QUESTIONS_AND_ANSWERS_as_of_30_JUN_09.doc

DOC document 26 KB Posted

Attached to
CONSTRUCTION OF FIRE STATION, ELLINGTON FIELD JOINT RESERVE BASE, HOUSTON, TX
Solicitation number
W912L109R0027
Issued by

About this file

Questions and Answers as of 30 Jun 09

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS as of 6 JUL 09.doc DOC document
QUESTIONS AND ANSWERS 2 as of 2 Jul 09.doc DOC document
070109-QUESTIONS_AND_ANSWERS_as_of_2_JUL_09 —
92075193A.Supplem.FootingRecom.Firestation.CH2MHILL.am.LTR 1 .pdf PDF
ELLINGTON_Geotech_report 1 .pdf PDF
20090630085606863.pdf PDF
ATTENDANCE ROSTER.pdf PDF
PREPROPOSAL MINUTES.pdf PDF
09R0027 Pre-Proposal presentation.ppt PPT presentation
EXHIBIT C.rtf RTF text file
EXHIBIT F.rtf RTF text file
EXHIBIT B.rtf RTF text file
EXHIBIT A.rtf RTF text file
EXHIBIT D.rtf RTF text file
EXHIBIT E.rtf RTF text file
REPLACE_ELLINGTON_FIRE_STATION_PDF_BINDER_05-05-09.pdf PDF
Fire Station Drawings 11.pdf PDF
Fire Station Drawings 7.pdf PDF
Fire Station Drawings 10.pdf PDF
Fire Station Drawings 16.pdf PDF
Fire Station Drawings 1.pdf PDF
Fire Station Drawings 14.pdf PDF
Fire Station Drawings 12.pdf PDF
Fire Station Drawings 9.pdf PDF
Fire Station Drawings 4.pdf PDF
Fire Station Drawings 13.pdf PDF
Fire Station Drawings 2.pdf PDF
Fire Station Drawings 8.pdf PDF
Fire Station Drawings 6.pdf PDF
Fire Station Drawings 15.pdf PDF
Fire Station Drawings 3.pdf PDF
Fire Station Drawings 5.pdf PDF
Pages 54-64.pdf PDF
Pages 41-45.pdf PDF
Pages 86-97.pdf PDF
Pages 25-34.pdf PDF
Existing Fire Station.pdf PDF
Pages 9-13.pdf PDF
Pages 1-8.pdf PDF
Pages 14-24.pdf PDF
Page 100.pdf PDF
Pages 98-99.pdf PDF
Pages 35-40.pdf PDF
Pages 65-74.pdf PDF
Pages 75-85.pdf PDF
Pages 46-53.pdf PDF
Volume2.pdf PDF
Volume1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

W912L1-09-R-0027

AS OF 30 JUN 09

1- Div. 9300 Ceramic Tile, 2.2B, the Dal-Tile French Quarter style tiles was discontinued, please, need an alternate tile.

A: price equivalent tile. Final Color to be chosen by COR.

2- Need concrete mix design for the concrete on roof metal deck.

A: Use maximum strength 3,000 psi (20 Mpa) at 28 days with a maximum water/cement ratio of 0.50 for Footings, Admin. Bldg floor slab and the roof slab.

Also, provide 6x6-w1.4xw1.4 WWF on roof slab.

3- Can you furnish, size and specification for the floor trench drain in the Apparatus Bay 155.

A: Refer to section 221319, Para 2.3A

4- Option #3: What is the CMU Wainscot higth?

A: Refer to detail E/A301 height 2’-8”

1. Div. 9300 Ceramic Tile, 2.2B, the Dal-Tile French Quarter style tiles was discontinued, please, need an alternate tile.

A: price equivalent tile. Final Color to be chosen by COR.

2. Need concrete mix design for the concrete on roof metal deck.

A: Use maximum strength 3,000 psi (20 Mpa) at 28 days with a maximum water/cement ratio of 0.50 for Footings, Admin. Bldg floor slab and the roof slab.

Also, provide 6x6-w1.4xw1.4 WWF on roof slab.

3. Can you furnish, size and specification for the floor trench drain in the Apparatus Bay 155.

A: Refer to section 221319, Para 2.3A

4. Option #3: What is the CMU Wainscot higth?

A: Refer to detail E/A301 height 2’-8”

5. Please need to know if the shipping of any shop drawings or anything for approval (after awarded) does it goes to Ellington Field, Houston or to the architect in the state of Florida?

A: Submittals will be sent directly to the A/E in Palm Beach, FL

Response to previous question from Q&A dated “as of” 29 Jun 09 #23.

23. Section 312000, Earth Moving, para 1.2 unit prices: reference is made to earthwork unit prices Included in Division 01 Section unit prices. There is no such section. Please clarify.

A: Disregard paragraph 1.2 Unit Prices (including subparagraphs A & B)

File details come from the government source that posted it. Updated .