Attachment 07 Plumbing Drawings.pdf
PDF 1 MB Posted
- Attached to
- Construction of a Visitor's Center at the Herbert R. Temple Jr. Army National Guard Readiness Center (TARC)
- Solicitation number
- W9133L-21-B-4000
About this file
This solicitation is for the construction of a Visitor's Center building at the Herbert R. Temple Jr. Army National Guard Readiness Center in Arlington, Virginia. The project involves civil, architectural, security, structural, plumbing, mechanical, and electrical work. The period of performance is 425 calendar days from notice to proceed to complete the project. The estimated value is between $1 million and $5 million. The primary NAICS code is 236220 for commercial and institutional building construction. The written solicitation, specifications and drawings are provided for interested contractors to review the full requirements.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND WHAT IS REQUIRED BY ONE
SHALL BE AS BINDING AS IF REQUIRED BY ALL. IN THE CASE OF A CONFLICT,
DISAGREEMENT, OR AMBIGUITY, PROVIDE THE BETTER QUALITY. IN THE CASE OF A
CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE GREATER QUANTITY OF WORK.
B. COORDINATE PIPING LOCATIONS AND INSTALLATION WITH EACH TRADE TO AVOID
CONFLICTS WITH OTHER TRADES.
C. PROVIDE FLOOR CLEANOUTS INDICATED FLUSH WITH FLOOR FINISHES.
D. PROVIDE CLEANOUTS WHERE INDICATED AND ADDITIONAL CLEANOUTS AS REQUIRED BY
LOCAL CODE.
E. REFER TO DRAWINGS FROM EACH DISCIPLINE BEFORE ROUGHING-IN PLUMBING
FIXTURES.
F. OBTAIN DIMENSIONS AND ROUTING IN FIELD BEFORE INSTALLATION OF PLUMBING AND
FIXTURES.
G. PROVIDE ISOLATION VALVES IN ACCORDANCE WITH DIAGRAMS, DETAILS, AND DIVISION
22 SPECIFICATIONS.
H. REFER TO STRUCTURAL DRAWINGS FOR DETAILS AND MAXIMUM SPACING
REQUIREMENTS REGARDING HANGER ATTACHMENTS TO STEEL BAR JOISTS.
GENERAL NOTES
KEYNOTE30
A123
AHU-02
SPACE NUMBER
BUILDING AREA (WHEN USED)
SPACE IDENTIFICATION TAG
EQUIPMENT NUMBER
UNIT DESIGNATION
EQUIPMENT IDENTIFICATION TAG
PIPE CAP
PIPE TURNED DOWN
PIPE TURNED UP
PIPE TEE UP
PIPE TEE DOWN
END OF LINE CLEANOUT PLUG
CO
CO
FLOOR CLEANOUT
PRESSURE GAUGE WITH GAUGE COCK
LIQUID FILLED THERMOMETER
UNION
GAS COCK
VALVE
VALVE IN RISER
AUTOMATIC BALANCING VALVE WITH FLOW TAPS
CONCENTRIC PIPE REDUCTION
SWING CHECK VALVE
PRESSURE REDUCING VALVE
SOLENOID OPERATED VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
VENTURI FLOW METER
POINT OF CONNECTION TO EXISTING
LIMIT OF DEMOLITION
STRUCTURAL GRID LINE WITH DESIGNATION
S
T&P
GRAPHICS SYMBOLS LEGEND
A
P6.1
P6.1
P6.1
DETAIL TITLE
1/4"=1'-0"
