Preproposal Conference - March ARB - 29 January 2025.pptx

PPTX presentation 9 MB Posted

Attached to
Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
Solicitation number
W912QR24R0034
Issued by

About this file

This is a pre-proposal conference presentation for a federal contract opportunity at March Air Reserve Base (ARB) in California, scheduled for January 29, 2025. The presentation covers three bundled projects under solicitation W912QR24R0034: (1) Construction of a KC-46A Two-Bay Maintenance/Fuel Cell Hangar ($167M), including demolition of existing facilities and construction of a 156,585 sq ft aircraft hangar; (2) Addition/Alteration to Building 1244 Fuselage Trainer ($13.7M), involving interior reconfiguration and roof replacement; and (3) Repair of Ramp Mooring Points and Paint ($1.2M), including 17,783 linear feet of pavement marking and 32 tie-down retrofits.

The procurement is being conducted as a full and open competition using a best-value trade-off approach by the U.S. Army Corps of Engineers Louisville District. Proposals are due March 18, 2025, with contract award expected in Summer 2025. The total contract duration is 1,095 days. Evaluation factors include Past Performance, Risk Management Plan, Schedule Narrative, and Small Business Participation Plan. A Project Labor Agreement (PLA) requirement is currently under review due to a Court of Federal Claims ruling. Proposals must be submitted electronically through PIEE, and technical questions must be submitted through ProjNet using bidder's key 6C7HIN-X3EUB5.

View the file

Other files

File Type Posted
W912QR24R0034_KC-46A_Specs-0007.pdf PDF
W912QR24R0034_KC-46A_Plans-0006.pdf PDF
W912QR24R0034_B1244_Specs-0005.pdf PDF
W912QR24R0034_KC-46A_Specs-0005.pdf PDF
W912QR24R0034_B1244_Plans-0005.pdf PDF
W912QR24R0034_KC-46A_Plans-0005.pdf PDF
W912QR24R0034_B1244_Plans-0004.pdf PDF
W912QR24R0034_KC-46A_Specs-0004.pdf PDF
W912QR24R0034_B1244_Specs-0004.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0004.pdf PDF
Site Visit Sign-In Sheet 3.6.25.pdf PDF
W912QR24R0034-0003.pdf PDF
March ARB_Site Visit Sign-in Sheet.pdf PDF
W912QR24R0034-0002.pdf PDF
W912QR24R0034-0001.pdf PDF
W912QR24R0034_B1244_Specs_Vol3-0000.pdf PDF
W912QR24R0034_KC-46A_FFE-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol4-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_SID-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol1-0000.pdf PDF
W912QR24R0034_B1244_Plans-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol3-0000.pdf PDF
W912QR24R0034_B1244_SID-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol2-0000.pdf PDF
W912QR24R0034_B1244_FFE-0000.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PreProposal Conference March ARB, CA

Presenters:

Liz Hershner – Project Manager Bruce Ealey – Project Engineer Lindsay Lawrence – Contract Specialist Jason Kling – Designer of Record

Date: 29 January 2025

Administrative Announcements Please ensure that you have signed in Send in chat for remote participants Company Name, POC Name, Email, Phone Are you interested in being the Prime or Subcontractor If you’re interested in being a subcontractor, state the type of work you are interested (Electrical, Mechanical, Roofing, etc.)

Please turn off all mobile devices No recording This briefing and the attendee roster will be posted to SAM Please be advised that none of the information discussed today is contractually-binding

Agenda Introduction of Team Members USACE Procurement Process Overview Overview of Upcoming Projects Construct KC-46 Two Bay Maintenance/Fuel Cell Hangar Addition/Alteration Building 1244 Fuselage Trainer (FuT) and Cargo Pallet Staging Repair Ramp Mooring Points and Restriping Q&A Session Site Visit

KC-46A Beddown Program Team Members

Mike CoatsProgram Manager (Air Force Reserve Command)
Billy EnglishProgram Manager (Air Force Reserve Command)
Lt Col Paul Egbalic452 AMXS Commander (March Air Reserve Base)
Lt Col Nathan Chal452 AMW/SEF (March Air Reserve Base)
Lt Col Thomas SmithKC-46A PIO (March Air Reserve Base)
Maj Eric Garcia452 CE Squadron Commander (March Air Reserve Base)
Kurt Heinze452 AMW Base Civil Engineer (March Air Reserve Base)
Liz Hershner, P.E.Air Force Reserve Section Chief (Louisville District Office)
Adrian Condrut, P.E.Project Manager (Louisville District Office)
Bruce Ealey, P.E.Project Engineer (Louisville District Office)
Renee BoothContracting Officer, Contracting Division (Louisville District Office)
Lindsay LawrenceContract Specialist, Contracting Division (Louisville District Office)
Crystal HarbinDeputy for Small Business (Louisville District Office)
Shaun FrostChief of Construction, Construction Division (Los Angeles District Office)
Pete Gauer, P.E.Regional Resident Engineer/ACO, Construction (Santa Ana Dams Resident Office)
Klaire Kaleem, P.E.Project Engineer/Alt ACO, Construction (Santa Ana Dams Resident Office)
Derek Huber, P.E.Section Chief/ACO, Construction (Louisville District Office)
Alex McCoy, P.E.Regional Resident Engineer/ACO, Construction (Louisville District Office)

