07215.doc

DOC document 33 KB Posted

Attached to
RECOVERY - XHEA052006 - Repair Munitions Shop, Building 27
Solicitation number
W912L2-09-R-5001
Issued by

About this file

Div 7

View the file

Other files

File Type Posted
01400.doc DOC document
16010.doc DOC document
A2.pdf PDF
10500.doc DOC document
02741.RTF RTF text file
02743.doc DOC document
01800.doc DOC document
09250.doc DOC document
M3.pdf PDF
10522.DOC DOC document
01200.doc DOC document
M2.pdf PDF
M1.pdf PDF
09006 15100.pdf PDF
07900.doc DOC document
10425.doc DOC document
08111.DOC DOC document
09512.doc DOC document
06402.doc DOC document
D1.pdf PDF
01040.doc DOC document
04200.doc DOC document
09225.doc DOC document
10800.DOC DOC document
A7.pdf PDF
02223.doc DOC document
07600.DOC DOC document
A5.pdf PDF
S2.pdf PDF
09200.DOC DOC document
Form 1354 JULY_2003 R1.pdf PDF
A1.pdf PDF
TOC_B-3.doc DOC document
03300.doc DOC document
09006 15300.pdf PDF
16050.doc DOC document
07510.doc DOC document
A6.pdf PDF
P3.pdf PDF
E1.pdf PDF
C1.pdf PDF
02742.doc DOC document
01560.doc DOC document
A4.pdf PDF
03210.doc DOC document
A3.pdf PDF
09660.DOC DOC document
A8.pdf PDF
08710.DOC DOC document
appl.for.pay1.1910-8e1.doc DOC document
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 07215

DIVISION 7
RIGID ROOF INSTALLATION

PART 1

GENERAL

a.

Scope: Furnish and install rigid roof insulation over all metal roof deck surfaces.

b.

Related Work: See Section 07510, (Built-Up Roofing). Roof insulation shall be furnished and installed by roofing Contractor.

c.

Submit manufacturer literature for each type of insulation to be utilized.

PART 2

PRODUCTS

a.

Type "A" rigid insulation board shall be minimum 1” thick, perlite based board conforming to ASTM C728 and Fed. Spec. #HH-1-529b. Fesco board by Johns-Manville or equal by U.S. Intec or Atlas. Perlite based insulation shall be manufactured and/or approved in advance by the membrane manufacturer and included in the roof system warranty. Taper as required, all crickets a minimum of ¼” per foot or as shown on the drawings.

b.

Bitumen: 220 degree Type IV, 33 lbs. per insulation layer. Supplied or approved by roofing system manufacturer.

c.

Additional materials and manufacturers to comply with roofing manufacturer's requirements.

d.

Wood Insulation Stops and nailers: Refer to Section 06100.

PART 3

EXECUTION

a.

Install in accordance with manufacturer's standard specification details for concrete decks.

(1) Metal Decks:

(a) Insulation shall be screw attached to metal deck with plates and deck screws approved by the manufacturer, fastener spacing shall provide a U.L. I-90 uplift rating.

(b) Fully mop tapered layer for crickets to first. Stagger all joints ½ panel each direction.

(2) Install all nailers required for back nailing or edge nailing of roofing system.

b.

Firmly set the units of insulation, long joints continuous and short joints staggered and fasten per Factory Mutual requirements.

c.

Closely butt all edges to insulation units without forcing into place. Cut and fit insulation where roof deck intersects vertical surfaces allowing a quarter inch back from all walls. Miter the insulation joints at ridges and elsewhere to prevent open joints and irregular surfaces. Cut all roof insulation to fit snugly around all pipes, roof penetrations and equipment curbs.

END OF SECTION

07215 - 1 H:\8348\8348003.23\Docs\B-3 Specs\Division 7\07215.doc November 1, 2005

File details come from the government source that posted it. Updated .