LEED Checklist.pdf

PDF 32 KB Posted

Attached to
Repair Squadron Operations, Bldg. 369
Solicitation number
W912PQ-11-B-0002
Issued by

About this file

LEED Checklist

View the file

Other files

File Type Posted
W912PQ-11-C-0020.pdf PDF
Q A Bid Opening.pdf PDF
Bid Opening - 02 June 2011.pdf PDF
Q A Round 6.pdf PDF
Q A Round 5.pdf PDF
Amendment 2.pdf PDF
Q A Round 4.pdf PDF
W912PQ-11-B-0002-0001.pdf PDF
Q A Round 3.docx DOCX document
Addendum_001_20110517.pdf PDF
AD101.pdf PDF
AD102.pdf PDF
AD201.pdf PDF
A-201.pdf PDF
Q A Round 2.docx DOCX document
Q A Round 1.docx DOCX document
106 Pre Bid Conference 11 May 2011.pptx PPTX presentation
attendance sheet.pdf PDF
Final Specifications.pdf PDF
Telecommunications.zip ZIP file
Mechanical.zip ZIP file
Structural.zip ZIP file
W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf PDF
General.zip ZIP file
Electrical.zip ZIP file
Fire_Protection.zip ZIP file
Existing_Dwgs_Reference_Only.zip ZIP file
Landscaping.zip ZIP file
Civil.zip ZIP file
Architectural.zip ZIP file
Plumbing.zip ZIP file
Wage Determinations - April 22 2011 - Mod 14.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name:

Project Address:

Yes ? No

8 18 SUSTAINABLE SITES 26 Points

Y Prereq 1 Construction Activity Pollution Prevention Required 1 Credit 1 Site Selection 1

5 Credit 2 Development Density and Community Connectivity 5 1 Credit 3 Brownfield Redevelopment 1 6 Credit 4.1 Alternative Transportation - Public Transportation Access 6

1 Credit 4.2 Alternative Transportation - Bicycle Storage and Changing Rooms 1 3 Credit 4.3 Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 Alternative Transportation - Parking Capacity 2

1 Credit 5.1 Site Development - Protect or Restore Habitat 1 1 Credit 5.2 Site Development - Maximize Open Space 1 1 Credit 6.1 Stormwater Design - Quantity Control 1 1 Credit 6.2 Stormwater Design - Quality Control 1 1 Credit 7.1 Heat Island Effect - Nonroof 1

1 Credit 7.2 Heat Island Effect - Roof 1 1 Credit 8 Light Pollution Reduction 1

Yes ? No

8 2 WATER EFFICIENCY 10 Points

Y Prereq 1 Water Use Reduction Required 4 Credit 1 Water Efficient Landscaping 2 to 4

Reduce by 50% 2 4 No Potable Water Use or Irrigation 4

2 Credit 2 Innovative Wastewater Technologies 2 4 Credit 3 Water Use Reduction 2 to 4

Reduce by 30% 2 Reduce by 35% 3

4 Reduce by 40% 4

Repair Squadron Operations Buiilding #369 NY ANG F.S. Gabreski Airport, NY

LEED 2009 for New Construction and Major Renovation Project Checklist

4 Reduce by 40% 4

11 24 ENERGY & ATMOSPHERE 35 Points

Y Prereq 1 Fundamental Commissioning of Building Energy Systems Required Y Prereq 2 Minimum Energy Performance Required Y Prereq 3 Fundamental Refrigerant Management Required 6 13 Credit 1 Optimize Energy Performance 1 to 19

Improve by 12% for New Buildings or 8% for Existing Building Renovations 1 Improve by 14% for New Buildings or 10% for Existing Building Renovations 2 Improve by 16% for New Buildings or 12% for Existing Building Renovations 3 Improve by 18% for New Buildings or 14% for Existing Building Renovations 4 Improve by 20% for New Buildings or 16% for Existing Building Renovations 5

6 Improve by 22% for New Buildings or 18% for Existing Building Renovations 6 Improve by 24% for New Buildings or 20% for Existing Building Renovations 7 Improve by 26% for New Buildings or 22% for Existing Building Renovations 8 Improve by 28% for New Buildings or 24% for Existing Building Renovations 9 Improve by 30% for New Buildings or 26% for Existing Building Renovations 10 Improve by 32% for New Buildings or 28% for Existing Building Renovations 11 Improve by 34% for New Buildings or 30% for Existing Building Renovations 12 Improve by 36% for New Buildings or 32% for Existing Building Renovations 13 Improve by 38% for New Buildings or 34% for Existing Building Renovations 14 Improve by 40% for New Buildings or 36% for Existing Building Renovations 15 Improve by 42% for New Buildings or 38% for Existing Building Renovations 16 Improve by 44% for New Buildings or 40% for Existing Building Renovations 17 Improve by 46% for New Buildings or 42% for Existing Building Renovations 18 Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations 19

7 Credit 2 On-Site Renewable Energy 1 to 7 1% Renewable Energy 1 3% Renewable Energy 2 5% Renewable Energy 3 7% Renewable Energy 4 9% Renewable Energy 5 11% Renewable Energy 6 13% Renewable Energy 7

2 Credit 3 Enhanced Commissioning 2 2 Credit 4 Enhanced Refrigerant Management 2 3 Credit 5 Measurement and Verification 3

2 Credit 6 Green Power 2

Yes ? No

10 4 MATERIALS & RESOURCES 14 Points

Y Prereq 1 Storage and Collection of Recyclables Required 3 Credit 1.1 Building Reuse - Maintain Existing Walls, Floors and Roof 1 to 3

Reuse 55% 1 Reuse 75% 2

3 Reuse 95% 3 1 Credit 1.2 Building Reuse - Maintain Interior Nonstructural Elements 1

2 Credit 2 Construction Waste Management 1 to 2 50% Recycled or Salvaged 1

2 75% Recycled or Salvaged 2 2 Credit 3 Materials Reuse 1 to 2

Reuse 5% 1 Reuse 10% 2

2 Credit 4 Recycled Content 1 to 2 10% of Content 1

2 20% of Content 2 2 Credit 5 Regional Materials 1 to 2

10% of Materials 1 2 20% of Materials 2

1 Credit 6 Rapidly Renewable Materials 1 1 Credit 7 Certified Wood 1

Yes ? No

12 3 INDOOR ENVIRONMENTAL QUALITY 15 Points

Y Prereq 1 Minimum Indoor Air Quality Performance Required Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required 1 Credit 1 Outdoor Air Delivery Monitoring 1

1 Credit 2 Increased Ventilation 1 1 Credit 3.1 Construction Indoor Air Quality Management Plan - During Construction 1 1 Credit 3.2 Construction Indoor Air Quality Management Plan - Before Occupancy 1 1 Credit 4.1 Low-Emitting Materials - Adhesives and Sealants 1 1 Credit 4.2 Low-Emitting Materials - Paints and Coatings 1 1 Credit 4.3 Low-Emitting Materials - Flooring Systems 1 1 Credit 4.4 Low-Emitting Materials - Composite Wood and Agrifiber Products 1 1 Credit 5 Indoor Chemical and Pollutant Source Control 1 1 Credit 6.1 Controllability of Systems - Lighting 1 1 Credit 6.2 Controllability of Systems - Thermal Comfort 1 y y 1 Credit 7.1 Thermal Comfort - Design 1 1 Credit 7.2 Thermal Comfort - Verification 1

1 Credit 8.1 Daylight and Views - Daylight 1 1 Credit 8.2 Daylight and Views - Views 1

Yes ? No

6 INNOVATION IN DESIGN 6 Points

5 Credit 1 Innovation in Design 1 to 5 1 Exemplary Performance - Construction Waste Management Plan 1 1 Ultra-Violet (UV) Emitters 1 1 Exemplary Performance - Recycled Content 1 1 Exemplary Performance - Regional Materials 1 1 Fly Ash in Concrete 1

1 Credit 2 LEED® Accredited Professional 1 Yes ? No

1 3 REGIONAL PRIORITY 4 Points

1 3 Credit 1 Regional Priority 1 to 4 1 MRc1.1 Building Reuse (75%) 1

Yes ? No

56 54 PROJECT TOTALS (Certification Estimates) 110 Points Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points