0705 - B-3 Project Manual 021017.pdf

PDF 26 MB Posted

Attached to
F-35 ALTER BUILDING 140 SQUAD OPS FACILITY Federal contract opportunity
Solicitation number
W912LN-17-B-1000
Issued by
Department of the Army Vermont Army National Guard

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ALTER BUILDING 140 SQUAD OPS FACILITY, newest first.
File Type Posted
W912LN-17-C-1000.pdf PDF
W912LN-17-B-1000_Amendment_0001.pdf PDF
Attachment_2_-_16V01ME_E1.11-SKE-2.pdf PDF
Attachment_3_-_Roof_Warranty.pdf PDF
Attachment_1_-_16V01ME_E1.10-SKE-1.pdf PDF
Pre_Proposal_Minutes.pdf PDF
B140_Site_Visit_Attendance_Roster.pdf PDF
B-140_Pre-Bid.pptx PPTX presentation
21-S1.0 - B140.pdf PDF
03-0705-XC Floor Plans.pdf PDF
0705-CD B3 F-35 Plan-ALIS.pdf PDF
10-0705-CD B3 Wall Types.pdf PDF
13-0705-CD B3 Stairs.pdf PDF
31-16V01ME Plumbing B-3 Submission 20170209.pdf PDF
16112ME- ALIS Mechanical B3 Submission 20170209.pdf PDF
17B1000_11_May_17.pdf PDF
29-16V01ME Mechanical B3 Submission 20170209.pdf PDF
17-0705-CD B3 Doors.pdf PDF
16112ME Lighting Photometrics.pdf PDF
19-0705-CD B3 Exterior Details.pdf PDF
0705-CD B3 F-35 Cover-ALIS.pdf PDF
30-16V01ME Electrical B3 Submission 20170209.pdf PDF
24-S2.1 - B140.pdf PDF
16V01ME-ALIS Electrical B3 Submission 20170208.pdf PDF
18-0705-CD B3 Windows.pdf PDF
B140_Squad_OPS.zip ZIP file
05-0705-XC Sections.pdf PDF
06-0705-CD B3 Site Plan.pdf PDF
20-0705-CD B3 Interior Details.pdf PDF
09-0705-CD B3 Roof Details.pdf PDF
02-Civil Plans B140 2-10-2017.pdf PDF
0705-Project Manual 021017 F35.pdf PDF
14-0705-CD B3 Int elev A-6-0-6.pdf PDF
32-16V01ME Fire Protection B3 Submission 20170208.pdf PDF
27-S3.2 - B140.pdf PDF
04-0705-XC Exterior Elevations.pdf PDF
15-0705-CD B3 Int elev A-6-7-13.pdf PDF
12-0705-CD B3 Sections.pdf PDF
23-S1.2 - B140.pdf PDF
11-0705-CD B3 Ext Elev.pdf PDF
22-S1.1 - B140.pdf PDF
25-S2.2- B140.pdf PDF
07-0705-CD B3 Plans.pdf PDF
08-0705-CD B3 Roof Plan.pdf PDF
16-0705-CD B3 Int elev A-6-14-18.pdf PDF
26-S3.1 - B140.pdf PDF
Civil Plans B140 2-10-2017.pdf PDF
28-S3.3 - B140.pdf PDF
01-0705-CD B3 Alter B-140 Cover.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

ALTER B-140

SQUAD OPS FACILITY

VERMONT AIR NATIONAL GUARD

BURLINGTON, VERMONT

CURZ 152813

FEBRUARY 10, 2017

SMITH | ALVAREZ | SIENKIEWYCZ ARCHITECTS

ALTER BUILDING 140 SQUAD OPS FACILITY PROJECT DIRECTORY

Smith-Alvarez-Sienkiewycz, Architects P.C. Page 1

PROJECT DIRECTORY

CONTRACTING OFFICER:

Department of Army & Air Force Vermont Air National Guard 45 NCO Drive, Suite A South Burlington, VT 05403