USACE Procurement Process Overview

Renee BoothLindsay Lawrence
Contracting OfficerContract Specialist
US Army Corps of EngineersUS Army Corps of Engineers
Louisville DistrictLouisville District

How to Obtain the Solicitation SAM – www.sam.gov Solicitation Numbers will begin with “W912QR” Construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar at March ARB, CA Solicitation will be W912QR24R0034 Interested vendors list Contracting does not keep records of potential Prime Contractors “Follow” the Notice on SAM to receive emails regarding updates / amendments RFP technical information will be posted on www.sam.gov

Obtaining the Issue Documents Requirements to download Technical Data Package:

Need to be registered in System for Award Management (SAM) database. You must sign up and sign-in to your account to use many features of SAM.gov (saving searches, viewing solicitations, etc.)

You must register your business entity (you as an individual or your organization) to be able to propose on contracts or apply for federal assistance (grants, loans, etc.) from the federal government.

Any amendments issued to the RFP will also be posted on www.sam.gov You will most likely receive a notification from PIEE first. Documents will be available on SAM to download by COB Advertisement Period – typically 30 days. For solicitation W912QR24R0034 this time period is 98 days.

The Procurement Process This section will contain information specific to the KC-46A Two Bay Hangar, B1244 Fuselage Trainer and Ramp Mooring Points/Paint projects presented today.

The March ARB projects is a Design-Bid-Build (D-B-B) Request for Proposals (RFP) Project award will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.

Proposals must be submitted on time.

* The Louisville District is located in the Eastern Time Zone.* The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposals based on specific factors which are defined in the RFP Package.

Proposal Requirements Source Selection Criteria for a “Best Value Trade-Off” usually consists of four factors:

Volume I:

Factor I: Past Performance Evaluation Recent projects, similar in size and scope Factor II: Risk Management Plan There are seven (7) requirements; failure to address all seven results in a deficiency and your proposal is un-awardable Factor III: Schedule Narrative There are ten (10) requirements; failure to address all ten results in a deficiency and your proposal is un-awardable Factor IV: Small Business Participation Plan Volume II:

Pro-Forma Evaluation
Price, JV agreements, Bonding, Pre-Award Information, Subcontracting Plan, and Project Labor Agreement

Submit your best proposal the 1st time. Discussions are only opened as necessary

Proposal Requirements (cont.)

Instructions for submitting a Request for Information (RFI) have been included in the Solicitation RFIs for this project will be received and answered through the ProjNet system Any RFIs submitted directly to the project team will not receive a response and will be directed to the ProjNet system.

This project’s Projnet Bidder’s Key is 6C7HIN-X3EUB5, which is used to post your RFIs to the proper project.

Proposal Submission We will utilize the Electronic Receipt of Proposal process – Instructions are located in Section 00 21 00 of the solicitation package Proposals uploaded to Procurement Integrated Enterprise Environment (PIEE) Solicitation Module You must be registered in PIEE to submit a proposal Follow the naming conventions provided in the solicitation W912QR24R0043-FIRM NAME-Volume I W912QR24R0043-FIRM NAME-Volume II Don’t wait until the last minute to upload your proposal – Late is Late and the proposal will NOT be accepted

Project Labor Agreement Given the anticipated $ value of the project, a Project Labor Agreement (PLA) was required. This is a requirement on all projects that exceed $35M IAW Executive Order 14063 and FAR 22.503.

A Protest of the PLA requirement in this project was filed in the Court of Federal Claims (COFC) and the court issued a ruling on January 21, 2025, finding that the PLA determination should be reconsidered, but they must also approve our path forward.

What does this mean for the project?

USACE will reevaluate the PLA requirement in the solicitation.

A report is due on 05 February 2025 from the Government to the COFC detailing the proposed timeframe required to address the inclusion of the PLA in the solicitation.

Louisville District will issue any changes to the solicitation via AMDT including any changes related to the PLA requirement in the solicitation.

To read the Court’s decision regarding the active case, click the link provided:

https://ecf.cofc.uscourts.gov/cgi-bin/CFC_RecentOpinionsOfTheCourt.pl

24-1057 – MVL USA, INC. v USA https://ecf.cofc.uscourts.gov/cgi-bin/show_public_doc?2024cv1057-97-0

PLA Public Ruling

March ARB Project OVerview Liz Hershner Project Manager US Army Corps of Engineers Louisville District

March Air Reserve Base Location Approximately 1 hour southeast of Los Angeles. Located east of I-215.

March Air RESERVE base

AERIAL VIEW

LEGEND

1: Visitor’s Center/Main Gate

2: Projects Locations

OverView of W912QR24R0034 Projects

LEGEND

1: Construct KC-46A Two-Bay Maintenance/Fuel Cell Hangar

2: Add/Alt B1244 Fuselage Trainer (FUT)

3: Repair Ramp Mooring Points and Striping

Construct KC-46A Two-Bay Maintenance / Fuel Cell Hangar

PROJECT INFORMATION

SCHEDULE / MILESTONES

PROJECT STATUS

Project is currently in advertisement stage Bid could include multiple options Possible sites for optional laydown areas will be indicated in the bid documents; contractors will be responsible for utilities and environmental permitting associated with use

Description/Scope: This project includes demolition of the existing facilities, utilities and concrete ramp within the new hangar footprint. Construct one aircraft hangar (~156,585sf) to simultaneously accommodate one KC-46A aircraft in each bay. Includes personnel support area, storage areas for hazardous materials, tools, supplies, and equipment. Hangar area will be provided with fire suppression and fall protection systems. Also included are all associated utilities, site work, communication support and required permitting.
Project Delivery Method: Design-Bid-Build
Procurement Method: Full and Open / Source Selection Evaluation Board
Estimated Construction Duration: 1095 days (total contract duration)
Magnitude of Construction: $167M
PM: Liz Hershner
Current or Previous Solicitation Number: W912QR24R0034
MilestoneApproximate Date
Solicitation Restarted10 December 2024
Bids Due18 March 2025
Construction Contract AwardSummer 2025
Contractor Receives NTPTBD
Construction Completion DateTBD

Addition/alteration b1244 Fuselage trainer (Fut) and cargo pallet staging

PROJECT INFORMATION

SCHEDULE / MILESTONES

PROJECT STATUS

Project is currently in advertisement stage

Possible sites for optional laydown areas will be indicated in the bid documents; contractors will be responsible for utilities and environmental permitting associated with use

Description/Scope: Addition/Alteration to the exterior and interior of the building by demo/installing all necessary walls and reconfiguring the interior layout for office space, briefing rooms/classroom/ breakroom, communication room, maintenance parts room, restroom and shower facilities to allow for mission requirements. Replace roof, install HVAC connected to all spaces and fuselage training device, include fire suppression system required for Fuselage Trainer. Seal in existing hangar doors. Construct FUT covered outdoor storage area.
Project Delivery Method: Design-Bid-Build
Procurement Method: Full and Open / Source Selection Evaluation Board
Estimated Construction Duration: 1095 days (total contract duration)
Magnitude of Construction: $13.7M
PM: Liz Hershner
Current or Previous Solicitation Number: W912QR24R0034
MilestoneApproximate Date
Solicitation Restarted10 December 2024
Bids Due18 March 2025
Construction Contract AwardSummer 2025
Contractor Receives NTPTBD
Construction Completion DateTBD

KC-46A Repair ramp mooring points and paint

PROJECT INFORMATION

SCHEDULE / MILESTONES

PROJECT STATUS

Project is currently in advertisement stage

Possible sites for optional laydown areas will be indicated in the bid documents; contractors will be responsible for utilities and environmental permitting associated with use

Description/Scope: Provide 17,783 linear feet of pavement marking, as well as retrofit 32 tie-downs with static ground per Unified Facilities Criteria (UFC) 3-260-01 to accommodate the KC-46A aircraft on the South Ramp.
Project Delivery Method: Design-Bid-Build
Procurement Method: Full and Open / Source Selection Evaluation Board
Estimated Construction Duration: 1095 days (total contract duration)
Magnitude of Construction: $1.2M
PM: Liz Hershner
Current or Previous Solicitation Number: W912QR24R0034
MilestoneApproximate Date
Solicitation Restarted10 December 2024
Bids Due18 March 2025
Construction Contract AwardSummer 2025
Contractor Receives NTPTBD
Construction Completion DateTBD

Summary Register in SAM.gov to obtain and respond to solicitations Source Selection Evaluation Criteria are basis for selection by source evaluation boards Unrestricted solicitations require small business participation Two-Bay Hangar, FuT and Ramp Mooring Points projects are advertised as one construction contract New construction and renovation work expected over next several years.

B2245 Squadron Operations Renovation – SRM (FY25) B600 Flight Simulator Building Renovation – MILCON (FY25) B2303 Repair Administrative Area for Aero Repair Shop – SRM (FY25) B2327 Battery Shop Alteration – SRM (FY25) B2320 Hydraulics/Boom Shop Alteration – SRM (FY25)

Q&A image3.png image4.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image1.png image2.png image5.png image6.png

File details come from the government source that posted it. Updated .