Addendum_001_20110517.pdf
PDF 13 KB Posted
- Attached to
- Repair Squadron Operations, Bldg. 369
- Solicitation number
- W912PQ-11-B-0002
About this file
Addendum to Drawings Specifications 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-11-C-0020.pdf | ||
| Q A Bid Opening.pdf | ||
| Bid Opening - 02 June 2011.pdf | ||
| Q A Round 6.pdf | ||
| Q A Round 5.pdf | ||
| Amendment 2.pdf | ||
| Q A Round 4.pdf | ||
| W912PQ-11-B-0002-0001.pdf | ||
| Q A Round 3.docx | DOCX document | |
| AD101.pdf | ||
| AD102.pdf | ||
| AD201.pdf | ||
| A-201.pdf | ||
| Q A Round 2.docx | DOCX document | |
| Q A Round 1.docx | DOCX document | |
| 106 Pre Bid Conference 11 May 2011.pptx | PPTX presentation | |
| attendance sheet.pdf | ||
| LEED Checklist.pdf | ||
| Final Specifications.pdf | ||
| Telecommunications.zip | ZIP file | |
| Mechanical.zip | ZIP file | |
| Structural.zip | ZIP file | |
| W912PQ-11-B-0002 Repair Squadron Operations Bldg 369.pdf | ||
| General.zip | ZIP file | |
| Electrical.zip | ZIP file | |
| Fire_Protection.zip | ZIP file | |
| Existing_Dwgs_Reference_Only.zip | ZIP file | |
| Landscaping.zip | ZIP file | |
| Civil.zip | ZIP file | |
| Architectural.zip | ZIP file | |
| Plumbing.zip | ZIP file | |
| Wage Determinations - April 22 2011 - Mod 14.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Squadron Operations Building 369 New York Air National Guard Project Number WKVB000617
TBC Project No. 6150930307 AMENDMENT 001
AMENDMENT 001
May 17, 2011
This Amendment forms a part of the Contract Documents and modifies the original Bidding Documents and previous Amendments as noted below. Acknowledge receipt of this Amendment in the space provided in the Bid Form. Failure to do so may subject Bidder to disqualification.
This Amendment consists of 5 page(s) including all attachments noted herein.
MODIFICATIONS TO PREVIOUS ADDENDA:
Not applicable.
MODIFICATIONS TO SPECIFICATIONS:
Not applicable.
MODIFICATIONS TO DRAWINGS:
1. Revise drawing AD101 as follows:
a. Revise Keynotes 4 & 5 to omit reference to submitting salvaged items to Contracting Officer.
b. Revise Keynote 24 to indicate tower and all associated hardware and cabling are to be re-moved and disposed by the General Contractor.
c. Revise Keynotes 27 through 33, indicate as “NOT USED”; removed items from floor plan.
d. Revise Keynote 36 to omit reference to salvaging benches.
e. Revise Keynote 43, indicate as “NOT USED”; removed items from floor plan.
f. Revise Note in its entirety to read: “FOR ALL ITEMS NOTED TO BE SALVAGED, CONTRACTOR IS RESPONSIBLE FOR:
• PROTECTING SALVAGED ITEMS IN PLACE DURING CONSTRUCTION, OR
• TEMPORARILY RELOCATING SALVAGED ITEMS AND PROTECTING THEM INSIDE
THE FACILITY UNTIL REINSTALLED, OR
• STORING SALVAGED ITEMS IN A TRAILER ON BASE NEXT TO THE FACILITY
DURING RENOVATION, OR
• STORING SALVAGED ITEMS OFF BASE AT A FACILITY PROVIDED BY THE
GENERAL CONTRACTOR.
THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR THE CONDITION OF ALL
PROTECTED/STORED EQUIPMENT. DAMAGED EQUIPMENT WILL BE REPLACED WITH
NEW BY THE GENERAL CONTRACTOR.”
g. Added new Note to read “UNLESS ITEMS ARE TO BE SALVAGED, ALL REMOVED ITEMS
ARE TO BE DISPOSED BY THE GENERAL CONTRACTOR.”
2. Revise drawing AD102 as follows:
a. Revise Keynote 8 to indicate tower and all associated hardware and cabling are to be removed and disposed by the General Contractor.
3. Revise drawing AD201 as follows:
a. Revise Keynote 9 to indicate tower and all associated hardware and cabling are to be removed and disposed by the General Contractor.
4. Revise drawing A-201 as follows:
a. Revise Keynote 14 to indicate as “NOT USED”; removed tower from elevations.
ATTACHMENTS:
1. Drawings AD101, AD102, AD201, A-201
END OF AMENDMENT 001