Q A Round 1.docx

DOCX document 16 KB Posted

Attached to
Repair Squadron Operations, Bldg. 369
Solicitation number
W912PQ-11-B-0002
Issued by

About this file

Prebid Questions Answers 1 dated 17 May 11.

View the file

Other files

File Type Posted
W912PQ-11-C-0020.pdf PDF
Q A Bid Opening.pdf PDF
Bid Opening - 02 June 2011.pdf PDF
Q A Round 6.pdf PDF
Q A Round 5.pdf PDF
Amendment 2.pdf PDF
Q A Round 4.pdf PDF
W912PQ-11-B-0002-0001.pdf PDF
Q A Round 3.docx DOCX document
Addendum_001_20110517.pdf PDF
AD101.pdf PDF
AD102.pdf PDF
AD201.pdf PDF
A-201.pdf PDF
Q A Round 2.docx DOCX document
106 Pre Bid Conference 11 May 2011.pptx PPTX presentation
attendance sheet.pdf PDF
LEED Checklist.pdf PDF
Final Specifications.pdf PDF
Telecommunications.zip ZIP file
Mechanical.zip ZIP file
Structural.zip ZIP file
W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf PDF
General.zip ZIP file
Electrical.zip ZIP file
Fire_Protection.zip ZIP file
Existing_Dwgs_Reference_Only.zip ZIP file
Landscaping.zip ZIP file
Civil.zip ZIP file
Architectural.zip ZIP file
Plumbing.zip ZIP file
Wage Determinations - April 22 2011 - Mod 14.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17 May 2011

Invitation for Bid (IFB) W912PQ-11-B-0002 - Squadron Operations Building #369 Pre-Bid Questions & Answers (1) :

1) Equipment Storage that is called out on plans, what are we doing with it?

a. Answer: The contractor shall be responsible to protect in place, or remove and relocate within the building, or provide onsite storage for existing building equipment and furnishings item number 4 & 5 on sheet AD101 at his/her own expense. An amended drawing AD101 will be issued to clarify these items and other items to be salvaged and stored by the owner.

2) Will security coming onto the Base be that same as it was for us?

a. Answer: Yes, all contractors and subcontractors will have to provide detailed information and allow vehicles to be searched at the Security Forces discretion.

3) Are there water flow tests for the sprinkler system?

a. Answer, yes, see the project specifications, and a copy will be made available to the successful contractor.

4) Is there a basement or crawl space under building # 369

a. Answer: No

5) What is the existing roof made of?

a. Answer: the existing roof is a ballasted EPDM roof.

6) Is there special consideration for veteran owned business?

a. Answer: No, not for this bid.

7) Does the building have any skylights?

a. Answer: No.

8) Does the site have lawn sprinklers?

a. Answer: Yes, and the contractor is required to protect and leave in place the existing sprinkler system.

9) What are we doing with the Communication Tower on the rear of the building?

a. Answer: As stated on the plans.

10) Where is the contractor’s lay down area?

a. Answer: The contractor’s lay down area is within the fenced project site as called out on the plans.

11) Are we doing anything to the large airfield exterior lights on poles?

a. Answer: No, replacement of these lights are not in your contract; however the contractor is responsible for protecting the power feed and reconnecting the switch in the renovated building for these lights.

12) Who is providing the new 500KVA transformer?

a. Answer: The contractor is providing and installing the new 500kva transformer. LIPA must approve the type of transformer to be installed.

13) Is the emergency generator replacement part of this project?

a. Answer: The contractor is NOT replacing the emergency generator, however, the contractor is responsible for reconnecting the generator and testing it as part of the project plans and specifications.