Attn: Brian Dusablon

(802) 660-5361

CONTRACTING OFFICER'S

REPRESENTATIVE:

Capt. Mathew Lehman

158 CES/CEE VTANG

30 Falcon Street So. Burlington, VT 05403

Attn: Mathew Lehman

(802) 660-5455

ARCHITECT:

Smith-Alvarez-Sienkiewycz, Architects 117 St. Paul Street, 3rd Floor Burlington, VT 05401

Attn: Stephen Smith

(802) 863-2227

ALTER BUILDING 140 SQUAD OPS FACILITY TABLE OF CONTENTS

Smith-Alvarez-Sienkiewycz, Architects, PC Page 1

GENERAL

PROJECT DIRECTORY

LOCATION MAP

TABLE OF CONTENTS

DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS

003000 SPECIAL CONTRACT PROVISIONS

003126 EXISTING HAZARDOUS MATERIALS INFORMATION

DIVISION 1 - GENERAL REQUIREMENTS

011000 SUMMARY

012300 BID OPTIONS

012500 SUBSTITUTION PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014000 QUALITY REQUIREMENTS

015000 TEMPORARY FACILITIES AND CONTROLS

016000 PRODUCT REQUIREMENTS

017300 EXECUTION

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017839 PROJECT RECORD DOCUMENTS

