AM-0001_01 22 00_Proposal Schedule.pdf
PDF 479 KB Posted
- Attached to
- Stare IIMC Barracks Renovation Ukraine
- Solicitation number
- W912GB20R0045
- Issued by
-
Department of the Army European Command
About this file
This document contains a price schedule and proposal for a design-build project solicitation. The solicitation is for the design and construction of a three-story barracks building to be located at the International Interagency Multifunctional Training Center near Stare, Ukraine. Offerors must provide pricing for the base item of constructing the barracks/training facility and an option item for procuring and installing listed equipment and furniture. The period of performance is 455 calendar days from notice to proceed, with liquidated damages of $849 per calendar day for delays. The solicitation was issued by the Department of the Army European Command.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
13 August 2020 02 October 2020
PART 1 GENERAL
1.1 SCHEDULE OF ITEMS: BASE ITEMS
1.1.1 Base Item 0001: NGU Stare IIMTC Barracks/Training Facility
Unit of Measure: Job.
Payment will be made for costs associated with the design and construction of the NGU Stare IIMTC Barracks/Training Facility as indicated in the SECTION 01 10 10 and its attachments, with the exception of the equipment and furniture listed on the SECTION 01 10 10 Attachment 5. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
1.2 SCHEDULE OF ITEMS: OPTION ITEMS
1.2.1 BaseOption Item 0001: Equipment and Furniture
Unit of Measure: Job.
Payment will be made for costs associated with procurement and installation of the equipment and furniture listed on the SECTION 01 10 10 Attachment 5. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Not Used
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
ATTACHMENT 1
PRICE SCHEDULE
NGU Stare IIMTC Barracks/Training Facility
Offerors shall provide pricing for all base and option items.
The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation/Request for Proposal. It also includes preparation of all documents, submittals, and schedules;
inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation/Request for Proposal for the period of performance for all base and option items.
Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation/Request for Proposal for the liquidated damages for all base and option items.
Option Items: Not applicableThe Government reserves the right to award the options up to 0 calendar days after contract award.
Item No.
Description Quantity Unit Unit Price Amount
BASE ITEMS
0001 NGU Stare IIMTC Barracks/Training Facility 1 Job $ $
Total of Base Item 0001 $
OPTION ITEMS
0002 Option Item 0001: Equipment and Furniture 1 Job $ $
Total of Option Item 0001 $
Total of Base and Option Items $
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --
Ochakiv Boat Storage Facility, Ukraine
COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10)
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use no later than 455 calendar days after the contractor receives the Notice to Proceed. Any options, if awarded, shall be completed concurrently with all other work.
The time stated for completion shall include final cleanup of the premises.
The Government intends to issue a single Notice to Proceed for all work.
LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12)
If the Contractor fails to complete the work associated with the NGU Stare IIMTC Barracks/Training Facility within the time specified in paragraph 1.1 above, the Contractor shall pay liquidated damages to the Government in the amount of $849 for each calendar day of delay until the work is completed or accepted.
File details come from the government source that posted it. Updated .