W912QR24R0034_B1244_Specs-0004.pdf

PDF 2 MB Posted

Attached to
Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
Solicitation number
W912QR24R0034
Issued by

About this file

This file is a Project Table of Contents for specification sections 08 11 13 (Steel Doors and Frames), 09 06 00 (Schedules for Finishes), 09 90 00 (Paints and Coatings), 13 34 19 (Metal Building Systems), and 22 00 00 (Plumbing, General Purpose) for a construction project at March Air Reserve Base, California. The specifications cover detailed requirements for materials, fabrication, installation, and finishes for various building components including steel doors, frames, wall panels, painting, plumbing systems, and metal building systems.

The specification sections provide comprehensive technical guidelines for contractors, including material specifications, installation methods, quality assurance requirements, and performance standards. Key elements include requirements for steel doors with various duty levels, color schedules for exterior and interior finishes, paint application procedures, metal building system fabrication and erection, and plumbing fixture installations. The documents specify precise technical standards for materials such as door construction, paint types, metal panel coatings, and plumbing equipment, ensuring high-quality construction that meets military facility standards.

View the file

Other files

File Type Posted
W912QR24R0034_KC-46A_Specs-0007.pdf PDF
W912QR24R0034_KC-46A_Plans-0006.pdf PDF
W912QR24R0034_B1244_Specs-0005.pdf PDF
W912QR24R0034_KC-46A_Specs-0005.pdf PDF
W912QR24R0034_B1244_Plans-0005.pdf PDF
W912QR24R0034_KC-46A_Plans-0005.pdf PDF
W912QR24R0034_B1244_Plans-0004.pdf PDF
W912QR24R0034_KC-46A_Specs-0004.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0004.pdf PDF
Site Visit Sign-In Sheet 3.6.25.pdf PDF
W912QR24R0034-0003.pdf PDF
Preproposal Conference - March ARB - 29 January 2025.pptx PPTX presentation
March ARB_Site Visit Sign-in Sheet.pdf PDF
W912QR24R0034-0002.pdf PDF
W912QR24R0034-0001.pdf PDF
W912QR24R0034_B1244_Specs_Vol3-0000.pdf PDF
W912QR24R0034_KC-46A_FFE-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol4-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_SID-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol1-0000.pdf PDF
W912QR24R0034_B1244_Plans-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol3-0000.pdf PDF
W912QR24R0034_B1244_SID-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol2-0000.pdf PDF
W912QR24R0034_B1244_FFE-0000.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P2# 504634 Addition/Alteration of B1244 March Air Base, CA

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

02 81 00 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 84 33 05/20 REMOVAL AND DISPOSAL OF

POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS SS

COUNTERTOPS

05 51 00 08/23 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

PROJECT TABLE OF CONTENTS

AMENDMENT 0004

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 PRICE BREAKOUT SCHEDULE

(See P2#505421 KC-46A Two-Bay Maintenance Hangar for Div 00 Specs)00.00 06 04/21 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

(See P2#505421 KC-46A Two-Bay Maintenance Hangar for Div 01 Specs)

PROJECT TABLE OF CONTENTS

AMENDMENT 0004Amendment 0004 - Certified Final

Volume I

W912QR24R0034_B1244_Specs-0004

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES

07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 06 00 08/22 SCHEDULES FOR FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 90 00 02/21 PAINTS AND COATINGS

09 97 13.27 DELETED

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 56 13 04/06 STEEL SHELVING

10 81 13 03/10 BIRD CONTROL DEVICES (BID OPTION)

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

PROJECT TABLE OF CONTENTS

AMENDMENT 0004

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

05/19 08/20

PROJECT TABLE OF CONTENTS

AMENDMENT 0004Amendment 0004 - Certified Final

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING, SUPPORTS, ANCHORAGE,

AND VIBRATION ISOLATION FOR MECHANICAL

SYSTEMS

23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING

(TAB) OF HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - HVAC AND AMI

25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - FIRE PROTECTION

DIVISION 26 - ELECTRICAL

26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 73 08/23 POWER SYSTEM STUDIES

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 07/18 EARTHWORK

31 05 22.00 06 07/16 GEOTEXTILES USED AS FILTERS

PROJECT TABLE OF CONTENTS

AMENDMENT 0004

PROJECT TABLE OF CONTENTS

AMENDMENT 0004Amendment 0004 - Certified Final

Volume II

31 32 23.00 06 07/16 LOW MOBILITY GROUTING AND GROUT PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE

32 11 33.13 05/20 PORTLAND CEMENT-STABILIZED BASE COURSES

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 13 73.00 06 07/16 COMPRESSION JOINT SEALS FOR CONCRETE

PAVEMENTS

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 92 19 08/17, CHG 1: 08/21 SEEDING

DIVISION 33 - UTILITIES

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS

AMENDMENT 0004

PROJECT TABLE OF CONTENTS

AMENDMENT 0004Amendment 0004 - Certified Final

SECTION 08 11 13

STEEL DOORS AND FRAMES

08/20

Amendment 0004

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A653/A653M (2023) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A879/A879M (2012; R 2017) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface

ASTM A924/A924M (2022a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM C578 (2022) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2021) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C612 (2014; R 2019) Standard Specification for Mineral Fiber Block and Board Thermal Insulation

ASTM D2863 (2019) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and Steel Frames

SECTION 08 11 13 Page 1 Amendment 0004 - Certified Final

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 80 (2022) Standard for Fire Doors and Other Opening Protectives

NFPA 105 (2022) Standard for Smoke Door Assemblies and Other Opening Protectives

NFPA 252 (2022) Standard Methods of Fire Tests of Door Assemblies

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR 111 (2009) Recommended Details for Standard Steel Doors, Frames, and Accessories and Related Components

SDI/DOOR 113 (2013; R2018) Standard Practice for Determining the Steady-State Thermal Transmittance of Steel Door and Frame Assemblies

SDI/DOOR A250.4 (2018) Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors, Frames and Frame Anchors

SDI/DOOR A250.6 (2015) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames

SDI/DOOR A250.8 (2017) Specifications for Standard Steel Doors and Frames

SDI/DOOR A250.11 (2012) Recommended Erection Instructions for Steel Frames

UNDERWRITERS LABORATORIES (UL)

UL 10C (2016; Reprint May 2021) UL Standard for Safety Positive Pressure Fire Tests of Door Assemblies

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Doors; G

Frames; G

Accessories

SECTION 08 11 13 Page 2

Schedule of Doors; G

Schedule of Frames; G

SD-03 Product Data

Doors; G

Recycled Content for Steel Door Product; S

Frames; G

Recycled Content for Steel Frame Product; S

Accessories

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.

PART 2 PRODUCTS

Amendment 0004***************************************************************

2.1 STANDARD STEEL DOORS

SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00 DOOR HARDWARE. Undercut where indicated. Provide exterior doors with top edge closed flush and sealed to prevent water intrusion. Provide doors at 1-3/4 inch thick, unless otherwise indicated. Provide door material that uses a minimum of 25 percent recycled content. Provide data indicating percentage of recycled content for steel door product.

***************************************************************Amendment 0004

2.1.1 Classification - Level, Performance, Model

2.1.1.1 Extra Heavy Duty Doors

SDI/DOOR A250.8 , Level 3, physical performance Level A, Model 2 with core construction as required by the manufacturer for interior doors and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners must be filled with board insulation. Provide Level 3 where indicated.

2.1.1.2 Maximum Duty Doors

SDI/DOOR A250.8 , Level 4, physical performance Level A, Model 2 with core construction as required by the manufacturer for interior door and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners must be filled with board insulation. Provide Level 4 where indicated.

2.2 INSULATED STEEL DOOR SYSTEMS

Provide insulated steel doors and frames in accordance with SDI/DOOR 113

SECTION 08 11 13 Page 3 at entrances to dwelling units and where indicated. Meet energy requirements including Solar Heat Gain Coefficient (SHGC) and U-factor.

Provide insulated steel doors with a core of polyurethane foam; face sheets, edges, and frames of galvanized steel not lighter than 23 gage, 16 gage, and 16 gage respectively; magnetic weatherstripping;

nonremovable-pin hinges; thermal-break aluminum threshold; and vinyl door bottom. Provide to doors and frames a phosphate treatment, rust-inhibitive primer, and baked acrylic enamel finish. Test doors in accordance with SDI/DOOR A250.4 and meet the requirements for Level C.

Prepare doors to receive specified hardware. Provide doors 1-3/4 inch thick.

2.3 ACCESSORIES

2.3.1 Astragals

For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors.

2.3.2 Moldings

Provide moldings around glass of interior and exterior doors and louvers of interior doors. Provide nonremovable moldings on outside of exterior doors and on corridor side of interior doors. Other moldings may be stationary or removable. Secure inside moldings to stationary moldings, or provide snap-on moldings.

2.4 INSULATION CORES

Provide insulating cores at all exterior doors, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and conforming to:

a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or

b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or

c. Mineral board: ASTM C612, Type I.

