29-16V01ME Mechanical B3 Submission 20170209.pdf

PDF 7 MB Posted

Attached to
F-35 ALTER BUILDING 140 SQUAD OPS FACILITY Federal contract opportunity
Solicitation number
W912LN-17-B-1000
Issued by
Department of the Army Vermont Army National Guard

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ALTER BUILDING 140 SQUAD OPS FACILITY, newest first.
File Type Posted
W912LN-17-C-1000.pdf PDF
W912LN-17-B-1000_Amendment_0001.pdf PDF
Attachment_3_-_Roof_Warranty.pdf PDF
Attachment_1_-_16V01ME_E1.10-SKE-1.pdf PDF
Attachment_2_-_16V01ME_E1.11-SKE-2.pdf PDF
Pre_Proposal_Minutes.pdf PDF
B-140_Pre-Bid.pptx PPTX presentation
B140_Site_Visit_Attendance_Roster.pdf PDF
0705 - B-3 Project Manual 021017.pdf PDF
21-S1.0 - B140.pdf PDF
03-0705-XC Floor Plans.pdf PDF
0705-CD B3 F-35 Plan-ALIS.pdf PDF
10-0705-CD B3 Wall Types.pdf PDF
13-0705-CD B3 Stairs.pdf PDF
31-16V01ME Plumbing B-3 Submission 20170209.pdf PDF
04-0705-XC Exterior Elevations.pdf PDF
15-0705-CD B3 Int elev A-6-7-13.pdf PDF
12-0705-CD B3 Sections.pdf PDF
23-S1.2 - B140.pdf PDF
11-0705-CD B3 Ext Elev.pdf PDF
22-S1.1 - B140.pdf PDF
25-S2.2- B140.pdf PDF
07-0705-CD B3 Plans.pdf PDF
08-0705-CD B3 Roof Plan.pdf PDF
16-0705-CD B3 Int elev A-6-14-18.pdf PDF
26-S3.1 - B140.pdf PDF
Civil Plans B140 2-10-2017.pdf PDF
28-S3.3 - B140.pdf PDF
01-0705-CD B3 Alter B-140 Cover.pdf PDF
16V01ME-ALIS Electrical B3 Submission 20170208.pdf PDF
18-0705-CD B3 Windows.pdf PDF
B140_Squad_OPS.zip ZIP file
05-0705-XC Sections.pdf PDF
06-0705-CD B3 Site Plan.pdf PDF
20-0705-CD B3 Interior Details.pdf PDF
09-0705-CD B3 Roof Details.pdf PDF
02-Civil Plans B140 2-10-2017.pdf PDF
0705-Project Manual 021017 F35.pdf PDF
14-0705-CD B3 Int elev A-6-0-6.pdf PDF
32-16V01ME Fire Protection B3 Submission 20170208.pdf PDF
27-S3.2 - B140.pdf PDF
16112ME- ALIS Mechanical B3 Submission 20170209.pdf PDF
17B1000_11_May_17.pdf PDF
17-0705-CD B3 Doors.pdf PDF
16112ME Lighting Photometrics.pdf PDF
19-0705-CD B3 Exterior Details.pdf PDF
0705-CD B3 F-35 Cover-ALIS.pdf PDF
30-16V01ME Electrical B3 Submission 20170209.pdf PDF
24-S2.1 - B140.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O N S U L T A N T S

A R C H I T E C T S

1 1 7 S t. P a u l S t r e e t

3 r d F l o o r

B u r l i n g t o n, V T

0 5 4 0 1

P: 8 0 2 • 8 6 3 • 2 2 2 7

F: 8 0 2 • 8 6 3 • 0 0 9 3

ALVAR E Z

SIENKIEWYCZ

S M I T H

R E V I S I O N S

DATE:

SCALE:

CHECKED:

DRAWN:

SAS PROJECT NO. 0705

CURZ 152813

P R O J E C T

ALTER B-140

SQUAD OPS

FACILITY

VERMONT AIR

NATIONAL

GUARD

SOUTH BURLINGTON,

VERMONT

TYPE B-3 SUBMITTAL

CIVIL

STRUCTURAL

MECHANICAL/

ELECTRICAL:

FEBRUARY 10, 2017

AS NOTED

ST

A T E O F V ERMONT

P R

O

F E S S I O N A L E N G IN

EE

R

R

E

G

I

S

T

E

R

E

D

NO. 5915

W

A

Y

N

E

G

F

I

L

L

I

O

N

ROOF PLAN -

MECHANICAL

DEMOLITION

RCN

LJP

MD1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text D.5

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text X

AutoCAD SHX Text Z

AutoCAD SHX Text Z.9

AutoCAD SHX Text 5.2

AutoCAD SHX Text 6.9

AutoCAD SHX Text 9.8

AutoCAD SHX Text 13.4

AutoCAD SHX Text 16.8

AutoCAD SHX Text 20.1

AutoCAD SHX Text 22.9

AutoCAD SHX Text Y.8

AutoCAD SHX Text Y.1

AutoCAD SHX Text Y

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text Y.9

AutoCAD SHX Text Y.2

AutoCAD SHX Text

XACCU-7

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text ALL EQUIPMENT ON ROOF AND WITHIN SCIF AREA SHALL REMAIN AS IS AND REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.

AutoCAD SHX Text

1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.

AutoCAD SHX Text

MECHANICAL DEMOLITION KEYNOTES ' '

AutoCAD SHX Text

DEMOLITION LINE TYPE LEGEND

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.

AutoCAD SHX Text

EXISTING GENERAL CONSTRUCTION TO BE REMOVED.

AutoCAD SHX Text

1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

EQUIPMENT TO BE RECLAIMED

AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.

AutoCAD SHX Text Date: 02/09/2017-9:59, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley02/09/2017-9:59, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley, Dwg: 16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley16V01ME MD1.0.dwg, Tab: MD1.0, User: Rnealley, Tab: MD1.0, User: RnealleyMD1.0, User: Rnealley, User: RnealleyRnealley

AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME

AutoCAD SHX Text

ROOF PLAN - MECHANICAL DEMOLITION

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

C O N S U L T A N T S

A R C H I T E C T S

1 1 7 S t. P a u l S t r e e t

3 r d F l o o r

B u r l i n g t o n, V T

0 5 4 0 1

P: 8 0 2 • 8 6 3 • 2 2 2 7

F: 8 0 2 • 8 6 3 • 0 0 9 3

ALVAR E Z

SIENKIEWYCZ

S M I T H

R E V I S I O N S

DATE:

SCALE:

CHECKED:

DRAWN:

SAS PROJECT NO. 0705

CURZ 152813

P R O J E C T

ALTER B-140

SQUAD OPS

FACILITY

VERMONT AIR

NATIONAL

GUARD

SOUTH BURLINGTON,

VERMONT

TYPE B-3 SUBMITTAL

CIVIL

STRUCTURAL

MECHANICAL/

ELECTRICAL:

FEBRUARY 10, 2017

AS NOTED

ST

A T E O F V ERMONT

P R

O

F E S S I O N A L E N G IN

EE

R

R

E

G

I

S

T

E

R

E

D

NO. 5915

W

A

Y

F

I

L

L

I

O

N

UPPER LEVEL FLOOR

PLAN - MECHANICAL

DEMOLITION

RCN

LJP

MD1.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text D.5

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text X

AutoCAD SHX Text Z

AutoCAD SHX Text Z.9

AutoCAD SHX Text 5.2

AutoCAD SHX Text 6.9

AutoCAD SHX Text 9.8

AutoCAD SHX Text 13.4

AutoCAD SHX Text 16.8

AutoCAD SHX Text 20.1

AutoCAD SHX Text 22.9

AutoCAD SHX Text Y.8

AutoCAD SHX Text Y.1

AutoCAD SHX Text Y

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text Y.9

AutoCAD SHX Text Y.2

AutoCAD SHX Text

MECH CHASE

AutoCAD SHX Text 172A

AutoCAD SHX Text

CLO.

AutoCAD SHX Text 114B

AutoCAD SHX Text

COMMAND POST ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

AutoCAD SHX Text

FILE/ STOR.

AutoCAD SHX Text 153C

AutoCAD SHX Text W.C.

AutoCAD SHX Text 154A

AutoCAD SHX Text T

AutoCAD SHX Text

XVAV

AutoCAD SHX Text

XEF

AutoCAD SHX Text

DUMB WAITER

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

ENTRY PORCH

AutoCAD SHX Text 101A

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

COMM. ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

ENTRY PORCH

AutoCAD SHX Text 106B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OPS SF COMMANDER

AutoCAD SHX Text

AutoCAD SHX Text

134TH FS COMMANDER

AutoCAD SHX Text

AutoCAD SHX Text

FS/OSF ORDERLY SECRETARY

AutoCAD SHX Text

AutoCAD SHX Text

FOYER

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE/ CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

AutoCAD SHX Text

TOWER ACCESS

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAGE

AutoCAD SHX Text 116A

AutoCAD SHX Text

MAIN BRIEFING ROOM

AutoCAD SHX Text

AutoCAD SHX Text

AIRFIELD/ FLIGHT MANAGEMENT

AutoCAD SHX Text

AutoCAD SHX Text

OFS SUPER. OFFICE

AutoCAD SHX Text 112A

AutoCAD SHX Text

COMMANDER

AutoCAD SHX Text

AutoCAD SHX Text

EGRESS PROCEDURES

AutoCAD SHX Text

AutoCAD SHX Text

WORK

AutoCAD SHX Text

AutoCAD SHX Text

CLO.

AutoCAD SHX Text 114C

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

AutoCAD SHX Text

LS HALL

AutoCAD SHX Text

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

AutoCAD SHX Text

BRIEFING ROOM

AutoCAD SHX Text

AutoCAD SHX Text

COPIER ALCOVE

AutoCAD SHX Text 114A

AutoCAD SHX Text

COCKPIT TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

BRIEFING ROOM

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text 161A

AutoCAD SHX Text

BRIEFING ROOM

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

AIRCREW GEAR

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

INTEL RECEPTION/ ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTEL CLASS B VAULT

AutoCAD SHX Text

AutoCAD SHX Text

CLO.

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

LS ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

AutoCAD SHX Text

SHWR

AutoCAD SHX Text

AutoCAD SHX Text

SHWR

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

MOP

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

MAILBOX ALCOVE

AutoCAD SHX Text 147A

AutoCAD SHX Text

F/M PLANNING

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

FOYER

AutoCAD SHX Text

AutoCAD SHX Text

SCHEDULING

AutoCAD SHX Text

AutoCAD SHX Text

OPS SUPPORT AIRPORT/PILOT SCHED/TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

SOF/RADIO DISPATCH

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

PILOT LOUNGE

AutoCAD SHX Text

AutoCAD SHX Text

SRC

AutoCAD SHX Text

AutoCAD SHX Text

BATTLE STAFF

AutoCAD SHX Text 155A

AutoCAD SHX Text

COMMAND POST

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 153B

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

CUST.

AutoCAD SHX Text

AutoCAD SHX Text W.C.

AutoCAD SHX Text

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

COMM. CLO.

AutoCAD SHX Text 172B

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

POINT OF DISCONNECT.

AutoCAD SHX Text

POINT OF DISCONNECT.

AutoCAD SHX Text

POINT OF DISCONNECT.

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.

AutoCAD SHX Text

MECHANICAL DEMOLITION KEYNOTES ' '

AutoCAD SHX Text

DEMOLITION LINE TYPE LEGEND

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.

AutoCAD SHX Text

EXISTING GENERAL CONSTRUCTION TO BE REMOVED.

AutoCAD SHX Text

1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

EQUIPMENT TO BE RECLAIMED

AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.

AutoCAD SHX Text Date: 02/09/2017-9:59, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley02/09/2017-9:59, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley, Dwg: 16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley16V01ME MD1.1.dwg, Tab: MD1.1, User: Rnealley, Tab: MD1.1, User: RnealleyMD1.1, User: Rnealley, User: RnealleyRnealley

AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME

AutoCAD SHX Text

FIRST FLOOR PLAN - MECHANICAL DEMOLITION

C O N S U L T A N T S

A R C H I T E C T S

1 1 7 S t. P a u l S t r e e t

3 r d F l o o r

B u r l i n g t o n, V T

0 5 4 0 1

P: 8 0 2 • 8 6 3 • 2 2 2 7

F: 8 0 2 • 8 6 3 • 0 0 9 3

ALVAR E Z

SIENKIEWYCZ

S M I T H

R E V I S I O N S

DATE:

SCALE:

CHECKED:

DRAWN:

SAS PROJECT NO. 0705

CURZ 152813

P R O J E C T

ALTER B-140

SQUAD OPS

FACILITY

VERMONT AIR

NATIONAL

GUARD

SOUTH BURLINGTON,

VERMONT

TYPE B-3 SUBMITTAL

CIVIL

STRUCTURAL

MECHANICAL/

ELECTRICAL:

FEBRUARY 10, 2017

AS NOTED

ST

A T E O F V ERMONT

P R

O

F E S S I O N A L E N G IN

EE

R

R

E

G

I

S

T

E

R

E

D

NO. 5915

W

A

Y

F

I

L

L

I

O

N

LOWER LEVEL FLOOR

PLAN - MECHANICAL

DEMOLITION

RCN

LJP

MD1.2

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text V

AutoCAD SHX Text X

AutoCAD SHX Text 20.1

AutoCAD SHX Text 22.9

AutoCAD SHX Text Y.8

AutoCAD SHX Text Y.1

AutoCAD SHX Text Y

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text Y.2

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

BRIEFING STOR.

AutoCAD SHX Text 024A

AutoCAD SHX Text

W.C. VEST.

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

XACV

AutoCAD SHX Text

XACV

AutoCAD SHX Text T

AutoCAD SHX Text

SCS SUPERVISOR

AutoCAD SHX Text 003A

AutoCAD SHX Text

MOP

AutoCAD SHX Text

AutoCAD SHX Text

MDF

AutoCAD SHX Text

AutoCAD SHX Text

RADIO OPER./ RADIO RM

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

UNHEATED STAIR

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text 013A

AutoCAD SHX Text

TEST ALCOVE

AutoCAD SHX Text 014A

AutoCAD SHX Text

MASS BREIFING/ TRAINING ROOM

AutoCAD SHX Text

AutoCAD SHX Text

RUBBER WORK

AutoCAD SHX Text

AutoCAD SHX Text

SEWING

AutoCAD SHX Text

AutoCAD SHX Text

UNISEX

AutoCAD SHX Text 014B

AutoCAD SHX Text

RUBBER STOR.

AutoCAD SHX Text 013B

AutoCAD SHX Text

LIFE SUPPORT GEAR

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

RECIEVING

AutoCAD SHX Text

AutoCAD SHX Text

CLO.

AutoCAD SHX Text 010A

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 011A

AutoCAD SHX Text

WEST HALL

AutoCAD SHX Text 016A

AutoCAD SHX Text

MAN TRAP

AutoCAD SHX Text

AutoCAD SHX Text

FLIGHT BRIEFING

AutoCAD SHX Text

AutoCAD SHX Text

FLIGHT BRIEFING

AutoCAD SHX Text

AutoCAD SHX Text

FLIGHT BRIEFING

AutoCAD SHX Text

AutoCAD SHX Text

FLIGHT BRIEFING

AutoCAD SHX Text

AutoCAD SHX Text

RECIEVING

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLO.

AutoCAD SHX Text 018A

AutoCAD SHX Text

MAINT. DEBRIEF

AutoCAD SHX Text

AutoCAD SHX Text

COMM. CLO.

AutoCAD SHX Text

AutoCAD SHX Text

WEAPONS & TACTICS

AutoCAD SHX Text

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

AutoCAD SHX Text

PSM/APSM OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

MISSION PLANNING

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 004A

AutoCAD SHX Text

ELECT.

AutoCAD SHX Text 032A

AutoCAD SHX Text

PM/APM OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLO.

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 102A

AutoCAD SHX Text

OPEN OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

FLIGHT BRIEFING

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

POINT OF DISCONNECT.

AutoCAD SHX Text

POINT OF DISCONNECT.

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text TURN OVER TO HVAC MAINTENANCE STAFF RECIRCULATOR PUMP, LEAD FREE BACKFLOW PREVENTORS, CONTROL VALVE, ACTUATORS, SUMP PIT CONTROLS & PUMP..

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

1. REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED REMOVE EXISTING HOT WATER BOILER COMPLETE INCLUDING ALL ASSOCIATED CONTROLS, SENSORS, WIRING FLUE PIPE, BREACHING WATER TREATMENT FEEDER AND PIPING. TURN OVER TO HVAC MAINTENANCE STAFF VFD PARTS FROM EXISTING BUDERUS BOILER. 2. REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING HWS&R PIPING AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. COORDINATE WITH ARCHITECTURAL CEILING PLANS AND INTERIOR ELEVATIONS. 3. REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM REMOVE EXISTING STEAM HUMIDIFIER COMPLETE INCLUDING DISPERSION TUBE, STEAM TUBE, COLD WATER CONNECTION AND ELECTRICAL WIRING. 4. REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL ASSOCIATED CONTROLS, WIRING, PIPING, DUCTWORK AND SUPPORTS COMPLETE. TURN OVER TO HVAC STAFF VFD CONTROL. 5. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. REMOVE EXISTING EXPANSION TANK AND PIPING COMPLETE. 6. REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING REMOVE EXISTING CIRCULATOR PUMP INCLUDING CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO HVAC MAINTENANCE STAFF ONE (1) CIRCULATOR PUMP. 7. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. REMOVE EXISTING AIR TERMINAL COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK. 8. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. REMOVE EXISTING DUCTWORK INCLUDING HANGERS AND SUPPORTS COMPLETE. 9. REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, REMOVE EXISTING COMBUSTION AIR ASSEMBLY INCLUDING ASSOCIATED DUCTWORK, DAMPERS, CONTROLS, WIRING AND LOUVER COMPLETE. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 10. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS REMOVE EXISTING VAV BOX AND ALL ASSOCIATED CONTROLS AND SUPPORTS COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 11. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. REMOVE EXISTING TRANSFER DUCT ASSEMBLY AND ASSOCIATED GRILLES COMPLETE. 12. REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL REMOVE & RELOCATE EXISTING EXHAUST HOOD TO NEW RUBBER ROOM. DISCARD ALL ASSOCIATED EXHAUST DUCT. 13. REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS REMOVE EXISTING DUCT MOUNTED HEATING COIL AND ASSOCIATED VALVES, CONTROLS AND PIPING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 14. REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND ASSOCIATED DAMPER, CONTROLS AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. CAP, INSULATE AND SEAL WEATHER TIGHT AT ROOF CURB BY G.C. 15. REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS REMOVE EXISTING CHWS&R PIPE AND ALL ASSOCIATED VALVES AND HANGERS COMPLETE. 16. REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT REMOVE EXISTING FINTUBE RADIATION AND ALL ASSOCIATED PIPING, VALVES, ELEMENT AND ENCLOSURE COMPLETE. 17. REMOVE EXISTING AIR SEPARATOR COMPLETE. REMOVE EXISTING AIR SEPARATOR COMPLETE. 18. REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE REMOVE EXISTING WALL MOUNTED THERMOSTAT AND ASSOCIATED CONTROL WIRE COMPLETE. 19. REMOVE EXISTING BOILER VENTING COMPLETE. REMOVE EXISTING BOILER VENTING COMPLETE. 20. REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND REMOVE EXISTING CABINET UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. FILL AND PATCH EXISTING WALL/CEILING TO MATCH EXISTING FINISHES AS/IF REQUIRED BY G.C. 21. REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING REMOVE EXISTING UNIT HEATER AND ASSOCIATED CONTROLS, PIPING AND WIRING COMPLETE. 22. REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM REMOVE EXISTING CHILLER COMPLETELY. PRESERVE AND TURNOVER TO VTANG FROM EXISTING CHILLER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS, MNB1000 AND ALL I/O MODULES, ICE CUBE RELAYS, 3-WAY CONTROL VALVE, 4 PRESSURE SENSORS, WATTNODE ELECTRICAL MONITOR AND CT'S, CIRCULATOR PUMP COMPLETE (INCL. MOTOR, PUMP & VFD), ONE COPELAND SCROLL COMPRESSOR, TWO CONDENSER FAN BLADES IDENTIFIED BY BASE HVAC STAFF. PRESERVE ASSOCIATED POWER METER TO BE INSTALLED WITH NEW CHILLER. 23. EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE EXISTING CONDENSING UNIT TO REMAIN. PROVIDE AND INSTALL NEW REFRIGERANT PIPE SIZED TO MATCH EXISTING. 24. EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW EXISTING FINTUBE IN EXISTING RECESSED TRENCH TO REMAIN. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 25. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED CONTROLS, REFRIGERANT PIPING AND SUPPORT COMPLETE. TURN OVER TO OWNER ALL LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. 26. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS, WIRING AND REFRIGERANT PIPING COMPLETE. ROOF PATCHING BY G.C. 27. EXISTING AIR COMPRESSOR TO REMAIN AS IS. EXISTING AIR COMPRESSOR TO REMAIN AS IS. 28. EXISTING FAN COIL UNIT TO REMAIN AS IS. EXISTING FAN COIL UNIT TO REMAIN AS IS. 29. EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 EXISTING JACE TO BE PRESERVED AND REUSED IN NEW WORK. EXISTING M22 CONTROLLER TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 30. REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS REMOVE EXISTING GAS FIRED UNIT HEATER AND ALL ASSOCIATED FLUE AND GAS PIPING COMPLETELY. REMAINING GAS PIPE TO BE VALVED AND CAPPED. 31. REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO REMOVE EXISTING REFRIGERANT PIPE AND HANGERS FROM FAN COIL UNIT TO CONDENSING UNIT COMPLETE. REPLACE WITH NEW AS SHOWN ON NEW WORK PLAN. 32. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCT AND SUPPORTS COMPLETE. 33. REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND REMOVE EXISTING WALL CAP. FILL AND PATCH TO MATCH EXISTING INTERIOR AND EXTERIOR FINISHES BY G.C. 34. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. REMOVE EXISTING LOUVER AND ASSOCIATED DAMPER ALONG WITH GENERATOR EXHAUST. OPENING TO BE INFILLED AND PATCHED TO MATCH EXISTING. 35. EXISTING DUCTWORK TO REMAIN AND CLEANED. EXISTING DUCTWORK TO REMAIN AND CLEANED. 36. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. EXISTING AIR TERMINAL TO REMAIN AND CLEANED. 37. EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R EXISTING CABINET UNIT HEATER TO REMAIN IN PLACE. RECONNECT TO NEW HWS&R PIPE AS SHOWN ON NEW WORK PLANS. 38. REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING REMOVE EXISTING DUCTLESS SPLIT AIR CONDITIONER AND ASSOCIATED CONDENSING UNIT AND REFRIGERANT PIPING COMPLETE. UNITS TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 39. EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TO EXISTING 10" ROUND DUCT RISER TO EXISTING VAV BOX ON SECOND FLOOR TOREMAIN. RECONNECT TO NEW O/A DUCT AS SHOWN ON NEW WORK PLANS. 40. EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS EXISTING HWS&R RISERS TO SECOND FLOOR TO REMAIN. RECONNECT TO NEW AS SHOWN ON NEW WORK PLANS. 41. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONTROLS AND REFRIGERANT PIPING. CONDENSING UNIT TO BE TURNED OVER TO VTANG HVAC MAINTENANCE STAFF. 42. EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON EXISTING HWS&R PIPES TO REMAIN IN PLACE. CONNECT TO NEW PIPES AS SHOWN ON NEW WORK PLANS.

AutoCAD SHX Text

MECHANICAL DEMOLITION KEYNOTES ' '

AutoCAD SHX Text

DEMOLITION LINE TYPE LEGEND

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.

AutoCAD SHX Text

EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.

AutoCAD SHX Text

EXISTING GENERAL CONSTRUCTION TO BE REMOVED.

AutoCAD SHX Text

EQUIPMENT TO BE RECLAIMED

AutoCAD SHX Text THE FOLLOWING EQUIPMENT WHEN REMOVED SHALL BE PROVIDED TO OWNER FOR REUSE (AS IDENTIFIED BY BASE HVAC STAFF): LONWORKS CONTROLLERS AND ASSOCIATED SENSORS. JACE CONTROLLERS. WATTNODE ELECTRICAL METERS AND CT'S. CIRCULATOR PUMPS COMPLETE INCLUDING MOTOR, PUMP & VFD. AUTOMATIC CONTROL VALVES AND ACTUATORS.

AutoCAD SHX Text

1. ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT ALL EQUIPMENT, PIPING AND DUCTWORK SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S COORDINATE ALL GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. 3. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. WATERPROOF BOTTOM AND SIDES OF ALL INTAKE, EXHAUST AND RELIEF PLENUMS. 4. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 5. FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL FIRE AND MOISTURE SEAL ALL DUCT AND PIPE PENETRATIONS THRU GENERAL CONSTRUCTION IN ACCORDANCE WITH SECTION 230500. 6. HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO HOT WATER WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 7. MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED MOUNTING HEIGHTS FOR THERMOSTATS, EQUIPMENT ON/OFF SWITCHES, ETC., LOCATED IN HANDICAP ACCESSIBLE SPACES SHALL BE 48" TO TOP OF CONTROL UNLESS NOTED OTHERWISE BY ARCHITECT. REFER TO ARCHITECTURAL ELEVATIONS FOR FURTHER DETAILS. 8. FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS FLEXIBLE DUCTS TO BE NOT OVER 5'-0" FEET LONG WITH APPROVED TRANSITIONS AND SMOOTH BENDS TO TERMINAL CONNECTIONS. 9. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. PITCH DUCT CONNECTIONS TO LOUVERS TO DRAIN TOWARD LOUVER. 10. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. FLEX DUCT SIZE TO MATCH RUNOUT SIZE UNLESS NOTED OTHERWISE. 11. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. DUCT DIMENSIONS ARE TO INSIDE OF LINER WHERE APPLICABLE. 12. PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK PROVIDE DUCT LINER FIRST 10'-0" OF SUPPLY DUCTWORK AFTER UNIT AND BACK 5'-0" OF RETURN DUCT. LINER SHALL BE 1" THICK, REFER TO SPECIFICATIONS FOR MORE INFORMATION. 13. DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN DO NOT SCALE FIN-TUBE RADIATION LENGTHS. REFER TO LINEAR FOOTAGE LISTED IN IDENTIFICATION SYMBOL. 14. REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS REMOVAL OF ANY WALL PENETRATION IN SAPF OR STC WALLS SHALL BE PATCHED AS PER ARCHITECTURAL DRAWINGS.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text Date: 02/09/2017-10:00, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley02/09/2017-10:00, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley, Dwg: 16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley16V01ME MD1.2.dwg, Tab: MD1.1, User: Rnealley, Tab: MD1.1, User: RnealleyMD1.1, User: Rnealley, User: RnealleyRnealley

AutoCAD SHX Text KREBS & LANSING 164 MAIN ST. COLCHESTER, VT 05446 P: 802-878-0375 F: 802-878-9618 RICHARD M. DOHERTY, P.E. 595 DORSET STREET, #6 SO. BURLINGTON, VT 05403 P: 802-660-9212 F: 802-660-8403 YEATON ASSOCIATES 66 JACKSON ST. LITTLETON, NH 03561 P: 603-444-6578 www.yeatonassociates.com YA# 16V01ME

AutoCAD SHX Text

LOWER LEVEL FLOOR PLAN - MECHANICAL DEMOLITION

C O N S U L T A N T S

A R C H I T E C T S

1 1 7 S t. P a u l S t r e e t

3 r d F l o o r

B u r l i n g t o n, V T

0 5 4 0 1

P: 8 0 2 • 8 6 3 • 2 2 2 7

F: 8 0 2 • 8 6 3 • 0 0 9 3

ALVAR E Z

SIENKIEWYCZ

S M I T H

R E V I S I O N S

DATE:

SCALE:

CHECKED:

DRAWN:

SAS PROJECT NO. 0705

CURZ 152813

P R O J E C T

ALTER B-140

SQUAD OPS

FACILITY

VERMONT AIR

NATIONAL

GUARD

SOUTH BURLINGTON,

VERMONT

TYPE B-3 SUBMITTAL

CIVIL

STRUCTURAL

MECHANICAL/

ELECTRICAL:

FEBRUARY 10, 2017

AS NOTED

ST

A T E O F V ERMONT

P R

O

F E S S I O N A L E N G IN

EE

R

R

E

G

I

S

T

E

R

E

D

NO. 5915

W

A

Y

F

I

L

L

I

O

N

UPPER LEVEL FLOOR

PLAN - MECHANICAL

RCN

LJP

M1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text D.5

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text X

AutoCAD SHX Text Z

AutoCAD SHX Text Z.9

AutoCAD SHX Text 5.2

AutoCAD SHX Text 6.9

AutoCAD SHX Text 9.8

AutoCAD SHX Text 13.4

AutoCAD SHX Text 16.8

AutoCAD SHX Text 20.1

AutoCAD SHX Text 22.9

AutoCAD SHX Text Y.8

AutoCAD SHX Text Y.1

AutoCAD SHX Text Y

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text Y.9

AutoCAD SHX Text Y.2

AutoCAD SHX Text

FS/CC OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OG SUPER

AutoCAD SHX Text

AutoCAD SHX Text

FS/CC OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OG ADMIN

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

OG CONF.

AutoCAD SHX Text

AutoCAD SHX Text

EXG. GENERATOR

AutoCAD SHX Text

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

AutoCAD SHX Text

EGRESS PROCEEDURES

AutoCAD SHX Text

AutoCAD SHX Text

MOBILITY STOR.

AutoCAD SHX Text

AutoCAD SHX Text

COMM.

AutoCAD SHX Text

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.