Q A Round 3.docx
DOCX document 15 KB Posted
- Attached to
- Repair Squadron Operations, Bldg. 369
- Solicitation number
- W912PQ-11-B-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-11-C-0020.pdf | ||
| Q A Bid Opening.pdf | ||
| Bid Opening - 02 June 2011.pdf | ||
| Q A Round 6.pdf | ||
| Q A Round 5.pdf | ||
| Amendment 2.pdf | ||
| Q A Round 4.pdf | ||
| W912PQ-11-B-0002-0001.pdf | ||
| Addendum_001_20110517.pdf | ||
| AD101.pdf | ||
| AD102.pdf | ||
| AD201.pdf | ||
| A-201.pdf | ||
| Q A Round 2.docx | DOCX document | |
| Q A Round 1.docx | DOCX document | |
| 106 Pre Bid Conference 11 May 2011.pptx | PPTX presentation | |
| attendance sheet.pdf | ||
| LEED Checklist.pdf | ||
| Final Specifications.pdf | ||
| Telecommunications.zip | ZIP file | |
| Mechanical.zip | ZIP file | |
| Structural.zip | ZIP file | |
| W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf | ||
| General.zip | ZIP file | |
| Electrical.zip | ZIP file | |
| Fire_Protection.zip | ZIP file | |
| Existing_Dwgs_Reference_Only.zip | ZIP file | |
| Landscaping.zip | ZIP file | |
| Civil.zip | ZIP file | |
| Architectural.zip | ZIP file | |
| Plumbing.zip | ZIP file | |
| Wage Determinations - April 22 2011 - Mod 14.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 May 2011
Invitation for Bid (IFB) W912PQ-11-B-0002 - Squadron Operations Building #369
Pre-Bid Questions & Answers (3):
22. The aluminum framing details indicate a 7" deep front-glazed "curtain wall" system, while spec section 084113 indicates a 5" deep center glazed "storefront" system. Please clarify.
Answer: In this project what is important is not the depth of the frame, satisfying all the AT/FP requirements listed on section 084113. In our basis of design the manufacturer and model selected satisfies all the requirements. Other manufacturers might need a 7 inch frame to satisfy the AT/FP requirements. Both 5 and 7 inch frames will satisfy the design intent for the project. As always there are other items around the opening such as the simulated stone sill, the drywall around the jambs and the head that will need to be adjusted depending on the selected frame depth.
23. Sheet LP-401 shows 95 Cinquefoil, however this plant is not indicated on Plant Schedule on sheet LP-501. What size is the Cinquefoil?
Answer: Delete the 95 Cinquefoil from Sheet LP-401.
24. Sheet LP-401 indicates steel edging - what size is the steel edging - height and thickness?
Answer: Para. 2.9.A.1 of spec 329300 PLANTS states the edging is 1/8" wide and 4" in height and can be black or green.
25. Could a one-week extension be granted for this project?
Answer: No, currently the bid due date remains as indicated in the solicitation.