EXHIBIT A.rtf

RTF text file 17 KB Posted

Attached to
CONSTRUCTION OF FIRE STATION, ELLINGTON FIELD JOINT RESERVE BASE, HOUSTON, TX
Solicitation number
W912L109R0027
Issued by

About this file

EXHIBIT A

Text of this file

REPLACE CRASH FIRE STATION W912L1-09-R-0027

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Prepare three (3) to five (5)

Provide the following information requested in this format for each of the three to five projects/contracts being described. Projects may be on going and cannot have been completed any earlier than 5 years from the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as ___________Prime or _________Subcontractor

2. Contract Number _____________________

3. Original Contract $ Value _____________ Current/Final Contract $ Value ____________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date: ______________2. Current Schedule____________________
3. Estimate/Final Completion Date:________________________________
4. Primary cause for Contract Modifications__________________________________

D. Provide detailed description of the work performed under the contract to include but not limited to similarity of the construction methods; size; project scope; cost magnitude and complexity of work performed to those required for the proposed effort. Also discuss similarity of the client type and/or location at which work was performed to the location(s) at which work will be performed and the key personnel of the referenced project to the performance under the proposed contract.

In addition address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors please list name and principal areas of work they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this project.

4. If you intend to use any of the same key personnel on this solicitations’ project indicate by name and position those personnel occupied on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (see section 00120 for information.) (LIMITED TO 3 PAGES PER PROJECT)

E. List point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired. (Even though you will be sending Exhibit C letters and questionnaires to theses references, do not include a copy of the Exhibit Cs in your proposal.)

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of these projects.

PART 2 : Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your Compliance with the requirements of FAR clause 52.219-8, Utilization of Small Business Concerns (Oct 2000). (Even if you are a Small or Small Disadvantaged Business this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. .It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. (FAR Clause 52-219-8) Describe below the methods you have used to comply with this policy on prior federal contracts? Include any evidence, or a point of contact to verify this information, if available.

2B. Applicable to large businesses offerors only - Discuss Compliance with Small Business Subcontracting Plan requirements (FAR 52.219-9) on previous federal contracts, if applicable. For each contract, state if a small business or disadvantaged business plan or goal was required. If so, identify in terms of a percentage the planned versus achieved goal during the contract. Provide contract number, Point of Contact (POC) and current phone number or email address for POC for verifying data.

2C: Unless previously discussed provide the names of the following Key Personnel to be used on this project- Project Manager, Site Superintendent, Quality Control Manager. In the event the intended key personnel for this construction do not have demonstrated past performance in the project(s) submitted in the Exhibit As, additional information is required. Each key personnel without prior past performance history submitted shall complete an Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form”. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

2D: Assessment of liquidated damages on any contracts within the last five years. (frequency, circumstances, severity of problem, etc.)

2E. Offerors are strongly encouraged to include with their proposals information on problems encountered on relative projects and the specific corrective actions taken to remedy the problems.

2F. Other Past Performance Considerations (OPTIONAL) Information, if provided, shall be limited to the period starting 5 years prior to the solicitation release date.

Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

Other files

File Type Posted
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
QUESTIONS AND ANSWERS 2 as of 2 Jul 09.doc DOC document
070109-QUESTIONS_AND_ANSWERS_as_of_2_JUL_09 —
92075193A.Supplem.FootingRecom.Firestation.CH2MHILL.am.LTR 1 .pdf PDF
ELLINGTON_Geotech_report 1 .pdf PDF
QUESTIONS_AND_ANSWERS_as_of_30_JUN_09.doc DOC document
20090630085606863.pdf PDF
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MINUTES.pdf PDF
09R0027 Pre-Proposal presentation.ppt PPT presentation
EXHIBIT C.rtf RTF text file
EXHIBIT F.rtf RTF text file
EXHIBIT B.rtf RTF text file
EXHIBIT D.rtf RTF text file
EXHIBIT E.rtf RTF text file
REPLACE_ELLINGTON_FIRE_STATION_PDF_BINDER_05-05-09.pdf PDF
Fire Station Drawings 11.pdf PDF
Fire Station Drawings 7.pdf PDF
Fire Station Drawings 10.pdf PDF
Fire Station Drawings 16.pdf PDF
Fire Station Drawings 1.pdf PDF
Fire Station Drawings 14.pdf PDF
Fire Station Drawings 12.pdf PDF
Fire Station Drawings 9.pdf PDF
Fire Station Drawings 4.pdf PDF
Fire Station Drawings 13.pdf PDF
Fire Station Drawings 2.pdf PDF
Fire Station Drawings 8.pdf PDF
Fire Station Drawings 6.pdf PDF
Fire Station Drawings 15.pdf PDF
Fire Station Drawings 3.pdf PDF
Fire Station Drawings 5.pdf PDF
Pages 54-64.pdf PDF
Pages 41-45.pdf PDF
Pages 86-97.pdf PDF
Pages 25-34.pdf PDF
Existing Fire Station.pdf PDF
Pages 9-13.pdf PDF
Pages 1-8.pdf PDF
Pages 14-24.pdf PDF
Page 100.pdf PDF
Pages 98-99.pdf PDF
Pages 35-40.pdf PDF
Pages 65-74.pdf PDF
Pages 75-85.pdf PDF
Pages 46-53.pdf PDF
Volume2.pdf PDF
Volume1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .