01 10 10_Att. 8 - Conceptual Thermomechanical (TM) Boiler System Design.pdf

PDF 2 MB Posted

Attached to
Stare IIMC Barracks Renovation Ukraine
Solicitation number
W912GB20R0045
Issued by

About this file

This package contains conceptual design documents for a thermomechanical boiler system for a barracks renovation project in Ukraine. The documents include plans for two boiler rooms showing the layout of boilers, piping, pumps, and related mechanical equipment. Specifications and schedules provide information on the boiler and pump models, insulation materials, and other components. Heat balance diagrams illustrate the flow of heating water and return lines. Collectively, these documents provide a conceptual design for the boiler and piping systems that will supply heat to the renovated barracks facility.

The related federal contract opportunity is for design-build services for interior work and mechanical systems at a barracks building on a military training center campus near Stare, Ukraine. The solicitation was issued by the U.S. Army Corps of Engineers European Command for renovation of the three-story barracks to include work on the boiler and piping systems conceptualized in the accompanying documents.

View the file

Other files

File Type Posted
AM-0003_SF30.pdf PDF
AM-0002_RFI responses via ProjNet.pdf PDF
AM-0002_ 01 10 10_Att. # 3 - Architectural Drawings AMENDED2.pdf PDF
AM-0002_SF-30.pdf PDF
AM-0001_Stare NGU IIMTC Site Visit Attendees Roster.pdf PDF
AM-0001_01 10 10_Att. # 5 - Facility Equipment List.pdf PDF
AM-0001_01 10 10_Att. # 3 - Architectural Drawings AMENDED.PDF PDF
AM-0001_SF-30.pdf PDF
AM-0001_01 10 10_SOW.pdf PDF
AM-0001_01 22 00_Proposal Schedule.pdf PDF
AM-0001_RFI responses via ProjNet.pdf PDF
01 10 10_Att. 1_Statement of Work Stare IIMTC_ 04SEPT2020.pdf PDF
01 10 10_Att. 15 - Technical Description of the Telecommunications system.pdf PDF
01 10 10_Att. 10 - Conceptual Ventilation Electrical & Controls Design.pdf PDF
01 10 10_Att. 20 - BLG Template.pdf PDF
01 10 10_Att. 16 - Experience Info Sheet.docx DOCX document
01 10 10_Att. 7 - Structural Calculation Guidelines.pdf PDF
01 10 10_Att. 22 USACE Spec Binder.pdf PDF
01 10 10_Att. 17 - Experience Overview Sheet.docx DOCX document
01 10 10_Att. 23 - VAT Procedures.pdf PDF
01 10 10_Att. 21 -Site Visit Registration Form.XLSX XLSX spreadsheet
01 10 10_Att. 3 - Architectural Drawings.pdf PDF
01 10 10_Att. 5 - Dining Facility Equipment List.pdf PDF
01 10 10_Att. 19 - BLA Template.docx DOCX document
01 10 10_Att. 4 - Conceptual Dining Facility Layout.pdf PDF
01 10 10_Att. 1A - Location Map.pdf PDF
01 10 10_Att. 18 - Past Performance Questionnaire_PPQ.docx DOCX document
01 10 10_Att. 13 - Conceptual Domestic Hot Water System Design.pdf PDF
01 10 10_Att. 2 - Conceptual Site Plan.pdf PDF
01 10 10_Att. 6 - Conceptual Internal Electrical Distribution.pdf PDF
W912GB20R0045.pdf PDF
01 10 10_Att. 9 - Conceptual Heating & Ventilation Systems Design (1).pdf PDF
01 10 10_Att. 11 - Conceptual Plumbing & Sanitary Design Analysis.pdf PDF
01 10 10_Att. 14 - Dedication Plaque.pdf PDF
01 10 10_Att. 12 - Conceptual Plumbing & Sanitary Systems Design.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. General data.

Sheet

Attached documents

Sheets Sheet

Stage

Thermomechanical part

Specification of equipment and materials.

Output data

Boiler room No. 1 plan with pipelines marking.

2.

WD

Developed by

Checked by

Controlled by

Doc.No.Rev.

Sheet

Q-ty DateSignature

General data.

Name Note

Designation

Fuel: soild - wood with calorific capacity Q=2,530 kcal/kg (by moisture 25-30 %

In v.

