Q A Round 2.docx
DOCX document 16 KB Posted
- Attached to
- Repair Squadron Operations, Bldg. 369
- Solicitation number
- W912PQ-11-B-0002
About this file
Prebid Questions Answers 2 dated 17 May 11
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-11-C-0020.pdf | ||
| Q A Bid Opening.pdf | ||
| Bid Opening - 02 June 2011.pdf | ||
| Q A Round 6.pdf | ||
| Q A Round 5.pdf | ||
| Amendment 2.pdf | ||
| Q A Round 4.pdf | ||
| W912PQ-11-B-0002-0001.pdf | ||
| Q A Round 3.docx | DOCX document | |
| Addendum_001_20110517.pdf | ||
| AD101.pdf | ||
| AD102.pdf | ||
| AD201.pdf | ||
| A-201.pdf | ||
| Q A Round 1.docx | DOCX document | |
| 106 Pre Bid Conference 11 May 2011.pptx | PPTX presentation | |
| attendance sheet.pdf | ||
| LEED Checklist.pdf | ||
| Final Specifications.pdf | ||
| Telecommunications.zip | ZIP file | |
| Mechanical.zip | ZIP file | |
| Structural.zip | ZIP file | |
| W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf | ||
| General.zip | ZIP file | |
| Electrical.zip | ZIP file | |
| Fire_Protection.zip | ZIP file | |
| Existing_Dwgs_Reference_Only.zip | ZIP file | |
| Landscaping.zip | ZIP file | |
| Civil.zip | ZIP file | |
| Architectural.zip | ZIP file | |
| Plumbing.zip | ZIP file | |
| Wage Determinations - April 22 2011 - Mod 14.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17 May 2011
Invitation for Bid (IFB) W912PQ-11-B-0002 - Squadron Operations Building #369
Pre-Bid Questions & Answers (2):
14. Who is responsible for the fire service line and Back flow device?
a. Answer: The successful contractor
15. Is filing with the local fire marshal required? or is the National Guard reviewing and approving drawings and performing their own final inspections?
a. The local Fire Marshall, Base Fire Marshall, the Engineer of Record, and the National Guard will be reviewing and approving the fire sprinkler system shop drawings and calculations.
16. Is there any area that might require Galvanized pipe and or explosion proof components?
a. No, not for the fire sprinkler system. See the design documents for the specifications on other systems in the building.
17. A flow test would help to determine pipe sizing and the possibility of a fire pump. Is, or will there be a test performed by others before our bid is due?
a. Answer: Yes a flow test was performed, see drawing notes on FX101.
18. Are the fire sprinkler sub contractors required to obtain any bonds. If so, please advise which one and the amount. Bid Bond, Performance Bond.
a. Answer: The Guard is requiring from only the Prime Contractor the bid, performance, and payment bonds.
19. Please confirm the scope in this bid solicitation for work related to the radio tower structure. Please confirm any scope for communication wiring or any other wiring structures associated with it?
a. Answer: Antenna tower and all associated hardware & cabling are to be removed and disposed by the General Contractor. This scope of work will be spelled out on a revised drawing sheet AD101 to be issued this week which will be the controlling contract document for work on the tower.
20. Please confirm there is no scope for communication wiring and devices throughout the building? Only raceways to be provided in locations indicated on the electrical drawings?
a. Answer: The complete scope of Communications is described in the Telecommunications part of the drawings and specifications. See Drawings T-001 through T-601 of the Design Documents.
21. Please confirm the scope for this contract in rooms 171 & 162 ?
a. Answer: The detailed scope of work in rooms 162 & 171 is included in the Design Documents.