P6.2P2.2
SANITARY RISER DIAGRAM
1/4"=1'-0"
S1
P4.2
SECTION LETTER
DRAWING WHERE SECTION IS INDICATED
SECTION WHERE CUT
ENLARGED PLAN NUMBER
DRAWING WHERE ENALRGED PLAN IS INDICATED
ENLARGED PLAN WHERE CUT
DETAIL NUMBER
DRAWING WHERE DETAIL IS INDICATED
DETAIL TAG
DETAIL NUMBER
DRAWING WHERE DETAIL IS INDICATED
DRAWING WHERE DETAIL IS CUT
ADDITIONAL DRAWING REFERENCES
P2.3
P2.4
SANITARY RISER DIAGRAM IDENTIFIER
DRAWING WHERE SANITARY RISER IS INDICATED
DRAWING WHERE SANITARY RISER IS TAGGED
ADDITIONAL DRAWING REFERENCES
P2.2
P2.3
P2.4
S1
P6.1
SANITARY RISER IDENTIFIER
DRAWING WHERE SANITARY RISER IS TAGGED
SANITARY RISER TAG
D1
P6.1
DOMESTIC RISER IDENTIFIER
DRAWING WHERE SANITARY RISER IS TAGGED
DOMESTIC RISER TAG
DOMESTIC RISER DIAGRAM
1/4"=1'-0"
D1
P5.2
DOMESTIC RISER DIAGRAM IDENTIFIER
DRAWING WHERE DOMESTIC RISER IS INDICATED
DRAWING WHERE DOMESTIC RISER IS TAGGED
ADDITIONAL DRAWING REFERENCES
P2.2
P2.3
P2.4
FUEL GAS RISER DIAGRAM
1/4"=1'-0"
G1
P5.2
FUEL GAS RISER DIAGRAM IDENTIFIER
DRAWING WHERE FUEL GAS RISER IS INDICATED
DRAWING WHERE FUEL GAS RISER IS TAGGED
ADDITIONAL DRAWING REFERENCES
P2.2
P2.3
P2.4
WALL CLEANOUT
WCO
YARD CLEANOUT (CLEANOUT TO GRADE)
CO (GCO)
FLOOR DRAIN WITH TAG
FLOOR SINK WITH TAG
FD-1
FS-1
X" XXX
PIPE WITH SIZE AND SERVICE
PITCH DOWN IN DIRECTION OF ARROW AT INDICATED SLOPE
FLOW IN DIRECTION OF ARROW
1/8" FT
WATER HAMMER ARRESTOR (PLUMBING & DRAINAGE
INSTITUTE SIZE INDICATED)
A
TEMPERATURE/PRESSURE PLUG
FS
FLOW SWITCH
MANUAL BALANCING VALVE
BACKWATER VALVE
HOSE BIBB OR WALL HYDRANT
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER
DOUBLE CHECK BACKFLOW PREVENTER
PUMP
PLUMBING FIXTURE SCHEDULE
TAG FIXTURE HEIGHT A.F.F.
PIPE SIZE
LEED
USAGE DATA
NOTES
COLD
WATER
TEPID
WATER
HOT
WATER
VENT
SOIL
WASTE
EWC-1 BI-LEVEL WATER COOLER WITH BOTTLE FILLING STATION TOP OF BUBBLER AT 39", LOWER AT 34" 1/2" 1-1/2" 1-1/2" 1
LA-1 LAVATORY -COUNTERTOP (ACCESSIBLE) COUNTER MOUNTED REFER TO ARCH DWGS 1/2" 1/2" 1-1/2" 1-1/2" 0.50 GPM 1, 3
MB-1 SERVICE BASIN (36"x36") RIM AT 12" 3/4" 3/4" 2" 3"
SK-1 SINK (ACCESSIBLE) COUNTER MOUNTED REFER TO ARCH DWGS 1/2" 1/2" 1-1/2" 1-1/2" 1.50 GPM 1, 3, 4
WC-1 WALL MOUNTED WATER CLOSET (ACCESSIBLE) TOP OF SEAT 17" 1" 2" 4" 1.60 GPF 2
WH-1 WALL HYDRANT (FREEZE RESISTANT) CENTERLINE OF OUTLET AT 18" 3/4"
WSB-1 WATER SUPPLY BOX BOTTOM AT 32" 1/2"
WSB-2 WATER SUPPLY BOX BOTTOM AT 8" ABOVE COUNTERTOP 1/2" 5
NOTES:
1. THIS ACCESSIBLE FIXTURE, ACCESSORIES, AND INSTALLATION SHALL CONFORM TO THE VUSBC AND ASAD 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN.
2. LOCATE FLUSH ACTUATORS ON WIDE SIDE OF STALLS OR APPROACH AREAS.
3. PROVIDE ASSE 1070 CERTIFIED MIXING VALVE IN STAINLESS STEEL WALL CABINET, ABOVE CEILING, OR BELOW FIXTURE.
4. PROVIDE DISHWASHER HOOKUP WHERE DISHWASHER IS PRESENT, CONNECT HW IN SINK BASE AND CONNECT SANITARY THROUGH AIR GAP FITTING INTO DISHWASHER TAIL PIECE SINK DRAIN.
5. PROVIDE ASSE 1022 CERTIFIED DUAL CHACK BACKFLOW PREVENTER ON OUTLET FOR BEVERAGE DISPENSER CONNECTION.
PUMP SCHEDULE
TAG
BASIS OF DESIGN
LOCATION SYSTEM TYPE PUMP TYPE
OPERATING DATA ELECTRICAL DATA CONNECTION SIZE
NOTES
MANUFACTURER MODEL
FLOW
(GPM)
PRESSURE
(FEET OF HEAD)
EFFICIENCY
POWER
(HP)
SPEED
(RPM)
VOLTS PHASE HERTZ INLET (IN) OUTLET (IN)
RCP-1 GRUNDFOS ALPHA 15-55 FS 165 ELEC/MECH ROOM 16
HOT WATER
RECIRCULATION
CIRCULATION 4.00 10.00 74% 0.06 3250 120 1 60 0.75 0.75
1. EDIT NOTES.
ELECTRIC WATER HEATER SCHEDULE
TAG
BASIS OF DESIGN
CAPACITY
(GALLONS)
RECOVERY
RATE (GPM)
TEMPERATURE
RISE (°F)
ELECTRICAL DATA
TEMPERATURE
SETTING (°F)
NOTES
MANUFACTURER MODEL INPUT RATE VOLTAGE PHASE HERTZ
EWH-1 CHRONOMITE ER-67S/480_3P 0 3 80 32 KW 480 3 60 120 1, 2
1. KW INPUT RATE FOR ELECTRIC WATER HEATERS BASED ON FULL LOAD SIMULTANEOUS OPERATION.
2. PROVIDE DISCONNECT SWITCH EQUAL TO CHRONOMITE 2095-4 - SR SERIES
DRAIN SCHEDULE
TAG
BASIS OF DESIGN
STRAINER/GRATE NOTES
MANUFACTURER MODEL
RD-1 J.R.SMITH 1025-C--U-AD 15" ROUND
1. PROVIDE 1/8TH BEND NO-HUB OUTLET
BACKFLOW PREVENTER SCHEDULE
TAG
BASIS OF DESIGN
LOCATION SYSTEM SIZE
DESIGN FLOW
RATE (GPM)
PRESSURE
DROP (PSI)
NOTES
MANUFACTURER MODEL
BFP-1 WATTS LF909QT-SHW ELEC/MECH ROOM 16 DCW 2.00 42.00 9.00 1
1. INSTALL IN VERTICAL POSITION. ROUTE REDUCED ZONE DISCHARGE TO NEAREST FLOOR DRAIN.
C
AO
M
M O N
W E
A LTH OF
V
I R G I N I
P
O
R O F
E
SS I
N
N
AL ENG
I
R E E
M O S E L E Y A R C H
IT
E C T S .C O M
JASON P. FORSYTH
Lic. No. 038767
PROJECT NO:
DATE:
N
O R
F O
L K
S T
R E
E T
R
IC
H
M O
N D
V
A
P H
O N
E
-7
F
A X
-5
A
B
C
D
E
1 2 4 53 6 7 8 9 10
F
G
H
I
J
/2
/2
:2
:1
A
M LEGENDS,
ABBREVIATIONS
AND GENERAL
NOTES
H . R
. T . J
R . A
R N
G R
EA
D
IN
ES
S C
EN
TE
R (T
A R
C ) V
IS
IT
O R
S C
EN
TE
R
S . G
E O
R G
E M
A S
O N
D R
A
R L
IN
G
T O
N
V A
P0.1
V A
F M
P N
-0
594303
MAY 27 2020
ABBREVIATIONS
GENERAL DATA
PLUMBING GENERAL DATA
Item Value
SERVICE SIZING
INSTANTANEOUS DEMAND (GPM) 42
SUPPLY FIXTURE UNITS (SFU) 29
DRAINAGE FIXTURE UNITS (DFU) 24
STORM DRAINAGE
AREA OF ROOF (SQUARE FEET) 3051
AREA OF WALL ABOVE/ADJACENT TO ROOF
(SQUARE FEET)
NA
TOTAL ROOF DRAINAGE (SQUARE FEET) 3051
WATER HEATERS
NUMBER 1
HOT WATER REQUIRED 5.7GPM
FUEL USED ELEC
OSD OPEN SITE DRAIN
PC PRECAST
PCF POUNDS PER CUBIT FOOT
PD PUMP DISCHARGE
PLUMB PLUMBING
PLYWD PLYWOOD
POLY POLYETHYLENE
PPT PRESSURE PRESERVATIVE TREATED
PREFAB PREFABRICATE(D)
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PV PROPANE VENT
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RISER
RAD RADIUS
RD ROOF DRAIN (BOTTOM OUTLET)
RDS ROOF DRAIN (SIDE OUTLET)
REF REFERENCE
REQD REQUIRED
REQMT REQUIREMENTS
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
S SOUTH
SAN SANITARY
SCH SCHEDULE
SD STORM DRAIN
SDN STORM DRAIN NOZZLE
SHT SHEET
SIM SIMILAR
SLT SEALANT
SOG SLAB ON GRADE
SP SUMP PUMP
SPEC SPECIFICATION
SPR SPRINKLER
SQ SQUARE
SRD SECONDARY ROOF DRAIN
SS STAINLESS STEEL
SSD SECONDARY STORM DRAIN
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
THK THICK(-NESS)
TLT TOILET
TOSL TOP OF SLAB
TW DOMESTIC TEMPERED WATER (90° F)
TYP TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED (INDICATED) OTHERWISE
V VENT
VAC VACUUM
VB VACUUM BREAKER
VERT VERTICAL
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WB WASHER BOX
WC WATER CLOSET
WCO WALL CLEANOUT
WHA-X WATER HAMMER ARRESTER WITH SIZE
WSHP WATER SOURCE HEAT PUMP
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
XFMR TRANSFORMER
EX EXISTING
EXP EXPANSION
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION DRAIN
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHS FIRE HOSE STATION
FHVC FIRE HOSE VALVE CABINET
FIX FIXTURE
FLR FLOOR
FLSHG FLASHING
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FT FOOT OR FEET
FVC FIRE VALVE CABINET
G NATURAL GAS
GCO GRADE CLEANOUT
GWH GAS WATER HEATER