017840 AS-BUILT UTILITY SITE DRAWINGS

017900 DEMONSTRATION AND TRAINING

019100 COMMISSIONING REQUIREMENTS

DIVISION 2 - SITE CONSTRUCTION

022700 TEMPORARY BUILDING SUPPORT AND SHORING

023000 SUBSURFACE CONDITIONS

024119 SELECTIVE DEMOLITION

029300 LAWNS

DIVISION 3 - CONCRETE

033000 CAST-IN-PLACE CONCRETE

033600 POLISHED CONCRETE FINISHING

035413 SELF-LEVELING UNDERLAYMENT

DIVISION 4 - MASONRY

042000 UNIT MASONRY

044313 ANCHORED STONE VENEER

Smith-Alvarez-Sienkiewycz, Architects, PC Page 2

DIVISION 5 - METALS

051000 STRUCTURAL METALS

053100 METAL DECK

054000 COLD-FORMED METAL FRAMING

055000 METAL FABRICATIONS

055113 METAL PAN STAIRS

055213 PIPE AND TUBE RAILINGS

DIVISION 6 - WOOD AND PLASTICS

061053 ROUGH CARPENTRY

061600 SHEATHING

062023 INTERIOR FINISH CARPENTRY

064200 SOLID SURFACE WALL PANELS

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

071410 FLUID-APPLIED WATERPROOFING

072100 THERMAL INSULATION

072119 SPRAY-APPLIED FOAM INSULATION

072150 FOUNDATION INSULATION AND VAPOR BARRIER

072500 WEATHER BARRIERS

072600 TOPICAL MOISTURE VAPOR MITIGATION SYSTEM – BID OPTION

074123 METAL SIDING

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS

081213 HOLLOW METAL FRAMES

081416 FLUSH WOOD DOORS

083113 ACCESS DOORS AND FRAMES

083473 WOOD SOUND CONTROL DOOR ASSEMBLIES

083953 BLAST-RESISTANT DOORS AND FRAMES

084226 ALL GLASS ENTRANCES

084413 ALUMINUM-FRAMED ENTRANCES AND CURTAINWALLS

087100 FINISH HARDWARE

088000 GLAZING

DIVISION 9 - FINISHES

090561 MOISTURE VAPOR EMISSION CONTROL

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093013 TILING

093033 STONE TILING

095113 ACOUSTICAL PANEL CEILINGS

095120 ACOUSTICAL TILE CEILINGS

Smith-Alvarez-Sienkiewycz, Architects, PC Page 3

096513 RESILIENT BASE AND ACCESSORIES

096536 STATIC-CONTROL RESILIENT FLOORING

096543 LINOLEUM FLOORING

096810 CARPET TILE

098410 ACOUSTIC WALL PANELS

099000 PAINTING

DIVISION 10 - SPECIALTIES

101000 VISUAL DISPLAY BOARDS

102113 PLASTIC TOILET COMPARTMENTS

102214 DEMOUNTABLE PARTITIONS

102800 TOILET AND BATH ACCESSORIES

104310 SIGNAGE

104413 FIRE PROTECTION CABINETS

105113 METAL LOCKERS

DIVISION 11 - EQUIPMENT

111200 VEHICLE CONTROL EQUIPMENT

115213 PROJECTION SCREENS

DIVISION 12 - FURNISHINGS

123216 MANUFACTURED PLASTIC-LAMINATE-FACED CABINETS

123619 WOOD COUNTERTOPS

126100 FIXED AUDIENCE SEATING

DIVISION 13 - SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 - CONVEYING SYSTEMS

142400 HYDRAULIC ELEVATOR

DIVISION 21 - FIRE SUPPRESSION

210500 COMMON WORK RESULTS FOR FIRE SUPPRESSION

210523 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING

210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND

EQUIPMENT

210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

210800 COMMISSIONING OF FIRE SUPPRESSION

211300 FIRE SUPPRESSION SPRINKLERS

DIVISION 22 - PLUMBING

220500 COMMON WORK RESULTS FOR PLUMBING

220513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

220516 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

220519 METERS AND GAGES FOR PLUMBING PIPING

Smith-Alvarez-Sienkiewycz, Architects, PC Page 4

220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING

220548 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

220800 COMMISSIONING OF PLUMBING

221005 PLUMBING PIPING

221006 PLUMBING PIPING SPECIALTIES

221500 GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

223000 PLUMBING EQUIPMENT

224000 PLUMBING FIXTURES

DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING

230130.51 HVAC AIR DUCT CLEANING

230500 COMMON WORK RESULTS FOR HVAC

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

230519 METERS AND GAGES FOR HVAC PIPING

230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230716 HVAC EQUIPMENT INSULATION

230719 HVAC PIPING INSULATION

230800 COMMISSIONING OF HVAC

230993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

232113 HYDRONIC PIPING

232114 HYDRONIC SPECIALTIES

232123 HYDRONIC PUMPS

232300 REFRIGERANT PIPING

232500 HVAC WATER TREATMENT

233100 HVAC DUCTS AND CASINGS

233300 AIR DUCT ACCESSORIES

233423 POWER VENTILATORS

233700 AIR OUTLETS AND INLETS

234000 HVAC AIR CLEANING DEVICES

235100 BREECHING CHIMNEYS AND STACKS

235233.13 FINNED WATER-TUBE BOILERS

236213 PACKAGED AIR-COOLED REFRIGERANT COMPRESSOR AND CONDENSER UNITS

236423 SCROLL WATER CHILLERS

237223 PACKAGED AIR-TO-AIR RECOVER UNITS

238124 COMPUTER ROOM AIR CONDITIONERS - FLOOR MOUNTED

238127 SMALL SPLIT-SYSTEM HEATING AND COOLING

238129 VARIABLE REFRIGERANT VOLUME (VRV) HVAC SYSTEM

238200 CONVECTION HEATING AND COOLING UNITS

238415 STEAM HUMIDIFIERS

DIVISION 25 - INTEGRATED AUTOMATION

250000 INTERGRATED AUTOMATION

250912 VARIABLE-FREQUENCY MOTOR CONTROLLERS

250913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

Smith-Alvarez-Sienkiewycz, Architects, PC Page 5

250923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

DIVISION 26 - ELECTRICAL

260100 BASIC ELECTRICAL REQUIREMENTS

260501 MINOR ELECTRICAL DEMOLITION

260513 MEDIUM-VOLTAGE CABLES

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260534 CONDUIT

260535 SURFACE RACEWAYS

260536 CABLE TRAYS FOR ELECTRICAL SYSTEMS

260537 BOXES

260548 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260573 POWER SYSTEM STUDIES

260923 DISTRIBUTED DIGITAL LIGHTING CONTROL SYSTEM

261200 MEDIUM-VOLTAGE TRANSFORMERS

262100 LOW-VOLTAGE ELECTRICAL SERVICE ENTRANCE

262413 SWITCHBOARDS

262416 PANELBOARDS

262713 ELECTRICITY METERING

262717 EQUIPMENT WIRING

262726 WIRING DEVICES

262817 ENCLOSED CIRCUIT BREAKERS

262818 ENCLOSED SWITCHES

262913 ENCLOSED CONTROLLERS

263100 PHOTOVOLTAIC COLLECTORS

263213 ENGINE GENERATORS

263600 TRANSFER SWITCHES

264113 LIGHTNING PROTECTION FOR STRUCTURES

264300 SURGE PROTECTIVE DEVICES

265100 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

271005 STRUCTURED CABLING FOR VOICE AND DATA - INSIDE-PLANT

275117 PUBLIC ADDRESS SYSTEMS

275129 AREA OF REFUGE/RESCUE ASSISTANCE SYSTEMS

DIVISION 28 - ELECTRICAL SAFETY AND SECURITY

281300 ACCESS CONTROL

281600 INTRUSION DETECTION

283100 FIRE DETECTION AND ALARM

DIVISION 31 - EARTHWORK

311100 CLEARING, GRUBBING AND STRIPPING

Smith-Alvarez-Sienkiewycz, Architects, PC Page 6

312000 EARTH MOVING

312300 STRUCTURE EXCAVATION AND BACKFILL

312319 & 312500 DEWATERING, DRAINAGE AND EROSION CONTROL

314000 SHEETING, SHORING AND BRACING

DIVISION 32 - EXTERIOR IMPROVEMENTS

321116.16 CRUSHED GRAVEL SUBBASE

321200 BITUMINOUS CONCRETE

321600 CAST IN PLACE CONCRETE, CURB, SIDEWALKS AND SLABS

323113 CHAIN-LINK FENCING AND GATES

DIVISION 33 - UTILITIES

330507 TRENCHLESS INSTALLATION OF UTILITY PIPING (HORIZONTAL DIRECTIONAL

DRILLING

330507.23 BORING AND JACKING

330561 MANHOLES

333100 SEWER PIPE

ALTER BUILDING 140 SQUAD OPS FACILITY SPECIAL CONTRACT REQUIREMENTS

Vermont Air National Guard Section 003000 - Page 1

SECTION 003000 - SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

1. INSURANCE - MINIMUM AMOUNTS

1.1. Reference Contract Clause titled, “Insurance -Work on a Government Installation (FAR 52.228-5). Kinds and minimum amounts are as follows:

KIND AMOUNTS (FAR 28.307-2)

Workmen’s Compensation $100,000 (see paragraph 1.2, below)

Comprehensive General Liability $500,000 per occurrence for bodily injury

Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage

(If applicable) $200,000 per person and $500,000 per Aircraft Public and Passenger occurrence for bodily injury, other than Liability passenger liability and $200,000 per occurrence for property damage; coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats $200,000 multiplied by the number of seats or passengers, whichever is greater

1.2. Except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.

1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the

Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

2. ORDER OF PRECEDENCE (REFERENCE FAR 52.236-21)

Any inconsistency in this solicitation or contract will be resolved by giving precedence in the following order:

1) Representations and other instructions,

2) Contract clauses, Vermont Air National Guard Section 003000 - Page 2

3) Other documents, to include special contract requirements Section 00800, exhibits, and attachments,

4) The specifications

5) The drawings

3. SCHEDULING

3.1. Normal base work hours for the Contractor will be between the hours of 6:30 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) seven (7) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.

3.2. The following Federal legal Holidays are observed by this base:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding

Friday; holidays falling on a Sunday will be observed on the following Monday.

3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.

3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.

Vermont Air National Guard Section 003000 - Page 3

4. INVOICING AND PAYMENT

4.1. Properly prepared invoices, bearing the contract number, shall be submitted in one copy to the Contracting Office, Vermont Air National Guard 45 NCO Drive Suite A, South Burlington, Vermont 05403, on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR Clause 52.232-5 Fixed-Price Construction Contracts and Far Clause 52.232-27, Prompt Payment for Construction Contracts, All payments will be made by electronic transfer of funds (EFT).

4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment

Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit http://www.dfas.mil/dfas/ecommerce/wawf/vendor.html . Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.

4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.

4.4. All requests for payments through WAWF must include a Subcontractor Payment

Register pursuant to FAR Clause 52.232-5 and a contractor’s certification that reads as follows:

I hereby certify, to the best of my knowledge and belief that -

The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor’s performance.

4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, and Small Business Subcontracting Reports, have been timely received. Payrolls shall indicate CLIN to which they are applicable.

Vermont Air National Guard Section 003000 - Page 4

4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.

5. CONTRACT ADMINISTRATION

5.1. The contracting office of the Vermont air National Guard, 45 NCO Drive Suite A, South Burlington, Vermont 05403, is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer’s Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.

5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer’s representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy. Each letter shall make reference to the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.

6. PAPERLESS CONTRACTING

6.1. The National Guard is fully committed to the Federal Government’s electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.

6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted. These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing. When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.

7. TELEPHONE COMMUNICATIONS SECURITY MONITORING

All communications with DOD organizations are subject to communications security (COMSEC) review. Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.

8. UTILITY SERVICES

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor

Vermont Air National Guard Section 003000 - Page 5 is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available: water, electric, and gas.

9. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The contractor shall submit all materials and articles requiring approval, as required by the Material and Workmanship Clause, FAR 52.236-5. Submittals shall be made using AF Form 3000, or approved equal. Submittals shall be processed in accordance with the procedures in Section referencing Submittals. Submittals shall be given a distinct identification system by CLIN if multiple CLINS are applicable. Individual submittal documents shall not be comprised of items for more than one CLIN. Address for delivery of submittals will be provided at the post award/pre-construction conference. The contractor is reminded that an individual within the company who has authority to make the certification must sign the certification on the AF Form 3000.

10. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS

10.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings; space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.

10.1.1. In accordance with FAR Clause 52.236-15, “Schedules for Construction

Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval three copies of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. Both the Contractor and the COR are required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer. This reports shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes.

10.2. Additionally, for projects exceeding $1M, the contractor shall provide a project plan in a commercially available network scheduling software that meets requirements of the specification to define work tasks and track progress. At least five (5) days prior to work initiation, the contractor shall provide the Contracting Officer a hardcopy CPM and a

Vermont Air National Guard Section 003000 - Page 6 formatted diskette or CD copy, or e-mail file copy, of the plan that shall include definition of rescues. No work may start until the Contracting Officer approves the plan in writing.

10.3. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. Updated plans and Form 3064 showing work progress (hardcopy and formatted diskette or CD, or e-mail file copy), unless otherwise directed by the Contracting Officer, shall be provided monthly. If there are possible deviations from the original plan, those must be noted and approved by the Contracting Officer before work changes are implemented. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”. The reports contemplated by the clause herein titled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions outlined in Section 01 33 00 of specifications.

11. NOTICE OF COMPLETION OF CONSTRUCTION/PRE-FINAL AND FINAL INSPECTION

The Contractor shall follow the procedures outlined in spec section titled CLOSEOUT in preparation for and notify the Government that they are ready for a pre-final inspection

12. DESIGNATION OF TECHNICAL REPRESENTATIVE

The Contracting Officer will appoint a qualified Contracting Officer’s Representative (COR) for the purposes of technically administering the contract; however, all matters concerning this contract or any work ordered placed against this contract must first be approved by the Contracting Officer. This in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.

13. CONTRACTOR STAFF AND EMPLOYEES

13.1. Prior to commencing on-site construction, the contractor shall provide the Contracting Officer with a telephone number and FAX number at which the contractor or his representative may be contacted at any time during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention.

13.2. Supervision. The Government shall not exercise any supervision or control over the contractor employees performing services under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn is responsible to the Government.

13.3. Contractor’s Employees. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the contractor to remove from the job site, any employee the Contracting Officer deems incompetent, careless or otherwise objectionable.

14. CONTRACTOR OFFICE AND STORAGE

14.1. Parking of contractor vehicles shall be restricted to the contractor’s designed on-site area or the work area. The company name shall be prominently displayed on all construction vehicles parked on the job site.

Vermont Air National Guard Section 003000 - Page 7

14.2. Security of material storage areas on the job site shall be the responsibility of the contractor. The area shall be kept neat and orderly and free of debris.

15. RECORD DRAWINGS

During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly, and submit the “red line” drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub-surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions to two permanently fixed surface features, the end of the each run including each change in direction. Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as-built conditions.

16. VERIFICATION OF DIMENSIONS

The contractor shall be responsible for the coordination and proper relation of all aspects of the work. He/she shall field verify all dimensions and advise the Contracting Officer of any discrepancies prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.

17. SECURITY REQUIREMENTS

17.1. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. Any necessary security clearances shall be obtained prior to commencement of work.

17.2. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-12), ''Policy for a Common Identification Standard for Federal Employees and Contractors,'' and Federal Information Processing Standards Publication (FIPS PUB) Number 201, ''Personal Identity Verification (PIV) of Federal Employees and Contractors” will be enacted during the life of this contract. Contractor shall comply with all requirements, at no additional cost to the Government.

17.3. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.

Vermont Air National Guard Section 003000 - Page 8

17.4. Contractors shall follow instructions provided by the Security Forces for access to the

158th Fighter Wing, Vermont Air National Guard Base. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all of your employees have the proper ID (driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.

17.5. The Prime Contractor and all of its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation.

17.6. U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.

17.7. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and are authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo identification (driver’s license, U.S. passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

17.8. All prospective contractors/contractor employees, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check.

17.9. Note: For the purposes of Contracting services, it is implied that, that any and all parties agree to a Criminal History Background Check once entered into any contract. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

17.10. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within a National Guard controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to National Guard installations, facilities and controlled access shall complete AT Level I awareness training. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer’s Representative (COR).

17.10.1. AT Level 1 awareness training is available at the following website:

https://atlevel1.dtic.mil/at

17.11. For Contractors that do not require CAC, but require access to a DoD Facility and/or

Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI

Vermont Air National Guard Section 003000 - Page 9

31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

18. REGULATIONS

18.1. The contractor shall comply with all applicable Federal, State, Local, DOD, National Guard Bureau, Army and Air Force regulations pertaining to safety, traffic control and fire prevention.

18.2. The contractor may use the Civil Engineering library, which contains most applicable

Army and Air Force publications as well as some commercial project data information, or the Defense Procurement and Acquisition Policy website, http://www.acq.osd.mil/dpap/, which has links for several other sites with available publications, forms and project data information. These may also be acquired from the Government Printing Office website, http://www.gpoaccess.gov/index.html

19. TRANSPORTATION, HANDLING AND STORAGE

19.1. The contractor shall coordinate with suppliers and shippers to ensure that incoming materials are properly identified with the contractor’s name, contract number and project title. The contractor shall designate an authorized individual to be available to receive shipment. The Government will not provide storage other than that available at the project site.

19.2. Storage of supplies, materials and equipment on the project site shall be accomplished in such a manner so as to prevent mechanical and climatic damage and loss due to vandalism or theft. Equipment temporarily removed in the performance of work and stored on the job site shall be stored and protected in accordance with previous paragraphs, and shall be replaced in a condition compatible with its original state.

Security for equipment and material removed from the job site for temporary storage until reuse shall be the responsibility of the contractor.

20. CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS

20.1. At the end of each workday, the contractor shall clean up the work and storage areas and stack all materials in a manner approved by the Contracting Officer or his designated representative. Upon completion of a project, the contractor shall ensure that all dirt, trash, and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contract or by the Contracting Officer, disposal of debris shall be made at the contractor’s expense and shall be delivered to a state approved disposal site located off base. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be scattered outside the work area (i.e., on nearby runways, ramps or taxiways).

