Q A Bid Opening.pdf
PDF 129 KB Posted
- Attached to
- Repair Squadron Operations, Bldg. 369
- Solicitation number
- W912PQ-11-B-0002
About this file
Question and Answer from Bid Opening
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-11-C-0020.pdf | ||
| Bid Opening - 02 June 2011.pdf | ||
| Q A Round 6.pdf | ||
| Q A Round 5.pdf | ||
| Amendment 2.pdf | ||
| Q A Round 4.pdf | ||
| W912PQ-11-B-0002-0001.pdf | ||
| Q A Round 3.docx | DOCX document | |
| Addendum_001_20110517.pdf | ||
| AD101.pdf | ||
| AD102.pdf | ||
| AD201.pdf | ||
| A-201.pdf | ||
| Q A Round 2.docx | DOCX document | |
| Q A Round 1.docx | DOCX document | |
| 106 Pre Bid Conference 11 May 2011.pptx | PPTX presentation | |
| attendance sheet.pdf | ||
| LEED Checklist.pdf | ||
| Final Specifications.pdf | ||
| Telecommunications.zip | ZIP file | |
| Mechanical.zip | ZIP file | |
| Structural.zip | ZIP file | |
| W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf | ||
| General.zip | ZIP file | |
| Electrical.zip | ZIP file | |
| Fire_Protection.zip | ZIP file | |
| Existing_Dwgs_Reference_Only.zip | ZIP file | |
| Landscaping.zip | ZIP file | |
| Civil.zip | ZIP file | |
| Architectural.zip | ZIP file | |
| Plumbing.zip | ZIP file | |
| Wage Determinations - April 22 2011 - Mod 14.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: How can a bidder modify his bid shortly before the bid opening and not adjust his bid bond which had to be presented as an original document prior to the bid opening.
A: Under the Federal Acquisition Regulation (FAR) 28.101-4(c)(2) there is an exception to the solicitation requirements on the bid bonds which allows the Government to accept the bid even though the bid bond is not accurate:
Subpart 28.1 -- Bonds and Other Financial Protections
28.101-4 -- Noncompliance with Bid Guarantee Requirements.
(c) Noncompliance with a solicitation requirement for a bid guarantee shall be waived in the following circumstances unless the contracting officer determines in writing that acceptance of the bid would be detrimental to the Government’s interest when --
(2) The amount of the bid guarantee submitted is less than required, but is equal to or greater than the difference between the offer price and the next higher acceptable offer;