HB HOSE BIBB
HORIZ HORIZONTAL
HP HORSEPOWER
HTG HEATING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
IN INCH
INSUL INSULATE OR INSULATION
INV INVERT
JAN JANITOR
KIT KITCHEN
KW KITCHEN WASTE
LAB LABORATORY
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LP PROPANE
LPV PROPANE VENT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
N NORTH
N/A NOT APPLICABLE/AVAILABLE
NC NORMALLY CLOSED
NG NATURAL GAS
NGV NATURAL GAS VENT
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO., (#) NUMBER
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
@ AT
AAV AIR ADMITTANCE VALVE
ABV ABOVE
ADJ ADJUSTABLE
ADNL ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPR APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BLDG BUILDING
BO BOTTOM OF
BOT BOTTOM
BSMT BASEMENT
BTWN BETWEEN
CA COMPRESSED AIR
CI CAST IRON
CIP CAST-IN-PLACE CONCRETE
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CNTR COUNTER
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONDS CONDENSATE
CONSTR CONSTRUCT(ION)
CONT CONTINUATION
CONTR CONTRACT(-OR)
CORR CORRIDOR
CP CIRCULATING PUMP
CR CLASSROOM
CT COOLING TOWER
CU COPPER
CU FT CUBIC FEET
CU YD CUBIC YARD
CW COLD WATER
DB DRY BULB
DCW DOMESTIC COLD WATER
DEMO DEMOLISH OR DEMOLITION
DF DRINKING FOUNTAIN
DHR DOMESTIC HOT WATER RETURN
DHR(140) DOMESTIC HOT WATER RETURN (140°)
DHW DOMESTIC HOT WATER
DHW(140) DOMESTIC HOT WATER (140°)
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DN DOWN
DS DOWNSPOUT
DT DRAIN TILE
DTL DETAIL
DTW DOMESTIC TEMPERED WATER
DWG DRAWING
E EAST
ELEC ELECTRICAL
EPBD ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
REVISIONS
DATE DESCRIPTION
A A
C C
B B
F F
E E
G G
D D
2"DCW SERVICE UP
4"SAN (INV EL = -3'-0" BFG)
2"VTR
UP TO FCO
2"SAN UP
1-1/2"SAN UP
3" SAN
3" SAN
4" SAN
4" SAN
2"VTR
3" SAN
3" SAN3" SAN
1 1/2" SAN 3" SAN
3" SAN
3" SAN
3" SAN
3" SAN4" SAN
4" SAN
3"SAN UP3"SAN UP
2" SD
2" SD
2" SD
2"SD (INV EL = -1'-6"BFG)
2"SD (INV EL = -1'-6"BFG)
2"SD (INV EL = -1'-6"BFG)
UP TO FCO
UP TO FCO
4" SAN
4" SAN
3"P-TRAP UP TO MB-1
C
AO
M
M O N
W E
A LTH OF
V
I R G I N I
P
O
R O F
E
SS I
N
N
AL ENG
I
R E E
M O S E L E Y A R C H
IT
E C T S .C O M
JASON P. FORSYTH
Lic. No. 038767
PROJECT NO:
DATE:
N
O R
F O
L K
S T
R E
E T
R
IC
H
M O
N D
V
A
P H
O N
E
-7
X
-5
A
B
C
D
E
1 2 4 53 6 7 8 9 10
F
G
H
I
J
/2
/2
:2
:2
A
M FOUNDATION
PLAN - PLUMBING
H . R
. T . J
R . A
R N
G R
EA
D
IN
ES
S C
EN
TE
R (T
A R
C ) V
IS
IT
O R
S C
EN
TE
R
S . G
E O
R G
E M
A S
O N
D R
A
R L
IN
G
T O
N
V A
P2.0
V A
F M
P N
-0
594303
MAY 27 2020
1/4" = 1'-0"
FOUNDATION PLAN - PLUMBING
E C
FEC
A A
C C
B B
F F
E E
G G
D D
ELEC/MECH
ROOM
IT ROOM
ADMIN
WORKSTATION
STAFF
CORRIDOR
JANITORS
CLOSET
SUPERVISOR
OFFICE
ADMIN WORK
AREA
CAC OFFICE
VISITOR
CORRIDOR
SECURITY
SCREENING
VESTIBULE
EXTERIOR
GARDEN
WAITING
ROOM
HELP DESK
STAFF TOILET
PUBLIC TOILET
BREAK ROOM
CAC
RECEPTIONIST
SK-1
MB-1
WC-1
LA-1LA-1
WC-1 WSB-1
WH-1
EWC-1
WH-1
WH-1
EWH-1
BFP-1
RCP-1
2" DCW
FD-1
FD-1
2"VTR
3/4" DCW
3/4" DCW
3/4" DCW
3/4" DHW
3/4" DHR
1 1/2" DCW
1" DHW
3/4" DCW
3/4" DHW
3/4" DCW
FD-1FD-1
2"VTR
2" DCW
FCO
FCO
1 1/2" V
2"SAN DN,
2"VTR
1" DCW1" DCW
1" DHW
1" DCW3/4" DCW
1/2" DHW1/2" DHW
1/2" DHW1/2" DCW
1 1/2" V
3"SAN DN,
1-1/2"V UP
UP TO RD-1 UP TO RD-1
UP TO RD-1
2"SD DN
2"SD DN
2"SD DN
FCO
FD-1
1/2" DCW
3/4" DCW
1/2" DHW
3/4" DHR WSB-2
C
AO
M
M O N
W E
A LTH OF
V
I R G I N I
P
O
R O F
E
SS I
N
N
AL ENG
I
R E E
M O S E L E Y A R C H
IT
E C T S .C O M
JASON P. FORSYTH
Lic. No. 038767
PROJECT NO:
DATE:
N
O R
F O
L K
S T
R E
E T
R
IC
H
M O
N D
V
A
P H
O N
E
-7
X
-5
A
B
C
D
E
1 2 4 53 6 7 8 9 10
F
G
H
I
J
/2
/2
:2
:2
A
M FLOOR PLAN
H . R
. T . J
R . A
R N
G R
EA
D
IN
ES
S C
EN
TE
R (T
A R
C ) V
IS
IT
O R
S C
EN
TE
R
S . G
E O
R G
E M
A S
O N
D R
A
R L
IN
G
T O
N
V A
P2.1
V A
F M
P N
-0
594303
MAY 27 2020
1/4" = 1'-0"
FIRST FLOOR PLAN - PLUMBING
WALL HYDRANT SHUTOFF
3/4" INLET
WALL CLAMP
DETERMINE TOTAL WALL
THICKNESS FOR HYDRANT
SHUTOFF VALVE DISTANCE
WALL HYDRANT WITH
LOCKABLE COVER
EXTERIOR WALL
INTERIOR WALL SURFACE
SLOPE SLIGHTLY TO TOWARDS THE
OUTSIDE TO ALLOW FOR DRAINAGE
DOMESTIC COLD WATER
ANGLE SUPPLY STOP VALVE
DOMESTIC COLD WATER (DCW)
SUPPLY DOWN IN WALL
KITCHEN HAND SINK
DCW SUPPLY TO FAUCET
FAUCET
DCW
P-TRAP
POINT-OF-USE THERMOSTATIC MIXING VALVE
ASSEMBLY - REFER TO PLANS AND SCHEDULES
FOR FURTHER INFORMATION AND EXACT LOCATIONS
DOMESTIC HOT WATER
ANGLE SUPPLY STOP VALVE
DHW (110F) SUPPLY TO FAUCET
DOMESTIC HOT WATER (DHW)
(140F) SUPPLY DOWN IN WALL
FINISHED FLOOR
EARTH
12" ABOVE
TOP OF PIPE
3"+ OF SAND
BEDDING
12"+
INITIAL BACKFILL: HAND PLACED
SAND FILL TO DEPTH OF 1/2 THE
PIPE DIAMETER
SECONDARY BACKFILL: HAND-PLACED
#10 SCREEINGS. MECHANICALLY
COMPACTED TO 95% PROCTOR IN 6"
LAYERS.BACKFILL MATERIAL SHALL
BE FREE OF STONES.
FINAL BACKFILL: HAND-PLACED
CLASS II MATERIAL. MECHANICALLY
COMPACTED TO 95% PROCTOR IN
6" LAYERS.BACKFILL MATERIAL
SHALL BE FREE OF STONES.
12"+
CLEVIS HANGER
PIPE INSULATION -
UPPER HALF OF PIPE
HIGH DENSITY INSULATION
INSERT - COVERS LOWER
HALF (180°) OF PIPE TYPE 40 PROTECTION
SHIELD - COVERS LOWER
HALF (180°)
CLAMP
UNISTRUT OR EQUAL
CHANNEL SUPPORT SYSTEM
SHIELD
PIPE INSULATION
INSERT
UNISTRUT OR EQUAL
CHANNEL SUPPORT SYSTEM
CLEVIS HANGER
PIPE INSULATION
INSERT
SHIELD
CLEVIS HANGER TRAPEZE SYSTEM
NOTE:
1. FOR COLD PIPE MAINTAIN INTEGRITY OF VAPOR
BARRIER AT SEAM BETWEEN INSERT AND PIPE
INSULATION.
2"
2" 2"
2"
CARRIER PIPE
CLAMP
PIPE INSULATION -
UPPER HALF OF PIPE
CARRIER PIPE
HIGH DENSITY INSULATION
INSERT - COVERS LOWER
HALF (180°) OF PIPE
TYPE 40 PROTECTION
SHIELD - COVERS LOWER
HALF (180°)
P
THERMOMETER - TYPICAL
AQUASTAT - IMMERSION
TEMPERATURE PUMP CONTROLLER
CAPILARY TUBING
PROBE AND SEPARATE WELL
CONTROL WIRING
P.G.
RECIRCULATION PUMP (RCP)
STRAINER
P.G.
TO WATER HEATER
COLD WATER SUPPLY
TO THERMOSTATIC MASTER
MIXING VALVE - WHERE REQUIRED
BUILDING RECIRCULATIONBALANCING VALVE
FLOOR DRAINFINISHED FLOOR
qo^m=dr^oa=fkpboq=abq^fi
P-TRAP
TRAP GUARD INSERT
FINISHED FLOOR
DCW SUPPLY TO DOMESTIC
WATER HEATING SYSTEM
INSTANTANEOUS
WATER HEATER
P
DHW SUPPLY TO BUILDING
DCW SUPPLY TO BUILDING
DHR(120F) BUILDING RETURN FROM BUILDING
P.G.
RCP-1
ISOLATION VALVE - TYPICAL
CHECK VALVE - TYPICAL
BALANCING VALVE
STRAINER1"DHR(110°F)
NOTES:
1. REFER TO ELECTRICAL DWGS. FOR POWER AND DISCONNECT INFORMATION - COORDINATE WITH MFGR'S INSTALLATION
REQUIREMENTS/INSTRUCTIONS AND RECOMMENDATIONS.
THERMOMETER - TYPICAL
AQUASTAT - IMMERSION TEMPERATURE PUMP CONTROLLER
THERMAL EXPANSION TANK
UNION - TYPICAL
ISOLATION VALVE - TYPICAL
2"DCW2"DCW
1"DHR(110°F)
FINISHED FLOOR
2"DHW
2"DHW
2"DCW
3/4"DCW
T&P VALVE
UNION
ISOLATION VALVE
C
AO
M
M O N
W E
A LTH OF
V
I R G I N I
P
O
R O F
E
SS I
N
N
AL ENG
I
R E E
M O S E L E Y A R C H
IT
E C T S .C O M
JASON P. FORSYTH
Lic. No. 038767
PROJECT NO:
DATE:
N
O R
F O
L K
S T
R E
E T
R
IC
H
M O
N D
V
A
P H
O N
E
-7
X
-5
A
B
C
D
E
1 2 4 53 6 7 8 9 10
F
G
H
I
J
/2
/2
:2
:2
A
M DETAILS
H . R
. T . J
R . A
R N
G R
EA
D
IN
ES
S C
EN
TE
R (T
A R
C ) V
IS
IT
O R
S C
EN
TE
R
S . G
E O
R G
E M
A S
O N
D R
A
R L
IN
G
T O
N
V A
P5.1
V A
F M
P N
-0
594303
MAY 27 2020
NO SCALE
buqboflo=t^ii=evao^kq=abq^fi
NO SCALE
hfq`ebk=e^ka=pfkh=abq^fi
NO SCALE
ms`=mfmb=_baafkd=abq^fi
NO SCALE
mfmb=prmmloq=^ka=qeboj^i=pefbia=abq^fip
NO SCALE
`fo`ri^qflk=mrjm=abq^fi
NO SCALE
qo^m=mofjbo=^ppbj_iv=abq^fip
12" = 1'-0"
INSTANTANEOUS ELECTRIC WATER HEATER DETAIL
A
| Sheets |
| P0.1 - LEGENDS, ABBREVIATIONS AND GENERAL NOTES |
| P2.0 - FOUNDATION PLAN - PLUMBING |
| P2.1 - FLOOR PLAN |
| P5.1 - DETAILS |
File details come from the government source that posted it. Updated .