07212.doc

DOC document 35 KB Posted

Attached to
RECOVERY - XHEA052006 - Repair Munitions Shop, Building 27
Solicitation number
W912L2-09-R-5001
Issued by

About this file

Div 7

View the file

Other files

File Type Posted
01400.doc DOC document
16010.doc DOC document
A2.pdf PDF
10500.doc DOC document
02741.RTF RTF text file
02743.doc DOC document
01800.doc DOC document
09250.doc DOC document
M3.pdf PDF
10522.DOC DOC document
01200.doc DOC document
M2.pdf PDF
M1.pdf PDF
09006 15100.pdf PDF
07900.doc DOC document
10425.doc DOC document
08111.DOC DOC document
09512.doc DOC document
06402.doc DOC document
D1.pdf PDF
01040.doc DOC document
04200.doc DOC document
09225.doc DOC document
10800.DOC DOC document
A7.pdf PDF
02223.doc DOC document
07600.DOC DOC document
A5.pdf PDF
S2.pdf PDF
09200.DOC DOC document
Form 1354 JULY_2003 R1.pdf PDF
A1.pdf PDF
07215.doc DOC document
TOC_B-3.doc DOC document
03300.doc DOC document
09006 15300.pdf PDF
16050.doc DOC document
07510.doc DOC document
A6.pdf PDF
P3.pdf PDF
E1.pdf PDF
C1.pdf PDF
02742.doc DOC document
01560.doc DOC document
A4.pdf PDF
03210.doc DOC document
A3.pdf PDF
09660.DOC DOC document
A8.pdf PDF
08710.DOC DOC document
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 07212

DIVISION 7
FACED BATT INSULATION

PART 1

GENERAL

1.1

SUMMARY

A.

Includes But Not Limited To

1.

Furnish and install thermal batt insulation as described in Contract Documents.

1.2

REFERENCES

A.

American Society For Testing And Materials

1.

ASTM C 665-96, 'Standard Specification for Mineral-Fiber Thermal Insulation For Light Frame Construction and Manufactured Housing'

PART 2

PRODUCTS

2.1

MATERIALS

A.

Insulation

1.

FRK faced meeting requirements of ASTM C 665, Type II, Class C.

2.

Order insulation by 'R' factor rather than 'U' factor, rating, or thickness, either 16 or 24 inches wide according to framing spacing.

3.

'R' Factor Required -a.

Ceilings - 30

4.

Acceptable Manufacturers -a.

Certainteed Corp, Valley Forge, PA (800) 523-7844 b.

Owens-Corning Fiberglass Corporation, Toledo, OH (800) 832-3585 c.

Johns-Manville, Denver, CO West (800) 622-0149 East (800) 368-4430 d.

Thermafiber by United States Gypsum Co, Chicago, IL (800) 874-4968

2.2

SOURCE QUALITY CONTROL

A. Insulation shall be manufactured to be in compliance with UBC or other applicable building codes.

PART 3

EXECUTION

3.1

INSTALLATION

A. Install in accordance with Manufacturer's directions, in compliance with UBC or other applicable building codes, and as follows

1.

If two layers of insulation are used to attain required 'R' factor, only layer towards interior of building shall have facing.

2.

Leave no gaps in insulation envelope.

3.

Install insulation between jambs & framing, behind plumbing & wiring and in similar places.

4.

Fit ends of batts snug against top and bottom plates.

5.

Where insulation is not enclosed by structure or drywall, support in place with wire or other suitable material and use only foil faced insulation.

6.

Install baffles between trusses and rafters at ventilation spaces if necessary to prevent insulation from blocking air flow from soffit.

7.

Do not cover recessed light fixtures with insulation. Cut out insulation to provide a minimum of 6-inch clearance around recessed lighting fixtures.

END OF SECTION

07212 - 2 H:\8348\8348003.23\Docs\B-3 Specs\Division 7\07212.doc November 1, 2005

File details come from the government source that posted it. Updated .