This document package includes construction drawings and specifications for a plumbing and sanitary systems design project. The drawings show layouts and diagrams for water, drainage, and sanitation systems for the renovation of a three-story barracks building that is part of an interior work and systems design-build project for the Stare IIMC Barracks in Ukraine. The project opportunity is a solicitation from the US Army's European Command to design and construct upgrades to plumbing, drainage, and sanitation infrastructure for the barracks facility. Responses are due under solicitation number W912GB20R0045. The construction drawings provide layouts and technical details for proposed water distribution, drainage, and sanitation systems to support renovations to the barracks.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Size A3
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WD 6
General data
52-18-VK
Trokhymenko
KREDO BUD-PROEKT LTDChecked by Berdnyk Trokhymenko
02.19
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine “International interdepartmental multipurpose training center of subunits”
KREDO BUD-PROEKT LTD
Basement rooms plan
Breakdown of rooms
Name
Number of room
Area, m²
Cat.
of room
Vegetable storeroom01
37.69
8 113 10
G
B
Zh
D
Ye
I
6 12
A
K
B
V
E
Zh
29.03
Vegetable storeroom
34.10
Vegetable storeroom
63.81
Auxiliary room
7.15
Spare parts storeroom
39.85
Corridor
29,54
Equipment and maintenance accessories room
Cooling chamber
Corridor
3.79
42.89 Corridor
25.96
Packing storeroom11
23.78
12 Auxiliary room
63.81
13 Hoistwell 1.49
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine “International interdepartmental multipurpose training center of subunits”
2 9
G
B
Zh
D
Ye
I
A
Zh
K
B
V
E
1. Breakdown of technological equipment is given on drawings “TX”.
3 5
Breakdown of rooms (end)
Name
Breakdown of rooms (beginning)
Name
Airlock 5.76
Corridor
Staircase 20.72
Corridor
105 Combat training room
14.29
108 WC for women
109 Personal hygiene room 4.43
37.27
97.41
2.52
7.65
73.06
25.16
Office
25.16
6.76
WC for men
Airlock
Dining hall for 150 seats
156.14
19.12 Cloakroom
17.36
Flour shop
71.10
Hot shop118
Room for equipment and maintenance accessories 2.39
7.56
Room for dry products storage120
Airlock 3.84
Washroom for kitchen and tableware121
21.96
21.28
Meat and fish shop122
Personnel claokroom124 9.23
WC125
1.08
Shower room126
Dining-facility manager office127
Room for cooks rest128
Personnel WC129
Eggs washing room130
Loading room131
132 Airlock
Airlock
Boiler room No. 2
Cloakroom for boiler firemen
WC
1.08
Corridor
2.18
8.21
7.77
2.42
3.23
4.08
1.68
1.63
21.58
2.01
33.39
Airlock 3.00
Staircase No. 2 11.60
Combat training room
55.97
Combat training room
Sleeping area for military personnel
Cabinet for tableware
Cabinet for dinner ware
1.55
Linen press 1.55
1.55
Corridor 1.63
Boiler room No. 1
13.93
Shower room 1.21
24.33 Vegetable shop123
Cat.
of room
Area, m²
Number of room
Cat.
of room
Area, m²
Number of room
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training
Breakdown of rooms
Name
Number of room
Area, m
²
Cat..
of room
Sleeping area for military personnel, 100 persons.201
Training room202
203 Corridor
72.59
204 Staircase No. 1
205 Weapon store room
16.98
20.72
25.81
Special means store room 27.01
WC
Washing room
Shower room
37.15
13.11
12.65
Weapon cleaning room
335.06
86.45
22.68
Utility room
16.81 Drying room for uniform and shoes drying
Commander’s room 19.32
23.67
Room for officers preparation for training
Executive office
17.61
Room for sergeants preparation for training 25.59
Store room for belongings and personal items of soldiers
17.27
218 Staircase No. 2 20.72
219 Place for exercises and sports
15.28
220 Place for equipment and maintenance accessories 2.19
221 Place for shoes cleaning
1.46
7 109
B
Zh
D
Ye
I
A
Zh
K
B
V
E
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training
B
V1,T3,T4 K1
B
K3
B
B
K
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine “International interdepartmental multipurpose training center of subunits”
KREDO BUD-PROEKT LTD
Diagrams of networks
V1,T3,T4,K1,K3 systems
Water metering unit with counter device Dn=32 with loop line and filter
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training
| 52-18-VK – Plumbing & Sewage - General Data |
| 52-18-VK – Plumbing & Sewage - Basement Rooms Plans |
| 52-18-VK – Plumbing & Sewage - Ground Floor Plan |
| 52-18-VK – Plumbing & Sewage - First Floor Plan |
| 52-18-VK – Plumbing & Sewage - Diagrams of Networks |
V1,T3,T4,K1,K3 Systems
| 52-18-VK – Plumbing & Sewage - Water Metering Unit with Counter Device Dn=32 with Loop Line and Filter |
| 52-18-VK.S – Plumbing & Sewage - Equipment Specification and Materials 1/2 |
| 52-18-VK.S – Plumbing & Sewage - Equipment Specification and Materials 2/2 |
File details come from the government source that posted it. Updated .