W912LN-17-B-1000 Attached Questions & Answers 9 Jun 17

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ALTER BUILDING 140 SQUAD OPS FACILITY, newest first.
File Type Posted
W912LN-17-C-1000.pdf PDF
Attachment_3_-_Roof_Warranty.pdf PDF
Attachment_1_-_16V01ME_E1.10-SKE-1.pdf PDF
Attachment_2_-_16V01ME_E1.11-SKE-2.pdf PDF
Pre_Proposal_Minutes.pdf PDF
B-140_Pre-Bid.pptx PPTX presentation
B140_Site_Visit_Attendance_Roster.pdf PDF
0705 - B-3 Project Manual 021017.pdf PDF
21-S1.0 - B140.pdf PDF
03-0705-XC Floor Plans.pdf PDF
0705-CD B3 F-35 Plan-ALIS.pdf PDF
10-0705-CD B3 Wall Types.pdf PDF
13-0705-CD B3 Stairs.pdf PDF
31-16V01ME Plumbing B-3 Submission 20170209.pdf PDF
04-0705-XC Exterior Elevations.pdf PDF
15-0705-CD B3 Int elev A-6-7-13.pdf PDF
12-0705-CD B3 Sections.pdf PDF
23-S1.2 - B140.pdf PDF
11-0705-CD B3 Ext Elev.pdf PDF
22-S1.1 - B140.pdf PDF
25-S2.2- B140.pdf PDF
07-0705-CD B3 Plans.pdf PDF
08-0705-CD B3 Roof Plan.pdf PDF
16-0705-CD B3 Int elev A-6-14-18.pdf PDF
26-S3.1 - B140.pdf PDF
Civil Plans B140 2-10-2017.pdf PDF
28-S3.3 - B140.pdf PDF
01-0705-CD B3 Alter B-140 Cover.pdf PDF
16V01ME-ALIS Electrical B3 Submission 20170208.pdf PDF
18-0705-CD B3 Windows.pdf PDF
B140_Squad_OPS.zip ZIP file
05-0705-XC Sections.pdf PDF
06-0705-CD B3 Site Plan.pdf PDF
20-0705-CD B3 Interior Details.pdf PDF
09-0705-CD B3 Roof Details.pdf PDF
02-Civil Plans B140 2-10-2017.pdf PDF
0705-Project Manual 021017 F35.pdf PDF
14-0705-CD B3 Int elev A-6-0-6.pdf PDF
32-16V01ME Fire Protection B3 Submission 20170208.pdf PDF
27-S3.2 - B140.pdf PDF
16112ME- ALIS Mechanical B3 Submission 20170209.pdf PDF
17B1000_11_May_17.pdf PDF
29-16V01ME Mechanical B3 Submission 20170209.pdf PDF
17-0705-CD B3 Doors.pdf PDF
16112ME Lighting Photometrics.pdf PDF
19-0705-CD B3 Exterior Details.pdf PDF
0705-CD B3 F-35 Cover-ALIS.pdf PDF
30-16V01ME Electrical B3 Submission 20170209.pdf PDF
24-S2.1 - B140.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The follow ing documents are incorporated as part of this Solicitation.

1. W912LN-17-B-1000 Attached Questions & Answ ers 9 Jun 17.

2. Attachment 1 Amended Draw ing 16V01ME E1.10-SKE-1

3. Attachment 2 Amended Draw ing 16V01ME E1.11-SKE-2

4. Attachment 3 Roof Warranty

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LN-17-B-1000

X 9B. DATED (SEE ITEM 11)

11-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2017

CODE

158 FW/MSC (F9P3MC)

VERMONT AIR NATIONAL GUARD - WAWF W912LN

45 NCO DRIVE SUITE A

SOUTH BURLINGTON VT 05403-5873

W912LN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912LN-17-B-1000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDEMNT A0001 Q & A 9 JUN 17

ADDENDUM #1

CURZ152813/CURZ152807 Alter Building 140 Squad Ops/ALIS

Item Description

The bid documents for the Alter B140 Squad Ops Facility and F-35 Alter B140 Squad Ops Facility at VTANG in Burlington, Vermont, prepared by Smith- Alvarez-Sienkiewycz Architects, dated February 10, 2017 are modified as follows:

DRAWINGS:

A. A-1.0 (ALIS), E1.1 (ALIS)

1. Rm 021, ALIS Server Room: Ceiling; Replace Type C1 ceiling with C2. Replace light fixture type H1 with fixture type SL. Refer to Drawing E6.1 (Ops) for lighting schedule. Same fixture count and layout.

B. E1.2 (ALIS)

1. Rm 021, ALIS Server Room: Shift the 4DY on the west wall south, centering on wall between north wall and entry door.

C. E1.2 (ALIS)

1. Rm 022, ALIS Admin.: Convert the two 4DY drops, closest to the doors on the east and west walls, to 4DR drops.

D. A-1.4/1.5 (Ops)

1. Rm 024, SCIF: Provide wood blocking in the north wall (centered), to accommodate a small (30”-48” high) x 19” wide wall-mounted GFE rack, 6”-12” below ceiling.

E. E0.1 (Ops)

1. General; Install TV drops (2D, 2DS, 2DY) 72” AFF rather than 60” AFF.

F. E0.1 (Ops)

1. Install the wall-phone drops (W-013/026) 46” AFF, (like the other W in the table) rather than 18” AFF.

G. E1.2 (Ops)

1. Rms 144 and 157, Office and TO Library: Remove one 2D TV drop (extra) in each of these two rooms, retaining the other. Only one per room is required. Finalize location in the field with the COR.

H. E1.2 (Ops)

1. Rm 149, Stan. Eval. and Sched. Training: Relocate 2D TV drop on east wall to the south wall, centered between door and proposed desk location.

I. E1.2 (Ops)

1. Rm 153, Heritage Room: Add a 4D and accompanying 120VAC electrical outlet to the south wall, above bar location. Finalize locations in the field with the COR.

J. E1.3 (Ops)

1. Rm 108, Main Briefing Room: Locate two floor boxes at the front (south end) of the room to fall below the table locations. Finalize locations in the field with the COR.

K. E1.3 (Ops)

1. Rm 119, CP Manager: Add 2D TV drop and accompanying 120VAC outlet to the north wall. Finalize locations in the field with the COR.

L. E1.4 (Ops)

1. Rm 008, Storage: Add L5-20P electrical outlet to the south wall, to accommodate new 19” rack. Finalize locations in the field with the COR.

M. E1.5 (Ops)

1. Rm 024, SCIF: Add one 2DY, one 2F, and one quad 120VAC electrical outlet at 72” AFF centered on the north wall to serve a small elevated 19” wall-mount GFE rack.

N. E1.5 (Ops)

1. Rm 019, Mission Planning: Remove two 4DY drops and accompanying electrical outlets on the east wall.

O. E1.10 (Ops)

1. Rm 120/141, Server and Comm. Rooms: Install cable tray suspended above the row of equipment racks approximately centered in the room, in addition to the wrap-around cable trays at the perimeter of the room. Refer to SKE-1, dated 5/24/2017, attached.

P. E1.11 (Ops)

1. Rm 013, Comm. Room: Install cable tray suspended above the row of equipment racks approximately centered in the room, in addition to the wrap-around cable trays at the perimeter of the room. Refer to SKE-1, dated 5/24/2017, attached.

2 Clarification of Aircrew Life Support Wood Locker Specification.

Response: The Aircrew Gear Cabinets (lockers) are custom. The 42 cabinet units are typical but they’re custom configured. Aircrew had very particular dimensions and specifications for those units. There is no spec. for wood lockers because they aren’t standard lockers, they need to be custom built as detailed on Drawing A-

10.2. These cabinets are covered by Section 062023 Interior Finish Carpentry.

3 The Solicitation Contract Form lists Items 0001 through 0007. It is clear that Items 0005, 0006 & 0007 correspond with the Bid Options as listed within section 012300 of the Project Manual. Provide additional scope clarification for the work that is to be included within items 001 through 0004 as it is not defined within section 012300 of the Project Manual and is not called out on the drawings.

Response: Solicitation item number 0001 is defined in the solicitation and is detailed in Project Manual “F-35 Alter B-140 Squad Ops Facility CURZ152807” for the ALIS portion of the work. Please note that there are two project manuals dated 10 February 2017 one referencing CURZ152807 and the other CURZ152813. The project manual referenced CURZ152813 is specific to line item 0002 of the solicitation. Line item 0003 includes the work associated with division 27 (each project manual) specific to the communications cabling. Line item 0004 is contractor manpower reporting and is addressed in division 1 and the solicitation. Please reference Solicitation Section 0010 item 13.

4 The Project Manual includes section 123216 Manufactured Plastic-Laminate- Faced Casework. Is this specification correct as the casework appears to be custom?

Response: The Plastic-Laminate-Faced Casework details are based on LSI Casework. LSI is a manufacturer that can provide custom cabinets. For example the LSI standard base cabinet has a 6” high drawer face but we prefer a 5” high drawer face. The cabinet sizes are standard. A manufacturer’s standard casework will be considered if they meet the specifications and do not differ from the details and dimensions significantly.

5 The Project Manual includes section 064200 Solid-Surface Wall Panels.

a. Does this specification also apply to the horizontal surfaces such as counters and benches?

b. Provide color Price Group for estimating purposes.

Response: No, Specification Section 064200 “Solid-Surface Wall Panels” applies only to the wall panels (in the Heritage Room, 153). Specification Section 062023 “Interior Finish Carpentry” includes all other solid-surface materials. Refer to 062023, 1.2, A. 2&3, “Solid surface counters and backsplashes.” (this would include the shower benches) and “Solid surface sliding doors and hardware.” The specifications call for colors to be selected from manufacturer’s full range so please carry Price Group D.

6 The project manual includes both section 072600 "Topical Moisture

Vapor Mitigation System" and section 090561 "Moisture Vapor Emission Control".

a. The description for Option #3 within specification section 012300 Bid Options” references 090560 Moisture Vapor Mitigation Emission Control.

This specification section does not exist, I assume this should be 090651?

b. Part 1.2B of Specification section 072600 "Topical Moisture Vapor Mitigation System" states "The supply and installation of products in this section is a bid option.

c. Which specification section applies to Option #3? Are both specification sections used on this project? If not, where does the other occur?

Response: Specification Section 090561 is a duplicate, please omit. Please use Specification Section 072600 “Topical Moisture Vapor Mitigation System”. This Specification Section in for Bid Option #3.

7 Please confirm if who is responsible for the IDS/Card Access vendor.

Is it GFE-GI? We spoke with Advantor and it was their understanding that their contract was directly with the government.

Response: Correct. Perform work in the drawings only. The IDS/Card access system will be installed under separate contract.

8 It is clear that all windows shown in the schedule on drawing A-8.0 are to be blast resistant. It is not clear which doors are required to be blast resistant. Confirm that the only door openings that are required to be blast resistant are those that require 1" laminated insulated glass and/or those called out as blast resistant in the hardware schedule.

Response: The exterior doors and frames are all blast resistant and are noted as such on the exterior elevations; Drawings A-4.0, A-4.1 and A-4.2. The only exception is the door frame on door 140 into the existing parachute tower. This is an existing HM frame that is welded to the existing steel structure and may remain in place. Refer to Specification Section 083953 “Blast-Resistant Doors and Frames”.

9 ED1.0 Change Keynote 17 to read as follows:

“Disconnect and remove existing diesel fueled generator and all associated controls, disconnect switch and return to government (coordinate with COR) at the completion of the contract. Conduit and wiring complete. See drawing ED1.2 for additional information. See electrical demo general notes #18 and #19 on this sheet.”

10 ED1.0 Change Electrical Demolition General Note 19 to read as follows:

“The electrical contractor shall be responsible for keeping the existing generator available for stand by operations during construction including fuel and oil changes. Oil changes are required to be accomplished for every 300 hours of operation with full documentation. Upon turn in of generator at the completion of the contract all maintenance and operational records must be provided with the generator.”

11 Is this project subject to Buy American?

Response: Yes. Please reference solicitation W912LN-17-B-1000 page 14 which references FAR 42.225-12 Notice of Buy American Act Requirement – Construction Materials Under Trade Agreements (May 2014) Alternate II (June 2009). Review this clause for the specifics on the Buy American requirement.

12 Spec Section 263100-2.2C-1, the annual energy production minimum is 44,260kWh. Is that for the life of the system or just the first year?

Response: The annual KWH production stated is for the 1st year @ 97.5% of the panel listing. We expect 90% after 10 years and 80% after 25 years.

13 Who is the manufacturer of the existing roofing? Is the existing roof still under warranty?

Response: Yes, but not for the duration of the project. The existing warranty from Omnova Solutions/GenFlex Roofing System is effective from 1/1/2003 to 1/1/2018. Attachment 3 includes the certificate.

14 Section 220719/3.3/A/5 - calls for 1" thick glass fiber insulation on the roof drain bodies. Are we to insulate the existing roof drain bodies, and if so, will Armaflex Sheeting be allowed in lieu of glass fiber?

Response: Existing roof drain bodies are to be insulated. Armaflex Sheeting does not meet or exceed the k-value of the specified Rigid Glass Fiber insulation at 0.23 at 75 Degrees F and is not acceptable.

15 Unable to locate any P-1W or P-1WH plumbing fixtures on the drawings.

Please confirm the locations of these items.

Response: Wall Mounted toilets were removed from the project. Omit P-1W and P-1WH from the project.

16 Drawing M1.3, close to columns T/22, has a FCU tagged FC4-21? There is no FC4-21 on the equipment schedule. Please confirm that this is actually

FC4-19.

Response: Confirmed FC4-21 is actually FC4-19 for the SOF Desk.

17 Please confirm if sound attenuators are required at all SAPF/ STC wall penetrations as shown in detail 22, on drawing M5.2. If they are required, we will need additional information for pricing purposes.

Response: All SAPF wall duct penetrations requires a minimum of 2” thick acoustical lining for a minimum of 24” or an equivalent sound attenuator.

18 Please confirm that all insulated ductwork located inside mechanical rooms and/ or exposed to view will require aluminum jacketing.

Response: Canvas Jacket is acceptable within mechanical rooms.

19 Will any weather jacketing be required on the roof mounted ductwork?

Response: The only roof mounted ductwork in scope is the intake and exhaust goosenecks for the ERV and as such require no insulation or jacketing.

20 Please confirm the dryer venting is to be priced out of Galvanized and not Aluminum.

Response: Dryer venting is to be galvanized.

21 Type "C" diffusers do not appear on the drawings. Please confirm if they have been deleted from the project.

Response: Type C diffusers were removed from the project. Omit Type C diffusers from the schedule.

22 Does the existing VTANG BAS system referenced in Section 250923 ‐ Page 5, 1.8 section D have an existing ATO?

Response: No

23 Does the existing VTANG BAS reside on the Bases NIPR Net (NIPR)?

Response: No, resides on a separate, internal network.

24 If the existing VTANG BAS systems does not have an ATO, the intent of the New BAS system will be to obtain an ATO to meet the Cyber Security Requirements for Department of Defense Facilities as described in Section 250923 ‐ Page 6 – 2.4, with that said, the existing VTANG BAS system will not be able to reside on or interface to the New BAS. Is this the correct understanding as to not void the ATO for the New

BAS?

Response: No. Contractor does not need to obtain an ATO. Government will obtain that after installation. All other specifications for the hardware and software requirements must be met.

25 Is the VTANG responsible for obtaining the ATO? If not, will the VTANG be sponsoring the ATO effort?

Response: Yes

26 Will the BAS contractor be able to complete the network installation for commissioning purposes, without connecting the network to NIPR? NIPR connection of the system will only occur after issuance of ATO?

Response: Yes. Existing system not set up on NIPR. Installed and operating on a separate network. However, no off base connectivity is possible. The structure of the network requires on site connectivity for all programming and commissioning services.

27 In reference to Section 250923 ‐ Page 7, 2.5 Operator Workstation Requirements, is the VTANG or the ATC contractor responsible for supplying Server #1, Server #2, Workstation #1 with specified monitors and the associated operating system software?

Response: Yes. All requirements prescribed in paragraph 2.5 are to be included and supplied by the general contractor in the base bid.

28 The specification references a ground face CMU in the project.

Response: The reference to the ground face in the specification is an error. There is no ground face CMU in this project.

29 Supplemental Information regarding the solicitation page 36/37 specific to Availability and Use of Utility Services:

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled "Availability and Use of Utility Services" (FAR Clause 52.236-14). The following utilities will be available: Water and electricity are available for use by the contractor, however, electricity shall not be used as a heating source.

30 There is a problem with receiving a quote for the blast resistant Aluminum Framed Entrances and Curtainwalls specified in section 084413. Kawneer, EFCO and Tubelite are specified. Kawneer appears to be the only manufacturer interested in quoting the job and currently has this project in their estimating que. At this point, EFCO & Tubelite are not working on this project and are not intending to providing a quote. Kawneer will only fully engineer the blast resistant windows prior to providing pricing and due to their current work-load and engineering backlog, they are not able to provide a quote to our installer prior to Friday - June 16, 2017. Installed quotes would be available to General Contractors on Monday - June 19, 2017. A bid extension of one week is requested. If not, could a material and installation allowance be established for this scope of work?

Response: The bid opening date will not be extended. Please utilize all available resources in your proposal.

(End of Summary of Changes)