2.5 STANDARD STEEL FRAMES

SDI/DOOR A250.8 , Level 4, except as otherwise specified. Form frames to sizes and shapes indicated, with welded corners or knock-down field-assembled corners. Provide steel frames for doors, transoms, cased openings, unless otherwise indicated. Provide frame product that uses a minimum of 25 percent recycled content. Provide data indicating percentage of recycled content for steel frame product.

2.5.1 Welded Frames

Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.

Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.

SECTION 08 11 13 Page 4

2.5.2 Mullions and Transom Bars

Provide mullions and transom bars of closed or tubular construction with heads and jambs butt-welded together. Bottom of door mullions must have adjustable floor anchors and spreader connections.

2.5.3 Stops and Beads

Provide form and loose stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center. Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.

2.5.4 Terminated Stops

Where indicated, terminate interior door frame stops 6 inch above floor.

2.5.5 Cased Openings

Fabricate frames for cased openings of same material, gage, and assembly as specified for metal door frames, except omit door stops and preparation for hardware.

2.5.6 Anchors

Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated not lighter than 18 gage.

2.5.6.1 Wall Anchors

Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.

a. Masonry: Provide anchors of corrugated or perforated steel straps or 3/16 inch diameter steel wire, adjustable or T-shaped;

b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;

c. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts in accordance with SDI/DOOR 111 ; and

2.5.6.2 Floor Anchors

Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.

2.6 FIRE AND SMOKE DOORS AND FRAMES

Provide fire and smoke doors and frames in accordance with NFPA 80 and NFPA 105 and this specification. Include insulated core materials in fire doors where indicated in the door schedule.

SECTION 08 11 13 Page 5

2.6.1 Labels

Provide fire doors and frames bearing the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey International (WHI) attesting to the rating required.

Testing must be in accordance with NFPA 252 or UL 10C . Provide labels that are metal with raised letters, bearing the name or file number of the door and frame manufacturer. Labels must be permanently affixed at the factory to frames and to the hinge edge of the door. Do not paint door and labels.

2.6.2 Oversized Doors

For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.

2.6.3 Astragal on Fire and Smoke Doors

On pairs of labeled fire doors, conform to NFPA 80 and UL requirements.

On smoke control doors, conform to NFPA 105 .

2.7 EXTERIOR FRAMES

Provide thermal insulation in all exterior frames. Provide frames of a minimum Level 4, with frames of a minimum thickness of 0.067 inch, 14 gage.

2.8 HARDWARE PREPARATION

Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Punch door frames, with the exception of frames that will have weatherstripping gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.

2.9 FINISHES

2.9.1 Hot-Dip Zinc-Coated and Factory-Primed Finish

Fabricate scheduled doors and frames from hot dipped zinc coated steel, alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight must meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot, total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint.

Thoroughly clean and chemically treat to insure maximum paint adhesion.

Factory prime as specified in SDI/DOOR A250.8 . Provide for exterior doors and interior doors.

2.9.2 Electrolytic Zinc-Coated Anchors and Accessories

Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .

SECTION 08 11 13 Page 6

2.10 FABRICATION AND WORKMANSHIP

Provide finished doors and frames that are strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Provide molded members that are clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints must be well formed and in true alignment. Conceal fastenings where practicable. On wraparound frames for masonry partitions, provide a throat opening 1/8 inch larger than the actual masonry thickness. Design other frames in exposed masonry walls or partitions to allow sufficient space between the inside back of trim and masonry to receive caulking compound.

2.11 PROVISIONS FOR GLAZING

Materials are specified in Section 08 81 00, GLAZING.

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Frames

Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction. Backfill frames with mortar. Coat inside of frames with corrosion-inhibiting bituminous material. For frames in exterior walls, ensure that stops are filled with rigid insulation before grout is placed.

3.1.2 Doors

Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .

After erection and glazing, clean and adjust hardware.

3.1.3 Fire and Smoke Doors and Frames

Install fire doors and frames, including hardware, in accordance with NFPA 80 . Install fire rated smoke doors and frames in accordance with NFPA 80 and NFPA 105 .

3.2 PROTECTION

Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.

3.3 CLEANING

Upon completion, clean exposed surfaces of doors and frames thoroughly.

Remove mastic smears and other unsightly marks.

-- End of Section --

SECTION 08 11 13 Page 7

SECTION 08 11 13 Page 8

SECTION 09 06 00

SCHEDULES FOR FINISHES

08/22

Amendment 0004

PART 1 GENERAL

1.1 SUMMARY

This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.

1.2 SUBMITTALS

SD-04 Samples

Contractor Color Boards; G

1.3 COLOR REFERENCE SYSTEMS

Colors for project finishes are identified in the Color Schedule and based on the Red, Green, Blue (RGB) Color Model, RAL Design Color Guide, AMS-STD-595 (Federal Standard 595C) color reference system.