N o.

o f o rig

Si gn at ur e an d d at e

In st

. o f I nv . N o.

Relative density (density) p=1,540 kg/m is accepted.

Technical solutions, accepted by the design, correspond to ecological, sanitary and hygienic, Elevation of designed pipelines to specify at site during works execution.

Manufacturing and installation of pipelines to execute according to “Rules of arrangement and safety operation

General part fire preventing and other current norms and regulations and provide safe for life and health of people object operation under condition of observing foressen by the design measures.

Thermal-mechanical part of the design is developed according to “Rules for construction and safe operation of steam boilers operating under pressurenot over 0.07 APa (0.7 kgf/cm ), water heating boliers and water heaters with water temperature not exceeding 388 K (115 C), DBN V.2.5-77-2014 “Boiler stations.”

In rooms of boiler rooms No. 1 and No. 2 two boilers are installed in each: “Altep KT-2E”, thermal rating 95 kW each.

Heating medium - water with parameters t=90-70 C

Wood is accepted as rated fuel.

Used water from drinking and service water pipeline shall correspond to the requirements of GOST 2874-82 “Potable water” of steam and hot water”.

Heating medium: water with parameters T1-T2=90-70 C for heating system

Designed boilers of boiler room No. 1 are the source of heat supply for heating of barracks rooms, boiler room

Output water: which corresponds to GOST 2874-82 “Potable water” units.

Auxiliary equipment of bolierseries 4.903-13 v.o.

Reference documents:

7.903.9-2, issue 1

Heat insulation of pipeline with positive temperatures.

Heat insulation of industrial fitting and flange joints.

7.903.9-2, issue 2 devices and pipelines.

Fixing parts of sanitary series 4.904-69 series 4.904-69

Parts of sanitary equipment fixation and pipelines series 4.903-10 Products and pipeline parts for heating network

Welded joints of pipelines to execute by electrodes of type Å42 per GOST 9467-64.

Ventilation of boiler rooms shall provide for three times air exchange not considering air necessary for burning.

Water from drainage pipelines to drain into sewage networks (or by means of flexible hose to pavement).

On drainage pipelines and pipelines to be insulated 2 layers of oil-bituminous coating on priming GF-021

Heat diagram.

For boiler rooms No. 1 and No. 2 piping layout schemes are designed. Heat diagram provides for inlet of water-heating medium with temperature T1-T2=90-70 C into heating system (and connection of boiler) of barracks with administration rooms.

Temperature change of direct and return system water is done by temperature controllers.

Heating system is closed with forced circulation. Circulation is provided by network electric pump

-18-TM.S

Wilo-TOP-S50/7 PN6/10, which is installed on return pipeline after hydroequalizer. Also provided

For cleaning of heat medium from suspended substances, before circulating pumps Wilo TOP-S 40/7 EM heating system, installation of two safety valves is provided on exit from the boiler. From safety valves

In order to remove air from the system, air discharge valves are installed on common supply pipeline as well as

T-valve pressure gauge is provided to be installed for pressure control in heating system.

Expansion tank with capacity V=200 l is installed for compensation by heating.

Installation and operation of equipment to carry out according to passports of manufacturer and to DBN V.2.5-64:2012 corresponding to the requirments of labour safety per DBN A.3.2-2-2009 “Labour safety and industrial industrial safety in

Internal heating system shall be flushed, tested for leakage and strength.

Schematic diagram of pipelines in boiler rooms No. 1 and No. 2.

4.

5.

6.

pressure in water supply network power supply of from the existing tank of water storage located on the territory

Moskalivske SDB. For to prevent counter-flow of heat medium after network and recirculating pumps is provided recurculating pumps installation of check valves is provided.

Drainage pipeline is provided for water drain from boiler. For boiler protection in case of emergency pressure raise in

Hydroequalizer (boiler rooms No. 1 and No. 2)

3 sheets series B 5.000-2.1

Fixing parts of pipelines, air ducts and other sanitary ware

Filling and makeup of system by water is provided directly from water supply network. In case of insufficient construction” installation of bypass line with additional network pump. To connect pipelines of direct and return water crossover pipeline (jumper) is provided where circulating pumps

Wilo TOP-S 40/7 EM are installed for boilers 97 kW, controlled by capillary thermostat.

on return pipeline before boilers mesh filters are installed.

drainage pipelines are also provided.

in set of safety kit.

“Internal water pipeline and sewage” and DBN V.2.3-24-2009.

52-18-TM

05.19

05.19

05.19

05.19

Chief designer

“Kredo Bud-Proekt” Ltd

Project "Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine inStare village, Boryspil district, Kyiv region" is executed on the basis of the task for design and measurement diagrams.

Trokhymenko Tostanovska Trokhymenko

Berdnyk

Boiler room No. 2 plan with pipelines marking.

3.

Section 1-1 Scale 1:50 (extract). Gas pipes diagram. Boiler room No. 1

Section 1-1 Scale 1:50 (extract). Gas pipes diagram. Boiler room No. 2

7.

Heating unit. Heat balance diagram. (Boiler room No. 1) 8.

No. 2 - source for installation and connection of water heater for hot water supply and utility needs.

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

“International interdepartmental multipurpose training center of subunits”

List of drawing of main set TM

Note

Name

List of reference and attached documents

In v.

N o.

o f o rig .S ig na tu re a nd d at e In st . o f I nv

. N o.

Rev. Q-ty Sheet Doc.No. Signature Date

Stage Sheet Sheets

WD 205.19Trokhymenko Tostanovska

Thermomechanical part

Trokhymenko 05.19

05.19

05.19

Berdnyk

“Kredo Bud-Proekt” Ltd

Boiler room No.1 plan with pipelines marking. Scale 1:50 (extract)

Boiler room No. 1 plan with pipelines marking.

52-18-TM

5,200

4,100 2,500

0.000

-0.030

-0.030

“KT-2E”

Boiler 95 kW

“Altep DUO PLUS”

To heat unit and water measuring unit

Water pipeline input

Ø 40 to sewage

(or manual pump by flexible hose)

500x500x500(h)

89x3.5 2Ø

T

T11 m m to pit T96

25x2.8 Ø

18x2.8

18x2.8

Ø m

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

V1

Dn20 x

Ø

200 l

Dn50 to pavement

Heat unit and distribution manifold (indicative only)

Boiler 95 kW

“KT-2E”

Boiler 95 kW

“KT-2E”

“Altep DUO PLUS”

“Altep DUO PLUS”

Ø

Connect to exhaust stack

350 (see part AB) Ø

250 (see part OB) Ø

Ventilation duct

V=52.2

H=2.5

4.8

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

“International interdepartmental multipurpose training center of subunits”

N o.

o f o rig .S ig na tu re a nd d at e In st . o f I nv

. N o.

Rev. Q-ty Sheet Doc.No. Signature Date

Stage Sheet Sheets

WD 305.19Trokhymenko Tostanovska

Thermomechanical part

Trokhymenko 05.19

05.19

05.19

Berdnyk

“Kredo Bud-Proekt” Ltd

Boiler room No. 2 plan with pipelines marking.

Boiler room No. 2 plan with pipelines marking.

Scale 1:25 (extract)

52-18-TM

4,100

2,500

0.000

-0.030 m

76x3.0 Ø

Dn20 x

Ø

T

T11

200 l

T96

T96

T96

T96

T96

T96

18x2.8

Ø

25x2.8 Ø by flexible hose)

500x500x500(h)

From boiler (see GV)

To boiler (see GV)

V

57x3.0 Ø

57x3.0 Ø

3.9

V=35.1

H=2.5 m to pit T96

25x2.8 Ø

18x2.8

18x2.8 Ø

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

Boiler 95 kW

“KT-2E”

Boiler 95 kW

“KT-2E”

“Altep DUO PLUS”

“Altep DUO PLUS”

Ø to pit T96

25x2.8 Ø

1. Boilers piping is given space-limited environment-see on boiler room No. 1.

76x3.0 Ø

Connect to exhaust stack

350 (see part AB) Ø

Ventilation duct

Ø 250 (see part OB)

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

N o.

o f o rig .S ig na tu re a nd d at e In st . o f I nv

. N o.

Rev. Q-ty Sheet Doc.No. Signature Date

Stage Sheet Sheets

WD 405.19Trokhymenko Tostanovska

Thermomechanical part

Trokhymenko 05.19

05.19

05.19

Berdnyk

“Kredo Bud-Proekt” Ltd

Hydroequalizer

Safety set mm

Safety set

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

T11

T11

89x3.5 Ø

89x3.5 2Ø

2.50

0.000

Boiler

95 kW

Boiler

57x3.0 Ø

57x3.0 Ø

T21

T21

T12 T12 to pit T96

25x2.8 Ø to pit T96

25x2.8 Ø

DUO PLUS

(KT 2E)

95 kW

DUO PLUS

(KT 2E)

To and form heat unit

Section 1-1 Scale 1:50 (extract).

Gas pipes diagram

Boiler room No. 1

Section 1-1 Scale 1:50 (extract). Scale 1:25

Gas pipes diagram

2.150

Connect to exhaust stack

350 (see part AB) Ø

300 Ø n o t l e s s

From boiler Altep

Connect to exhaust stack

350 (see part AB) Ø

Ø

300 Ø

“DUO PLUS” (KT-2E) 95 kW

From boiler Altep

Ø

“DUO PLUS” (KT-2E) 95 kW

Ø 40 to sewage

(or manual pump by flexible hose)

500x500x500(h) to pavement

52-18-TM

Connect to exhaust stack

350 (see part AB) Ø

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

N o.

o f o rig .S ig na tu re a nd d at e In st . o f I nv

. N o.

Rev. Q-ty Sheet Doc.No. Signature Date

Stage Sheet Sheets

WD 505.19Trokhymenko Tostanovska

Thermomechanical part

Trokhymenko 05.19

05.19

05.19

Berdnyk

“Kredo Bud-Proekt” Ltd Section 1-1 Scale 1:50 (extract).

Gas pipes diagram

Boiler room No. 2

Section 1-1 Scale 1:50 (extract). Scale 1:25

Gas pipes diagram

2.150

Connect to exhaust stack

350 (see part AB) Ø

300 Ø n o t l e s s

From boiler Altep

Ø

300 Ø

“DUO PLUS” (KT-2E) 95 kW

From boiler Altep

Ø

“DUO PLUS” (KT-2E) 95 kW

Safety set m m

Safety set

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

76x3.0 Ø

T11

T11

76x3.0 Ø

57x3.0 2Ø

2.50

0.000

Boiler

95 kW

Boiler

57x3.0 Ø

57x3.0 Ø

T21

Y21

T12 T12 to pit T96

25x2.8 Ø to pit T96

25x2.8 Ø

DUO PLUS

(KT 2E)

95 kW

DUO PLUS

(KT 2E)

To and from boiler (see GV)

Connect to exhaust stack

350 (see part AB) Ø

Ø 40 to sewage

(or manual pump by flexible hose)

500x500x500(h) to pavement

52-18-TM

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

A2

WD

Stage

Doc.No.Rev. SheetQ-ty DateSignature

SheetsSheet

Legend ball valve mesh filter thermometer check valve transfer air discharge valve safety valve manometer expansion tank

Pipelines schematic diagram

Developed by

Checked by

Chief designer

Controlled by of boiler rooms No. 1 and 2.

Thermomechanical part

T21 Pipeline of reverse heating water

T11 Pipeline of heating water

T96 Drainage pipeline

V1 Pipeline of outgoing water

Pipelines schematic diagram m

Safety set

T96

25x2.0 Ø

T96

20x2.0 Ø

Ø 40 to sewage

T2

T11

T21

T

T

76x3.0

Ø

32x2.0 Ø

T11 89x3.5

To heat unit

T21 89x3.5

From heat unit

V1

Dn20

200 l

From existing water metering unit

Ø

Ø

Safety valve

Dn15, Dn=2.5 kgf/cm

11s42p

Dn65

11s42p

Dn65

11b27p

Dn25

11s42p

Dn20

11b27p

Dn15

11b27p

Dn20

11s42p

Dn80

11s42p

Dn80

11s42p

Dn80

11s42p

Dn80

11s42p

Dn80

11b27p

Dn15

T12 Crossover pipeline (jumper)

T96

25x2.0 Ø

T21

T11

FG-80

m

T12

89x3.5 Ø

76x3.0

Ø

89x3.0 Ø

89x3.0 Ø

89x3.0

Ø network pump circulating pump controlled by capillar thermostat thermomanometer

11s42p

Dn65

11s42p

Dn50

11s42p

Dn65

Bypass

11s42p

Dn80

11s42p

Dn80

11s42p

Dn80

11s42p

Dn80

Valve of automatic compensation of leakage of the system.

11s42p

Dn50

11s42p

Dn80

11s42p

Dn65

Heat medium flow direction

57x3.0

Ø

T11 m

Safety set

T96

25x2.0 Ø

Safety valve

Dn15, Dn=2.5 kgf/cm

11s42p

Dn65

11s42p

Dn65

11s42p

Dn20

T96

25x2.0 Ø

T11

T12

76x3.0 Ø

11s42p

Dn65

11s42p

Dn65

11s42p

Dn65

57x3.0

25x2.0 Ø

25x2.0 Ø

T21

76x3.0

Ø

76x3.0 Ø

89x3.0

Ø

T96

20x2.0 Ø

(or by manual pump to pavement by flexible hose)

95 kW

Boiler “Altep DUO PLUS”

Ø

Network pump Wilo-TOP-S50/7 PN 6/10

Circulating pump Wilo-TOP-S40/7 EM

Network pump Wilo-TOP-S40/7 EM

(KT-2E)

95 kW

Boiler “Altep DUO PLUS”

(KT-2E)

05.19Trokhymenko Tostanovska Trokhymenko

05.19

05.19

05.19

Berdnyk “Kredo Bud-Proekt” Ltd

N=330 W; p=2,200 rpm; L=17 m /h

N=610 W; p=2,800 rpm; L=25 m /h

N=330 W; p=2,200 rpm; L=17 m /h

1. Heating unit for boiler room No. 2 is not installed, (diameters Dn50) - for installation of water heater see on boiler room No. 1 and 2 plan and in section GV.

Note

52-18-TM

Note

Note

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

“International interdepartmental

A3

WD

Stage

Doc.No.

Rev.

Sheet

Q-ty DateSignature

Sheets Sheet

A pp ro ve d

Hydroequalizer

Specification

Designation

Name

Notes

Weight

Q-ty

Grade, design.

one kg

GOST 10704-91

GOST 17379-83

GOST 12820-80

GOST 19904-90

GOST 8509-93

GOST 19904-90

GOST 10704-91

Electric welded steel pipe

219x6.0 L=800 mm

Pipe cap

Dn=219x6.0 for Dn=1 mPa

Flange Dn=65

Shield of thin sheeted steel

2 mm with open. 5 mm in each 10 mm

L-steel support

L50x50x4

Plate of thin-sheeted steel thickness = 3 mm 200x200

Junction piece - electric welded steel pipe

89x3.0

Air discharger automatic rm pcs pcs pcs pcs pcs rm

Developed by

Checked by

Controlled by

Thermomechanical part

Ø

Ø

Ø

In v.

N o.

o f o rig .S ig na tu re a nd d at e In st . o f I nv

. N o.

05.19Trokhymenko Tostanovska Trokhymenko

05.19

05.19

05.19Berdnyk

“Kredo Bud-Proekt” Ltd

Chief designer

(Boiler room No. 1)

52-18-TM

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

Heat balance scheme schemeHeat balance

Size A4

Sheets Stage

Sheet

Developed by

Checked by

Chief designer

Controlled by

Doc.No.Rev. Sheet Q-ty

DateSignature

WD

Legend

Flanged ball valve thermometer manometer

T21 Pipeline of reverse heating water

T11 Pipeline of heating water

T11

From heating networks

Dn80

11s42p

T21

To heating networks

T21 89x3.5FGA-80 Ø

(from boilers)

To supply manifold

T11 89x3.5 Ø

Dn80

11s42p

FGA-80

Dn80

11s42p

Dn80

11s42p

T11 89x3.5 Ø

(to boilers)

From return manifold

89x3.5 Ø supply manifold return manifold

Coupler-joint ball cock

Ø

Ø

T21

108x3.5

108x3.5

L=1 m

L=1 m

Dn6511s42p

To main system.

Dn40 11b27p to system No. 2 (basement)

Dn40 11b27p from system No. 2 (basement)

Dn6511s42p

Ø 75x12.5

Ø 50x8.3

(sump filter)

(sump filter)

Network pump

Wilo-TOP-S50/15

N=1,100 W; L=39 m /h

Transfer st./polypr.

Ø 76x3.0/ Ø75x12.5

Transfer st./polypr.

