02202.doc
DOC document 36 KB Posted
- Solicitation number
- W912L2-09-R-5001
About this file
Div 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01400.doc | DOC document | |
| 16010.doc | DOC document | |
| A2.pdf | ||
| 10500.doc | DOC document | |
| 02741.RTF | RTF text file | |
| 02743.doc | DOC document | |
| 01800.doc | DOC document | |
| 09250.doc | DOC document | |
| M3.pdf | ||
| 10522.DOC | DOC document | |
| 01200.doc | DOC document | |
| M2.pdf | ||
| M1.pdf | ||
| 09006 15100.pdf | ||
| 07900.doc | DOC document | |
| 10425.doc | DOC document | |
| 08111.DOC | DOC document | |
| 09512.doc | DOC document | |
| 06402.doc | DOC document | |
| D1.pdf | ||
| 01040.doc | DOC document | |
| 04200.doc | DOC document | |
| 09225.doc | DOC document | |
| 10800.DOC | DOC document | |
| A7.pdf | ||
| 02223.doc | DOC document | |
| 07600.DOC | DOC document | |
| A5.pdf | ||
| S2.pdf | ||
| 09200.DOC | DOC document | |
| Form 1354 JULY_2003 R1.pdf | ||
| A1.pdf | ||
| 07215.doc | DOC document | |
| TOC_B-3.doc | DOC document | |
| 03300.doc | DOC document | |
| 09006 15300.pdf | ||
| 16050.doc | DOC document | |
| 07510.doc | DOC document | |
| A6.pdf | ||
| P3.pdf | ||
| E1.pdf | ||
| C1.pdf | ||
| 02742.doc | DOC document | |
| 01560.doc | DOC document | |
| A4.pdf | ||
| 03210.doc | DOC document | |
| A3.pdf | ||
| 09660.DOC | DOC document | |
| A8.pdf | ||
| 08710.DOC | DOC document |
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02202
| DIVISION 2 |
| EXCAVATION, EMBANKMENT, AND PREPARATION OF SUBGRADE |
Part 1 General
1.1 This section addresses the following work items as identified on the construction drawings:
A. Clearing and Grubbing
B. Non-structural earthwork including excavation and backfill
C. Demolition of existing utilities
D. Embankment
1.2 Specifications:
All materials used in construction, and the installation and testing requirements, for completion of all work as identified in this Section, shall be in accordance with:
· Standard Specifications for Public Improvements, sponsored by the City of Tucson and Pima County except where superceded by Federal Regulations and/or requirements.
Part 2
PRODUCTS
See paragraph 1.2 above
Part 3
EXECUTION
See paragraph 1.2 above
END OF SECTION
02202 - 1 H:\8348\8348003.23\Docs\B-3 Specs\Division 2\02202.doc November 7, 2005
File details come from the government source that posted it. Updated .