QUESTIONS AND ANSWERS as of 6 JUL 09.doc

DOC document 33 KB Posted

Attached to
CONSTRUCTION OF FIRE STATION, ELLINGTON FIELD JOINT RESERVE BASE, HOUSTON, TX
Solicitation number
W912L109R0027
Issued by

About this file

Questions and Answers as of 6 Jul 09

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS 2 as of 2 Jul 09.doc DOC document
070109-QUESTIONS_AND_ANSWERS_as_of_2_JUL_09 —
92075193A.Supplem.FootingRecom.Firestation.CH2MHILL.am.LTR 1 .pdf PDF
ELLINGTON_Geotech_report 1 .pdf PDF
QUESTIONS_AND_ANSWERS_as_of_30_JUN_09.doc DOC document
20090630085606863.pdf PDF
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MINUTES.pdf PDF
09R0027 Pre-Proposal presentation.ppt PPT presentation
EXHIBIT C.rtf RTF text file
EXHIBIT F.rtf RTF text file
EXHIBIT B.rtf RTF text file
EXHIBIT A.rtf RTF text file
EXHIBIT D.rtf RTF text file
EXHIBIT E.rtf RTF text file
REPLACE_ELLINGTON_FIRE_STATION_PDF_BINDER_05-05-09.pdf PDF
Fire Station Drawings 11.pdf PDF
Fire Station Drawings 7.pdf PDF
Fire Station Drawings 10.pdf PDF
Fire Station Drawings 16.pdf PDF
Fire Station Drawings 1.pdf PDF
Fire Station Drawings 14.pdf PDF
Fire Station Drawings 12.pdf PDF
Fire Station Drawings 9.pdf PDF
Fire Station Drawings 4.pdf PDF
Fire Station Drawings 13.pdf PDF
Fire Station Drawings 2.pdf PDF
Fire Station Drawings 8.pdf PDF
Fire Station Drawings 6.pdf PDF
Fire Station Drawings 15.pdf PDF
Fire Station Drawings 3.pdf PDF
Fire Station Drawings 5.pdf PDF
Pages 54-64.pdf PDF
Pages 41-45.pdf PDF
Pages 86-97.pdf PDF
Pages 25-34.pdf PDF
Existing Fire Station.pdf PDF
Pages 9-13.pdf PDF
Pages 1-8.pdf PDF
Pages 14-24.pdf PDF
Page 100.pdf PDF
Pages 98-99.pdf PDF
Pages 35-40.pdf PDF
Pages 65-74.pdf PDF
Pages 75-85.pdf PDF
Pages 46-53.pdf PDF
Volume2.pdf PDF
Volume1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

W912L1-09-R-0027

FIRE STATION

As of 2 Jul 09

1. The finish schedule calls for Sconc on various floors but in the legend there is no description for Sconc. What product is to be used to seal these floors?

A: S CONC = Sealed concrete; Refer to legend in upper right hand corner of sheet A-602

2. In the apparatus bay and infectous control room calls for an add alternate for epoxy floor enamel but there is no specification on this product. What product do we use for this? Is this the resinous flooring A: Refer to section 096723 – Resinous Flooring from the Spec Book dated may 8, 2009 for epoxy floor.

3. On the finish schedule it calls for painted concrete on N,S,E,W walls but this is a metal building with no concrete walls what is to be painted? Also the south wall is cmu.

A: You are correct three walls of the Apparatus Bays (N, E & W) are part of the metal building, as such they come pre-finish. Please disregard the reference to Concrete.

For the South wall of Apparatus you should use CMU with integral Color instead, similar to the exterior block around the Admin. Bldg.

4. Are the Specifications 275116 and 283112 current? They call for the Fire Alarm and Mass Notification to be separate and Autonomous. Other Government Specs I have seen require them to be housed in the same UL Listed cabinet.

A: The specs are current but incorrect; the mass notification and fire alarm systems can be housed together.

5. Are the Mass Notification strobes multicolored? If they are which colors are required?

A: Mass Notification strobes are amber, fire alarm strobes are clear.

6. Should we provide a new Monaco Transceiver or use the existing equipment?

A: A new transceiver is required per drawings and specs. to support the Mass Notification system. Provide a Monaco BT-XM transceiver

7. If we are to provide a new Transceiver, which model is required?

A: See response to comment 6 above.

8. What do we do with section 000107 SIGN AND SEALS PAGE at front pages of the specifications (after the cover page). I can not find any instruction. Please verify if it’s required to sign, seals page and submit with proposal A: Disregard section 000107. Those blanks sheets are meant for the A/E designers of Record.

9. Can you direct me to where I can locate the insurance requirements on The Ellington Fire Station?

A: An amendment with those requirements will be posted no later than 6 Jul 09.

10. At the pre bid it was mentioned this project was going to be set aside for small business through an amendment. Is there an amendment coming out with this information and when?

A: No amendment will be done for this as the original solicitation states on page 1 that this is a Total Small Business Set Aside. The requirements are listed in Q&A dated posted on 30 Jun 09.

11. In this bid is there any request for Window Tinting (Glass Glazing,Safety Film,Window Films) We are a 3M window film company.

A: Please review plans and specs at www.fbo.gov. The solicitation # is W912L1-09-R-0027.

12. Appreciate any assistance in obtaining a list of general contractors bidding the project.

A: You may find an “Interested Vendors List” on www.fbo.gov with this solicitation.

File details come from the government source that posted it. Updated .