20.2. The hauling and disposal of excess fill material including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be the responsibility of the contractor. Disposal shall be in accordance with applicable state and local regulations.

Vermont Air National Guard Section 003000 - Page 10

21. ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law. Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

22. HAZARDOUS MATERIALS

22.1. Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.

22.2. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

23. POLLUTION ABATEMENT

23.1. All work shall be performed in a manner minimizing pollution of air, water and land as required.

23.2. Transporting materials to or from the site shall be accomplished in a manner preventing materials or particles from becoming airborne. Earth materials shall be wetted or otherwise protected. Gravel, sand and concrete shall be contained within vehicles to prevent spillage. Tarpaulins must be fastened over load before entering surrounding streets. Removal of any materials dropped or blown off vehicles shall be the responsibility of the contractor.

23.3. Burning of any material is strictly prohibited.

23.4. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils, bitumen, acids or other harmful materials. Grading shall be accomplished

Vermont Air National Guard Section 003000 - Page 11 to prevent surface drainage from the construction site containing harmful amounts of sediment from draining onto adjacent areas.

23.5. Flushing of concrete trucks is restricted to the location specifically designed for this purpose by the Contracting Officer’s Representative.

23.6. Excess mortar, plaster or drywall materials shall not be disposed of on Government property. Water utilized for plastering or drywall equipment shall be disposed of in accordance with the instructions of the COR, and under no circumstances shall water be disposed of in areas which are planted or scheduled to be planted.

24. COORDINATION WITH GOVERNMENT ACTIVITIES

24.1. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes, permission to do so must be requested in writing to the Contracting Officer five (5) working days prior to commencing work on the planned interruption and shall be subject to Civil Engineering approval. Written requests for street closing shall be submitted for approval of the Civil Engineer five (5) working days prior to closing the street.

24.2. Work in connection with this contract which requires utility outages, including electrical, water, gas, steam, etc., which will close down or limit (as determined by the Contracting Officer) normal activities in the building, construction area or other affected areas, shall be performed by the contractor at a time other than the regular work period of the organization occupying the facility. Work required by the contractor on a non-standard basis or at premium pay shall be done at no additional cost to the Government. Request for utility outages shall be submitted to the Civil Engineer, in writing five (5) working days prior to commencing work and shall be subject to his/her approval.

24.3. Any temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utility services shall be subject to Contracting Officer’s approval.

25. UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area;

excluding direct haul and access routes, contracting and Civil Engineering offices, and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

26. PERFORMANCE EVALUATION OF CONTRACTOR

26.1. As a minimum, the contractor’s performance will be evaluated upon final inspection.

Any specific requirements for contract quality control and quality assurance by the Government personnel will be defined in the specifications. The contractor will be rated as outstanding, satisfactory or unsatisfactory in the areas of contract quality control, timely performance, effectiveness of management, compliance with labor standards, and compliance with safety standards. The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record.

Vermont Air National Guard Section 003000 - Page 12

Performance evaluation reports will be available to all DoD Contracting Officers for their future use.

26.2. All DoD contractors are required to obtain a Public Key Infrastructure (PKI) certificate to access the CPARS/ACASS/CCASS applications. DoD contractors are required to purchase a certificate from an External Certificate Authority (ECA) at no additional cost to the Government. . Contractor must be proactive in obtaining certificates, as they will not have the ability to view and comment on performance evaluations without the certificate. . If you have questions on obtaining PKI certificates, please visit www.cpars.navy.mil. Contractors who fail to have their certificates will not be able to access the system

27. CONTRACTOR QUALITY CONTROL

27.1. The contractor shall comply with the quality control provisions as specified herein. The

Contractor shall perform all quality control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The quality control system consists of plans, workmanship, fabrication, construction, and operations that comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence. If the contractor fails to submit an acceptable quality control plan within the time herein prescribed, the Contracting Officer may refuse to allow construction to start if an acceptable interim plan is not furnished or may withhold funds from progress payments in accordance with the contract clause titled, “Payments under Fixed Price Construction Contracts”, until such time as the contractor submits an acceptable final plan.

27.2. Quality Control Plan

27.2.1. General. Upon receipt of the Notice of Contract Award, the contractor’s quality control plan (2 copies) shall be submitted for acceptance in accordance with Section Quality Control Plan of specifications.

27.2.2. Acceptance. The Contracting Officer’s Representative will review the quality control plan. The contractor shall make such changes and additions as necessary for clarity and completeness as requested by the Contracting Officer’s Representative through the Contracting Officer. Acceptance of the contractor’s plan is predicated on satisfactory performance during construction. Acceptance is conditional and the Government reserves the right to require the contractor to make changes in quality control plans, personnel and operations to correct deficiencies and to assure contract compliance.

27.2.3. Changes. When the contractor proposes changes in the quality control plan or implementation during construction, the Contracting Officer shall be notified in writing. The contractor shall implement no changes prior to acceptance in writing by the Contracting Officer.

Vermont Air National Guard Section 003000 - Page 13

28. SAFETY ASSURANCE

28.1. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subpart A. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The Safety Manual is available at the following web site:

http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirements Manual.aspx

28.2. Contractor Responsibility. The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any actions on the part of the contractor, his employees or subcontractors, which result in illness, injury or death.

28.2.1. Inspections, Tests and Reports. The required inspections, tests and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers and others as required, shall be at the contractor’s expense.

28.2.2. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the contractor in the execution of work shall comply with applicable regulations.

28.2.3. Traffic Control Devices. The contractor shall comply with the recommendations contained in Part 6 of the U. S. Department of Transportation, Federal Highway Administration’s “Manual on Uniform Traffic Control Devices”, 2003 edition with Revision 2 available at http://mutcd.fhwa.dot.gov/) to ensure proper warnings to motorists and adequate traffic control. The contractor shall provide all warning lights, barricades and other traffic control devices and signs.

29. WORK BY THE GOVERNMENT

The Government reserves the right to undertake performance by Government forces, for the same type or similar work as contracted herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.

30. VALUE ENGINEERING CHANGE PROPOSALS

All value engineering change proposals (VECP’s) shall be submitted in accordance with the requirements of FAR Clause 52.248-3, Value Engineering – Construction. All VECP’s shall be submitted in three (3) copies.

Vermont Air National Guard Section 003000 - Page 14

31. PRE-CONSTRUCTION CONFERENCE

Before work commences on this contract, the Contracting Officer will conduct a conference to acquaint the contractor with Government policies and procedures that are to be observed during the execution of the work and to develop mutual understanding relative to the administration of the contract. Contractors and/or major subcontractors shall attend this meeting at no additional cost to the Government.

32. PARTNERING

The Government intends to encourage the formation of cohesive partnerships with the contractors on selected contracts. This partnership will be structured to draw on the strengths of each organization in order to identify and achieve reciprocal goals. The objective is effective contract performance in achieving completion within budget, on schedule, and in accordance with the Plans and Specifications. This partnership between the contractor and the Government will be voluntary and its implementation will not be a part of the contract requirements nor will it result in a change to the contract price or terms.

33. MILITARY REAL PROPERTY DATA – DD FORM 1354

33.1. Contractors shall furnish real property data to the Government for each new construction and/or renovation project awarded, unless otherwise notified. The real property data shall be furnished via DD Form 1354, Transfer and Acceptance of Military Real Property, or in a format prescribed on the DD Form 1354. The Contractor is responsible for accuracy of data current up to the time of submission.

33.2. For major renovation and/or complex projects, or those expected to exceed 12 months, the Contractor shall furnish real property data no less than on a quarterly basis.

Frequency of submission shall be standard throughout the duration of the project.

Contractors are advised to record information on the DD Form 1354 (or approved facsimile) as the…