W912QR24R0034-0003.pdf

PDF 2 MB Posted

Attached to
Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
Solicitation number
W912QR24R0034
Issued by

About this file

This is Amendment 0003 to solicitation W912QR24R0034 for Construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar at March ARB, CA. The amendment makes several key changes: (1) extends the proposal due date from March 18, 2025 to March 25, 2025 at 4:00 PM ET; (2) adds a second site visit as a result of changes to the evaluation criteria; (3) updates Wage Decision CA20240025 dated August 23, 2024 to Wage Decision CA20250025 dated February 7, 2025; and (4) revises Section 00 22 00 Evaluation Criteria by removing requirements related to Project Labor Agreement (removes Paragraph 2.5 Volume II – Tab F, Paragraph 4.1 Tab F Rating, Paragraph 9.6 Tab F), and clarifies page limitations.

The amendment provides detailed instructions for electronic proposal submission through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module and ProjNet bidder inquiry system. Proposals must be submitted in two volumes - Volume I containing technical factors (Past Performance, Risk Management Plan, Schedule Narrative, Small Business Participation Plan) and Volume II containing price and pro forma information. The target ceiling for contract award is $180 Million and the basis of award is Best Value Trade-Off, with all non-price factors combined being approximately equal to price.

View the file

Other files

File Type Posted
W912QR24R0034_KC-46A_Specs-0007.pdf PDF
W912QR24R0034_KC-46A_Plans-0006.pdf PDF
W912QR24R0034_B1244_Specs-0005.pdf PDF
W912QR24R0034_KC-46A_Specs-0005.pdf PDF
W912QR24R0034_B1244_Plans-0005.pdf PDF
W912QR24R0034_KC-46A_Plans-0005.pdf PDF
W912QR24R0034_B1244_Plans-0004.pdf PDF
W912QR24R0034_KC-46A_Specs-0004.pdf PDF
W912QR24R0034_B1244_Specs-0004.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0004.pdf PDF
Site Visit Sign-In Sheet 3.6.25.pdf PDF
Preproposal Conference - March ARB - 29 January 2025.pptx PPTX presentation
March ARB_Site Visit Sign-in Sheet.pdf PDF
W912QR24R0034-0002.pdf PDF
W912QR24R0034-0001.pdf PDF
W912QR24R0034_B1244_Specs_Vol3-0000.pdf PDF
W912QR24R0034_KC-46A_FFE-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol4-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_SID-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol1-0000.pdf PDF
W912QR24R0034_B1244_Plans-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol1-0000.pdf PDF
W912QR24R0034_KC-46A_Specs_Vol3-0000.pdf PDF
W912QR24R0034_B1244_SID-0000.pdf PDF
W912QR24R0034_B1244_Specs_Vol2-0000.pdf PDF
W912QR24R0034_KC-46A_Plans_Vol2-0000.pdf PDF
W912QR24R0034_B1244_FFE-0000.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See AMDT 0003 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

1 50

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0034

X 9B. DATED (SEE ITEM 11)

04-Sep-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

19-Feb-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0034-0003

W912QR24R0034

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003 CONTINUATION

Solicitation W912QR24R0034 for the Construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar at March ARB, CA is hereby modified as follows:

1. The proposal due date has been extended from 04:00 PM Eastern Time (ET) 18 March 2025 to 04:00 PM ET 25 March 2025.

2. A second Site Visit has been added as a result of the change to the Evaluation Criteria noted within Item 4 below. Please reference specific details within Site Visit Clause 52.236-27.

3. Wage Decision CA20240025, dated 23 August 2024, is hereby revised, and replaced in its entirety by Wage Decision CA20250025, dated 07 February 2025.

4. Section 00 22 00 EVALUATION CRITERIA has been replaced in their entirty:

Paragraph 2.5 Volume II – Tab F: Project Labor Agreement has been removed Paragraph 4.1 Tab F – Project Labor Agreement Rating has been removed Paragraph 6.1.1 NOTE: Page limitations have been clarified Paragraph 9.6 Tab F- Project Labor Agreement has been removed

5. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 18-Mar-2025 04:00 PM to 25-Mar-2025 04:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

ELECTRONIC PROPOSAL SUBMISSION

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED

ELECTRONICALLY THROUGH THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT

(PIEE) SOLICITATION MODULE. No paper copies, CD-ROMs or facsimile submissions will be accepted.

Electronic Proposal Submission is required through the PIEE-SOLICITATION MODULE (https://piee.eb.mil/).

Instructions for uploading proposals are as follows:

1. Register in PIEE:

a. Navigate to https://piee.eb.mil/

b. Select Register [top right]

c. Select Vendor

d. Create a User ID and Password and follow the prompts [next]

e. Create Security Questions [next]

f. Complete your User Profile Information [next]

g. Complete your Supervisor or Approving Official Information [next]

h. Complete Roles

i. Step 1. Select SOL-Solicitation

ii. Step 2. Select Proposal Manager

iii. Step 3. Click Add Roles

iv. Step 4. Fill in our Location Code (CAGE Code) [next]

i. Provide a justification for your registration [next]

j. Follow the remaining prompts to submit your registration

2. Log into PIEE and select the Solicitation Icon.

3. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status)

4. The search results display. Select the Solicitation Number link to open the solicitation.

5. The solicitation displays. The information is view only.

6. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.

7. Click the Offer tab to Add and review current offers on the Solicitation. Click the Add button to add an offer to the Solicitation.

8. Select the applicable Cage Code for which submitting the proposal for. The list is prefiltered based on the Cage in the Proposal Manager’s profile.

9. It is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

a. W912QR24R0034-FIRMNAME-VOLUME I

b. W912QR24R0034-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 foldouts, etc.)

will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion delivery time & date recorded within PIEE-Solicitation. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked). Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Nov 2021),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

10. Upload the attachments that comprise the proposal by selecting Choose Files link.

11. After entering all necessary information enter a Signature Date an Click the Signature button.

12. The Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and One Time Password (OTP). Click the Sign and Submit button to continue.

13. After successfully adding the Proposal a success message of the submission will be displayed and the proposal displayed collapsed. Users may expand and view all their proposals on a Solicitation.

The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or selfregister into system.

The Solicitation Number is: W912QR24R0034

The Bidder Inquiry Key is: 6C7HIN-X3EUB5

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your SecretQuestion.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs.

Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds is due No Later than (NTL) 4:00 PM 14 March 2025. No Government responses will be entered into the ProjNet system after 20 March 2025.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

06 March 2025 at 10:00 AM PT – There is a limit of 4 people per contractor and visitors Visitors are limited US Citizens and Legal Permanent Residents.

RSVP to Contract Specialist, Lindsay Lawrence at Lindsay.B.Lawrence@usace.army.mil NLT 4:00 PM PT on 27 February 2025. No late requests will be accepted.

Point of Contact (POC) at March, ARB is MAJ Eric Garcia, and he may be reached at the following phone number: (951) 707-7631. MAJ Garcia’s e-mail address is eric.garcia.26@us.af.mil.

(c) Participants will meet at—

March ARB Visitor’s Center - March Air Reserve Base, CA.

Site visit attendees will park at the visitor’s center and then be bussed to the site to conduct the site visit.

(End of provision)

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been modified:

EVALUATION CRITERIA

1. Overview.

1.1 The intent of this solicitation is to select one contractor for the Construction of a KC-46 Two-Bay

Maintenance/Fuel Cell Hangar. The project includes an addition/alteration to Bldg. 1244 for Fuselage Trainer (FUT) and Cargo Pallet Staging. Additionally, the project will involve the repair of ramp mooring points & re-striping. Construction includes personnel support areas and storage areas for hazardous materials, tools, supplies and equipment. Hangar area will provide fire suppression and a fall protection system. Construction will also include, but is not limited to, all associated utilities, site work, communication support, parking areas, secure airfield fencing, exterior lighting, landscaping and ramp pavement transitions. Construction contract will also include the demolition of an existing hangar located on the site. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

The Government will evaluate the proposals in accordance with the criteria described herein and award a firm-fixed-price contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

1.2 The basis of award is the Best Value Trade-Off Process. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.3 The target ceiling for contract award is $180 Million. Offerors are under no obligation to approach this ceiling.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror’s capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 All submissions to this proposal announcement shall be submitted electronically through the Procurement

Integrated Enterprise Environment (PIEE) no later than the time and date specified in Block 13 of Standard Form 1442. Please refer to and follow the instructions specified in the Electronic Proposal Submission Instructions, attached herein.

