QUESTIONS AND ANSWERS
W912L1-09-R-0027
AS OF 30 JUN 09
1- Div. 9300 Ceramic Tile, 2.2B, the Dal-Tile French Quarter style tiles was discontinued, please, need an alternate tile.
A: price equivalent tile. Final Color to be chosen by COR.
2- Need concrete mix design for the concrete on roof metal deck.
A: Use maximum strength 3,000 psi (20 Mpa) at 28 days with a maximum water/cement ratio of 0.50 for Footings, Admin. Bldg floor slab and the roof slab.
Also, provide 6x6-w1.4xw1.4 WWF on roof slab.
3- Can you furnish, size and specification for the floor trench drain in the Apparatus Bay 155.
A: Refer to section 221319, Para 2.3A
4- Option #3: What is the CMU Wainscot higth?
A: Refer to detail E/A301 height 2’-8”
1. Div. 9300 Ceramic Tile, 2.2B, the Dal-Tile French Quarter style tiles was discontinued, please, need an alternate tile.
A: price equivalent tile. Final Color to be chosen by COR.
2. Need concrete mix design for the concrete on roof metal deck.
A: Use maximum strength 3,000 psi (20 Mpa) at 28 days with a maximum water/cement ratio of 0.50 for Footings, Admin. Bldg floor slab and the roof slab.
Also, provide 6x6-w1.4xw1.4 WWF on roof slab.
3. Can you furnish, size and specification for the floor trench drain in the Apparatus Bay 155.
A: Refer to section 221319, Para 2.3A
4. Option #3: What is the CMU Wainscot higth?
A: Refer to detail E/A301 height 2’-8”
5. Please need to know if the shipping of any shop drawings or anything for approval (after awarded) does it goes to Ellington Field, Houston or to the architect in the state of Florida?
A: Submittals will be sent directly to the A/E in Palm Beach, FL
Response to previous question from Q&A dated “as of” 29 Jun 09 #23.
23. Section 312000, Earth Moving, para 1.2 unit prices: reference is made to earthwork unit prices Included in Division 01 Section unit prices. There is no such section. Please clarify.
A: Disregard paragraph 1.2 Unit Prices (including subparagraphs A & B)