Ø 76x3.0/ Ø75x12.5

To main system

Ø 75x12.5

05.19

Trokhymenko Tostanovska

Thermomechanical part

Trokhymenko 05.19

05.19

05.19Berdnyk

“Kredo Bud-Proekt” Ltd (Boiler room No. 1)

52-18-TM

Transfer st./polypr.

Ø 46x3.0/ Ø50x8.3

Transfer st./polypr.

Ø 46x3.0/ Ø50x8.3

Ø 50x8.3

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

Position

Name and technical parameters

Type, grade document mark, of data sheet

Code of equipment, of products of material

Manufacturing plant

Measuring unit

Q-ty

Weight units, kg

Notes

Equipment. Boiler room No. 1.

Domestic water heating boiler “DUO PLUS” (KT-2E) N=95 kW 1.

set

2.

28.5

FG-80

4.

Network pump Wilo-TOP-S50/7

5.

Exhaust stack 325 mm h=10.5 m pcs.

pcs.

pcs.

6.

Membrane expansion tank V=200 l US 200461

7.

pcs.

8.

pcs.

Water reserve tank pcs

Pressure indicator (MPa)

Industrial thermometer pcs 2

Control and measuring instruments

TZhST50-(0-100)S

MP100MS-1.2 MPa

SheetsSheet

Stage

Thermomechanical part

WD

Developed by

Checked by

Chief designer

Controlled by

Doc.No.

Rev.

Sheet Q-ty DateSignature

Equipment specification and materials

Ø

Sump filter

Wilo-TOP-S50/7

See partAB

Considered in part AB

1.

2.

Materials

Branch 4 pcs pcs pcs

90-76*3.0

1.

2.

3.

90-25*2.5

90-18*2.0

5.

6.

9.

10.

Branch

Branch pcs pcs pcs

Three-way valve pcs pcs

Embedded detail for thermometer 3kch-275.0090

Sockolet for thermometer

11b38bk

Mesh filter Dn65 pcs.

3.

9.

Hydraulic equailizer Dn219

GOST 10704-91

pcs.

See sheetTM-5 considered transfer k-76*3.0-57*3.0 transfer k-76*3.0-32*2.0

Circulating pump Wilo TOP-S40/7-EM; N=330 W; p=2,200 rpm; L=17 m /h set

7.

Straight tee

8.

Ø 65 pcs

Wilo TOP-S40/7 controlled by capillar thermostat

Thermomanometer (MPa)

3.

pcsTMTB-31 transfer k-57*3.0-45*3.0 pcs

4.

5.

Branch 90-57*3.0 pcs

11.

Four-way valve Dn65 (butterfly)

364FR 1

pcs

52-18-TM

“DUO PLUS” (KT-2E) N=95 kW

N=610 W; p=2,800 rpm; L=25 m /h

05.19

05.19

05.19

05.19

“Kredo Bud-Proekt” Ltd

Trokhymenko

Tostanovska

Trokhymenko Berdnyk

Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine

Pipelines

Steel welded pipe

GOST 10704-91

Fittings

25x2.8 pcs.

7/4 pcs.

pcs. 3

Sheet

SheetRev. Q-ty Doc.No. Signature Date pcs.

pcs.

pcs. 5 pcs.

pcs.

pcs.

Water and gas pipe

18x2.8

GOST 3262-75

Steel welded pipe

GOST 10704-91

Ø

Ø

Ø

52-18-TM

1.

2.

rm rm

12,0/10,0 rm 4.0

Water and gas pipe

1.

4.

5.

GOST 3262-75

2.

3.

4.

Flanged ball valve

Dn50/Dn40

Flanged ball valve

Dn65

11s42p

11s42p

Coupler-joint ball cock, brass

Dn20

Coupler-joint ball cock, brass

Dn15

11b27p

11b27p

3.

11b27p

Coupler-joint ball cock, brass

Dn25

5. pcs. 2

Safety valve Dn15, P=2.5 kgf/cm

17s28nzh

6.

65 16kch9p

Flange check valve

Dn

Steel flanges Dn65 P=10 kgf/cm

Steel flanges Dn20 P=10 kgf/cm

7.

10.

12.

GOST 12821-80

GOST 12821-80

14.

Air discharger Dn15 pcs. 2

Gas pipelines

Gas pipeline of thin-sheeted galvanized steel, thickness 0.5 mm 300/260x260

Transfer from cross-section 300x300 to 325 of thin-sheeted galvanized steel

Ø

Ø

1pcs

1.

2.

GOST 14918-80

5.0/2.0 rm

GOST 14918-80

32x2.8 Ø

Water and gas pipe

GOST 3262-75

rm 8.0/6.0 rm

8.0 insulated/cold water

10.0

L-steel support

GOST 8509-93

insulated insulated insulated insulated insulated

Remote thermostat for installation on exhaust stack including:

4.

1/1 set

Switching contact

Duct L=75 mm

Sensor 5 mm, L=75 mm Ø pcs.

pcs.

pcs. 1/1

1/1

1/1

57x3.0

Flange check valve

Dn

8.

16kch9p

GOST 19904-90

L50x50x4

Plate of thin-sheeted steel thickness = 3 mm 200x200 pcs pcs thickness 0.5 mm

3.

Valve of automatic compensation of leakage of system

13. 65

Dn

1pcs

Flange check valve

Dn 1pcs

16b1bk

Explosive valve on gas pipeline (15x15) cm

2pcs

5.

6.

9.

Steel flanges Dn50/Dn40 P=10 kgf/cm

11.

GOST 12821-80

14/8 pcs.

a) b) c)

76x3.0/ Ø 89x3.5 Ø

Position

Name and technical parameters

Type, grade document mark, of data sheet

Code of equipment, of products of material

Manufacturing plant

Measuring unit

Q-ty

Weight units, kg

Notes pcsPressure indicator (MPa)

Industrial thermometer pcs

Control-measuring instruments

1.

2.

TZhST50-(0-100)S

MP100MC-0.6 MPa

FGA-80 pcs.

Flanged ball valve

Dn80

11s42p pcs.

Materials

Bricky primer GF-0,21

Enamel EP - 51 (green) 0.1 kg

0.2 kg

M-125, thickness 60 mm

Glass-fibre plastic, rolled RST-A-L-V

Mineral wool mats, stitched, without lining M-125, thickness 40 mm

Pipelines heat insulation

Mineral wool mats, stitched, without lining

2.775m

0.027 m

0.0628 m

1.

2.

(Heating unit)

(Distribution manifolds)

Flanged ball valve Dn65/Dn40 11s42p/ pcs.

2/2

1.

2.

Pipelines

Steel welded pipe 89x3.0

GOST 10704-91

Ø m

5.0

1.

2.

Steel welded pipe 159x3.5 Ø

GOST 10704-91

m 2.0

1.

2.

3.

4.

5.

2pcs pcs

Embedded detail for thermometer

3kch-275.0090

Sockolet for manometer

3.

4.

Three-way valve (for manometer) 6pcs

Combined heat insulating structures with vertical layering on roofing felt

Insulation

1.

m m

(for gas pipelines)

2.

Mineral wool blocks sewn in unwoven stitched fabric

Glass-fibre plastic rolled RST-250-L (for pipelines) rm/ rm/ m m rm/ rm/

44.0

44.0

7.0

7.0

Sheet

SheetRev. Q-ty Doc.No.Signature Date

52-18-TM

Fittings

Sump filter

11b27p

Position

Name and technical parameters

Type, grade document mark, of data sheet

Code of equipment, of products of material

Manufacturing plant

Measuring unit

Q-ty

Weight units, kg

Notes

52-18-TM Thermomechanical - General Data
52-18-TM Thermomechanical - Boiler Room No. 1 Plan with Pipelines

Marking.

52-18-TM Thermomechanical - Boiler Room No. 2 Plan with Pipelines Marking.

52-18-TM Thermomechanical - Section 1-1 Scale 1:50 (extract). Gas Pipes Diagram Boiler room No. 1
52-18-TM Thermomechanical - Section 1-1 Scale 1:50 (extract). Gas Pipes Diagram Boiler room No. 2
52-18-TM Thermomechanical - Pipelines Schematic Diagram of Boiler Rooms No. 1 and 2.
52-18-TM Thermomechanical - Hydroequalizer (Boiler Room No. 1)
52-18-TM Thermomechanical - Heating Unit Heat Balance Scheme (Boiler Room No. 1)
52-18-TM Thermomechanical - Equipment Specification

and Materials 1/3 52-18-TM Thermomechanical - Equipment Specification and Materials 2/3 52-18-TM Thermomechanical - Equipment Specification and Materials 3/3

File details come from the government source that posted it. Updated .