2.3 Offerors are required to submit a proposal electronically consisting of the information identified in paragraphs 2.4 and 2.5 below. The sections should parallel the submission requirements identified herein.

2.4 Volume I shall be submitted electronically in accordance with the Proposal Submission Instructions in

Section 00 21 00 and include the following information:

Volume I – Factor I: Past Performance

Volume I – Factor II: Risk Management Plan

Volume I – Factor III: Schedule Narrative

Volume I – Factor IV: Small Business Participation Plan

*NOTE: Failure to place the required submission information under the appropriate section may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit will not be evaluated.

2.5 Volume II shall be submitted electronically in accordance with the Proposal Submission Instructions in

Section 00 21 00 and include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers and

User/Customer will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance and Responsibility Review: Upon receipt of proposals the Government will conduct an initial screening to ascertain that each offeror has submitted all of the required information, including electronic media, in the quantities and format specified in the RFP. Followed by a review to determine that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The Government will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Risk Management Plan and Factor III – Schedule Narrative will be rated using Table 3 below. Factor IV – Small Business Participation Plan will be rated using Table 4 below.

3.2.3 Source Selection Advisory Council (SSAC) Review: The Government will review the evaluation results to ensure the evaluation process follows the evaluation criteria, and the ratings are appropriately and consistently applied. The Government will consolidate their advice and recommendations into a written comparative analysis and recommendation for use in selecting the offeror who represents the best value to the Government.

3.2.4 Price Evaluation: The Government will evaluate price proposals independent of the non-price evaluation.

The SSEB will not have access to price information until completion of the technical evaluation.

3.2.5 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All non-price factors, when combined, are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Volume/Factor Relative Order of Importance

Volume I – Factor I – Past Performance 1st

Volume I – Factor II – Risk Management Plan 2nd

Volume I – Factor III – Schedule Narrative 3rd

Volume I – Factor IV – Small Business Participation Plan 4th

Volume II - Price and Pro Forma Information

Tab A - Standard Form 1442 and Price Breakout Schedule Not Rated

Tab B - Joint Venture Agreement Not Rated

Tab C - Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability

Tab D - Pre-Award Information Not Rated

Tab E - Subcontracting Plan Acceptable / Unacceptable

4.2 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

TABLE 1

Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude eof effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

TABLE 2

Performance Confidence Assessments

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

TABLE 3

Combined Technical/Risk Rating Method

Adjectival Rating Description Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

TABLE 4

Small Business Ratings

Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.

Good Proposal indicates a thorough approach and understanding of the small business objectives.

Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet small business objectives.

4.3 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

7. Clarifications. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “PPIRS” or “FAPIIS.”

9. Discussion. Negotiations that take place after the competitive range is established during a competitive acquisition. The contracting officer conducts discussions with each offeror within the competitive range, and they are tailored to each offeror's proposal.

5.0 Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Submitted projects must be 85% completed to be considered substantially complete. Additionally, project descriptions must exhibit that enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project, can be used for its intended purposes, and can be verified through the project details and references provided. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size to this requirement shall include: A minimum of 100,000 SF of new construction and/or renovation inclusive of aircraft maintenance hangars and associated administrative spaces.

5.1.3 Projects considered similar in scope to this project shall include: New construction and/or renovation of large-frame, high-bay aircraft maintenance hangars (such as for C-17, KC-135, KC-46 or KC-10 aircraft) that include new construction and/or renovation of administrative areas (such as office space, briefing rooms, classrooms, communication rooms and restrooms/shower facilities) and associated features such as parking areas, utilities and civil site work.

