09250.doc
DOC document 33 KB Posted
- Solicitation number
- W912L2-09-R-5001
About this file
Div 9
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01400.doc | DOC document | |
| 16010.doc | DOC document | |
| A2.pdf | ||
| 10500.doc | DOC document | |
| 02741.RTF | RTF text file | |
| 02743.doc | DOC document | |
| 01800.doc | DOC document | |
| M3.pdf | ||
| 10522.DOC | DOC document | |
| 01200.doc | DOC document | |
| M2.pdf | ||
| M1.pdf | ||
| 09006 15100.pdf | ||
| 07900.doc | DOC document | |
| 10425.doc | DOC document | |
| 08111.DOC | DOC document | |
| 09512.doc | DOC document | |
| 06402.doc | DOC document | |
| D1.pdf | ||
| 01040.doc | DOC document | |
| 04200.doc | DOC document | |
| 09225.doc | DOC document | |
| 10800.DOC | DOC document | |
| A7.pdf | ||
| 02223.doc | DOC document | |
| 07600.DOC | DOC document | |
| A5.pdf | ||
| S2.pdf | ||
| 09200.DOC | DOC document | |
| Form 1354 JULY_2003 R1.pdf | ||
| A1.pdf | ||
| 07215.doc | DOC document | |
| TOC_B-3.doc | DOC document | |
| 03300.doc | DOC document | |
| 09006 15300.pdf | ||
| 16050.doc | DOC document | |
| 07510.doc | DOC document | |
| A6.pdf | ||
| P3.pdf | ||
| E1.pdf | ||
| C1.pdf | ||
| 02742.doc | DOC document | |
| 01560.doc | DOC document | |
| A4.pdf | ||
| 03210.doc | DOC document | |
| A3.pdf | ||
| 09660.DOC | DOC document | |
| A8.pdf | ||
| 08710.DOC | DOC document | |
| appl.for.pay1.1910-8e1.doc | DOC document |
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 09250
| DIVISION 9 |
| GYPSUM WALLBOARD |
PART 1
GENERAL
1.1 The contractor shall furnish all labor and materials to render a complete gypsum wallboard system installation.
PART 2
PRODUCTS
2.1 Gypsum Wallboard: 5/8" thick type X, ASTM C-36 SW tapered edges.
2.2 Water-resistant gypsum wall board: 5/8” thick, ASTM C 630, SW tapered edges.
2.3 Wallboard Casings:
A. Corner bead: USG #800 Durabead
B. "L" metal edge trim USG #200-B
C. Control joint: USG #093
2.4 Screws: 1-1/8" Type "S" Buglehead @ RC-1 channel, 1" Type "S" Buglehead at all other areas.
2.5 Tape and Cement: Approved manufacturer's materials.
2.6 Texture: Hawk and Trowel, provide samples to the Contracting Officer for approval.
2.7 Caulking: USG. Acoustical Sealant.
PART 3
EXECUTION
3.1 Walls: Apply board perpendicular to framing with ends occurring over firm bearing, joints staggered, field bearings screwed at 12" centers (5 per 48" width). End bearings screwed on 7" centers. Start at center of boards and work toward ends. Apply casings per manufacturer's directions and install at all outside edges and at intersections with dissimilar materials. Trim out corners with corner bead. Tape, cement, and sand wallboard surfaces. Apply thin cement layer, set tape into cement, let dry for 24 hours, and sand joints, texture entire area to uniform finish.
3.2 Complete installed system shall conform to all local codes and manufacturer's requirements for support size and spacing and lateral bracing.
3.3 Submit sample of finish texture for approval prior to commencing work.
END OF SECTION
09250 - 1 H:\8348\8348003.23\Docs\B-3 Specs\Division 9\09250.doc November 1, 2005
File details come from the government source that posted it. Updated .