29-16V01ME Mechanical B3 Submission 20170209.pdf
PDF 7 MB Posted
- Attached to
- F-35 ALTER BUILDING 140 SQUAD OPS FACILITY Federal contract opportunity
- Solicitation number
- W912LN-17-B-1000
About this file
Not Listed
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE:
SCALE:
CHECKED:
DRAWN:
SAS PROJECT NO. 0705
CURZ 152813
P R O J E C T
ALTER B-140
SQUAD OPS
FACILITY
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
TYPE B-3 SUBMITTAL
CIVIL
STRUCTURAL
MECHANICAL/
ELECTRICAL:
FEBRUARY 10, 2017
AS NOTED
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R
E
G
I
S
T
E
R
E
D
NO. 5915
W
A
Y
N
E
G
F
I
L
L
I
O
N
ROOF PLAN -
MECHANICAL
DEMOLITION
RCN
LJP
MD1.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D.5
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text X
AutoCAD SHX Text Z
AutoCAD SHX Text Z.9
AutoCAD SHX Text 5.2
AutoCAD SHX Text 6.9
AutoCAD SHX Text 9.8
AutoCAD SHX Text 13.4
AutoCAD SHX Text 16.8
AutoCAD SHX Text 20.1
AutoCAD SHX Text 22.9
AutoCAD SHX Text Y.8
AutoCAD SHX Text Y.1
AutoCAD SHX Text Y
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text Y.9
AutoCAD SHX Text Y.2
AutoCAD SHX Text
XACCU-7
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text ALL EQUIPMENT ON ROOF AND WITHIN SCIF AREA SHALL REMAIN AS IS AND REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
AutoCAD SHX Text
1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.
AutoCAD SHX Text
MECHANICAL DEMOLITION KEYNOTES ' '
AutoCAD SHX Text
DEMOLITION LINE TYPE LEGEND
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.
AutoCAD SHX Text
EXISTING GENERAL CONSTRUCTION TO BE REMOVED.
AutoCAD SHX Text
1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
EQUIPMENT TO BE RECLAIMED
AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.
AutoCAD SHX Text Date: 02/09/2017-9:59, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley02/09/2017-9:59, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley, Tab: MD1.0, User: RnealleyMD1.0, User: Rnealley, User: RnealleyRnealley
AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME
AutoCAD SHX Text
ROOF PLAN - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE:
SCALE:
CHECKED:
DRAWN:
SAS PROJECT NO. 0705
CURZ 152813
P R O J E C T
ALTER B-140
SQUAD OPS
FACILITY
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
TYPE B-3 SUBMITTAL
CIVIL
STRUCTURAL
MECHANICAL/
ELECTRICAL:
FEBRUARY 10, 2017
AS NOTED
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R
E
G
I
S
T
E
R
E
D
NO. 5915
W
A
Y
F
I
L
L
I
O
N
UPPER LEVEL FLOOR
PLAN - MECHANICAL
DEMOLITION
RCN
LJP
MD1.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D.5
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text X
AutoCAD SHX Text Z
AutoCAD SHX Text Z.9
AutoCAD SHX Text 5.2
AutoCAD SHX Text 6.9
AutoCAD SHX Text 9.8
AutoCAD SHX Text 13.4
AutoCAD SHX Text 16.8
AutoCAD SHX Text 20.1
AutoCAD SHX Text 22.9
AutoCAD SHX Text Y.8
AutoCAD SHX Text Y.1
AutoCAD SHX Text Y
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text Y.9
AutoCAD SHX Text Y.2
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text 172A
AutoCAD SHX Text
CLO.
AutoCAD SHX Text 114B
AutoCAD SHX Text
COMMAND POST ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
AutoCAD SHX Text
FILE/ STOR.
AutoCAD SHX Text 153C
AutoCAD SHX Text W.C.
AutoCAD SHX Text 154A
AutoCAD SHX Text T
AutoCAD SHX Text
XVAV
AutoCAD SHX Text
XEF
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
ENTRY PORCH
AutoCAD SHX Text 101A
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
COMM. ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
ENTRY PORCH
AutoCAD SHX Text 106B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OPS SF COMMANDER
AutoCAD SHX Text
AutoCAD SHX Text
134TH FS COMMANDER
AutoCAD SHX Text
AutoCAD SHX Text
FS/OSF ORDERLY SECRETARY
AutoCAD SHX Text
AutoCAD SHX Text
FOYER
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
CONFERENCE/ CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
AutoCAD SHX Text
TOWER ACCESS
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAGE
AutoCAD SHX Text 116A
AutoCAD SHX Text
MAIN BRIEFING ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AIRFIELD/ FLIGHT MANAGEMENT
AutoCAD SHX Text
AutoCAD SHX Text
OFS SUPER. OFFICE
AutoCAD SHX Text 112A
AutoCAD SHX Text
COMMANDER
AutoCAD SHX Text
AutoCAD SHX Text
EGRESS PROCEDURES
AutoCAD SHX Text
AutoCAD SHX Text
WORK
AutoCAD SHX Text
AutoCAD SHX Text
CLO.
AutoCAD SHX Text 114C
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
AutoCAD SHX Text
LS HALL
AutoCAD SHX Text
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
AutoCAD SHX Text
BRIEFING ROOM
AutoCAD SHX Text
AutoCAD SHX Text
COPIER ALCOVE
AutoCAD SHX Text 114A
AutoCAD SHX Text
COCKPIT TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
BRIEFING ROOM
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text 161A
AutoCAD SHX Text
BRIEFING ROOM
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
AutoCAD SHX Text
AIRCREW GEAR
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
BREAK ROOM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
INTEL RECEPTION/ ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
INTEL CLASS B VAULT
AutoCAD SHX Text
AutoCAD SHX Text
CLO.
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
LS ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
AutoCAD SHX Text
SHWR
AutoCAD SHX Text
AutoCAD SHX Text
SHWR
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
MOP
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
MAILBOX ALCOVE
AutoCAD SHX Text 147A
AutoCAD SHX Text
F/M PLANNING
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
FOYER
AutoCAD SHX Text
AutoCAD SHX Text
SCHEDULING
AutoCAD SHX Text
AutoCAD SHX Text
OPS SUPPORT AIRPORT/PILOT SCHED/TRAINING
AutoCAD SHX Text
AutoCAD SHX Text
SOF/RADIO DISPATCH
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
PILOT LOUNGE
AutoCAD SHX Text
AutoCAD SHX Text
SRC
AutoCAD SHX Text
AutoCAD SHX Text
BATTLE STAFF
AutoCAD SHX Text 155A
AutoCAD SHX Text
COMMAND POST
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 153B
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
CUST.
AutoCAD SHX Text
AutoCAD SHX Text W.C.
AutoCAD SHX Text
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
COMM. CLO.
AutoCAD SHX Text 172B
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
POINT OF DISCONNECT.
AutoCAD SHX Text
POINT OF DISCONNECT.
AutoCAD SHX Text
POINT OF DISCONNECT.
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.
AutoCAD SHX Text
MECHANICAL DEMOLITION KEYNOTES ' '
AutoCAD SHX Text
DEMOLITION LINE TYPE LEGEND
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.
AutoCAD SHX Text
EXISTING GENERAL CONSTRUCTION TO BE REMOVED.
AutoCAD SHX Text
1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
EQUIPMENT TO BE RECLAIMED
AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.
AutoCAD SHX Text Date: 02/09/2017-9:59, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley02/09/2017-9:59, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley, Tab: MD1.1, User: RnealleyMD1.1, User: Rnealley, User: RnealleyRnealley
AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME
AutoCAD SHX Text
FIRST FLOOR PLAN - MECHANICAL DEMOLITION
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE:
SCALE:
CHECKED:
DRAWN:
SAS PROJECT NO. 0705
CURZ 152813
P R O J E C T
ALTER B-140
SQUAD OPS
FACILITY
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
TYPE B-3 SUBMITTAL
CIVIL
STRUCTURAL
MECHANICAL/
ELECTRICAL:
FEBRUARY 10, 2017
AS NOTED
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R
E
G
I
S
T
E
R
E
D
NO. 5915
W
A
Y
F
I
L
L
I
O
N
LOWER LEVEL FLOOR
PLAN - MECHANICAL
DEMOLITION
RCN
LJP
MD1.2
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text V
AutoCAD SHX Text X
AutoCAD SHX Text 20.1
AutoCAD SHX Text 22.9
AutoCAD SHX Text Y.8
AutoCAD SHX Text Y.1
AutoCAD SHX Text Y
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text Y.2
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
BRIEFING STOR.
AutoCAD SHX Text 024A
AutoCAD SHX Text
W.C. VEST.
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
XACV
AutoCAD SHX Text
XACV
AutoCAD SHX Text T
AutoCAD SHX Text
SCS SUPERVISOR
AutoCAD SHX Text 003A
AutoCAD SHX Text
MOP
AutoCAD SHX Text
AutoCAD SHX Text
MDF
AutoCAD SHX Text
AutoCAD SHX Text
RADIO OPER./ RADIO RM
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
UNHEATED STAIR
AutoCAD SHX Text
AutoCAD SHX Text
STOR.
AutoCAD SHX Text 013A
AutoCAD SHX Text
TEST ALCOVE
AutoCAD SHX Text 014A
AutoCAD SHX Text
MASS BREIFING/ TRAINING ROOM
AutoCAD SHX Text
AutoCAD SHX Text
RUBBER WORK
AutoCAD SHX Text
AutoCAD SHX Text
SEWING
AutoCAD SHX Text
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text 014B
AutoCAD SHX Text
RUBBER STOR.
AutoCAD SHX Text 013B
AutoCAD SHX Text
LIFE SUPPORT GEAR
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
RECIEVING
AutoCAD SHX Text
AutoCAD SHX Text
CLO.
AutoCAD SHX Text 010A
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 011A
AutoCAD SHX Text
WEST HALL
AutoCAD SHX Text 016A
AutoCAD SHX Text
MAN TRAP
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT BRIEFING
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT BRIEFING
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT BRIEFING
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT BRIEFING
AutoCAD SHX Text
AutoCAD SHX Text
RECIEVING
AutoCAD SHX Text
AutoCAD SHX Text
BREAK ROOM
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
AutoCAD SHX Text
MEN'S
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
CLO.
AutoCAD SHX Text 018A
AutoCAD SHX Text
MAINT. DEBRIEF
AutoCAD SHX Text
AutoCAD SHX Text
COMM. CLO.
AutoCAD SHX Text
AutoCAD SHX Text
WEAPONS & TACTICS
AutoCAD SHX Text
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
AutoCAD SHX Text
PSM/APSM OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
MISSION PLANNING
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 004A
AutoCAD SHX Text
ELECT.
AutoCAD SHX Text 032A
AutoCAD SHX Text
PM/APM OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
CLO.
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 102A
AutoCAD SHX Text
OPEN OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
FLIGHT BRIEFING
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
POINT OF DISCONNECT.
AutoCAD SHX Text
POINT OF DISCONNECT.
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text TURN OVER TO HVAC MAINTENANCE STAFF RECIRCULATOR PUMP, LEAD FREE BACKFLOW PREVENTORS, CONTROL VALVE, ACTUATORS, SUMP PIT CONTROLS & PUMP..
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.
AutoCAD SHX Text
MECHANICAL DEMOLITION KEYNOTES ' '
AutoCAD SHX Text
DEMOLITION LINE TYPE LEGEND
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.
AutoCAD SHX Text
EXISTING GENERAL CONSTRUCTION TO BE REMOVED.
AutoCAD SHX Text
EQUIPMENT TO BE RECLAIMED
AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.
AutoCAD SHX Text
1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text Date: 02/09/2017-10:00, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley02/09/2017-10:00, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley, Tab: MD1.1, User: RnealleyMD1.1, User: Rnealley, User: RnealleyRnealley
AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME
AutoCAD SHX Text
LOWER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE:
SCALE:
CHECKED:
DRAWN:
SAS PROJECT NO. 0705
CURZ 152813
P R O J E C T
ALTER B-140
SQUAD OPS
FACILITY
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
TYPE B-3 SUBMITTAL
CIVIL
STRUCTURAL
MECHANICAL/
ELECTRICAL:
FEBRUARY 10, 2017
AS NOTED
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R
E
G
I
S
T
E
R
E
D
NO. 5915
W
A
Y
F
I
L
L
I
O
N
UPPER LEVEL FLOOR
PLAN - MECHANICAL
RCN
LJP
M1.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D.5
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text X
AutoCAD SHX Text Z
AutoCAD SHX Text Z.9
AutoCAD SHX Text 5.2
AutoCAD SHX Text 6.9
AutoCAD SHX Text 9.8
AutoCAD SHX Text 13.4
AutoCAD SHX Text 16.8
AutoCAD SHX Text 20.1
AutoCAD SHX Text 22.9
AutoCAD SHX Text Y.8
AutoCAD SHX Text Y.1
AutoCAD SHX Text Y
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text Y.9
AutoCAD SHX Text Y.2
AutoCAD SHX Text
FS/CC OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OG SUPER
AutoCAD SHX Text
AutoCAD SHX Text
FS/CC OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OG ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
AutoCAD SHX Text
OG CONF.
AutoCAD SHX Text
AutoCAD SHX Text
EXG. GENERATOR
AutoCAD SHX Text
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
AutoCAD SHX Text
EGRESS PROCEEDURES
AutoCAD SHX Text
AutoCAD SHX Text
MOBILITY STOR.
AutoCAD SHX Text
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .