W912P5-14-R-0003-0008.pdf

PDF 32 KB Posted

Attached to
Center Hill - Auxiliary Dam Reinforcing Berm and Left Rim Stabilization
Solicitation number
W912P5-14-R-0003
Issued by

About this file

Amendment 0008

View the file

Other files

File Type Posted
W912P514R0003PlansAm8.pdf PDF
W912P5-14-R-0003TspecsAm8Pgs.pdf PDF
W912P5-14-R-0003-0007.pdf PDF
W912P5-14-R-0003TspecsAm7Pgs.pdf PDF
W912P514R0003PlansAm6.pdf PDF
W912P5-14-R-0003TspecsAm6Pgs.pdf PDF
W912P5-14-R-0003-0006.pdf PDF
W912P5-14-R-0003TSpecsAm5Pgs.pdf PDF
As-BuiltDrawings-ForInfoOnly.pdf PDF
W912P5-14-R-0003-0005.pdf PDF
W912P5-14-R-0003-0004.pdf PDF
W912P514R0003PlansAm3.pdf PDF
W912P5-14-R-0003-0003.pdf PDF
W912P514R0003TSpecsAm3Pgs.pdf PDF
W912P514R0003PlansDGN08.zip ZIP file
W912P5-14-R-0003Plans.pdf PDF
W912P5-14-R-0003TSpecsAppB4of5.pdf PDF
W912P5-14-R-0003TSpecsAppB5of5.pdf PDF
W912P5-14-R-0003TSpecsAppB3of5.pdf PDF
W912P514R0003TspecsAm2Pgs.pdf PDF
W912P5-14-R-0003TSpecsAm1Pgs.pdf PDF
W912P5-14-R-0003TSpecsAppendixA.pdf PDF
W912P514R0003PlansDGN02.zip ZIP file
W912P514R0003PlansDGN04.zip ZIP file
W912P514R0003PlansDGN03.zip ZIP file
W912P514R0003PlansDGN05.zip ZIP file
W912P514R0003PlansDGN07.zip ZIP file
W912P514R0003PlansDGN10.zip ZIP file
W912P5-14-R-0003TSpecs.pdf PDF
Q4-RCC-G-08.1.pdf PDF
W912P5-14-R-0003TSpecsAppB2of5.pdf PDF
W912P5-14-R-0003-0002.pdf PDF
W912P5-14-R-0003.pdf PDF
W912P5-14-R-0003TSpecsAppB1of5.pdf PDF
W912P514R0003PlansDGN01.zip ZIP file
W912P514R0003PlansDGN09.zip ZIP file
W912P514R0003PlansDGN06.zip ZIP file
W912P5-14-R-0003-0001.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD33094432

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Center Hill - Auxiliary Reinforcing Berm and Left Rim stabilization The purpose of this amendment is to:

1. Revise the Specifications.

2. Revise one existing draw ing, Q4-RCC-B-13.1.

3. Update clause 52.252-3 Alterations in Solicitation.

4. Update clause 252.236-7001 Contract Draw ings and Specifications.

The due date for proposals remains December 10, 2015 at 2:00 pm Central Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-14-R-0003

X 9B. DATED (SEE ITEM 11)

30-Sep-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Dec-2015

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37202-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P5-14-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008

RFP No. W912P5-14-R-0003

Amendment No. 0008 Auxiliary Dam Reinforcing Berm and Left Rim Stabilization

Center Hill Reservoir Project DeKalb County, Tennessee

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 31 68 13 REINFORCEMENT FOR SLOPE PROTECTION

1. Remove Section 31 68 13 pages 5 and 6, and replace with revised Section 31 68 13 pages 5 and 6.

II. CHANGES TO CONTRACT DRAWINGS

A. Replace the following drawing with the listed revised drawing:

Previous Revised Drawing No. Drawing No. Description

Q4-RCC-B-13.1 Q4-RCC-B-13.2 SLOPE REINFORCEMENT DETAILS

--- END OF AMENDMENT NO. 0008 TECHNICAL CHANGES---

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001: The purpose of this amendment is to:

1. Add an additional organized site visit and opportunity to view geologic cores.

2. Extend the due date for questions to 2 November 2015 at 9:00 AM Central Time.

3. Revise the Specifications.

4. Add the CAD drawings.

5. Update clause 52.236-27 Alt I Site Visit (Construction)

6. Update clause 52.252-3 Alterations in Solicitation

7. Update clause 252.236-7001 Contract Drawings and Specifications

Amendment 0002: The purpose of this amendment is to:

1. Post first round of Questions and Answers. The due date for questions has been changed to 6 November 2015 at

9:00 AM CT.

2. Revise the Specifications and add Appendix B to the Technical Specifications.

3. Replace one exiting drawing, Q4-RCC-G-08.1.

4. Post Site Visit Comments and Attendees.

5. Update clause 52.252-3 Alterations in Solicitation.

6. Update clause 252.236-7001 Contract Drawings and Specifications.

Amendment 0003: The purpose of this amendment is to:

1. Revise the Plans and Specifications.

2. Post the second site visit attendees.

3. Post second round of Questions and Answers. The due date for questions remains 6 November 2015 at 9:00 AM

CT.

4. Revise the Proposal Price Breakout Schedule

5. Update clause 52.252-3 Alterations in Solicitation.

6. Update clause 252.236-7001 Contract Drawings and Specifications.

Amendment 0004: The purpose of this amendment is to:

1. Change the estimated quantities for CLIN 0009, Overburden Excavation for the Reinforcing Berm, and CLIN 0011, Rock Excavation for Reinforcing Berm, on the Proposal Price Breakout Schedule.

2. Update clause 52.252-3 Alterations in Solicitation.

Amendment 0005: The purpose of this amendment is to:

1. Revise the Specifications and add a new Drawing Folio

2. Post third round of Questions and Answers. No additional questions will be accepted at this time.

3. Change the proposal due date to December 4, 2015 at 2:00 PM Central Time.

4. Revise the Proposal Price Breakout Schedule.

5. Update clause 52.252-3 Alterations in Solicitation.

6. Update clause 252.236-7001 Contract Drawings and Specifications.

Amendment 0006: The purpose of this amendment is to:

1. Revise the Specifications and Drawings.

2. Revise answer to Question 51 and post fourth round of Questions and Answers. No additional questions will be accepted at this time.

3. Change the proposal due date to December 10, 2015 at 2:00 pm Central Time.

4. Revise the Proposal Price Breakout Schedule.

5. Update clause 52.252-3 Alterations in Solicitation.

6. Update clause 252.236-7001 Contract Drawings and Specifications.

Amendment 0007: The purpose of this amendment is to:

1. Revise the Specifications.

2. Revise answer to Question 7 and post fifth round of Questions and Answers. No additional questions will be accepted at this time.

3. Update clause 52.252-3 Alterations in Solicitation.

4. Update clause 252.236-7001 Contract Drawings and Specifications.

Amendment 0008: The purpose of this amendment is to:

1. Revise the Specifications.

2. Revise one existing drawing, Q4-RCC-B-13.1.

3. Update clause 52.252-3 Alterations in Solicitation.

4. Update clause 252.236-7001 Contract Drawings and Specifications.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Technical Specifications: W912P5-14-R-0003TSpecs.pdf W912P5-14-R-0003TSpecsAppendixA.pdf W912P5-14-R-0003TspecsAm1Pgs.pdf W912P5-14-R-0003TspecsAm2Pgs.pdf W912P5-14-R-0003TSpecsAppB1of5.pdf W912P5-14-R-0003TSpecsAppB2of5.pdf W912P5-14-R-0003TSpecsAppB3of5.pdf

W912P5-14-R-0003TSpecsAppB4of5.pdf W912P5-14-R-0003TSpecsAppB5of5.pdf W912P5-14-R-0003TSpecsAm3Pgs.pdf W912P5-14-R-0003TspecsAm5Pgs.pdf W912P5-14-R-0003TspecsAm6Pgs.pdf W912P5-14-R-0003TspecsAm7Pgs.pdf W912P5-14-R-0003TspecsAm8Pgs.pdf

Plans: W912P5-14-R-0003Plans.pdf W912P514R0003PlansAm3.pdf As-BuiltDrawings-ForInfoOnly.pdf W912P514R0003PlansAm6.pdf W912P514R0003PlansAm8.pdf

SHEET DRAWING TITLE

1 OF 108 Q4-RCC-G-01 COVER SHEET

2 OF 108 Q4-RCC-G-02 VICINITY AND LOCATION MAP

3 OF 108 Q4-RCC-G-03 LIST OF DRAWINGS

4 OF 108 Q4-RCC-G-04 LEGENDS AND ABBREVIATIONS - GEOTECHNICAL

5 OF 108 Q4-RCC-G-05 LEGENDS AND ABBREVIATIONS - STRUCTURAL

6 OF 108 Q4-RCC-G-06 LEGENDS AND ABBREVIATIONS - ELECTRICAL

7 OF 108 Q4-RCC-G-07 LEGENDS AND ABBREVIATIONS - SECURITY

8 OF 108 Q4-RCC-G-08.1 CONTRACTOR WORK LIMITS - RCC REINFORCING BERM

9 OF 108 Q4-RCC-G-09 CONTRACTOR WORK LIMITS - LEFT RIM

10 OF 108 Q4-RCC-V-01 REFERENCE MONUMENTS

11 OF 108 Q4-RCC-V-02.1 EXISTING INSTRUMENTATION

12 OF 108 Q4-RCC-V-03 SURVEY MONUMENTS

13 OF 108 Q4-RCC-V-04 SURVEY DISK DETAILS

14 OF 108 Q4-RCC-V-05 THERMAL DATA LOGGER - LOCATION AND DETAILS

15 OF 108 Q4-RCC-B-01 EXPLORATION PLAN

16 OF 108 Q4-RCC-B-02 LEFT EXPLORATION TRENCH

17 OF 108 Q4-RCC-B-03 RIGHT EXPLORATION TRENCH

18 OF 108 Q4-RCC-B-04 SECTION A1-A1

19 OF 108 Q4-RCC-B-05 SECTION A2-A2

20 OF 108 Q4-RCC-B-06 SECTION B-B

21 OF 108 Q4-RCC-B-07 SECTION C-C

22 OF 108 Q4-RCC-B-08 SECTION D-D

23 OF 108 Q4-RCC-B-09 FOUNDATION PLAN AND TOP OF ROCK

24 OF 108 Q4-RCC-B-10 RCC EXCAVATION PLAN

25 OF 108 Q4-RCC-B-11 RCC EXCAVATION SECTIONS

26 OF 108 Q4-RCC-B-12 DENTAL CONCRETE DETAILS

27 OF 108 Q4-RCC-B-13.2 SLOPE REINFORCEMENT DETAILS

28 OF 108 Q4-RCC-B-14 BLANKET GROUTING

29 OF 108 Q4-RCC-B-15.1 LEFT RIM - PRE EXCAVATION PLAN

30 OF 108 Q4-RCC-B-16 NORTH FACING - SHEET 1 OF 2

31 OF 108 Q4-RCC-B-17 NORTH FACING - SHEET 2 OF 2

32 OF 108 Q4-RCC-B-18 SOUTH FACING PROFILE - SHEET 1 OF 2

33 OF 108 Q4-RCC-B-19 SOUTH FACING PROFILE - SHEET 2 OF 2

34 OF 108 Q4-RCC-B-20 LEFT RIM - POST EXCAVATION PLAN

35 OF 108 Q4-RCC-B-21 LEFT RIM - CROSS SECTIONS SHEET 1 OF 9

36 OF 108 Q4-RCC-B-22 LEFT RIM - CROSS SECTIONS SHEET 2 OF 9

37 OF 108 Q4-RCC-B-23 LEFT RIM - CROSS SECTIONS SHEET 3 OF 9

38 OF 108 Q4-RCC-B-24 LEFT RIM - CROSS SECTIONS SHEET 4 OF 9

39 OF 108 Q4-RCC-B-25 LEFT RIM - CROSS SECTIONS SHEET 5 OF 9

40 OF 108 Q4-RCC-B-26 LEFT RIM - CROSS SECTIONS SHEET 6 OF 9

41 OF 108 Q4-RCC-B-27 LEFT RIM - CROSS SECTIONS SHEET 7 OF 9

42 OF 108 Q4-RCC-B-28 LEFT RIM - CROSS SECTIONS SHEET 8 OF 9

43 OF 108 Q4-RCC-B-29 LEFT RIM - CROSS SECTIONS SHEET 9 OF 9

44 OF 108 Q4-RCC-C-01 GRADING PLAN

45 OF 108 Q4-RCC-C-02 CROSS SECTION

46 OF 108 Q4-RCC-C-03 GRADING SECTIONS - A-A TO C-C

47 OF 108 Q4-RCC-C-04 GRADING SECTIONS - D-D TO F-F

48 OF 108 Q4-RCC-C-05 GRADING SECTIONS - G-G TO I-I

49 OF 108 Q4-RCC-C-06 GRADING SECTIONS - J-J TO L-L

50 OF 108 Q4-RCC-C-07 DRAINAGE PLAN AND SECTIONS

51 OF 108 Q4-RCC-C-08.1 BEHIND LEFT RIM CUT - PLAN

52 OF 108 Q4-RCC-C-09 BEHIND LEFT RIM CUT - NOTES AND DETAIL

53 OF 108 Q4-RCC-C-10.1 BEHIND LEFT RIM CUT - CROSS SECTIONS STA. 1+00 - STA. 2+50 54 OF 108 Q4-RCC-C-11.1 BEHIND LEFT RIM CUT - CROSS SECTIONS STA. 3+00 - STA. 4+50 55 OF 108 Q4-RCC-C-12.1 BEHIND LEFT RIM CUT - CROSS SECTIONS STA. 5+00 - STA. 6+50 56 OF 108 Q4-RCC-C-13.1 BEHIND LEFT RIM CUT - CROSS SECTIONS STA. 7+00 - STA. 8+00

57 OF 108 Q4-RCC-C-14.1 MISCELLANEOUS – DETAILS

58 OF 108 Q4-RCC-S-01.1 RCC BERM - PLAN

59 OF 108 Q4-RCC-S-02 ELEVATION

60 OF 108 Q4-RCC-S-03 SPILLWAY SECTION - SHEET 1 OF 2

61 OF 108 Q4-RCC-S-04 SPILLWAY SECTION - SHEET 2 OF 2

62 OF 108 Q4-RCC-S-05 WATERSTOP DETAILS

63 OF 108 Q4-RCC-S-06 NON OVERFLOW SECTION

64 OF 108 Q4-RCC-S-07.1 GALLERY ENTRANCE

65 OF 108 Q4-RCC-S-08 FACING DETAILS

66 OF 108 Q4-RCC-S-09.1 GALLERY DETAILS

67 OF 108 Q4-RCC-S-10 HANDRAIL DETAILS

68 OF 108 Q4-RCC-S-11 RCC TEST SECTION

69 OF 108 Q4-RCC-S-12 GENERAL PLACEMENT - PROCEDURES

70 OF 108 Q4-RCC-S-13 GENERAL PLACEMENT - GERCC PLACEMENT METHODS

71 OF 108 Q4-RCC-S-14 BARRIER SWING GATE - DETAILS

72 OF 108 Q4-RCC-E-01 GENERAL LAYOUT AND DETAIL

73 OF 108 Q4-RCC-E-02 SINGLE LINE DIAGRAM

74 OF 108 Q4-RCC-E-03 GALLERY DETAILS - SHEET 1 OF 2

75 OF 108 Q4-RCC-E-04 GALLERY DETAILS - SHEET 2 OF 2

76 OF 108 Q4-RCC-E-05 AREA AND GALLERY LIGHTING CONTROLS

77 OF 108 Q4-RCC-E-06 480 VOLT PANEL SCHEDULE

78 OF 108 Q4-RCC-E-07 MOTORS WIRING DIAGRAM

79 OF 108 Q4-RCC-E-08 AREA LIGHTING DETAILS

80 OF 108 Q4-RCC-E-09 GROUNDING MAT - PLAN

81 OF 108 Q4-RCC-E-10 GROUNDING MAT - DETAILS

82 OF 108 Q4-RCC-E-11 LIGHTING PROTECTION DETAILS

83 OF 108 Q4-RCC-E-12 MISCELLANEOUS DETAILS

84 OF 108 Q4-RCC-T-01 SECURITY - BLOCK DIAGRAM

85 OF 108 Q4-RCC-T-02 SECURITY - SECURITY AND CCTV BLOCK DIAGRAMS

86 OF 108 Q4-RCC-T-03 SECURITY - UPS BLOCK DIAGRAM

87 OF 108 Q4-RCC-T-04 SECURITY - TELEPHONE BLOCK DIAGRAM

88 OF 108 Q4-RCC-T-05 SECURITY - SITE PLAN

89 OF 108 Q4-RCC-T-06 GALLERY SECURITY LAYOUT - SHEET 1 OF 2

90 OF 108 Q4-RCC-T-07 GALLERY SECURITY LAYOUT - SHEET 2 OF 2

91 OF 108 Q4-RCC-T-08 SECURITY - EQUIPMENT CABINETS LAYOUTS

92 OF 108 Q4-RCC-T-09 ELECTRICAL - SECURITY DETAILS

93 OF 108 Q4-RCC-T-10 SECURITY - CCTV DETAILS

94 OF 108 Q4-RCC-T-11 ELECTRICAL - 120 VOLT PANEL SCHEDULES

95 OF 108 Q4-RCC-T-12 ELECTRICAL - UPS PANEL SCHEDULES

96 OF 108 Q4-RCC-T-13 SECURITY SYSTEM CABLE SCHEDULE

97 OF 108 Q4-RCC-M-01 GALLERY PIPING AND VENTILATION DETAILS

98 OF 108 Q4-RCC-M-02 SUMP PIT DETAILS - MECHANICAL PIPING SECTIONS

99 OF 108 Q-4/315.2 ELECTRICAL - ROADWAY CONDUITS - NON OVERFLOW SECTIONS

100 OF 108 Q-4/316.3 ELECTRICAL SYSTEM - ROADWAY CONDUITS - POWER INTAKE

SYSTEM

101 OF 108 Q-4/317.2 ELECTRICAL - ROADWAY CONDUITS - SPILLWAY PIERS 1 AND 9

102 OF 108 Q-4/317A.1 ELECTRICAL - ROADWAY CONDUITS - SPILLWAY PIERS 2 AND 8

103 OF 108 Q-4/319.1 ELECTRICAL SYSTEM - ROADWAY CONDUITS - MANHOLE DETAILS

104 OF 108 Q-4/320.3 ELECTRICAL - PYLON CONDUITS - FLOOR PLANS

105 OF 108 Q-4/321.3 ELECTRICAL - PYLON CONDUITS - SECTIONS

106 OF 108 Q-4/325.2 ELECTRICAL - GALLERY CONDUITS - LEFT END

107 OF 108 Q-4/827.9 POWER WIRING PLAN

108 OF 108 Q-4/839A.9 SPREAD ROOM ARRANGEMENT - SECTIONS

CAD Drawings:

W912P5-14-R-0003PlansDGN01.zip W912P5-14-R-0003PlansDGN02.zip W912P5-14-R-0003PlansDGN03.zip W912P5-14-R-0003PlansDGN04.zip W912P5-14-R-0003PlansDGN05.zip W912P5-14-R-0003PlansDGN06.zip W912P5-14-R-0003PlansDGN07.zip W912P5-14-R-0003PlansDGN08.zip W912P5-14-R-0003PlansDGN09.zip W912P5-14-R-0003PlansDGN10.zip

(End of clause)

(End of Summary of Changes)