01 10 10_Att. 8 - Conceptual Thermomechanical (TM) Boiler System Design.pdf
PDF 2 MB Posted
- Attached to
- Stare IIMC Barracks Renovation Ukraine
- Solicitation number
- W912GB20R0045
- Issued by
-
Department of the Army European Command
About this file
This package contains conceptual design documents for a thermomechanical boiler system for a barracks renovation project in Ukraine. The documents include plans for two boiler rooms showing the layout of boilers, piping, pumps, and related mechanical equipment. Specifications and schedules provide information on the boiler and pump models, insulation materials, and other components. Heat balance diagrams illustrate the flow of heating water and return lines. Collectively, these documents provide a conceptual design for the boiler and piping systems that will supply heat to the renovated barracks facility.
The related federal contract opportunity is for design-build services for interior work and mechanical systems at a barracks building on a military training center campus near Stare, Ukraine. The solicitation was issued by the U.S. Army Corps of Engineers European Command for renovation of the three-story barracks to include work on the boiler and piping systems conceptualized in the accompanying documents.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. General data.
Sheet
Attached documents
Sheets Sheet
Stage
Thermomechanical part
Specification of equipment and materials.
Output data
Boiler room No. 1 plan with pipelines marking.
2.
WD
Developed by
Checked by
Controlled by
Doc.No.Rev.
Sheet
Q-ty DateSignature
General data.
Name Note
Designation
Fuel: soild - wood with calorific capacity Q=2,530 kcal/kg (by moisture 25-30 %
In v.
N o.
o f o rig
Si gn at ur e an d d at e
In st
. o f I nv . N o.
Relative density (density) p=1,540 kg/m is accepted.
Technical solutions, accepted by the design, correspond to ecological, sanitary and hygienic, Elevation of designed pipelines to specify at site during works execution.
Manufacturing and installation of pipelines to execute according to “Rules of arrangement and safety operation
General part fire preventing and other current norms and regulations and provide safe for life and health of people object operation under condition of observing foressen by the design measures.
Thermal-mechanical part of the design is developed according to “Rules for construction and safe operation of steam boilers operating under pressurenot over 0.07 APa (0.7 kgf/cm ), water heating boliers and water heaters with water temperature not exceeding 388 K (115 C), DBN V.2.5-77-2014 “Boiler stations.”
In rooms of boiler rooms No. 1 and No. 2 two boilers are installed in each: “Altep KT-2E”, thermal rating 95 kW each.
Heating medium - water with parameters t=90-70 C
Wood is accepted as rated fuel.
Used water from drinking and service water pipeline shall correspond to the requirements of GOST 2874-82 “Potable water” of steam and hot water”.
Heating medium: water with parameters T1-T2=90-70 C for heating system
Designed boilers of boiler room No. 1 are the source of heat supply for heating of barracks rooms, boiler room
Output water: which corresponds to GOST 2874-82 “Potable water” units.
Auxiliary equipment of bolierseries 4.903-13 v.o.
Reference documents:
7.903.9-2, issue 1
Heat insulation of pipeline with positive temperatures.
Heat insulation of industrial fitting and flange joints.
7.903.9-2, issue 2 devices and pipelines.
Fixing parts of sanitary series 4.904-69 series 4.904-69
Parts of sanitary equipment fixation and pipelines series 4.903-10 Products and pipeline parts for heating network
Welded joints of pipelines to execute by electrodes of type Å42 per GOST 9467-64.
Ventilation of boiler rooms shall provide for three times air exchange not considering air necessary for burning.
Water from drainage pipelines to drain into sewage networks (or by means of flexible hose to pavement).
On drainage pipelines and pipelines to be insulated 2 layers of oil-bituminous coating on priming GF-021
Heat diagram.
For boiler rooms No. 1 and No. 2 piping layout schemes are designed. Heat diagram provides for inlet of water-heating medium with temperature T1-T2=90-70 C into heating system (and connection of boiler) of barracks with administration rooms.
Temperature change of direct and return system water is done by temperature controllers.
Heating system is closed with forced circulation. Circulation is provided by network electric pump
-18-TM.S
Wilo-TOP-S50/7 PN6/10, which is installed on return pipeline after hydroequalizer. Also provided
For cleaning of heat medium from suspended substances, before circulating pumps Wilo TOP-S 40/7 EM heating system, installation of two safety valves is provided on exit from the boiler. From safety valves
In order to remove air from the system, air discharge valves are installed on common supply pipeline as well as
T-valve pressure gauge is provided to be installed for pressure control in heating system.
Expansion tank with capacity V=200 l is installed for compensation by heating.
Installation and operation of equipment to carry out according to passports of manufacturer and to DBN V.2.5-64:2012 corresponding to the requirments of labour safety per DBN A.3.2-2-2009 “Labour safety and industrial industrial safety in
Internal heating system shall be flushed, tested for leakage and strength.
Schematic diagram of pipelines in boiler rooms No. 1 and No. 2.
4.
5.
6.
pressure in water supply network power supply of from the existing tank of water storage located on the territory
Moskalivske SDB. For to prevent counter-flow of heat medium after network and recirculating pumps is provided recurculating pumps installation of check valves is provided.
Drainage pipeline is provided for water drain from boiler. For boiler protection in case of emergency pressure raise in
Hydroequalizer (boiler rooms No. 1 and No. 2)
3 sheets series B 5.000-2.1
Fixing parts of pipelines, air ducts and other sanitary ware
Filling and makeup of system by water is provided directly from water supply network. In case of insufficient construction” installation of bypass line with additional network pump. To connect pipelines of direct and return water crossover pipeline (jumper) is provided where circulating pumps
Wilo TOP-S 40/7 EM are installed for boilers 97 kW, controlled by capillary thermostat.
on return pipeline before boilers mesh filters are installed.
drainage pipelines are also provided.
in set of safety kit.
“Internal water pipeline and sewage” and DBN V.2.3-24-2009.
52-18-TM
05.19
05.19
05.19
05.19
Chief designer
“Kredo Bud-Proekt” Ltd
Project "Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine inStare village, Boryspil district, Kyiv region" is executed on the basis of the task for design and measurement diagrams.
Trokhymenko Tostanovska Trokhymenko
Berdnyk
Boiler room No. 2 plan with pipelines marking.
3.
Section 1-1 Scale 1:50 (extract). Gas pipes diagram. Boiler room No. 1
Section 1-1 Scale 1:50 (extract). Gas pipes diagram. Boiler room No. 2
7.
Heating unit. Heat balance diagram. (Boiler room No. 1) 8.
No. 2 - source for installation and connection of water heater for hot water supply and utility needs.
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
List of drawing of main set TM
Note
Name
List of reference and attached documents
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WD 205.19Trokhymenko Tostanovska
Thermomechanical part
Trokhymenko 05.19
05.19
05.19
Berdnyk
“Kredo Bud-Proekt” Ltd
Boiler room No.1 plan with pipelines marking. Scale 1:50 (extract)
Boiler room No. 1 plan with pipelines marking.
52-18-TM
5,200
4,100 2,500
0.000
-0.030
-0.030
“KT-2E”
Boiler 95 kW
“Altep DUO PLUS”
To heat unit and water measuring unit
Water pipeline input
Ø 40 to sewage
(or manual pump by flexible hose)
500x500x500(h)
89x3.5 2Ø
T
T11 m m to pit T96
25x2.8 Ø
18x2.8
18x2.8
Ø m
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
V1
Dn20 x
Ø
200 l
Dn50 to pavement
Heat unit and distribution manifold (indicative only)
Boiler 95 kW
“KT-2E”
Boiler 95 kW
“KT-2E”
“Altep DUO PLUS”
“Altep DUO PLUS”
Ø
Connect to exhaust stack
350 (see part AB) Ø
250 (see part OB) Ø
Ventilation duct
V=52.2
H=2.5
4.8
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WD 305.19Trokhymenko Tostanovska
Thermomechanical part
Trokhymenko 05.19
05.19
05.19
Berdnyk
“Kredo Bud-Proekt” Ltd
Boiler room No. 2 plan with pipelines marking.
Boiler room No. 2 plan with pipelines marking.
Scale 1:25 (extract)
52-18-TM
4,100
2,500
0.000
-0.030 m
76x3.0 Ø
Dn20 x
Ø
T
T11
200 l
T96
T96
T96
T96
T96
T96
18x2.8
Ø
25x2.8 Ø by flexible hose)
500x500x500(h)
From boiler (see GV)
To boiler (see GV)
V
57x3.0 Ø
57x3.0 Ø
3.9
V=35.1
H=2.5 m to pit T96
25x2.8 Ø
18x2.8
18x2.8 Ø
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
Boiler 95 kW
“KT-2E”
Boiler 95 kW
“KT-2E”
“Altep DUO PLUS”
“Altep DUO PLUS”
Ø to pit T96
25x2.8 Ø
1. Boilers piping is given space-limited environment-see on boiler room No. 1.
76x3.0 Ø
Connect to exhaust stack
350 (see part AB) Ø
Ventilation duct
Ø 250 (see part OB)
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WD 405.19Trokhymenko Tostanovska
Thermomechanical part
Trokhymenko 05.19
05.19
05.19
Berdnyk
“Kredo Bud-Proekt” Ltd
Hydroequalizer
Safety set mm
Safety set
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
T11
T11
89x3.5 Ø
89x3.5 2Ø
2.50
0.000
Boiler
95 kW
Boiler
57x3.0 Ø
57x3.0 Ø
T21
T21
T12 T12 to pit T96
25x2.8 Ø to pit T96
25x2.8 Ø
DUO PLUS
(KT 2E)
95 kW
DUO PLUS
(KT 2E)
To and form heat unit
Section 1-1 Scale 1:50 (extract).
Gas pipes diagram
Boiler room No. 1
Section 1-1 Scale 1:50 (extract). Scale 1:25
Gas pipes diagram
2.150
Connect to exhaust stack
350 (see part AB) Ø
300 Ø n o t l e s s
From boiler Altep
Connect to exhaust stack
350 (see part AB) Ø
Ø
300 Ø
“DUO PLUS” (KT-2E) 95 kW
From boiler Altep
Ø
“DUO PLUS” (KT-2E) 95 kW
Ø 40 to sewage
(or manual pump by flexible hose)
500x500x500(h) to pavement
52-18-TM
Connect to exhaust stack
350 (see part AB) Ø
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WD 505.19Trokhymenko Tostanovska
Thermomechanical part
Trokhymenko 05.19
05.19
05.19
Berdnyk
“Kredo Bud-Proekt” Ltd Section 1-1 Scale 1:50 (extract).
Gas pipes diagram
Boiler room No. 2
Section 1-1 Scale 1:50 (extract). Scale 1:25
Gas pipes diagram
2.150
Connect to exhaust stack
350 (see part AB) Ø
300 Ø n o t l e s s
From boiler Altep
Ø
300 Ø
“DUO PLUS” (KT-2E) 95 kW
From boiler Altep
Ø
“DUO PLUS” (KT-2E) 95 kW
Safety set m m
Safety set
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
76x3.0 Ø
T11
T11
76x3.0 Ø
57x3.0 2Ø
2.50
0.000
Boiler
95 kW
Boiler
57x3.0 Ø
57x3.0 Ø
T21
Y21
T12 T12 to pit T96
25x2.8 Ø to pit T96
25x2.8 Ø
DUO PLUS
(KT 2E)
95 kW
DUO PLUS
(KT 2E)
To and from boiler (see GV)
Connect to exhaust stack
350 (see part AB) Ø
Ø 40 to sewage
(or manual pump by flexible hose)
500x500x500(h) to pavement
52-18-TM
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
A2
WD
Stage
Doc.No.Rev. SheetQ-ty DateSignature
SheetsSheet
Legend ball valve mesh filter thermometer check valve transfer air discharge valve safety valve manometer expansion tank
Pipelines schematic diagram
Developed by
Checked by
Chief designer
Controlled by of boiler rooms No. 1 and 2.
Thermomechanical part
T21 Pipeline of reverse heating water
T11 Pipeline of heating water
T96 Drainage pipeline
V1 Pipeline of outgoing water
Pipelines schematic diagram m
Safety set
T96
25x2.0 Ø
T96
20x2.0 Ø
Ø 40 to sewage
T2
T11
T21
T
T
76x3.0
Ø
32x2.0 Ø
T11 89x3.5
To heat unit
T21 89x3.5
From heat unit
V1
Dn20
200 l
From existing water metering unit
Ø
Ø
Safety valve
Dn15, Dn=2.5 kgf/cm
11s42p
Dn65
11s42p
Dn65
11b27p
Dn25
11s42p
Dn20
11b27p
Dn15
11b27p
Dn20
11s42p
Dn80
11s42p
Dn80
11s42p
Dn80
11s42p
Dn80
11s42p
Dn80
11b27p
Dn15
T12 Crossover pipeline (jumper)
T96
25x2.0 Ø
T21
T11
FG-80
m
T12
89x3.5 Ø
76x3.0
Ø
89x3.0 Ø
89x3.0 Ø
89x3.0
Ø network pump circulating pump controlled by capillar thermostat thermomanometer
11s42p
Dn65
11s42p
Dn50
11s42p
Dn65
Bypass
11s42p
Dn80
11s42p
Dn80
11s42p
Dn80
11s42p
Dn80
Valve of automatic compensation of leakage of the system.
11s42p
Dn50
11s42p
Dn80
11s42p
Dn65
Heat medium flow direction
57x3.0
Ø
T11 m
Safety set
T96
25x2.0 Ø
Safety valve
Dn15, Dn=2.5 kgf/cm
11s42p
Dn65
11s42p
Dn65
11s42p
Dn20
T96
25x2.0 Ø
T11
T12
76x3.0 Ø
11s42p
Dn65
11s42p
Dn65
11s42p
Dn65
57x3.0
25x2.0 Ø
25x2.0 Ø
T21
76x3.0
Ø
76x3.0 Ø
89x3.0
Ø
T96
20x2.0 Ø
(or by manual pump to pavement by flexible hose)
95 kW
Boiler “Altep DUO PLUS”
Ø
Network pump Wilo-TOP-S50/7 PN 6/10
Circulating pump Wilo-TOP-S40/7 EM
Network pump Wilo-TOP-S40/7 EM
(KT-2E)
95 kW
Boiler “Altep DUO PLUS”
(KT-2E)
05.19Trokhymenko Tostanovska Trokhymenko
05.19
05.19
05.19
Berdnyk “Kredo Bud-Proekt” Ltd
N=330 W; p=2,200 rpm; L=17 m /h
N=610 W; p=2,800 rpm; L=25 m /h
N=330 W; p=2,200 rpm; L=17 m /h
1. Heating unit for boiler room No. 2 is not installed, (diameters Dn50) - for installation of water heater see on boiler room No. 1 and 2 plan and in section GV.
Note
52-18-TM
Note
Note
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental
A3
WD
Stage
Doc.No.
Rev.
Sheet
Q-ty DateSignature
Sheets Sheet
A pp ro ve d
Hydroequalizer
Specification
Designation
Name
Notes
Weight
Q-ty
Grade, design.
one kg
GOST 10704-91
GOST 17379-83
GOST 12820-80
GOST 19904-90
GOST 8509-93
GOST 19904-90
GOST 10704-91
Electric welded steel pipe
219x6.0 L=800 mm
Pipe cap
Dn=219x6.0 for Dn=1 mPa
Flange Dn=65
Shield of thin sheeted steel
2 mm with open. 5 mm in each 10 mm
L-steel support
L50x50x4
Plate of thin-sheeted steel thickness = 3 mm 200x200
Junction piece - electric welded steel pipe
89x3.0
Air discharger automatic rm pcs pcs pcs pcs pcs rm
Developed by
Checked by
Controlled by
Thermomechanical part
Ø
Ø
Ø
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
05.19Trokhymenko Tostanovska Trokhymenko
05.19
05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Chief designer
(Boiler room No. 1)
52-18-TM
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
Heat balance scheme schemeHeat balance
Size A4
Sheets Stage
Sheet
Developed by
Checked by
Chief designer
Controlled by
Doc.No.Rev. Sheet Q-ty
DateSignature
WD
Legend
Flanged ball valve thermometer manometer
T21 Pipeline of reverse heating water
T11 Pipeline of heating water
T11
From heating networks
Dn80
11s42p
T21
To heating networks
T21 89x3.5FGA-80 Ø
(from boilers)
To supply manifold
T11 89x3.5 Ø
Dn80
11s42p
FGA-80
Dn80
11s42p
Dn80
11s42p
T11 89x3.5 Ø
(to boilers)
From return manifold
89x3.5 Ø supply manifold return manifold
Coupler-joint ball cock
Ø
Ø
T21
108x3.5
108x3.5
L=1 m
L=1 m
Dn6511s42p
To main system.
Dn40 11b27p to system No. 2 (basement)
Dn40 11b27p from system No. 2 (basement)
Dn6511s42p
Ø 75x12.5
Ø 50x8.3
(sump filter)
(sump filter)
Network pump
Wilo-TOP-S50/15
N=1,100 W; L=39 m /h
Transfer st./polypr.
Ø 76x3.0/ Ø75x12.5
Transfer st./polypr.
Ø 76x3.0/ Ø75x12.5
To main system
Ø 75x12.5
05.19
Trokhymenko Tostanovska
Thermomechanical part
Trokhymenko 05.19
05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd (Boiler room No. 1)
52-18-TM
Transfer st./polypr.
Ø 46x3.0/ Ø50x8.3
Transfer st./polypr.
Ø 46x3.0/ Ø50x8.3
Ø 50x8.3
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
Position
Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty
Weight units, kg
Notes
Equipment. Boiler room No. 1.
Domestic water heating boiler “DUO PLUS” (KT-2E) N=95 kW 1.
set
2.
28.5
FG-80
4.
Network pump Wilo-TOP-S50/7
5.
Exhaust stack 325 mm h=10.5 m pcs.
pcs.
pcs.
6.
Membrane expansion tank V=200 l US 200461
7.
pcs.
8.
pcs.
Water reserve tank pcs
Pressure indicator (MPa)
Industrial thermometer pcs 2
Control and measuring instruments
TZhST50-(0-100)S
MP100MS-1.2 MPa
SheetsSheet
Stage
Thermomechanical part
WD
Developed by
Checked by
Chief designer
Controlled by
Doc.No.
Rev.
Sheet Q-ty DateSignature
Equipment specification and materials
Ø
Sump filter
Wilo-TOP-S50/7
See partAB
Considered in part AB
1.
2.
Materials
Branch 4 pcs pcs pcs
90-76*3.0
1.
2.
3.
90-25*2.5
90-18*2.0
5.
6.
9.
10.
Branch
Branch pcs pcs pcs
Three-way valve pcs pcs
Embedded detail for thermometer 3kch-275.0090
Sockolet for thermometer
11b38bk
Mesh filter Dn65 pcs.
3.
9.
Hydraulic equailizer Dn219
GOST 10704-91
pcs.
See sheetTM-5 considered transfer k-76*3.0-57*3.0 transfer k-76*3.0-32*2.0
Circulating pump Wilo TOP-S40/7-EM; N=330 W; p=2,200 rpm; L=17 m /h set
7.
Straight tee
8.
Ø 65 pcs
Wilo TOP-S40/7 controlled by capillar thermostat
Thermomanometer (MPa)
3.
pcsTMTB-31 transfer k-57*3.0-45*3.0 pcs
4.
5.
Branch 90-57*3.0 pcs
11.
Four-way valve Dn65 (butterfly)
364FR 1
pcs
52-18-TM
“DUO PLUS” (KT-2E) N=95 kW
N=610 W; p=2,800 rpm; L=25 m /h
05.19
05.19
05.19
05.19
“Kredo Bud-Proekt” Ltd
Trokhymenko
Tostanovska
Trokhymenko Berdnyk
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
Pipelines
Steel welded pipe
GOST 10704-91
Fittings
25x2.8 pcs.
7/4 pcs.
pcs. 3
Sheet
SheetRev. Q-ty Doc.No. Signature Date pcs.
pcs.
pcs. 5 pcs.
pcs.
pcs.
Water and gas pipe
18x2.8
GOST 3262-75
Steel welded pipe
GOST 10704-91
Ø
Ø
Ø
52-18-TM
1.
2.
rm rm
12,0/10,0 rm 4.0
Water and gas pipe
1.
4.
5.
GOST 3262-75
2.
3.
4.
Flanged ball valve
Dn50/Dn40
Flanged ball valve
Dn65
11s42p
11s42p
Coupler-joint ball cock, brass
Dn20
Coupler-joint ball cock, brass
Dn15
11b27p
11b27p
3.
11b27p
Coupler-joint ball cock, brass
Dn25
5. pcs. 2
Safety valve Dn15, P=2.5 kgf/cm
17s28nzh
6.
65 16kch9p
Flange check valve
Dn
Steel flanges Dn65 P=10 kgf/cm
Steel flanges Dn20 P=10 kgf/cm
7.
10.
12.
GOST 12821-80
GOST 12821-80
14.
Air discharger Dn15 pcs. 2
Gas pipelines
Gas pipeline of thin-sheeted galvanized steel, thickness 0.5 mm 300/260x260
Transfer from cross-section 300x300 to 325 of thin-sheeted galvanized steel
Ø
Ø
1pcs
1.
2.
GOST 14918-80
5.0/2.0 rm
GOST 14918-80
32x2.8 Ø
Water and gas pipe
GOST 3262-75
rm 8.0/6.0 rm
8.0 insulated/cold water
10.0
L-steel support
GOST 8509-93
insulated insulated insulated insulated insulated
Remote thermostat for installation on exhaust stack including:
4.
1/1 set
Switching contact
Duct L=75 mm
Sensor 5 mm, L=75 mm Ø pcs.
pcs.
pcs. 1/1
1/1
1/1
57x3.0
Flange check valve
Dn
8.
16kch9p
GOST 19904-90
L50x50x4
Plate of thin-sheeted steel thickness = 3 mm 200x200 pcs pcs thickness 0.5 mm
3.
Valve of automatic compensation of leakage of system
13. 65
Dn
1pcs
Flange check valve
Dn 1pcs
16b1bk
Explosive valve on gas pipeline (15x15) cm
2pcs
5.
6.
9.
Steel flanges Dn50/Dn40 P=10 kgf/cm
11.
GOST 12821-80
14/8 pcs.
a) b) c)
76x3.0/ Ø 89x3.5 Ø
Position
Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty
Weight units, kg
Notes pcsPressure indicator (MPa)
Industrial thermometer pcs
Control-measuring instruments
1.
2.
TZhST50-(0-100)S
MP100MC-0.6 MPa
FGA-80 pcs.
Flanged ball valve
Dn80
11s42p pcs.
Materials
Bricky primer GF-0,21
Enamel EP - 51 (green) 0.1 kg
0.2 kg
M-125, thickness 60 mm
Glass-fibre plastic, rolled RST-A-L-V
Mineral wool mats, stitched, without lining M-125, thickness 40 mm
Pipelines heat insulation
Mineral wool mats, stitched, without lining
2.775m
0.027 m
0.0628 m
1.
2.
(Heating unit)
(Distribution manifolds)
Flanged ball valve Dn65/Dn40 11s42p/ pcs.
2/2
1.
2.
Pipelines
Steel welded pipe 89x3.0
GOST 10704-91
Ø m
5.0
1.
2.
Steel welded pipe 159x3.5 Ø
GOST 10704-91
m 2.0
1.
2.
3.
4.
5.
2pcs pcs
Embedded detail for thermometer
3kch-275.0090
Sockolet for manometer
3.
4.
Three-way valve (for manometer) 6pcs
Combined heat insulating structures with vertical layering on roofing felt
Insulation
1.
m m
(for gas pipelines)
2.
Mineral wool blocks sewn in unwoven stitched fabric
Glass-fibre plastic rolled RST-250-L (for pipelines) rm/ rm/ m m rm/ rm/
44.0
44.0
7.0
7.0
Sheet
SheetRev. Q-ty Doc.No.Signature Date
52-18-TM
Fittings
Sump filter
11b27p
Position
Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty
Weight units, kg
Notes
| 52-18-TM Thermomechanical - General Data |
| 52-18-TM Thermomechanical - Boiler Room No. 1 Plan with Pipelines |
Marking.
52-18-TM Thermomechanical - Boiler Room No. 2 Plan with Pipelines Marking.
| 52-18-TM Thermomechanical - Section 1-1 Scale 1:50 (extract). Gas Pipes Diagram Boiler room No. 1 |
| 52-18-TM Thermomechanical - Section 1-1 Scale 1:50 (extract). Gas Pipes Diagram Boiler room No. 2 |
| 52-18-TM Thermomechanical - Pipelines Schematic Diagram of Boiler Rooms No. 1 and 2. |
| 52-18-TM Thermomechanical - Hydroequalizer (Boiler Room No. 1) |
| 52-18-TM Thermomechanical - Heating Unit Heat Balance Scheme (Boiler Room No. 1) |
| 52-18-TM Thermomechanical - Equipment Specification |
and Materials 1/3 52-18-TM Thermomechanical - Equipment Specification and Materials 2/3 52-18-TM Thermomechanical - Equipment Specification and Materials 3/3