PART 2 PRODUCTS

2.1 CONTRACTOR COLOR BOARDS

Contractor to submit actual color boards to include all finish color samples specified on the project, prior to the submittal and approval of individual finish submittals. The DOR must review and approve the color boards to verify overall building finish coordination and aesthetic.

Color boards must be prepared by professional interior designers or architects with significant interior design experience. Qualification of designers is based on education, experience and examination. Interior designers or architects must have completed a program accredited by the Council for Interior Design Accreditation (CIDA) or equal accreditation program of academic training in interior design. In addition, the interior designer or architect must also have attained National Council for Interior Design Qualification (NCIDQ) certification or state licensure, certification or registration and must not be affiliated with a furniture dealership, vendor or manufacturer.

2.2 COLOR SCHEDULE

The color information provided in the following paragraphs lists the colors, patterns and textures for exterior and interior finishes, including both factory applied and field applied colors. In the case of difference between the drawings and specifications, colors identified in this specification govern.

SECTION 09 06 00 Page 1 ent 0004 - CertifieCertified Final StatusCertified Final StatusCertified Final StatusAmendment 0004 - Certified Final

2.3 EXTERIOR FINISHES

Reference drawings for color information.

2.3.1 Exterior Walls

Exterior wall colors apply to exterior wall surfaces including recesses at entrances and projecting vestibules. When applicable, paint conduit to closely match the adjacent surface color. Provide wall colors to match the colors listed below.

2.3.1.1 Metal Wall Panels, Hardware, and Associated Trim

MP-1 Insulated metal panel - color matching Base sample Antique Linen (RGB

- 224-207-176)

MP-1 Metal Panel - color matching Base sample Antique Linen (RGB - 224-207-176)

2.3.1.2 Glass and Glazing

IGU-1 - Solar Control Low-Iron Low-E Clear Insulating Glass

2.3.2 Exterior Trim

Provide exterior trim to match the colors listed below.

2.3.2.1 Steel Doors and Door Frames

Color Matching Base Sample - Tobacco Brown (RGB - 102-84-57)

2.3.2.2 Aluminum Doors and Door Frames

Bronze, Anodized.

2.3.2.3 Aluminum Windows (mullion, muntin, sash, trim, and sill)

Bronze, Anodized.

2.3.2.4 Overhead Coiling Doors

Color matching Base sample Tobacco Brown (RGB - 102-84-57)

2.3.2.5 Overhead Coiling Service Doors

Color matching Base sample Tobacco Brown (RGB - 102-84-57)

2.3.2.6 Fascia

Color matching Base sample Terracotta (RGB - 161-92-77)

2.3.2.7 Soffits

MSP-1 (Roof soffit) Color matching Base sample Terracotta (RGB - 161-92-77)

MSP-2 (Tug bay and Main entry) Color matching Base sample Antique Linen

(RGB - TBD)

SECTION 09 06 00 Page 2 ent 0004 - Certified Certified Final StatusAmendment 0004 - Certified Final

IMP-1 (Hangar doors) Color matching Base sample Antique Linen (RGB - 224-207-176

2.3.2.8 Gutters

Color matching Base sample Terracotta (RGB - 161-92-77)

2.3.2.9 Downspouts and Conductor Heads

Color matching Base sample Antique Linen (RGB - 224-207-176)

2.3.2.10 Louvers

Match adjacent material in color. Color matching Base sample Antique Linen (RGB - 224-207-176)

2.3.2.11 Flashings

Match adjacent material in color.

2.3.2.12 Handrails and Guardrails

As indicated on drawings.

2.3.2.13 Caulking and Sealants

Match adjacent material in color.

2.3.2.14 Control Joints

Match adjacent material in color.

2.3.2.15 Expansion Joint and/or Covers

Match adjacent material in color.

2.3.2.16 Bollards

Safety Yellow

2.3.2.17 Canopies

Color matching Base sample Tobacco Brown (RGB - 102-84-57)

2.3.2.18 Translucent Panels

Frame color - TBD

Panel color - Crystal / Crystal

Shoji grid pattern

2.3.3 Exterior Roof

Apply roof color to exterior roof surfaces including sheet metal flashings and copings, mechanical units, mechanical penthouses, roof trim, pipes, conduits, electrical appurtenances, and similar items. Provide roof color to match the colors listed below.

SECTION 09 06 00 Page 3 ent 0004 - Certified FCertified Final StatusAmendment 0004 - Certified Final

PVC roof and accessories, white color.

2.3.3.1 Metal

Color matching Base sample Terracotta (RGB - 161-92-77)

2.4 INTERIOR FINISHES

2.4.1 Interior Floor Finishes

Provide flooring materials to match the colors listed below.

2.4.1.1 Carpet Tile

CPT-1 - Tarkett, Pattern: Thread Craft #11569, Color: Night Vale #60801, 18 inch by 36 inch tile, Installation: Ashlar.

2.4.1.2 Luxury Vinyl Tile

RF-1 - Mannington, Pattern: Bend ALB401, Color: Pop, 6 inch by 36 inch tile, Unbeveled edges, Installation: Ashlar.

2.4.1.3 Porcelain Tile

TLP-1 - Concept Surfaces, Style: Luna, Color: DG, Finish:

Matte, 12 inch by 24 inch, Installation: Straight.

2.4.1.4 Grout

GR-1 - Mapei, Color: 09 Gray.

2.4.1.5 Aluminum Transition

Clear, Anodized.

Amendment 0004 ***********************************************************

2.4.1.6 Concrete (Sealed and Hardened)

CS-1 - Concrete, Sealed : Euclid Chemical, Euco Diamond Hard, Color: Clear .

*********************************************************** Amendment 0004

2.4.1.7 Industrial Floor Coating

RES-1 - Stonhard, Style: Stonshield QBT, Color: Flagstone

2.4.2 Interior Base Finishes

Provide base materials to match the colors listed below.

2.4.2.1 Resilient Base and Moldings

RB-1 - Tarkett, 4 inch Cove base, Color: TA4 Gateway.

2.4.2.2 Integral Cove Base

RESB-1 - Stonhard, 4 inch Cove base, Style: Stonshield QBT, Color: Flagstone.

SECTION 09 06 00 Page 4 ent 0004 - Certified FCertified Final StatusAmendment 0004 - Certified Final

2.4.3 Interior Wall Finishes

Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.

2.4.3.1 Paint

PA-1 - Sherwin Williams, Color: SW7035 Aesthetic White.

PA-3 - Sherwin Williams, Color: SW7604 Smoky Blue.

PA-4 - Sherwin Williams, Color: SW7017 Dorian Gray.

2.4.3.2 Ceramic Tile

TLC-1 - Daltile, Pattern: Color Wheel Linear, Color: White 0100 6 inch by 18 inch Tile, Installation: Vertical Straight.

2.4.3.3 Grout

GR-2 - Mapei, Color: 27 Silver.

2.4.3.4 Resinous Wall Coating

RES-3 - Stonhard, Style: Stonglaze, Color: Ash Gray.

2.4.3.5 Metal Liner Panels

MLP-1 - Manufacturer's Standard White.

2.4.4 Interior Ceiling Finishes

Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.

Provide ceiling materials to match the colors listed below.

2.4.4.1 Acoustical Tile and Grid

ACT-1 - Armstrong Ceilings, 3354 Optima Square Tegular, 24 inch by 24 inch, Color: White, Grid: 15/16 inch.

2.4.4.2 Paint (Ceilings)

PA-2 - Sherwin Williams, Color: SW7007 Ceiling Bright White.

2.4.4.3 Paint (Soffits)

PA-2 - Sherwin Williams, Color: SW7007 Ceiling Bright White.

2.4.4.4 Metal Deck

PA-2 - Sherwin Williams, Color: SW7007 Ceiling Bright White.

SECTION 09 06 00 Page 5 ent 0004 - Certified Certified Final StatusAmendment 0004 - Certified Final

2.4.4.5 Structural Framing

PA-2 - Sherwin Williams, Color: SW7007 Ceiling Bright White.

2.4.5 Interior Trim

Provide interior trim to match the colors listed below.

2.4.5.1 Steel Doors

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.2 Steel Door Frames

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.3 Steel Windows (mullion, muntin, sash, trim, and stool)

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.4 Fire Extinguisher Cabinets

Brushed Stainless Steel.

2.4.5.5 Handrails

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.6 Guardrails

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.7 Ladders

PA-5 - Sherwin Williams, Color: SW7069 Iron Ore.

2.4.5.8 Bollards

Interior - Safety Yellow.

2.4.6 Interior Window Treatment

Provide window treatments to match the colors listed below.

2.4.6.1 Window Shades

RS-1 - Mechoshade, Ecoveil 1550 Series, 3 percent Open, Color:

1566 Eggshell.

2.4.7 Interior Miscellaneous

Provide miscellaneous items to match the colors listed below.

2.4.7.1 Toilet Partitions and Urinal Screens

TP-1 - ASI Global Partitions, Color-Thru Solid Phenolic, Color:

Fog 3450C.

SECTION 09 06 00 Page 6 ment 0004 - Certified Certified Final StatusAmendment 0004 - Certified Final

2.4.7.2 Plastic Laminate

PLAM-1 - Formica, Color: 3245-58 Smoke, Finish: Matte.

2.4.7.3 Solid Surfacing Material

SSF-1 - Formica, Everform, Color: 733 Mirage.

2.4.7.4 Window Sills (Solid Surface)

SSF-1 - Formica, Everform, Color: 733 Mirage.

2.4.7.5 Corner Guards

CG-1 - Construction Specialties, Color: 933 Mission White.

CG-2 - Construction Specialties, CO-8, Color: #4 Satin Finish.

2.4.7.6 Signage Message Color

To Match: Sherwin Williams, Color: SW 7069 Iron Ore.

2.4.7.7 Signage Background Color To Match

To Match: Sherwin Williams, Color: SW 7035 Aesthetic White.

2.4.7.8 Wall Switch Handles and Standard Receptacle Bodies

Manufacturer's Standard Grey.

2.4.7.9 Electrical Device Cover Plates

Brushed Stainless Steel.

2.4.7.10 Electrical Panels

Manufacturer's Standard Grey.

2.4.7.11 Shower Curtain

Manufacturer's Standard White Vinyl.

2.4.7.12 Shower Wall

SSF-2 - Manufacturer's Standard White.

2.5 PLACEMENT SCHEDULE

Placement of color to be in accordance with the drawings.

PART 3 EXECUTION

Not Used.

-- End of Section --

SECTION 09 06 00 Page 7 ment 0004 - Certified Certified Final StatusAmendment 0004 - Certified Final

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 09 06 00 Page 8

SECTION 09 90 00

PAINTS AND COATINGS

02/21

Amendment 0004

PART 1 GENERAL

1.1 RELATED REQUIREMENTS

1.1.1 Painting Included

Where a space or surface is indicated to be painted, include the following unless indicated otherwise.

a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.

b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.

c. Existing coated surfaces that are damaged during performance of the work.

1.1.1.1 Exterior Painting

Includes new surfaces of the building and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.

1.1.1.2 Interior Painting

Includes new surfaces of the building and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.

a. Exposed columns, girders, beams, joists, and metal deck; and

b. Other contiguous surfaces.

1.1.2 Painting Excluded

Do not paint the following unless indicated otherwise.

a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.

b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.

c. Steel to be embedded in concrete.

d. Copper, stainless steel, aluminum, anodized aluminum, brass, and lead except existing coated surfaces.

e. Hardware, fittings, and other factory finished items.

SECTION 09 90 00 Page 1

f. Do not paint surfaces in the following areas: As indicated on drawings.

1.1.3 Mechanical and Electrical Painting

Includes field coating of interior and exterior new surfaces.

a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.

(1) Exposed piping, conduit, and ductwork;

(2) Supports, hangers, air grilles, and registers;

(3) Miscellaneous metalwork and insulation coverings.

b. Do not paint the following, unless indicated otherwise:

(1) New zinc-coated, aluminum, and copper surfaces under insulation

(2) New aluminum jacket on piping

(3) New interior ferrous piping under insulation.

1.1.3.1 Fire Extinguishing Sprinkler Systems

Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes.

1.1.4 Miscellaneous Painting

1.1.4.1 Lettering Building

Paint as identified on the drawings water-type decalcomania, finished with a protective coating of spar varnish.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100 (2017; Suppl 2020) Documentation of the Threshold Limit Values and Biological Exposure Indices

ASTM INTERNATIONAL (ASTM)

ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss

ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method

SECTION 09 90 00 Page 2

ASTM D4444 (2013; R 2018) Standard Test Method for Laboratory Standardization and Calibration of Hand-Held Moisture Meters

ASTM D6386 (2016a) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting

ASTM F1869 (2022) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

CENTERS FOR DISEASE CONTROL AND PREVENTION (CDC)

Intelligence Bulletin 65 (2013) Occupational Exposure to Carbon Nanotubes and Nanofibers

MASTER PAINTERS INSTITUTE (MPI)

MPI 3 (2016) Primer, Alkali Resistant, Water Based

MPI 4 (2016) Interior/Exterior Latex Block Filler

MPI 9 (2016) Alkyd, Exterior Gloss (MPI Gloss Level 6)

MPI 38 (2016) Elastomeric Coating, Exterior, Water Based, Non-Flat

MPI 39 (2018) Primer, Latex, for Interior Wood

MPI 50 (2015) Primer Sealer, Latex, Interior

MPI 51 (2016) Alkyd, Interior, (MPI Gloss Level 3)2

MPI 72 (2016) Polyurethane, Two-Component, Pigmented, Gloss (MPI Gloss Level 6-7)

MPI 76 (2016) Primer, Alkyd, Quick Dry, for Metal

MPI 77 (2015) Epoxy, Gloss

MPI 79 (2016) Primer, Alkyd, Anti-Corrosive for Metal

MPI 95 (2015) Primer, Quick Dry, for Aluminum

MPI 101 (2016) Primer, Epoxy, Anti-Corrosive, for Metal

MPI 107 (2016) Primer, Rust-Inhibitive, Water Based

MPI 108 (2015) Epoxy, High Build, Low Gloss

MPI 113 (2018) Elastomeric, Pigmented, Exterior, SECTION 09 90 00 Page 3

Water Based, Flat

MPI 116 (2012) Block Filler, Epoxy

MPI 134 (2015) Primer, Galvanized, Water Based

MPI 138 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 2)

MPI 139 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 3)

MPI 140 (2016) Latex, Interior, High Performance Architectural, (MPI Gloss Level 4)

MPI 141 (2016) Latex, Interior, High Performance Architectural, Semi-Gloss (MPI Gloss Level 5)

MPI 144 (2016) Latex, Interior, Institutional Low Odor/VOC, (MPI Gloss Level 2)

MPI 145 (2016) Latex, Interior, Institutional Low Odor/VOC, ( MPI Gloss Level 3)

MPI 146 (2016) Latex, Interior, Institutional Low Odor/VOC, (MPI Gloss Level 4)

MPI 147 (May 2016) Latex, Interior, Institutional Low Odor/VOC, Semi-Gloss (MPI Gloss Level 5)

MPI 153 (2016) Light Industrial Coating, Interior, Water Based, Semi-Gloss (MPI Gloss Level 5)

MPI 154 (2016) Light Industrial Coating, Interior, Water Based, Gloss (MPI Gloss Level 6)

MPI 161 (2016) Light Industrial Coating, Exterior, Water Based ( MPI Gloss Level 3)

MPI 163 (2016) Light Industrial Coating, Exterior, Water Based, Semi-Gloss (MPI Gloss Level 5)

MPI 164 (2016) Light Industrial Coating, Exterior, Water Based, Gloss (MPI Gloss Level 6)

MPI ASM (2019) Architectural Painting Specification Manual

MPI GPS-1-14 (2014) Green Performance Standard GPS-1-14

MPI GPS-2-14 (2014) Green Performance Standard GPS-2-14

MPI MRM (2015) Maintenance Repainting Manual

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC 7/NACE No.4 (2007) Brush-Off Blast Cleaning

SECTION 09 90 00 Page 4

SSPC Glossary (2011) SSPC Protective Coatings Glossary

SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals

Amendment 0004************************************************************

SSPC QP 1 (2019) Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Metal Components)

SSPC QP 3 (2010) Standard Procedure for Evaluating Qualifications of Shop Painting Applicators

************************************************************Amendment 0004

SSPC SP 1 (2015) Solvent Cleaning

SSPC SP 2 (2018) Hand Tool Cleaning

SSPC SP 3 (2018) Power Tool Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

SSPC SP 10/NACE No. 2 (2015) Near-White Blast Cleaning

SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning

SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-313 (2018) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1000 Air Contaminants

SECTION 09 90 00 Page 5

1.3 DEFINITIONS

1.3.1 Qualification Testing

Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third-party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.

1.3.2 Batch Quality Conformance Testing

Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing must be accomplished by an MPI testing lab.

1.3.3 Coating

SSPC Glossary ; (1) A liquid, liquefiable, or mastic composition that is converted to a solid protective, decorative, or functional adherent film after application as a thin layer; (2) Generic term for paint, lacquer, enamel.

1.3.4 DFT or dft

Dry film thickness, the film thickness of the fully cured, dry paint or coating.

1.3.5 DSD

Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five levels are generically defined under the Assessment sections in the MPI MRM, MPI Maintenance Repainting Manual.

1.3.6 EXT

MPI short term designation for an exterior coating system.

1.3.7 INT

MPI short term designation for an interior coating system.

1.3.8 Loose Paint

Paint or coating that can be removed with a dull putty knife.

1.3.9 mil / mils

The English measurement for 0.001 in or one one-thousandth of an inch.

1.3.10 MPI Gloss Levels

MPI system of defining gloss. Seven gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.

Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.

Gloss levels are defined by MPI as follows:

SECTION 09 90 00 Page 6

Gloss Level Description Units at 60 degree angle

Units at 80 degree angle

G1 Matte or Flat 0 to 5 10 max

G2 Velvet 0 to 10 10 to 35

G3 Eggshell 10 to 25 10 to 35

G4 Satin 20 to 35 35 min

G5 Semi-Gloss 35 to 70

G6 Gloss 70 to 85

G7 High Gloss

Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).

1.3.11 MPI System Number

The MPI coating system number in each MPI Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).

1.3.12 Paint

SSPC Glossary ; (1) Any pigmented liquid, liquefiable, or mastic composition designed for application to a substrate in a thin layer that is converted to an opaque solid film after application. Used for protection, decoration, identification, or to serve some other functional purposes; (2) Application of a coating material.

1.3.13 REX

MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.

1.3.14 RIN

MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.

1.4 SCHEDULING

Allow paint, polyurethane, varnish, and wood stain installations to cure prior to the installation of materials that adsorb VOCs, including carpets, textiles, unprimed gypsum wallboard, acoustical ceiling panels.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SECTION 09 90 00 Page 7

Samples of specified materials may be taken and tested for compliance with specification requirements.

SD-02 Shop Drawings

Piping Identification

SD-03 Product Data

Coating; G

Product Data Sheets

SD-04 Samples

Color; G

SD-07 Certificates

Qualification Testing laboratory for coatings; G

Indoor Air Quality for Paints and Primers

Indoor Air Quality for Consolidated Latex Paints

SD-08 Manufacturer's Instructions

Mixing

Manufacturer's Safety Data Sheets

SD-10 Operation and Maintenance Data

Coatings, Data Package 1; G

1.6 QUALITY ASSURANCE

1.6.1 Regulatory Requirements

1.6.1.1 Environmental Protection

In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.

Notify Contracting Officer of any paint specified herein which fails to conform.

1.6.1.2 Lead Content

Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.

1.6.1.3 Chromate Content

Do not use coatings containing zinc-chromate or strontium-chromate.

SECTION 09 90 00 Page 8

1.6.1.4 Asbestos Content

Provide asbestos-free materials.

1.6.1.5 Mercury Content

Provide materials free of mercury or mercury compounds.

1.6.1.6 Silica

Provide abrasive blast media containing no free crystalline silica.

1.6.1.7 Human Carcinogens

Provide materials that do not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).

1.6.1.8 Carbon Based Fibers / Tubes

Materials must not contain carbon based fibers such as carbon nanotubes or carbon nanofibers. Intelligence Bulletin 65 ranks toxicity of carbon nanotubes on a par with asbestos.

Amendment 0004************************************************************

1.6.2 Deleted

1.6.3 SSPC QP 1 Certification

Contractors that perform surface preparation or coating application on steel substrates must be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to Contract award, and must remain certified while accomplishing any surface preparation or coating application. If a Contractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all scheduled and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

1.6.4 SSPC QP 3 Certification

Shop application shall have SSPC QP 3 or AISC SPE qualifications. The painting Contractors and painting subcontractors must remain so certified for the duration of the project. If a Contractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered. Notify the Contracting Officer of any change in Contractor certification status. Notify the Contracting Officer of all scheduled and unannounced on-site audits from SSPC and furnish a copy of all audit reports.

************************************************************Amendment 0004

1.6.5 Approved Products List

The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of Contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI

SECTION 09 90 00 Page 9

"Approved Product List", however, only one list may be used for the entire Contract and each coating system is to be from a single manufacturer.

Provide all coats on a particular substrate from a single manufacturer.

No variation from the MPI Approved Products List is acceptable.

1.6.6 Paints and Coatings Indoor Air Quality Certifications

Provide paint and coating products certified to meet indoor air quality requirements by MPI GPS-1-14 , MPI GPS-2-14 or provide certification by other third-party programs. Provide current product certification documentation from certification body.

Provide certification of Indoor Air Quality for Paints and Primers.

Provide certification of Indoor Air Quality for Consolidated Latex Paints.

Submit required indoor air quality certifications in one submittal package.

1.6.7 Field Samples and Tests

The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph SAMPLING PROCEDURE. Test each chosen product as specified in the paragraph TESTING PROCEDURE. Remove products from the job site which do not conform, and replace with new products that conform to the referenced specification.

Test replacement products that failed initial testing as specified in the paragraph TESTING PROCEDURE at no cost to the Government.

1.6.7.1 Sampling Procedure

Select paint at random from the products that have been delivered to the job site for sample testing. The Contractor must provide one quart samples of the selected paint materials. Take samples in the presence of the Contracting Officer, and label, and identify each sample. Provide labels in accordance with the paragraph PACKAGING, LABELING, AND STORAGE.

1.6.7.2 Testing Procedure

Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI.

This is the start of the file's text. The full file is on GovTribe.