03120.doc

DOC document 46 KB Posted

Attached to
RECOVERY - XHEA052006 - Repair Munitions Shop, Building 27
Solicitation number
W912L2-09-R-5001
Issued by

About this file

Div 3

View the file

Other files

File Type Posted
01400.doc DOC document
16010.doc DOC document
A2.pdf PDF
10500.doc DOC document
02741.RTF RTF text file
02743.doc DOC document
01800.doc DOC document
09250.doc DOC document
M3.pdf PDF
10522.DOC DOC document
01200.doc DOC document
M2.pdf PDF
M1.pdf PDF
09006 15100.pdf PDF
07900.doc DOC document
10425.doc DOC document
08111.DOC DOC document
09512.doc DOC document
06402.doc DOC document
D1.pdf PDF
01040.doc DOC document
04200.doc DOC document
09225.doc DOC document
10800.DOC DOC document
A7.pdf PDF
02223.doc DOC document
07600.DOC DOC document
A5.pdf PDF
S2.pdf PDF
09200.DOC DOC document
Form 1354 JULY_2003 R1.pdf PDF
A1.pdf PDF
07215.doc DOC document
TOC_B-3.doc DOC document
03300.doc DOC document
09006 15300.pdf PDF
16050.doc DOC document
07510.doc DOC document
A6.pdf PDF
P3.pdf PDF
E1.pdf PDF
C1.pdf PDF
02742.doc DOC document
01560.doc DOC document
A4.pdf PDF
03210.doc DOC document
A3.pdf PDF
09660.DOC DOC document
A8.pdf PDF
08710.DOC DOC document
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 03120

DIVISION 3
CAST-IN-PLACE CONCRETE FORMWORK

PART 1

GENERAL

1.1

SUMMARY

A.

Includes But Not Limited To

1.

Design, construction, and safety of formwork.

2.

Furnish and install required formwork ready for placing of concrete.

3.

Strip and dispose of formwork.

A. Related Sections

1.

Section 03300 - Concrete

1.2 REFERENCES

A. American Society For Testing And Materials

1.

ASTM D 1751-83 (1991), 'Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non‑extruding and Resilient Bituminous Types)'

1.3

SUBMITTALS

A.

Quality Assurance/Control - Manufacturer’s application instructions for form release agent.

PART 2

PRODUCTS

2.1

COMPONENTS

A.

Forms - Wood, metal, or plastic as arranged by Contractor. Forming material shall be compatible with specified form release agents and with finish requirements for concrete to be left exposed or to receive decorative finish.

B. Form Release Agents

1.

Chemically acting type

2. Approved Manufacturers a.

Crete-Lease 727 or 20-VOC by Cresset Chemical Co, Weston, OH (800) 367-2020 b.

Clean Strip (J-1 or J-3 VOC) by Dayton Superior, Oregon, IL (800) 745-3707 c.

E-Z Strip or DEBOND Form Coating by L & M Construction Chemicals, Omaha, NE (800) 362-3331 d.

Rich Cote or Rich Gold E by Richmond Screw Anchor Co, Fort Worth, TX (817) 284-4981

e. Duogard or Duogard II by W R Meadows, Elgin, IL (800) 342-5976

C. Expansion Joints

1.

Manufactured commercial fiber type meeting requirements of ASTM D 1751 and 1/2 inch thick.

2. Acceptable Manufacturers a.

Flexcell by Celotex Building Products Div, Tampa, FL (813) 873-1700 b.

Conflex by Masonite Building & Industrial Products Group, Chicago, IL (800) 257-7885 c.

Sealtight by W R Meadows Inc, Elgin, IL (800) 342-5976

PART 3

EXECUTION

3.1

INSTALLATION

A.

Forms

1.

Assemble forms so forms are sufficiently tight to prevent leakage.

2.

Properly brace and tie forms.

3.

Provide temporary cleanouts at base of tall forms to facilitate cleaning and inspection.

4.

Make proper form adjustments before, during, and after concreting.

5.

Use new forms, or used forms that have been cleaned of loose concrete and other debris from previous concreting and repaired to proper condition. Provide smooth liner on forms used for concrete to be exposed if necessary to attain specified finish quality.

6.

Use metal cold joint forms when unable to place concrete for footings, foundations, and slabs in continuous pours.

B.

Accessories

1.

Provide for installation of inserts, templates, fastening devices, and other accessories to be set in concrete prior to placing.

2.

Position anchor bolts for hold-down anchors and columns and securely tie in place prior to placing concrete.

C.

Form Release Agents

1.

Apply in accordance with Manufacturer's recommendations.

2.

Film thickness shall be no thicker than as recommended by Manufacturer to attain specified finish. Finish shall be of quality equal to CCS-1 or CCS-2 surface as defined by Cresset Chemical.

3.

Allow no release agent on reinforcing steel or footings.

D.

Expansion Joints - Install at joints between floor slab and foundation wall.

E.

Form Removal - Removal of forms can usually be accomplished in 12 to 24 hours. If temperature is below 50 deg F or if concrete depends on forms for structural support, leave forms intact for sufficient period for concrete to reach adequate strength.

END OF SECTION

03120 - 1 H:\8348\8348003.23\Docs\B-3 Specs\Division 3\03120.doc November 1, 2005

File details come from the government source that posted it. Updated .