FINE-GRADED AREAS.
3.32
TREE PRESERVATION AND PROTECTION
PROTECTING EXISTING TREES FROM MECHANICAL AND OTHER INJURY
DURING LAND-DISTURBING AND CONSTRUCTION ACTIVITY TO ENSURE
THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE EFFECTIVE
FOR EROSION AND SEDIMENT CONTROL AND PROVIDE OTHER
ENVIRONMENTAL AND AESTHETIC BENEFITS.
3.38
MINIMUM STANDARDS
MS-1: PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL
GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT
STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT
FOR MORE THAN ONE YEAR.
MS-2: DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW
AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON
SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED
FROM THE PROJECT SITE.
MS-3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED
AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT
EROSION.
MS-4: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED
AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES
SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
MS-6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND
CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY
THE TRAP OR BASIN.
a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134
CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY
CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES
SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE
CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN
THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR
STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF
CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR
THOSE EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
MS-7: CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER
THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING
EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE
PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE
PROBLEM IS CORRECTED.
MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR
OTHER PROTECTION SHALL BE PROVIDED.
MS-10: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER
CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11: BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR
PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY
REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL
BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT
AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE
USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER
MATERIALS.
MS-13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION
VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY
VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14: ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO
WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.
MS-15: THE BED AND BANKS OF A WATER COURSE SHALL BE STABILIZED
IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH
THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
a. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE
TIME.
b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF
TRENCHES.
c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR
PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH,
AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
FLOWING STREAMS OR OFF-SITE PROPERTY.
d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE
STABILIZATION.
e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE
REGULATIONS.
f. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT
OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE
ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY.
SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL
AS TO LARGER LAND-DISTURBING ACTIVITIES.
MS-18: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND
THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF
TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
MS-19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES
SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE
DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY OF 24-HOUR DURATION
IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA:
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE
SHALL BE DIRECTLY DISCHARGED INTO AN ADEQUATE NATURAL OR
MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR
THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE
SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE
PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE
FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE
AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE
HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA
OF THE PROJECT IN QUESTION; OR
(2) (a) NATURAL CHANNELS SHALL BE ANALYZED BY USE OF A TWO-YEAR
STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL
BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE
ANALYZED BY USE OF A TEN-YEAR STORM TO VERIFY THAT
STORMWATER WILL NOT OVERTOP ITS BANKS AND BY USE OF A
TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT
CAUSE EROSION OF CHANNEL BEDS OR BANKS; AND
(c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY USE
OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE
CONTAINED WITHIN THE PIPE OR SYSTEM.
c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY
CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE,
THE APPLICANT SHALL:
(1) IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN-YEAR STORM
WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT
CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE
TEN-YEAR STORM IS CONTAINED IN THE APPURTENANCES; OR
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE
PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM
TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR
WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM
A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A
MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER
DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE
VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE
IMPROVEMENTS.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING
WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT
CONDITION OF THE SUBJECT PROJECT.
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER
DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN
FOR MAINTENANCE REQUIREMENTS OF THE DETENTION FACILITIES. THE
PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE
FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE
MAINTENANCE.
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A
RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT
THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE
A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING
CHANNEL.
h. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR
SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A
STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A
DETENTION FACILITY.
j. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR
PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT
SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS.
INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE
A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT
REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL
ENGINEERING CALCULATIONS.
k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL
BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL,
CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER
WATERS OF THE STATE.
l. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR
STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE
CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE
PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME
AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A
24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE
YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW
RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A
LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE
SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED
THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A
REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE
SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE
RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND
SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN
ANY REGULATIONS PROMULGATED PURSUANT TO §10.1-562 OR 10.1-570 OF
THE ACT.
m. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS OF §10.1-561 A OF THE ACT AND
THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER
QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT
(§10.1-603.2 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT
REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN
ACCORDANCE WITH 4VAC50-60-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) PERMIT REGULATIONS.
n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT
IN 4VAC50-60-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM
(VSMP) PERMIT REGULATIONS SHALL BE DEEMED TO SATISFY THE
REQUIREMENTS OF MINIMUM STANDARD 19.
MANAGEMENT STRATEGIES
1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN
GRADING AND SEED AND MULCH IMMEDIATELY FOLLOWING
INSTALLATION.
2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION
IMMEDIATELY AFTER GRADING.
3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM
DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER
CONTROLS.
4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE
MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY
WITH THE CONTRACT DOCUMENTS OR STATE LAW.
MAINTENANCE
REFER TO "MINIMUM STANDARDS" FOR ADDITIONAL INFORMATION
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED
AT A FREQUENCY OF: AT LEAST ONCE EVERY FIVE BUSINESS DAYS; OR
AT LEAST ONCE EVERY 10 BUSINESS DAYS AND NO LATER THAN 48
HOURS FOLLOWING A MEASURABLE STORM EVENT. IN THE EVENT THAT
A MEASURABLE STORM EVENT OCCURS WHEN THERE ARE MORE THAN
48 HOURS BETWEEN BUSINESS DAYS, THE INSPECTION SHALL BE
CONDUCTED NO LATER THAN THE NEXT BUSINESS DAY. PROVIDE
MAINTENANCE AND/OR REPAIRS OF ALL MEASURES AS REQUIRED. THE
FOLLOWING ITEMS SHALL BE CHECKED IN PARTICULAR:
1. CLEAN OUT THE SEDIMENT BASIN WHEN THE LEVEL OF SEDIMENT
BUILDUP REACHES THE CLEANOUT POINT INDICATED ON THE
RISER PIPE.
2. CHECK THE SEDIMENT TRAPS REGULARLY FOR SEDIMENT
CLEANOUT.
3. CHECK THE GRAVEL INLET PROTECTION FOR SEDIMENT BUILDUP
WHICH WILL PREVENT DRAINAGE, IF THE GRAVEL IS CLOGGED BY
SEDIMENT; REMOVE AND CLEAN, OR REPLACE.
4. CHECK THE SILT FENCE BARRIER FOR UNDERMINING OR
DETERIORATION OF THE FABRIC. REMOVE SEDIMENT WHEN THE
LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP
OF THE BARRIER.
5. CHECK THE SEEDING AREAS TO ENSURE THAT A STAND OF GRASS
IS MAINTAINED. FERTILIZE AND RESEED AS NEEDED.
6. ESTABLISH TEMPORARY FILL DIVERSIONS AT THE TOP OF FILL
SLOPES, AS REQUIRED, AT THE END OF EACH WORKING DAY.
PERMANENT STABILIZATION
ALL NON-PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE
STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING
FINISH GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. &
SPEC. 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED
FOR "MINIMUM CARE LAWNS" AND "GENERAL SLOPES" IN THE
HANDBOOK. MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED
SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND LIME
SHALL BE APPLIED PRIOR TO MULCHING.
GENERAL EROSION CONTROL NOTES
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND
STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES
WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO
MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS 4VAC50-30 & 9VAC25-840-40 EROSION AND
SEDIMENT CONTROL REGULATIONS.
ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE
WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING
ACTIVITY AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE
PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL
PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND-DISTRUBING ACTIVITIES IN
AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING,
BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREAS), THE
CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY
THE PLAN APPROVING AUTHORITY.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY
ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY
THE PLAN APPROVING AUTHORITY.
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT
CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
STABILIZATION IS ACHIEVED.
ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED
INTO AN APPROVED FILTERING DEVICE.
ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL
MEASURES PERIODICALLY AND AFTER EACH
RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY
REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF
THE EROSION CONTROL DEVICES SHALL BE MADE
IMMEDIATELY.
SURROUNDING WATERSHED
FROM ARLINGTON COUNTY GIS, THE VISITOR'S CENTER AREA IS
OUTSIDE OF THE RPA AND 1% ANNUAL FLOODPLAIN.
PLANTING PRACTICES
ONLY NATIVE SPECIES SHOULD BE PLANTED ON-SITE.
PROJECT NO:DATE:
A
M
O
R G
E
M
A S
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
S
I O
N
A
C H
I E V
R O
U G
H
O
U R
S
27 MAY 2020
EROSION
CONTROL
NOTES AND
DETAILS
CA001
SAFETY FENCE
3.01
SAF
TEMPORARY STONE CONSTRUCTION ENTRANCE
3.02
CE
SECTION B-B
* MUST EXTEND FILL WIDTH OF
INGRESS AND EGRESS OPERATION
SECTION A-A
PLAN VIEW
SIDE ELEVATION
EX PAVEMENT
MOUNTABLE BERM
(OPTIONAL)
FILTER CLOTH
EXISTING
GROUND
5:1
3'
70' MIN
6" MIN
70' MIN
WASHRACK
12' MIN*
10' MIN
10'
MIN
10' MIN
3" MIN
3" MIN
6'-7"
POSITIVE DRAINAGE
TO SEDIMENT
TRAPPING DEVICE
VDOT #1 COARSE
AGGREGATE
12' MIN*
FILTER CLOTH
DRAIN SPACE
A
A
B B
NOTE: THE CONTRACTOR IS TO KEEP THE EXISTING
ROADWAY FREE OF SOIL BUILD-UP AT ALL TIMES
EXISTING
PAVEMENT
PERSPECTIVE VIEW
PERSPECTIVE VIEW
PLASTIC FENCE
PERSPECTIVE VIEW
METAL FENCE
5'
MIN
6' MAX
REINFORCED
CONCRETE
POLYETHYLENE FABRIC
(ATTACH TO POSTS
WITH METAL TIE WIRES)
CONVENTIONAL
METAL (T) OR (U)
POSTS
BRACING
CONCRETE
FOOTING
GROUND LINE
LINE POST
WIRE
FABRIC
10' OC MAX
POINTS 'A' SHOULD BE HIGHER THAN POINT 'B'
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
FLOW
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
FLOW
6' M A
X
A
B
A
4"
3'
MAX
FLOW
EXTENSION OF FABRIC AND WIRE INTO THE TRENCH
FLOW
FLOW
4"
FILTER FABRIC
WIRE
SILT FENCE WITHOUT WIRE SUPPORT
3.05-1
SF
SILT FENCE WITH WIRE SUPPORT
3.05-2
SSF
1. SET POST AND EXCAVATE A 4"x4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS
2. STAPLE WIRE FENCE TO THE POSTS
3. ATTACH THE FILTER FABRIC TO THE WIRE
FENCE AND EXTEND IT INTO THE TRENCH
4. BACKFILL AND COMPACT THE EXCAVATED SOIL
1. SET THE STAKES 2. EXCAVATE A 4"x4" TRENCH UPSLOPE
ALONG THE LINES OF STAKES
3. STAPLE FILTER MATERIAL TO STAKES
AND EXTEND IT INTO THE TRENCH
4. BACKFILL AND COMPACT THE EXCAVATED SOIL
6' M A
X
SILT FENCE DROP INLET PROTECTION
3.07-1
IP
3' MIN
2"x4" WOOD FRAME
DROP INLET WITH GRATE
FRAME
GATHER EXCESS
AT CORNERS
PERSPECTIVE VIEWS
1.5' MAX
DETAIL 'A'ELEVATION OF STAKE AND
FABRIC ORIENTATION
STAKE
FABRIC
1' MIN
SPECIFIC APPLICATION
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS
A RELATIVELY FLAT AREA (SLOPE NO GRATER THAN 5%) WHERE THE INLET
SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 CFS) ARE TYPICAL. THE
METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS,
SUCH AS IN STREET OR HIGHWAY MEDIANS.
BLOCK AND GRAVEL DROP INLET
SEDIMENT FILTER
3.07-3
IP
* GRAVEL SHALL BE #3, #357 OR #5 COARSE AGGREGATE.
WIRE SCREEN
FILTERED WATER
DROP INLET
WITH GRATE
SEDIMENT
RUNOFF WATER
WITH SEDIMENT
CONCRETE BLOCK
WIRE SCREEN
GRAVEL* FILTER
OVERFLOW
PROJECT NO:DATE:
A
M
O
R G
E
M
A S
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
S
I O
N
A
C H
I E V
R O
U G
H
O
U R
S
27 MAY 2020
EROSION
CONTROL
NOTES AND
CA002
TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES
SPECIES PLANT CHARACTERISTICS
SEEDING RATE NORTH
a
SOUTH
b
Acre 1000 ft²
3/1 to
4/30
5/1 to
8/15
8/15 to
11/1
2/15 to
4/30
5/1 to
9/1
9/1 to
11/15
OATS
(Avena sativa)
RYE
d
(Secale cereale)
GERMAN MILLET
(Setaria italica)
ANNUAL RYEGRASS
c
(Lolium multi-forum)
WEEPING LOVEGRASS
(Eragrostis curvula)
KOREAN LESPEDEZA
(Lespedeza stipulacea)
3 bu. (up to 100 lbs., not less than 50 lbs.)
2 lbs.
X - - - -X
Use spring varieties (e.g. Noble)
2 bu. (up to 110 lbs., not less than 50 lbs.)
2.5 lbs.
X - X - XX
Use for late fall seedings, winter cover. Tolerates cold and low moisture.
50 lbs.
approx. 1 lb.
- X - X --
Warm-season annual. Dies at first frost. May be added to summer mixes.
60 lbs.
15 lbs.
25 lbs.
lb.
ozs.
approx. 1 lbs.
X
X
X X X- -
X - X --
X XX- -
May be added in mixes. Will mow out of most stands.
Warm-season perennial. May bunch.
Tolerates hot, dry slopes and acid, infertile soils. May be added to mixes.
Warm-season annual legume.
Tolerates acid soils. May be added to mixes.
a
Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2.
b
Southern Piedmont and Coastal Plain.
c
May be used as a cover crop with spring seeding.
d
May be used as a cover crop with fall seeding.
X May be planted between these dates.
- May not be planted between these dates.
TABLE 3.32-D
SITE SPECIFIC SEEDING MIXTURES FOR COASTAL PLAIN AREA
Minimum Care Lawn Total Lbs. Per Acre
- Commercial or Residential
- Kentucky 31 or Turf-Type Tall Fescue or
- Common Bermudagrass
175-200 lbs
75 lbs
High-Maintenance Lawn
200-250 lbs
40 lbs (unhulled)
30 lbs (hulled)
General Slope (3:1 or less)
- Kentucky 31 Fescue
- Red Top Grass
- Seasonal Nurse Crop
128 lbs
2 lbs
20 lbs
150 lbs
Low-Maintenance Slope (Steeper than 3:1)
- Kentucky 31 Fescue
- Common Bermudagrass
- Red Top Grass
- Seasonal Nurse Crop
- Sericea Lespedeza
93-108 lbs
0-15 lbs
2 lbs
20 lbs
20 lbs
150 lbs
Use seasonal nurse crop in accordance with seeding dates as stated below
February, March through April Annual Rye
May 1st through August Foxtail Millet
September, October through November 15th Annual Rye
November 16th through January Winter Rye
May through October, use hulled seed. All other seeding periods, use unhulled seed. Weeping
Lovegrass may also be added to any slope or low-maintenance mix during warmer seeding periods; add 10-20 lbs/acre in mixes
Plant native species such as Red Fescue
- Kentucky 31 or Turf-Type Tall Fescue or
- Hybrid Bermudagrass (seed) or
- Hybrid Bermudagrass (by other vegetative establishment method, see Std. & Spec. 3.34)
TEMPORARY DIVERSION DIKE
3.09
DD
TEMPORARY SLOPE DRAIN
3.15
TSD
TEMPORARY SEEDING
3.31
TS
PERMANENT SEEDING
3.32
PS
18" MIN
4.5' MIN
COMPACTED SOIL
FLOW
D
CORRUGATED METAL
EXTENSION COLLAR
EARTHEN DIKE
(COMPACTED)
PROVIDE INLET
PROTECTION
FLARED END SECTION
WATERPROOF SEAL
PROVIDE OUTLET
PROTECTION
EARTHEN DIKE
(COMPACTED)
Y
P
SECTION VIEW
SECTION A - A
NOTE:
SEDIMENT MAY BE CONTROLLED AT OUTLET OF SLOPE DRAIN IF UPLAND PONDING WILL
CREATE EROSION ISSUES. REQUIRES THE APPROVAL OF THE EROSION CONTROL INSPECTOR.
D
18"
D+6"
D
D+6"
24:1
A
A
BLOCK AND GRAVEL CURB INLET SEDIMENT FILTER
3.07-8
IP
* GRAVEL SHALL BE #3, #357 OR #5 COARSE AGGREGATE.
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CURB INLET
2"x4" WOOD STUD
WIRE SCREEN
SEDIMENT
CURB INLET
CONCRETE BLOCK
GRAVEL* FILTER
WIRE SCREEN
OVERFLOW
PROJECT NO:DATE:
A
M
O
R G
E
M
A S
A
R L
I N
G T
O N
V
A
H.
R.
T.
JR
. A
RN
G
RE
AD
INE
SS
CE
NT
ER
(T
AR
C)
VI
SIT
OR
S C
EN
TE
R
VA
FM
PN
-00
44634 MAY 27, 2020
REVISIONS
DATE DESCRIPTION
Y O
S
I O
N
A
C H
I E V
R O
U G
H
O
U R
S
27 MAY 2020
EROSION
CONTROL
NOTES AND
CA003
UTILITY TRENCH EROSION PROTECTION
EXCAVATED TRENCH MATERIAL
TRENCH PER PLANS,
DETAILS, AND
SPECIFICATIONS
X
SILT FENCE USED IN
UNPAVED AREAS
STOCKPILED MATERIALS
STRAW BALE
BARRIER USED IN
PAVED AREAS
OVERLAND FLOW
O
V
E
R
L
A
F
L
O
W
SECTION 2.4 - ARLINGTON STORMWATER MANUAL
· ONLY THE FOLLOWING NON-STORMWATER DISCHARGES ARE AUTHORIZED BY ARLINGTON COUNTY’S MS4
PERMIT, UNLESS THE STATE WATER CONTROL BOARD, THE VIRGINIA SOIL AND WATER CONSERVATION BOARD
(BOARD), OR ARLINGTON COUNTY DETERMINES THE DISCHARGE TO BE A SIGNIFICANT SOURCE OF
POLLUTANTS TO SURFACE WATERS: WATER LINE FLUSHING; LANDSCAPE IRRIGATION; DIVERTED STREAM
FLOWS; RISING GROUND WATERS; UNCONTAMINATED GROUND WATER INFILTRATION (AS DEFINED AT 40 CFR
35.2005(20)); UNCONTAMINATED PUMPED GROUND WATER; DISCHARGES FROM POTABLE WATER SOURCES;
FOUNDATION DRAINS; AIR CONDITIONING CONDENSATION; IRRIGATION WATER; SPRINGS; WATER FROM
CRAWL SPACE PUMPS; FOOTING DRAINS; LAWN WATERING; INDIVIDUAL RESIDENTIAL CAR WASHING; FLOWS
FROM RIPARIAN HABITATS AND WETLANDS; DECHLORINATED SWIMMING POOL DISCHARGES; DISCHARGES OR
FLOWS FROM FIRE FIGHTING; AND, OTHER ACTIVITIES GENERATING DISCHARGES IDENTIFIED BY THE
DEPARTMENT OF ENVIRONMENTAL QUALITY AS NOT REQUIRING VPDES AUTHORIZATION.
· APPROPRIATE CONTROLS MUST BE IMPLEMENTED TO PREVENT ANY NON-STORMWATER DISCHARGES NOT
INCLUDED ON THE ABOVE LIST (E.G., CONCRETE WASH WATER, PAINT WASH WATER, VEHICLE WASH WATER, DETERGENT WASH WATER, ETC.) FROM BEING DISCHARGED INTO ARLINGTON COUNTY’S MS4 SYSTEM, WHICH
INCLUDES THE CURB AND GUTTER SYSTEM, AS WELL AS CATCH BASINS AND OTHER STORM DRAIN INLETS, OR
STREAM NETWORK.
· PER CHAPTER 26 OF THE ARLINGTON COUNTY CODE, IT SHALL BE UNLAWFUL FOR ANY PERSON TO
DISCHARGE DIRECTLY OR INDIRECTLY INTO THE STORM SEWER SYSTEM OR STATE WATERS, ANY
SUBSTANCE LIKELY, IN THE OPINION OF THE COUNTY MANAGER, TO HAVE AN ADVERSE EFFECT ON THE
STORM SEWER SYSTEM OR STATE WATERS.
7.0 SPILL PREVENTION & RESPONSE
MOST SPILLS CAN BE CLEANED UP FOLLOWING MANUFACTURER SPECIFICATIONS. ABSORBENT/OIL DRY, SEALABLE CONTAINERS, PLASTIC BAGS, AND SHOVELS/BROOMS ARE SUGGESTED MINIMUM SPILL RESPONSE ITEMS THAT SHOULD BE AVAILABLE AT THIS
LOCATION.
1ST PRIORITY: PROTECT ALL PEOPLE
2ND PRIORITY: PROTECT EQUIPMENT AND PROPERTY
3RD PRIORITY: PROTECT THE ENVIRONMENT
1. CHECK FOR HAZARDS (FLAMMABLE MATERIAL, NOXIOUS FUMES, CAUSE OF SPILL) - IF FLAMMABLE LIQUID, TURN OFF
ENGINES AND NEARBY ELECTRICAL EQUIPMENT. IF SERIOUS HAZARDS ARE PRESENT LEAVE THE AREA AND CALL 911.
LARGE SPILLS ARE LIKELY TO PRESENT A HAZARD.
2. MAKE SURE THE SPILL AREA IS SAFE TO ENTER AND THAT IT DOES NOT POSE AN IMMEDIATE THREAT TO HEALTH OR SAFETY
OF ANY PERSON.
3. STOP THE SPILL SOURCE.
4. CALL CO-WORKERS AND SUPERVISOR FOR ASSISTANCE AND TO MAKE THEM AWARE OF THE SPILL AND POTENTIAL
DANGERS.
5. IF POSSIBLE, STOP SPILL FROM ENTERING DRAINS (USE ABSORBENT OR OTHER MATERIAL AS NECESSARY).
6. STOP SPILL FROM SPREADING (USE ABSORBENT OR OTHER MATERIAL)
7. IF SPILLED MATERIAL HAS ENTERED A STORM SEWER; CONTACT LOCALITY'S STORM WATER DEPARTMENT.
8. CLEAN UP SPILLED MATERIAL ACCORDING TO MANUFACTURER SPECIFICATIONS, FOR LIQUID SPILLS USE ABSORBENT
MATERIALS AND DO NOT FLUSH AREA WITH WATER.
9. PROPERLY DISPOSE OF CLEANING MATERIALS AND USED ABSORBENT MATERIAL ACCORDING TO MANUFACTURER
SPECIFICATIONS.
EMERGENCY CONTACTS:
NORMAL WORKING HOURS
DEQ NORTHERN REGIONAL OFFICE 703-583-3800
NIGHTS, HOLIDAYS & WEEKENDS
VA DEPT. OF EMERGENCY MANAGEMENT 804-674-2400
24 HOUR REPORTING SERVICE
LOCAL CONTACTS
ARLINGTON COUNTY FIRE & POLICE 703-558-2222
DES WATER, SEWER, STREETS 24-HOUR EMERGENCY 703-228-6555
WASHINGTON GAS EMERGENCY 703-750-1400
POLLUTION PREVENTION PRACTICES:
(1) CLEARING, GRADING, EXCAVATING AND UN-STABILIZED AREAS - UTILIZE EROSION AND SEDIMENT CONTROLS TO…