5.1.4 The prime contractor must have self-performed at least 15 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.

5.1.5 Additional consideration may be given for individual projects submitted that contain the following features:

a) Previous experience with USACE, Air Force, Air Force Reserve Command, or DoD

b) Aircraft Hangars with a clear span of 400’-0” or above

c) Previous experience with Total Building Commissioning for a Maintenance/Fuel Cell Hangar (including HVAC systems, breathing air systems, and power generation)

d) Previous experience with USACE Transportation Center (TSC) coordination in obtaining approvals for and installation of airfield pavement

e) Previous experience with dewatering and/ or disposing of contaminated water (to include PFAS/PFOA) for a Federal agency

5.1.6 The following information shall be provided for each project:

a) Project Title, Location, and Contract Number/Unique Identifier

b) Current percentage of construction complete and the date it was or will be complete

a. For projects that are not yet complete, provide description of work remaining to be completed.

c) Scope of the project, to include purpose/use of facility

d) Size of the project, differentiate square footage of new construction versus renovation if the project includes both

e) Role of firm: Provide a description of the type of work performed and the percentage of work that was self-performed

f) Dollar value of the project

g) Customer primary point of contact (POC) and alternate POC (name, relationship to project, agency/firm affiliation, city, state, current and correct phone number, and current and correct email address)

5.1.7 For projects submitted under this factor, offerors must include any ratings (including Contractor

Performance Assessment Reporting System (CPARS) database ratings for federal projects submitted), letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire (PPQ) is attached for your convenience and is only required if a CPARS evaluation is not available for the submitted project. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. If providing a CPARS database rating, offerors are required to provide the complete CPARS evaluation, which includes the individual categorical ratings in addition to the supporting rating narratives. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).

5.2 Evaluation Criteria:

5.2.1 The Government will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the Government will determine how relevant a past project is when compared to the scope complexities, size, and magnitude of effort of the solicited project. For the purposes of this evaluation factor, “scope complexities” can be described as the technical performance characteristics which define the work completed on the project, and “magnitude of effort” can be described as the amount of self-performance effort expended to successfully perform the project. Additionally, in the computation of the individual project relevancy rating, the Government will consider any applicable additional consideration elements referenced in paragraph 5.1.5 above. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.

5.2.2 The Government will next evaluate how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review ALL past performance information retrieved through the CPARS database, using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.2.3 The Government will review all past performance information collected and determine the quality of the offeror’s performance (including any letters, awards, etc. provided), general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The Government will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the Government’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.

6.0 Volume I – Factor II: Risk Management Plan

6.1.1 Submission Requirements:

Provide a risk management plan narrative for the project that describes how your labor, resources, designers, subcontractors, and material suppliers will be managed, supervised, coordinated, and used to ensure successful completion of the project. The Risk Management Plan, at a minimum, shall include the following information:

Identify significant areas of risk and provide your plan for mitigating risk during contract performance.

Describe your process for managing, coordinating, and tracking changes that arise during construction.

Describe how you will manage, supervise and coordinate the subcontractors’ work and who in the organization will be responsible for this management and coordinate.

Describe your process for construction quality control and managing quality control during construction.

Describe the duties of the key project delivery staff (e.g., PM, Superintendent, CQCSM, SSHO) and how this team will work together to deliver the project.

Describe your process for commissioning including commissioning services or activities to be performed, commissioning documents to be provided, as well as your plan to mitigate risk associated with commissioning activities on the solicited project.

Provide an organizational chart for this project showing home office support, on-site management, and the responsible chain of command. JV offerors must show the respective areas of responsibility for each partner. Clearly delineate on-site from off-site personnel on the organizational chart. On-site Superintendent, Quality Control and Safety shall be included in the chart.

NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the narrative portion of this factor. Information submitted that exceeds the specified limit will not be evaluated.

There is a separate page limit of two (2) 11” x 17” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the bar chart portion of this factor.

6.1.2 Evaluation Criteria:

Risk Management Plan narratives will be evaluated based on the level of understanding of the work and the involvement the contractor will have in the management, oversight, control, and coordination of the work performed during construction of the project.

The offeror’s organizational chart will be evaluated based on the clarity, adequacy, and capabilities for successfully managing the solicited project.

7.0 Volume I – Factor III: Schedule Narrative

7.1 Submission Requirements:

Based on the project budget and scope, provide a schedule narrative describing the construction sequence/process for successful completion of the project including optional items referenced in FAR Clause 52.217-7 (Construction, Commissioning, and Close-Out) within the duration shown in FAR 52.211-

10. At a minimum, the Schedule Narrative shall address the timing and process(es) necessary to complete the key activities indicated below:

Pre-Construction Submittals and Government Review Submission of Initial Project Schedule Workforce Mobilization Activities Long Lead Items Mandatory Construction Tasks as outlined in the project specifications Key Permits as outlined in the project specifications SWPP and Site Work Commissioning Activities and Critical Submittals (Including, but not limited to, the high

Expansion Foam Suppression System requirements, Concrete Paving for Airfields and other Heavy-Duty pavements)

Project Closeout Planning and Coordination (including Red Zone Meeting) As-Builts

7.1.1 Additionally, offerors are to provide a simple bar chart that shows the sequencing of key construction activities indicated in paragraph 7.1 above, with references to specific durations (shown in calendar days) for each item.

NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the narrative portion of this factor.

There is a separate page limit of five (5) single sided, 11” x 17” (landscape) pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the bar chart portion of this factor.

7.2 Evaluation Criteria

7.2.1 The narrative will be evaluated based on the understanding of events identified in paragraph 7.1 above and the offeror’s methodology and capability to complete the project within the contract duration. Narratives that demonstrate a clear understanding of the sequencing/schedule impacts of the key activities and provide an exceptional approach with key project specific element references for successfully sequencing the work on the solicited project within the contract duration may be rated more favorably and considered by the Government in the best value determination.

7.2.2 The bar chart will be evaluated based on the offeror’s understanding of the appropriate sequencing and durations of the identified key construction activities.

NOTE: The Government will evaluate the offeror’s schedule using calendar days, not dates.

8.0 Volume I – Factor IV: Small Business Participation Plan

8.1 Submission Requirements

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN. The Small Business Participation Plan shall be based on the offeror’s best effort and is required to address each of the following areas individually:

The extent to which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;

The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e., teaming agreements signed, are to be considered more heavily than non-enforceable ones);

The complexity and variety of the work small firms are to perform on this acquisition;

The practicality of the Small Business Participation Plan, i.e., aggressive goals.

The Small Business Participation Plan shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business

(2) Percentage of your participation as a prime contractor: __________________ %

NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.

(3) Percentage of total contract value of subcontracts planned for:

% of Total Contract Value

Large % Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned % Small Service Disabled Veteran Owned %

Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.

NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.

(4) List principal supplies/services (be specific) to be subcontracted to:

Name of Company

Type of Service/Supply

Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone Small Veteran Owned Small Service Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.

(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

8.2 Evaluation Criteria:

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN.

The Small Business Participation Plan will be evaluated based on the offeror’s best efforts, the level of small business commitment that is being demonstrated for the proposed acquisition, and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of 20% of the total contract value (through collective small business participation from any type of small business or sub-category small business).

Pursuant to DFARS PGI 215.304(c), the following elements will be considered in evaluating an offeror’s Participation Plan:

The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;

The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);

The complexity and variety of the work such firms are to perform;

The realism of the plans;

Past performance of offerors in complying with the requirements of the Subcontracting Plan Goals for such firms and monetary targets for participation;

The extent of participation of such firms in terms of the proposed subcontracted value; and The extent to which the offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals to help ensure small business receives a fair proportion of DOD awards.

9.0 Volume II - Price and Proforma Information

9.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.

9.1.1 Submission Requirements:

The offeror shall complete and submit Standard Form 1442 and Section 00 10 00, Proposal Price Breakout Schedule. Both of these forms are included in Section 00 10 00 of this solicitation.

9.1.2 Price Analysis Government Review:

The price will be analyzed on the total price for the base proposal plus all options. The price will be evaluated by the Government for fairness and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or understated as indicated by the application of price analysis techniques. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government. Offerors are cautioned to distribute pricing appropriately.

9.2 Tab B – Joint Venture Agreements

9.2.1 Submission Requirements:

If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier with the proposal.

Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this…

This is the start of the file's text. The full file is on GovTribe.