Q A AS OF 2 JUL 09

Text of this file

REPLACE CRASH FIRE STATION

W912L1-09-R-0027

QUESTIONS AND ANSWERS

W912L1-09-R-0027

FIRE STATION

AS OF 1 JUL 09

1. Sheet E604 shows schematic drawing for control panel. Can't find in specs. Who is to furnish and provide panel and control wiring for this item?

A: Specifications for controls are in section 083613 and are to be provided by door manufacturer. Control wiring shall be provided by door manufacturer and power wiring by electrical contractor.

2. Push button shown on sheet E 5-02 appears to be same as above. Furnished by? No dimensions for panel shown. If furnished by door supplier we need more info from them regarding control components furnished under their division. There seems to be some info. missing regarding controllers for doors. sizes, specifications etc. See sheet E130 that shows symbol for combo starter but no size, fuse size etc. These units should also be reversing type for proper door operation. Are these starters part of door package, this is usually the case. Please clarify.

A: Master control panel, stop and go lights, open/stop/close push button control, safety features, and starters to be provided by door manufacturer. See specifications section 339673 for door manufacturer requirements. Any additional electrical work not required by door manufacturer shall be provided by electrical contractor.

3. Sheet E-601 shows 2 new communication manholes and 2 existing. Sheet E-100 shows 2 existing manholes and 1 new manhole. Which drawing is correct?.

A: Sheet E-100 is correct. There is only one new manhole. Sheet E-601 should only show one new manhole.

4. Sheet E6-03 detail 4 specifies conduit system only for CCTV system. Is this correct?

A: This is correct.

5. Sheets E-602 and E6-03. There are several differences as far as the amount of devices shown on sheets, some are missing on Sheet E6-03 but shown on riser diagram Sheet E6-02. Also it appears that system requires complete conduit system per plan note on Sheet E6-02. Is this correct? We normally install conduit stub only with Plenum rated cable system.

A: Drawing E-602 is the fire alarm and MNS riser. Drawing E-603 contains riser diagrams for the CATV, CCTV, Security, Intercom, and Telephone Data. The two drawings are not related in any way. The riser diagrams typically show intent of the system and the actual devices required are indicated on the respective floor plans. The riser diagrams are not intended to be used for device count.

MSN and Fire Alarm systems are considered “Life Safety” systems per UFC 4-021-01, and as such all fire alarm and MNS wiring will be installed in conduit as specified and noted on the drawings.

Other files

File Type Posted
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
QUESTIONS AND ANSWERS 2 as of 2 Jul 09.doc DOC document
92075193A.Supplem.FootingRecom.Firestation.CH2MHILL.am.LTR 1 .pdf PDF
ELLINGTON_Geotech_report 1 .pdf PDF
QUESTIONS_AND_ANSWERS_as_of_30_JUN_09.doc DOC document
20090630085606863.pdf PDF
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MINUTES.pdf PDF
09R0027 Pre-Proposal presentation.ppt PPT presentation
EXHIBIT C.rtf RTF text file
EXHIBIT F.rtf RTF text file
EXHIBIT B.rtf RTF text file
EXHIBIT A.rtf RTF text file
EXHIBIT D.rtf RTF text file
EXHIBIT E.rtf RTF text file
REPLACE_ELLINGTON_FIRE_STATION_PDF_BINDER_05-05-09.pdf PDF
Fire Station Drawings 11.pdf PDF
Fire Station Drawings 7.pdf PDF
Fire Station Drawings 10.pdf PDF
Fire Station Drawings 16.pdf PDF
Fire Station Drawings 1.pdf PDF
Fire Station Drawings 14.pdf PDF
Fire Station Drawings 12.pdf PDF
Fire Station Drawings 9.pdf PDF
Fire Station Drawings 4.pdf PDF
Fire Station Drawings 13.pdf PDF
Fire Station Drawings 2.pdf PDF
Fire Station Drawings 8.pdf PDF
Fire Station Drawings 6.pdf PDF
Fire Station Drawings 15.pdf PDF
Fire Station Drawings 3.pdf PDF
Fire Station Drawings 5.pdf PDF
Pages 54-64.pdf PDF
Pages 41-45.pdf PDF
Pages 86-97.pdf PDF
Pages 25-34.pdf PDF
Existing Fire Station.pdf PDF
Pages 9-13.pdf PDF
Pages 1-8.pdf PDF
Pages 14-24.pdf PDF
Page 100.pdf PDF
Pages 98-99.pdf PDF
Pages 35-40.pdf PDF
Pages 65-74.pdf PDF
Pages 75-85.pdf PDF
Pages 46-53.pdf PDF
Volume2.pdf PDF
Volume1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .