W912PQ-11-C-0020.pdf

PDF 621 KB Posted

Attached to
Repair Squadron Operations, Bldg. 369
Solicitation number
W912PQ-11-B-0002
Issued by

About this file

Award Document

View the file

Other files

File Type Posted
Q A Bid Opening.pdf PDF
Bid Opening - 02 June 2011.pdf PDF
Q A Round 6.pdf PDF
Q A Round 5.pdf PDF
Amendment 2.pdf PDF
Q A Round 4.pdf PDF
W912PQ-11-B-0002-0001.pdf PDF
Q A Round 3.docx DOCX document
Addendum_001_20110517.pdf PDF
AD101.pdf PDF
AD102.pdf PDF
AD201.pdf PDF
A-201.pdf PDF
Q A Round 2.docx DOCX document
Q A Round 1.docx DOCX document
106 Pre Bid Conference 11 May 2011.pptx PPTX presentation
attendance sheet.pdf PDF
LEED Checklist.pdf PDF
Final Specifications.pdf PDF
Telecommunications.zip ZIP file
Mechanical.zip ZIP file
Structural.zip ZIP file
W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf PDF
General.zip ZIP file
Electrical.zip ZIP file
Fire_Protection.zip ZIP file
Existing_Dwgs_Reference_Only.zip ZIP file
Landscaping.zip ZIP file
Civil.zip ZIP file
Architectural.zip ZIP file
Plumbing.zip ZIP file
Wage Determinations - April 22 2011 - Mod 14.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F9E7CE1173A001

WKVB000617 - Repair Squadron Operations, Bldg. 369

Construction Contract for project WKVB000617, Repair Squadron Operations, Bldg. 369 at the 106th Rescue Wing, F.S. Gabreski Air National

Guard Base NY. Work w ill be performed in accordance w ith plans and technical specif ications. This project is being solicited as a total small business set-aside. The North American Industry Classif ication (NAICS) Code is 236220 and the Size Standard for Small Business is $33.5M of average annual receipts for the past 3 years. Project Magnitude is betw een $1M and $5M. Persons intending on submitting a BID should attend the Pre-Bid Conference and Site Visit. Failure to submit a bid on all items shall result in rejection of the bid. Solicitation and all information, notices, amendments for this solicitation w ill be posted at http://w w w .fbo.gov . Include if applicable. Instructions for obtaining

Plans for this solicitation are located in Section 00100. Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.

X

FRED RODRIGUEZ 631 723 7562

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jul-2011

(RFP)

(IFB)

CALL:

Repair Squadron Operations, Bldg. 369

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Jun 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

W912PQ-11-C-0020

7. ISSUED BY CODE

106 NEW YORK AIR NATIONAL GUARD

106 MSG/MSC - WAWF W912PQ

150 RIVERHEAD ROAD

WESTHAMPTON BEACH NY 11978-1201

W912PQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

WKVB000617

8. ADDRESS OFFER TO (If Other Than Item 7)

631 723 7569FAX:TEL: 631 723 7562 TEL: FAX:

W912PQ-11-B-0002-0002 58

See Item 7

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE

5PR12

FACILITY CODE

5PR12

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

$4,628,700.00 See Schedule

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified) 1

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE F6710027. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

F67100 - DFAS - LIMESTONE

DFAS - BAASD/CC TEL# 800-756-4571

P.O. BOX 369020 WAWF CODE: F67100

BLDG #21 - MAILROOM

COLUMBUS OH 43236-9024

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR

E. AMANTI & SONS, INC.

TOM AMANTI

390 HIGHLAND AVE

SALEM MA 01970-1745

15. TELEPHONE NO. (Include area code)

978-745-4144

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

X 29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: BID RECEIVED 6/2/2011

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print) FRED RODRIGUEZ / CONTRACTING OFFICER

TEL: 631 723 7562 EMAIL: fred.rodriguez@ang.af.mil

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY 03-Aug-2011

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PQ-11-C-0020

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 $0.00

BASE BID FOR WKVB000617

FFP

Non personal services: Provide all plant, labor, new and current material, transportation, , tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to renovate an existing 26,180 SF facility in accordance with specs dated 27 April 2011 and drawings dated 27 April 2011.

FOB: Destination

SIGNAL CODE: A

NET AMT $0.00

0001AA 1 Lump Sum $2,009,908.00 $2,009,908.00 Sustainment Repair

FFP

To include but not limited to roof replacement, Heating, cooling ,and system ventilation replacement, electrical building service, transformer, and distribution system replacement, carpet & ceiling tile replacement, painting, wall coverings, Communications systems distribution systems.

MILSTRIP: F9E7CE1173A001

PURCHASE REQUEST NUMBER: F9E7CE1173A001

SIGNAL CODE: A

NET AMT $2,009,908.00

ACRN AA

CIN: F9E7CE1173A0010001AA

$2,009,908.00

0001AB 1 Lump Sum $2,618,792.00 $2,618,792.00 Restoration & Modernization repair

FFP

To include but not limited to AT/FP windows and doors, AF/FP standoffs including parking lot, curbing & drainage repair, paving, storm drainage system repair, DDC

& Smart Meters, sprinkler system, Fire Alarm system with Mass notification, Interior Carpentry walls & floor plan, All LEED required components, landscaping, emergency generator electrical system distribution, efficient insulation wall & roof.

Communications rooms HVAC equipment, lockers, ADA compliant plumbing systems and fixtures.

FOB: Destination

MILSTRIP: F9E7CE1173A001

PURCHASE REQUEST NUMBER: F9E7CE1173A001

NET AMT $2,618,792.00

ACRN AB

CIN: F9E7CE1173A0010001AB

$2,618,792.00

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0001AA 28-SEP-2012 1 F9E7CE - 106 CES

CAPT JEFFREY SABATINI-(631)723-7435

150 RIVERHEAD ROAD

BLDG. 250, BASE SUPPLY RECEIVING

FRANCIS S. GABRESKI AIRPORT (ANG)

WESTHAMPTON BEACH NY 11978-1201

631-723-7440

F9E7CE

0001AB 28-SEP-2012 1 (SAME AS PREVIOUS LOCATION)

F9E7CE

TABLE OF CONTENTS

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00010 - BID SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project #WKVB000617 Dated 27 April 2011

ATTACHMENT 2 – WAGE DETERMINATION NY100013, Mod 21 dated 07/29/2011 NY13.

Amendments 1 and 2 and all changes made by the amendments are incorporated into award.

Questions and Answers:

Pre-Bid Questions & Answers:

1) Equipment Storage that is called out on plans, what are we doing with it?

a. Answer: The contractor shall be responsible to protect in place, or remove and relocate within the building, or provide onsite storage for existing building equipment and furnishings item number 4

& 5 on sheet AD101 at his/her own expense. An amended drawing AD101 will be issued to clarify these items and other items to be salvaged and stored by the owner.

2) Will security coming onto the Base be that same as it was for us?

a. Answer: Yes, all contractors and subcontractors will have to provide detailed information and allow vehicles to be searched at the Security Forces discretion.

3) Are there water flow tests for the sprinkler system?

a. Answer, yes, see the project specifications, and a copy will be made available to the successful contractor.

4) Is there a basement or crawl space under building # 369

a. Answer: No

5) What is the existing roof made of?

a. Answer: the existing roof is a ballasted EPDM roof.

6) Is there special consideration for veteran owned business?

a. Answer: No, not for this bid.

7) Does the building have any skylights?

a. Answer: No.

8) Does the site have lawn sprinklers?

a. Answer: Yes, and the contractor is required to protect and leave in place the existing sprinkler system.

9) What are we doing with the Communication Tower on the rear of the building?

a. Answer: As stated on the plans.

10) Where is the contractor’s lay down area?

a. Answer: The contractor’s lay down area is within the fenced project site as called out on the plans.

11) Are we doing anything to the large airfield exterior lights on poles?

a. Answer: No, replacement of these lights are not in your contract; however the contractor is responsible for protecting the power feed and reconnecting the switch in the renovated building for these lights.

12) Who is providing the new 500KVA transformer?

a. Answer: The contractor is providing and installing the new 500kva transformer. LIPA must approve the type of transformer to be installed.

13) Is the emergency generator replacement part of this project?

a. Answer: The contractor is NOT replacing the emergency generator, however, the contractor is responsible for reconnecting the generator and testing it as part of the project plans and specifications.

14. Who is responsible for the fire service line and Back flow device?

a. Answer: The successful contractor

15. Is filing with the local fire marshal required? or is the National Guard reviewing and approving drawings and performing their own final inspections?

a. The local Fire Marshall, Base Fire Marshall, the Engineer of Record, and the National Guard will be reviewing and approving the fire sprinkler system shop drawings and calculations.

16. Is there any area that might require Galvanized pipe and or explosion proof components?

a. No, not for the fire sprinkler system. See the design documents for the specifications on other systems in the building.

17. A flow test would help to determine pipe sizing and the possibility of a fire pump. Is, or will there be a test performed by others before our bid is due?

a. Answer: Yes a flow test was performed, see drawing notes on FX101.

18. Are the fire sprinkler sub contractors required to obtain any bonds. If so, please advise which one and the amount. Bid Bond, Performance Bond.

a. Answer: The Guard is requiring from only the Prime Contractor the bid, performance, and payment bonds.

19. Please confirm the scope in this bid solicitation for work related to the radio tower structure. Please confirm any scope for communication wiring or any other wiring structures associated with it?

a. Answer: Antenna tower and all associated hardware & cabling are to be removed and disposed by the General Contractor. This scope of work will be spelled out on a revised drawing sheet AD101 to be issued this week which will be the controlling contract document for work on the tower.

20. Please confirm there is no scope for communication wiring and devices throughout the building? Only raceways to be provided in locations indicated on the electrical drawings?

a. Answer: The complete scope of Communications is described in the Telecommunications part of the drawings and specifications. See Drawings T-001 through T-601 of the Design Documents.

21. Please confirm the scope for this contract in rooms 171 & 162 ?

a. Answer: The detailed scope of work in rooms 162 & 171 is included in the Design Documents.

b.

22. The aluminum framing details indicate a 7" deep front-glazed "curtain wall" system, while spec section

084113 indicates a 5" deep center glazed "storefront" system. Please clarify.

Answer: In this project what is important is not the depth of the frame, satisfying all the AT/FP requirements listed on section 084113. In our basis of design the manufacturer and model selected satisfies all the requirements. Other manufacturers might need a 7 inch frame to satisfy the AT/FP requirements. Both 5 and 7 inch frames will satisfy the design intent for the project. As always there are other items around the opening such as the simulated stone sill, the drywall around the jambs and the head that will need to be adjusted depending on the selected frame depth.

23. Sheet LP-401 shows 95 Cinquefoil, however this plant is not indicated on Plant Schedule on sheet LP-501.

What size is the Cinquefoil?

Answer: Delete the 95 Cinquefoil from Sheet LP-401.

24. Sheet LP-401 indicates steel edging - what size is the steel edging - height and thickness?

Answer: Para. 2.9.A.1 of spec 329300 PLANTS states the edging is 1/8" wide and 4" in height and can be black or green.

25. Could a one-week extension be granted for this project?

Answer: No, currently the bid due date remains as indicated in the solicitation.

26. Is project exempt from payment of state, county and/or local sales & use taxes?

Answer: Yes as per Federal Acquisition Regulation clause 52.229-3 that is listed in the solicitation.

27. Spec 010001 General Conditions. Para. 1.10 (Page 7); is contractor responsible or is project exempt from local and state permits?

Answer: All required Base and non-Base permitting is the responsibility of the Contractor, however before taking any steps or making contact with outside agencies the contractor shall meet and plan with the ANG BCE / his agents.

The contractor shall secure and pay for any and all required permits, fees, licenses and inspections necessary for the proper execution of the work in compliance with all highest standards, rules, codes, regulations, guidance and laws having jurisdiction.

28. Will existing loose furnishings and stored items and equipment be removed from structure prior to construction start?

Answer: See project Questions & Answers previously answered on this project.

29. Have existing structure and site been surveyed for hazardous materials and/or equipment content? Is hazmat abatement and/or special work precautions required on this project?

Answer: See Section 024119, Paragraph 1.9 Field Conditions, Subparagraphs D and D.1

30. Drawing AD201, Key Note 4 outlines removal and replacement of existing deteriorated roof blocking, what is quantity and description for this replacement?

Answer: Quantity is unknown at this point. Include 150 LF with bid and provide unit price per LF that will be used for both credit or debit to the Government.

31. Drawing AD101, Key Note 15; will slab on grade (SOG) patching be required at the CMU wall removal?

Answer: Yes If slab is damaged during the CMU removal.

32. Spec 015000 Temp. Facilities & Controls, Para. 1.4 (Page 1); Use Charges states contractor shall pay for and

Solicitation (page 41 of 58) article 8 Utilities states "utilities are adequate and will be furnished to the contractor without charge...". Confirm solicitation is correct.

Answer: Contractor will not be charged for utilities.

33. Drawing P101, new sanitary line south of column 28 does not appear on AD101 and S101 drawings for concrete work required, please review, confirm and correct AD101.

Answer: Slab demolition is required for all new underground plumbing. Extend of demolition depends on General

Contractor's means and methods of pipe installation. Drawing S101 should be used as a reference and suggestive of the extend of demolition. All repairs must follow detail 10/S 501

34. Drawing P101, Key Notes 8 & 9; what is the concrete scope required by these notes? Is sanitary piping being cut back and sealed below SOG? What is corresponding concrete repairs and detail, if required?

Answer: All pipes must be cut and sealed below concrete floor slab. All repairs must follow detail 10/S 501

35. Drawing S-101 SOG replacement detail 10/S501 (we assume these relate to SD101 Key Note 2 for below slab sanitary runs), east of column 31, west of column 13 & 25,north of column 39 & 40 and south of column 17 that do not appear on AD101 demolition drawing, please review, confirm and correct.

Answer: Correct assumption

36. Drawing S-101 (& AD-101 Key Note 25) outlines SOG removal and replacement for stage at Main Briefing.

Drawings differ and that shown on AD-101 is not correct, please review and advise.

Answer: Drawing S 101 is controlling document

37. On drawing S-101, south of column 15 & 16 I a note "10/S-501". We assume this relates to SOG replacement right, please review, confirm and correct.

Answer: Correct assumption

38. Drawing A-501 detail 8 note says to carry the Gyp. Bd. to the deck above but detail shows it carried just above ceiling. Which is correct?

Answer: Gyp Board should go above ceiling

39. Drawing AD101 right side of vestibule 1 shows walls being demolished. Drawing A-101 at vestibule 142 shows the walls as remaining. Which is correct?

Answer: Walls are to remain

40. Drawing FX101, Key Note 2; shows a New Fire Service which will require slab on grade demolition not shown on AD101 drawings, what is patching detail of concrete at this location?

Answer: All repairs must follow detail 10/S 501

41. Drawing E601, Key Note 18, 3/E601 Enlarged Electric Room 152 Plan; CT Cabinet Pad appears to be external of building, what are construction details for this pad?

Answer: Cabinet could be either wall mounted or pad mounted, coordinate with local power company LIPA. Pad, if needed should be 6 inches of 3000 psi concrete with wire welded mesh on top of lean concrete down to frost line.

Coordinate size of pad and size of cabinet with LIPA.

42. Areas shown on drawing S101 exceed that required for plumbing under slab pipe installation, can demolition be limited to that need to install pipe or are large areas to be removed as outlined? If minimal demolition can be used what is the detail?

Answer: Slab demolition is required for all new underground plumbing. Extend of demolition depends on General

Contractor's means and methods of pipe installation. Drawing S101 should be used as a reference and suggestive of the extend of demolition. All repairs must follow detail 10/S 501

43. Spec 042000 Unit Masonry, Para. 2.3.c Fabric – Match Existing; are records exist of brick used during original construction? Could a brick manufacturer be provided?

Was colored mortar used to bed exiting brick?

Answer: Contractor shall provide current manufactured samples for BCE approval for use. Contractor may be required to build a mock-up wall for Base review and approval prior to work being performed on the building.

44. Spec 105626, Mobile Storage Shelving (page 7) Para. 3.2.B; outlines an underlayment system to conceal tracks, what are details for this underlayment and it's composition or material?

Answer: Dave this Government furnished equipment, can you provide information on the equipment to the GC??

45. Spec 126100, Fixed Audience Seating; this section outlines new seating. Is seating new or existing removed and reinstalled per drawings? Are existing seats to be reconditioned and if so what is the scope outline?

Answer: Delete Section. See project Questions & Answers previously answered on this project.

46. Section 015000, 2.2, Field offices, "Common-use field office." Is this a separate field office in addition to the

General Contractors field office to be used for common use, or is this common-use field office referring to the

General Contractors field office?

Answer: As long as the General Contractor's Field Office satisfies the requirements under 2.2 and is accessible to construction personnel, no other Field Office is required.

22. Section 015000-4, 3.2, Telephone Service. is the General Contractor responsible for the costs of the telephone utility service or just the costs for providing equipment & setting up the telephone lines?

Answer: See project Questions & Answers previously answered on this project.

47. Is there a pattern diagram for the floor finish in room #130 for VCT-1 & VCT-2?

Answer: Room 130 floor: Random pattern with a ratio of 1/10, which means for every 10 field tiles they should install one accent tile. VCT 1 is the field, VCT 2 is accent.

48. Drawings are unclear as to the tube steel being galvanized or other. Please clarify.

Answer: See S-102, General Note 1, All steel shall be painted per specifications; S-101, Structural Steel, Note 11, Painting of structural steel is required for any exposed steel. Also see specification sections 099113 for Exterior

Paint and 099123 for Interior Paint; see the Painting Schedules for Steel Substrates in the specifications.

49. Do you require engineer stamped drawings and calculations for steel?

Answer: See Drawing S-101, Structural Steel, Note 12. Any connection that is not shown or is not completely detailed on the structural drawings shall be designed by a registered structural engineer in the state where the project is physically located, retained by the fabricator. Provide calculations for all connection design duly sealed by a registered engineer in the state where the project is physically located for approval by E.O.R.

26. In the materials schedule areas getting wall covering (WC-1 & WC-2)in pattern / finishes it says that it’s a horizontal layout. Does this mean the wall covering to be installed railroad or a regular install of up and down?

Answer: Whichever way the roll needs to be installed to accomplish a horizontal pattern

50. Is this project tax exempt?

Answer: See answer to question 26.

51. What is the procedure for getting a crane onto the base?

Answer: Coordinating the delivery with the Base Civil Engineer (BCE) and the Suffolk County Airport manager in accordance with FAA regulations. All crane booms shall be lowered at the end of each day.

52. Specification 10400 - PROJECT CORDINATION

Specification section 1.5 CONTRACTOR’S STAFF - A) Contractor's project manager, B) Contractor's quality control manager, C) superintendent, D) Construction Quality control Manager, E) Contractor's sub contract manager, and E) Safety manager.

Can our competent onsite Superintendent/Project Manager perform all above responsibility? If not, how many on-site project staff personnel are you looking for?

Answer: Depending on qualifications we are expecting a Job Superintendent, a quality control, and a safety Manager.

If qualified the quality control and safety Manager can be the same person. The rest of the required personnel must be assigned to the project but do not have to be on-site on a full time basis, only as necessary in order to perform their duties.

53. Is there any asbestos abatement or any other hazardous material involve in existing building?

Answer: See Section 024119, Paragraph 1.9 Field Conditions, Subparagraphs D and D.1

54. Is there any contamination in existing soil for parking lot demo?

Answer: None known to the Government.

55).Specification 10050-3 special conditions - Which permits are required for constructions?

Answer: None are required.

56. Drawing C-501 section 8 (Asphalt pavement section)

Drawing call for new 6" compacted sub grade, 6" aggregate base, 2" asphalt base and 2" asphalt top. So we are removing 16" of asphaltic pavement.

Drawing CD-101 call for removal of asphalt pavement.

What is the existing asphalt pavement thickness? Is there any concrete under the asphalt?

Should new pavement match existing grade?

Answer: The compacted sub grade is not new, contractor needs to re-compact existing sub grade, provide new 6‖ aggregate base with 2‖ of asphalt base and 2‖ of asphalt top.

Based on the original drawings:

1. There is no information on the thickness of the existing pavement

2. There are no concrete items under the asphalt

3. New pavement shall match existing grade

57. Drawing A-301 building section 2/A-101, We could not find detail 1/A-304 and 3/A-303. Please advise.

Answer: Disregard markings on Sheet A-301

58. Drawing A-611, Window types W-3 to W-7 shows to match existing openings. However we found width of windows from "existing drawing for reference only", but we could not see height of windows. Please advise.

Answer: They can be found in the existing drawings A-7 and A-8

Windows W-3 and W-7 are the same 4’-4 ½‖ M.O., W-4 is 5’-3‖ M.O., and Windows W-5 and W-6 are 7’-10 ½‖

M.O.

59. Drawing A-101, General note number 2 says paint all exposed steel.

Do we have to paint existing all steel or only new steel we installed?

Answer: Paint all new steel and follow room finish schedule where there is exposed ceiling that requires paint.

60. Drawing C-501 section 16, Please clarify top and bottom elevation of segmental retaining wall.

Answer: Top elevation of retaining wall is at 53.00 (3’-0‖ above finished floor), Bottom varies (see existing grading on C-101 and building elevations A-201)

61. What is height of the segmental block wall that makes up the raised planter around the building ?

Answer: Normal 8" block

62. Please confirm the scope of work related to column footing, foundation, In reference to structural drawing S-

101 in the general note #1 say comprehensive strength for footings and foundations should be 4000 PSI, we don’t see the foundation footings details for column So please clarify?

Answer: There are no new footings, the note is in reference to the work in the Auditorium 2.

63. As Per structural drawing S-101 there are 29 columns given inside the building and in existing wall, do we have to do something with those columns? (it shows dotted line) and in the legend note indicates existing columns, is there any new columns which we have from the foundation so please clarify?

Answer: There are no new columns

64. Can you tell us how old the existing electrical transformer is? The age of the transformer will help determine whether or not it may carry PCB’s.

Answer: The existing transformer is a brand new one installed in 2010. It will have to be replaced under the new project.

65. In lieu of deflection runner and clips may we substitute a slotted deflection top track similar to Marino-Ware slotted slip track?

Answer: HEAD OF WALL DEFLECTION, We see no issue with substituting this slotted deflection channel as long as it is properly fire-stopped (slots allow air movement) and/or sound-proofed as required at certain partition types.

66. Detail 4-A503 indicates to ‖provide and install ceiling bracing per manufacture for seismic category B‖ Detail

8-A503 indicates attachment clips and stabilizer bars at perimeter. Armstrong and the IBC says related to Category

B, ―ceiling installation should conform to basic minimums established in ASTM C636

Answer: ACOUSTIC CEILING INSTALLATION, ASTM C636 should be followed for seismic zone 'B' and thus no extra bracing is required

Post Bid Opening Question:

Q: How can a bidder modify his bid shortly before the bid opening and not adjust his bid bond which had to be presented as an original document prior to the bid opening.

A: Under the Federal Acquisition Regulation (FAR) 28.101-4(c)(2) there is an exception to the solicitation requirements on the bid bonds which allows the Government to accept the bid even though the bid bond is not accurate:

Subpart 28.1 -- Bonds and Other Financial Protections

28.101-4 -- Noncompliance with Bid Guarantee Requirements.

(c) Noncompliance with a solicitation requirement for a bid guarantee shall be waived in the following circumstances unless the contracting officer determines in writing that acceptance of the bid would be detrimental to the

Government’s interest when --

(2) The amount of the bid guarantee submitted is less than required, but is equal to or greater than the difference between the offer price and the next higher acceptable offer;

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUL 2004

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984

52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000

52.204-7 Central Contractor Registration APR 2008

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

DEC 2010

52.209-8 (DEV) Updates of Information Regarding Responsibility Matters

(Deviation)

OCT 2010

52.211-13 Time Extensions SEP 2000

52.214-26 Audit and Records--Sealed Bidding OCT 2010

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -

Modifications - Sealed Bidding

OCT 2010

52.214-28 Subcontracting Certified Cost Or Pricing Data--

Modifications--Sealed Bidding

OCT 2010

52.215-10 Price Reduction for Defective Certified Cost or Pricing Data OCT 2010

52.219-6 Notice Of Total Small Business Set-Aside JUN 2003

52.219-8 (DEV) Utilization of Small Business Concerns (DEVIATION) MAY 2004

52.219-14 Limitations On Subcontracting DEC 1996

52.222-1 Notice To The Government Of Labor Disputes FEB 1997

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification JAN 2009

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

DEC 2007

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003

52.223-6 Drug-Free Workplace MAY 2001

52.223-14 Toxic Chemical Release Reporting AUG 2003

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets SEP 2009

52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995

52.228-14 Irrevocable Letter of Credit DEC 1999

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes APR 2003

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.232-17 Interest OCT 2010

52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984

52.232-27 Prompt Payment for Construction Contracts OCT 2008

52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration

OCT 2003

52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-4 Physical Data APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Items DEC 2010

52.245-1 Alt I Government Property (Aug 2010) Alternate I AUG 2010

52.245-9 Use And Charges AUG 2010

52.246-12 Inspection of Construction AUG 1996

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (May 2004) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

JAN 2009

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007

252.204-7008 Export-Controlled Items APR 2010

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2006

252.211-7007 Reporting of Government-Furnished Equipment in the DoD

Item Unique Identification (IUID) Registry

NOV 2008

252.215-7000 Pricing Adjustments DEC 1991

252.219-7003 Alt I Small Business Subcontracting Plan (DoD Contracts)(OCT

2010) Alternate I

OCT 2010

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010

252.223-7001 Hazard Warning Labels DEC 1991

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 1993

252.225-7012 Preference For Certain Domestic Commodities JUN 2010

252.227-7033 Rights in Shop Drawings APR 1966

252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

MAR 2008

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7005 Airfield Safety Precautions DEC 1991

252.236-7007 Additive or Deductive Items DEC 1991

252.242-7004 Material Management And Accounting System JUL 2009

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment MAR 1998

252.244-7000 Subcontracts for Commercial Items and Commercial

Components (DoD Contracts)

NOV 2010

252.247-7023 Transportation of Supplies by Sea MAY 2002

252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of NGB-PARC and shall not be binding until so approved.

(End of clause)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(JUL 2010)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by a Contractor to furnish supplies or services (including construction) for performance of a prime contract, but excludes supplier agreements with vendors, such as long-term arrangements for materials or supplies that would normally be applied to a Contractor's general and administrative expenses or indirect cost.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting

Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds

$10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the

Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c)(1) Unless otherwise directed by the contracting officer, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, (and any modifications to these subcontracts that change previously reported data), the Contractor shall report the following information at http://www.fsrs.gov for each first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

http://www.fsrs.gov/ http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fsrs.gov

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(2) By the end of the month following the month of a contract award, and annually thereafter, the Contractor shall report the names and total compensation of each of the five most highly compensated executives for the Contractor's preceding completed fiscal year at http://www.ccr.gov, if--

(i) In the Contractor's preceding fiscal year, the Contractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(3) Unless otherwise directed by the contracting officer, by the end of the month following the month of a first-tier subcontract with a value of $25,000 or more, and annually thereafter, the Contractor shall report the names and total compensation of each of the five most highly compensated executives for each first-tier subcontractor for the subcontractor's preceding completed fiscal year at http://www.fsrs.gov, if--

(i) In the subcontractor's preceding fiscal year, the subcontractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.ccr.gov http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.sec.gov/answers/execomp.htm http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.fsrs.gov

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(d)(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards to that subcontractor.

(e) Phase-in of reporting of subcontracts of $25,000 or more.

(1) Until September 30, 2010, any newly awarded subcontract must be reported if the prime contract award amount was $20,000,000 or more.

(2) From October 1, 2010, until February 28, 2011, any newly awarded subcontract must be reported if the prime contract award amount was $550,000 or more.

(3) Starting March 1, 2011, any newly awarded subcontract must be reported if the prime contract award amount was

$25,000 or more.

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (JAN 2011)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information

System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the Central Contractor Registration database at http://www.ccr.gov.

(b)(1) The Contractor will receive notification when the Government posts new information to the Contractor's record.

(2) The Contractor will have an opportunity to post comments regarding information that has been posted by the

Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3)(i) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of

Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

(ii) As required by section 3010 of Public Law 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.sec.gov/answers/execomp.htm

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than three hundred and sixty five days (365) calendar days. The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,139.10 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the

Administrative Contracting Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall--

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.

The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .