Div 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01400.doc | DOC document | |
| 16010.doc | DOC document | |
| A2.pdf | ||
| 10500.doc | DOC document | |
| 02741.RTF | RTF text file | |
| 02743.doc | DOC document | |
| 09250.doc | DOC document | |
| M3.pdf | ||
| 10522.DOC | DOC document | |
| 01200.doc | DOC document | |
| M2.pdf | ||
| M1.pdf | ||
| 09006 15100.pdf | ||
| 07900.doc | DOC document | |
| 10425.doc | DOC document | |
| 08111.DOC | DOC document | |
| 09512.doc | DOC document | |
| 06402.doc | DOC document | |
| D1.pdf | ||
| 01040.doc | DOC document | |
| 04200.doc | DOC document | |
| 09225.doc | DOC document | |
| 10800.DOC | DOC document | |
| A7.pdf | ||
| 02223.doc | DOC document | |
| 07600.DOC | DOC document | |
| A5.pdf | ||
| S2.pdf | ||
| 09200.DOC | DOC document | |
| Form 1354 JULY_2003 R1.pdf | ||
| A1.pdf | ||
| 07215.doc | DOC document | |
| TOC_B-3.doc | DOC document | |
| 03300.doc | DOC document | |
| 09006 15300.pdf | ||
| 16050.doc | DOC document | |
| 07510.doc | DOC document | |
| A6.pdf | ||
| P3.pdf | ||
| E1.pdf | ||
| C1.pdf | ||
| 02742.doc | DOC document | |
| 01560.doc | DOC document | |
| A4.pdf | ||
| 03210.doc | DOC document | |
| A3.pdf | ||
| 09660.DOC | DOC document | |
| A8.pdf | ||
| 08710.DOC | DOC document | |
| appl.for.pay1.1910-8e1.doc | DOC document |
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01800
| DIVISION 1 |
| ENVIRONMENTAL REQUIREMENTS AND REFERENCES |
PART 1
GENERAL
1.1
HAZARDOUS MATERIAL USAGE:
A. The Contractor shall be required to establish a hazardous material (HM) storage and distribution system when HM is to be used. All HM required to support the contract shall be reported to the Hazardous Material Pharmacy (HMP) using the Contractor HM Identification Form. The Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting. Additional HM needed by the Contractor shall be identified to the Contracting Officer's Representative for approval by the HMP. (See Attachment 18A)
B. The Contractor planning to use HM for the work shall be required to register with the base HMP prior to start of work in order to support the installation's compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements.
C. The Contractor shall be required to maintain Contractor HM Identification Form for HM on the job site for inspection/verification.
D. The Contracting Officer's Representative will verify that the HM identified to HMP is the only HM in use on the job site.
E. The Contractors shall be required to provide the HMP.
F. The HMP shall consist of a list of each material and quantity of material for all proposed HM. Hazardous Material (HM) shall mean any item that is:
- a health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).
- regulated in its disposal by EPA under 40 CFR.
- hazardous as defined by DOT regulations under 49 CFR.
- hazardous as defined by the Dangerous Goods Regulations of the International Air Transport Association.
G. A material safety data sheet (MSDS) shall be provided for each item on the list.
H. Typical examples of hazardous materials used on the job site include, but are not limited to:
1. petroleum based liquids/gases (gasoline, kerosene, diesel, propane, butane, acetylene, etc.)
2. explosives
3. adhesives and glues
4. shot charges for anchor systems
5. volatile solvents (such as PVC cleaner and glues, paint thinners)
6. non-water-based paints
7. liquid sealants
8. epoxies and coating systems
9. acidic or alkali cleaners
I. The Contractor shall be required to establish their own HM storage and issue location that fully complies with federal, state and local environmental regulations. Materials issued shall be tracked for quantities used. Unused materials shall be inventoried and removed from the ANG installation prior to close-out of the contract or expiration date of the HM. Reports of materials delivered, used and removed from the installation shall be submitted to the Contracting Officer monthly and prior to contract close-out.
J. The Contractor shall be required to comply with all federal, state and local environmental standards.
K. The Contractor shall accompany the Base Environmental Engineer (BEE) and the COR on project close-out inspection to ensure all used/unused HM is removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the Government accepting beneficial occupancy of the facility or construction item.
PART 2
PRODUCTS (Not Used)
PART 3
EXECUTION (Not Used)
ATTACHMENT 18A
Contractor Hazardous Material Identification Form Date:
Part I This part is to be completed by Contractor prior to start date, and shall be maintained on the job site.
Contractor Company:
Proposed Work Term:
to
Contractor Point of Contact:
(name, phone number, emergency 24 hour contact number, etc.)
HM to be used:
MFG./Product M.S.D.S.
Attached
| Quantity Used |
| Disposal Procedures |
| Used/Unused Material Removed From ANG Installation |
Note: This form is good for a one-month period and is to be submitted to the hazardous material pharmacy (HMP). All HM (hazardous material) used thereafter will be identified to Contracting Officer's Representative for approval by the HMP. See Part II for Contractor close-out procedures. HMP phone number is (520) 295-6170
HMP Approval Signatures:
COR (Contracting Officer Representative)
BEE (Bioenvironmental Engineering Representative)
ENV (Environmental Manager)
Safety Officer
Contractor Hazardous Material Identification Form
Close-Out Procedures Date:
Part II Attach this form to Part I The Contractor shall accompany the Environmental Manager on the close-out inspection to ensure all used/unused HM was removed from the installation.
Close-Out Signatures:
COR (Contracting Officer Representative)
BEE (Bioenvironmental Engineering Representative)
ENV (Environmental Manager)
Contractor
END OF SECTION
END OF DIVISION
01800 - 4 H:\8348\8348003.23\Docs\B-3 Specs\Division 1\01800.doc October 20, 2005