01 10 10_Att. 9 - Conceptual Heating & Ventilation Systems Design (1).pdf
PDF 6 MB Posted
- Attached to
- Stare IIMC Barracks Renovation Ukraine
- Solicitation number
- W912GB20R0045
- Issued by
-
Department of the Army European Command
About this file
This design package provides conceptual heating, ventilation and air conditioning (HVAC) system designs for the renovation of administrative buildings and barracks at the Stare IIMC training facility in Ukraine. The HVAC designs cover the basement, ground and first floors of the barracks building and include proposed supply and exhaust ventilation systems using fans and ductwork. Heating would be provided by a new building heating unit and distribution piping network utilizing radiators. The designs are intended to meet Ukrainian regulatory requirements and international standards for indoor climate control.
The related federal contract opportunity is a design-build project for interior renovations and mechanical systems at the three-story Barracks Building located on the Stare IIMC campus in Ukraine. The solicitation was issued by the U.S. Army's European Command for HVAC and other interior work.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A4
WD
Stage Doc.No.Rev. SheetQ-ty DateSignature
SheetsSheet
Explanatory note
Developed by
Controlled by
Checked by
Chief designer 1
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
General explanation note.
Trokhymenko Tostanovska Trokhymenko
Heating and ventilation
52-18-OB
“Kredo Bud-Proekt" Ltd
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
05.19 05.19 05.19
05.19Berdnyk and DSTU-N B.1.1-27:2011;
2. Design is developed according to the current regulatory documents on the territory of Ukraine:
- DBN V. 2.5-67:2013 - “Heating, ventilation and air conditioning”;
-DSTU-N B V.1.1-27:2010 -“Building climatology”;
- DBN V.1.2-7-2008 - “Safety and reliability assurance system for contstruction objects.
- DBN V.1.2-10-2008 - “Noise protection”;
-DBN V.1.1-7-2016 - “Fire safety of construction objects”
Basic requirements to buildings and structures.”
-“Buildings and structures. Residential buildings”- DBN V.2.2-15-2005
- DBN V.2.2-9-2009 - “Public facilities”
- DBN V.2.2-20-2008 - “Buildings and structures. Dormitories”;
Section OB of the design due to major repairs provides for heating and ventilation of the basement, ground and first floors of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine “International interdepartmental multipurpose training center of subunits”.
DBN V.2.2-25-2009 -“Food outlets”.
Designed system is rated for provision of internal air parameters according to the requirements of GOST 12.1.005-88.
Rated parameters of outside air for cold period: to. = -22 °C, inside ti. = +15–22 °C for heating of room according to DBN V.2.2-9-99 and DBN V.2.2-3-97.
Supply source existing external heat network Heating medium of network water is with parameters 95–70 °C. (after heating unit, see section TM).
Heating medium of heating system is water under 95–70 °C.
Heating of basement, ground and first floor rooms of barracks is provided from designed building internal networks. Installation of heating unit and heat distribution manifold is provided in room of boiler room No. 1. Heating system two-pipes with bottom distribution. (basement separate branch). On supply pipelines on distribution manifold (see TM) installation of network is provided
Radiators of type RADIK, type 22 are used as heating devices “KORADO”. for heating systems polypropylene PN 20 pipes are used.
Adjusting of heating systems is done at place by stop valves.
Pipelines slope is not less 0.002.
Pipelines laid in under floor channels of the ground floor should be heat insulated. Pipelines passways through fencing structures to arrange in protective cases. Heating unit to arrange by metal pipes per GOST 10704-91. Water drainage from heating systems is fulfilled into pit located in heating unit room.
Then from pit by means of hand pupm to perimeter pavement.
of pump Wilo-TOP-S50/15DM PN10/6, N=1,100 W, p=2,800 rpm
Heating.
1. Climatic data are accepted according to the requirements of DBN V.2.5-67:2013
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No. Signature Date
Ventilation.
Design provides for planning of ventilation systems of rooms on the first and second floors of the barracks according to construction drawings, technological equipment and task for designing.
Designed ventilation systems are rated for provision of internal air paramaters according to the requirements of GOST 12.1.005-88.
52-18-OB. PZ
Certificates of concealed works should be drawn after erection works completion:
1. Niches readiness for radiators installation,
2. Correctness of slopes, pipes bending, installation of sanitary ware.
3. Correctness of installation and non-faulty of fittings operation, safety devices.
4. Certificate of heating system acceptance.
To provide air exchange in rooms: offices, sleeping areas, dining facility, shops, WC and other special premises design provides for the following supply-exhaust units:
for rooms of basement, ground and first floor of the building design provides for supply ventilation systems with mechanical air draft P1–P14 and exhaust ventilation systems with mechanical air draft V1–V44. Exhsaust systems are also designed with natural air draft VP1–VP11. In supply systems P1, P2, P9, P12 and P13 fans VENTS VLM315ES with electric motors 190 W are used, in supply systems P3 and P10 fan VENTS VKM355-B with electric motor 233 W is used, in supply systems P4, P5 and P6 fan VENTS VKM 450 with electric motor 665 W is used, in supply system P11-fan VENTS VLM400 with electric motor 460 W is used, in supply system P14 fan VENTS VKM100 with electric motor 73 W is used. Supply to boiler rooms is provided by systems P7 and P8 with electric motors VENTS 200VKM with electric motors 154 W.
Exhaust system V1 from technical room to basement provides elimination of air by means of fan VENTS VKM315ES with electric motor 190 W. Exhaust systems V2 and v3-z of vegetable, meat and fish shops eliminate air by means of fans VENTS VKM150 with electric motors 98 W. Air is eliminated from hot shop, flour shop and washing room by system V4 by means of fan VENTS 450VKM with electric motor 665 W.
Air is eliminated from dining hall by systems V5 and V6 by means of fans VENTS 450VKM with electric motors 665 W. Besides, used by equipment air elimination from hot shop is provided by (local pumps) systems V13, V15, V15 by means of fans VENTS VKM355B (V13) and fans VENTS VKM 450 with electric motors 665 W. From WC of the ground and first floors V9, V10, V11, V22, V23 and V24: air elimination is provided by means of fan VENTS VKM 100 with electric motor 73 W (V9) and by means of fans VENTS VKM150 with electric motor 98 W. Exhaust systems V7 and V17 pump out air from sleeping rooms by means of fans VENTS VKM315ES and VENTS VKM400 with ekectric motors 190 W and 460 W. Air is pumped out from classrooms and offices by systems V8 (fan VKM315), V18 (fan VKM150) and V21 (fan VKM200) with motors 190, 98 and 154 W correspondingly.
Air is pumped our from drying room by system V20 by means of fan VKM100 with electric motor 73 W.
Air elimination is also provided by exhaust systems VP1–VP11 with natural draft. For exhaust systems with mechanical and natural draft ventilation ducts are provided made of insulated metal pipes and by means of branch channels 150x150 mm, 200x200 mm, 200x400 mm, 200x450, 250x600 and 250x650 mm. Air ducts of ventilation system are made of galvamized steel class “sch” per
GOST 14918-80.
v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No. Signature Date
NameNo.
Measuring unit Quantity
Technical and economic features
1.
2.
3.
4.
5.
6.
7.
8.
m m m m
9.
Submission of design documentation to insurance fund of documentation of Ukraine
Code per DC 018-2000
Consequence class
Object complexity category not applicable
2,221.1
CC1
II
m
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
40x6.7 Ø
32x5.4
25x4.2
Ø
Ø
63x10.5 Ø
50x8.3 Ø
224.0
202.0
244.0
180.0
34.0
10.
mPolypropylene pipe PN20 75x12.5 Ø 26.0
52-18-OB.PZ
Air supply and exhaust are fulfilled by means of nonregulated air grids MVMB250, MVM200, MVM150, MVM200x100, MVM 150x100, MVM 100x100 and MVM100. All air ducts out of rooms are insulated by material BestIsol for prevention of condensate accumulation on their surface. (or Technonikol, thickness 30 mm) Ventilation systems shutoff automatically in case of fire.
Natural air supply systems due to airing. Calculation of ventilation systems are given in balance tables (air exhange rate per hour). Steel thickness for air ducts is according to DBN V.2.5-67:2013 depending on air duct size.
Fixing of air ducts to be done by means of typical structures, series 5.904-1.
v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No.SignatureDate
Table of air exchange rate
Room name To supply To exhaust
Quantity of air supply m³/h
Note ro om N o.
mech. mech. natur. natur.
Quantity of air exhaust m³/h
BASEMENT
52-18-OB.PZ
1,250 1,250M M 1,250
Vegetable storeroom01
Vegetable storeroom
Vegetable storeroom
Auxiliary room
Spare parts storeroom
Corridor
Equipment and maintenance
Cooling chamber
Corridor
Corridor
Packing storeroom11
12 Auxiliary room
13 Hoistwell
14 Switchboard room accessories
2 2
2 2
2 2
3002 2- - 302 2- -
101 1- -
1252 2- -
3002 2- -
151 1
V1=1,235
VP1=15
P1=1,250 per balance per balance per balance v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No. SignatureDate
Table of air exchange rate
Room name To supply To exhaust
Quantity of air supply
N o.
mech. mech. natur. natur.
Quantity of air exhaust m³/h ground floor
52-18-OV.PZ
Airlock
Corridor
Staircase
Corridor
Combat training room
WC for women
Personal hygiene room
Office
WC for men
Airlock
Dining hall for 150 seats
Cloakroom
Flour shop
Hot shop
Room for equipment and
Store rooms
Airlock
Washroom for kitchen and
Meat and fish shop
Combat training room
Combat training room
Sleeping room for
Vegetable shop personnel maintenance accessories of dry products ware
Personnel cloakroom
Toilet
Shower room
20x25/20x25 25 pers.
20x25/20x25 25 pers. 25 persons500 500
24x50/24x5024x50/24x50 50 persons1,200 1,200
15 persons
15 persons 3 persons
20x15/20x15 15 pers.
20x15/20x15 15 pers.
20x15/20x15 15 pers.
20x15/20x15 15 pers.
20x3/20x3 3 pers.
20x3/20x3 3 pers.
100100
50 for l.b.
25 for sink 50 for l.b.
25 for bidet 25 for sink
4500 450030x150/30x150 30x150/30x150
1152 2
+4070
2 2 2 2 90 90 750 l.e.
6,100 10,170
2 p.e.60 %
M M
750x6=4,500 l.e.
1,000x4=4,000 l.e.
1,200 l.e.
- - 2 2 15
- - 2 2 50
4 6 315 475 1,500 l.e.
3 4 230 310 3 4 230 310
5 5 140
5 5 45
50 for l.b.
50 for l.b. 50
50 for l.b.25 for sink25 for b.u.
v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No. Signature Date
Table of air exchange rate
Room name To supply To exhaust
Quantity of air supply
N o.
mech. mech. natur. natur.
Quantity of air exhaust m³/h ground floor
52-18-OV.PZ
19,705 21,995M M 2,290
127 Dining-facility manager office
Room for cooks rest
Personnel WC129 Store rooms 130
Loading room131
132 Airlock
Airlock
Premise
Cloakroom for boiler firemen
WC
Corridor
Airlock
Staircase No. 2
Cabinet for tableware
Cabinet for dinner ware
Linen press
Corridor Premise
Shower room of cleaning equipment of boiler room (No. 2) of boiler room (No. 1)
25251 of build. 11
25251 of build. 11 50 for l.b.
50 for l.b. 50
- - 2 2 20
3 3 3 3
3 3 3 3 675 155
+625 -105
50 for l.b.
50 for l.b. 7525 for sink 25 for sink
5 5
5 5
V4=1,500P2=1,300 P3=2,060 P4=4,500 P5=4,905 P6=4,070 P7=625 P8=675
P9=1,200 P10=2,000
V2=310 V3=310
V5=750 V6=4,500 V7=1,200 V8=1,160 V9=175 V10=350 V11=375
V13=1,950 V14=470
21,335M V16=3,500 21,275M
VP2=50
VP3=45
VP4=70
VP5=50
VP6=90
VP7=105
VP8=155
VP9=75
655M
V12=475
V15=4,250
Compensation of supply air (rest 660) by means airing
VP10=15
v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Sheet
SheetRev. Q-ty Doc.No. Signature Date
Table of air exchange rate
Room name To supply To exhaust
Quantity of air supply
N o.
mech. mech. natur. natur.
Quantity of air exhaust m³/h
1st floor
52-18-OB.PZ
4,330 5,970M M 1,640
Compensation of supply air (rest 255) by means airing
Sleeping area for 201
Training room202
203 Corridor
204 Staircase No. 1
205 Weapon store room
Store room
WC
Washing room
Shower room
Weapon cleaning room
Utility
Drying room for
Commander’s room
Room for preparation
Executive office Room for preparation of soldiers
218 Staircase No. 2
Place for exercises
220 Place for equipment and
221 Place for shoes cleaning
Store room for belongings of personnel for 100 persons special means sergeants for training and personal items uniform and shoes room preparation for training and sports maintenance accessories
24x100/24x100 24x100/24x100
100 persons2,400 2,400 2 2 2 2 520 520
1 1- - 85
2 2- - 160 5 persons 100 10020x5/20x5
5 pers.
20x5/20x5
5 pers.
15 persons 300 30020x15/20x15 15 pers.
20x15/20x15 15 pers.
1 1 50
3 35 5 150 250
2 2 2 2 100 100 375-
50 for l.b.
25 for bidet and b.u.
25 for sink
3 3 5 5
15 persons 300 30020x15/20x15
15 pers.
20x15/20x15
15 pers.
3 persons60 6020x3/20x3 3 pers.
20x3/20x3 3 pers.
2 2- - 135
80x5/80x5 5 pers.
80x5/80x5 5 pers. 400 400
P11=2,800 P12=1,280 P13=1,300 P14=250
5,630M
V17=2,800 V18=520 V19=445 V20=250 V21=760 V22=310 V23=375 V24=425
VP11=85
5,885M
52-18-OB
“Kredo Bud-Proekt” Ltd
Developed by
Controlled by
Checked by
Chief designerTrokhymenko Tostanovska Trokhymenko
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
2.,3
1.
Sheet Note
List of working drawings of main set of OB mark
5.
6.
7.
General data (beginning)
Name
General data (end)
8.
9.
10.
11.
Name
Air temperature
Es tim at ed
Ba ro m et ric
Te m pe ra tu re
A ve ra ge of point ge og ra ph ic la tit ud e, C pr es su re
, g Pa
50 24 900
Stare village of a ir, C hu m id ity fro m y ea r %
Rated parameters of outside air accepted per DBN V.2.5-67:2013 and DSTU-N B V.1.1-27-2010
Consumption of heat kW Name buidlings (structures) of room
Installed power of electric motors kW
Consumption of cold kW
For heating
Volume m³
Periods of year under t°n=C
Adminstrative building for barracks with administration buildings
Main indicators on ventilation drawings, (heating and air conditioning)
-22 -10
For ventilation
For hot water
Total
1859,000 (180) 550 - 9.370 av er ag e
2.8
Period with average daily air temperature
D ur at io n from 17.10 till 11.04
Te m pe ra tu re of a ir, C co ld es t
Te m pe ra tu re of a ir, C d ay
-26 -21
Te m pe ra tu re of a ir, C ho tte st
Te m pe ra tu re of a ir, C d ay co ld es t fiv e d ay s fiv e d ay s ho tte st
+26 +24 76
D ur at io n he at in g of p er io d
<= 8 C d ay s
A ve ra ge
Te m pe ra tu re
C
-0.1
>= 21 C
D ur at io n d ay s
A ve ra ge
Te m pe ra tu re
C
18 20.6
A ve ra ge sp ee d of w in d m /s
7.9
D ur at io n d ay s
A ve ra ge
Te m pe ra tu re
C
(<= 10 C)
(195 0.7) in 8 C
D ur at io n he at in g of p er io d transfer in 10 C transfer
(from 6.10 till 19.04)
D ur at io n he at in g of p er io d
3,591 hours
Q ua nt ity of ra in fa ll pe r y ea r, m m
Name
Reference documents:
Attached documents:
Note
Equipment specification. 52-18-OB.CO V on 16 sheets
List of reference and attached documents
Buildings and structures. Residential buildingsDBN V.2.2-15-2005
Parts of sanitary equipment fixation and
Parts of air ducts fixation
Heating, ventilation and air conditioning series 5.904-51 Hoods and deflectors of ventilation systems series 1.494-21
Adjustable slit grating Grid fixing to air ducts and building structures series 1.494-10
GOST 13448-82 Louvered grille
Internal sanitary engineering systemsDBN D 2.2-16-99, SNiP 3.05.01-85
Ventilation systems. Catalogue VENTS
Designation series 5.904-1
DBN V.2.5-67:2013
series 5.904-51
DBN V. 2.5-67:2013
DBN V.2.2-9-2009 Public facilities
Stage Sheet Sheets Rev. Q-ty Sheet Doc.No. Signature Date
A ve ra ge pe r y ea r, re la tiv e hu m id ity
To ta l so la r r ad ia tio n pe r h ea tin g pe rio d
Mj/m2 horizontal
DBN V.2.2-20-2008 Buildings and structures. Dormitories
General data (beginning)
Heating and ventilation
178 (heater)
1WD 16
General data (continued)
12.
13.
14.
15.
16.
Boryspil district Kyiv region
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
05.19 05.19 05.19
05.19Berdnyk
Plan at elev. -2.640 with heating system marking Plan at elev. +0.000 with heating system marking Plan at elev. +3.300 with heating system marking
Heating system diagram
Plan at elev. -2.670 with ventilation systems marking Plan at elev. +0.000 with ventilation systems marking Plan at elev. +3.300 with ventilation systems marking
DBN V.2.2-25-2009 Food outlets.
Plan at elev. +6.590 with ventilation systems marking. Plan extract on axis 12 and V–Ye at elev.+6.590 Ventilation systems P1–P10 diagrams
Ventilation systems P11–P14, V1–V11 diagrams
Ventilation systems V12–V24 diagram Vemtilation systems VP1–VP11 diagrams
OP on 3 sheets.
pe r y ea r
Rev. Q-ty Sheet Doc. No. Signature Date
Developed by
Controlled by
Checked by
Chief designerTrokhymenko Tostanovska Trokhymenko
In v.
N o.
o f o rig
Si gn at ur e an d d at e
In st
. o f I nv . N o.
General data (continued)
Heating and ventilation Stage Sheet Sheets
Parameters of ventilation and heating systems
Fan Electric motor Heat exchanger Air cooler Filter NoteAir heater Symbol system
Q-ty system
Room name, (process equipment) under service
Type of unit of assembly
Type of fulfilment per explosion proof
N
Scheme of ful-filment Position L, P, n, m/year3 Pa rpm
N, kW n, rpm
Type, of fulfilment per explosion proofing TypeQ-ty N
Temperature of heating C from till
Temperature of heating C from till
Q-ty
Consump-
Q kW tion of heat m, Pa
P
Pa
P Consump-
Q kW tion of cold
Temperature of cooling C from till
Type Q-ty
Pa
P x, 1P1
P2
P5
VKM355-B
VKM315ES1
1,300
2,060
2,780 2,780190
(1,460)
(2,210)
(+12) (+22) -10 +161 12 (2x6)
VKM315ES
P3
1,250 (1,460) 190350 2,780 2,780
1,375 1,375
Filter G3 1 Filter F7 1 Filter G3 1 Filter F7 1 Filter G3 1 Filter F7 1
12 (2x6)(+12) (+22) -10 +161
(+12) (+22) -10 +161
VKM315-ES
P14
V1
V2
V3
V4
V5
Filter G3 1 Filter F7 1(+12) (+22)
-10 +161P4
(+12) (+22) -10 +161 Filter G3
Filter F7
Corridor (basement) per
Hot shop, meat and fish, Hot shop, flour shop VKM450 4,905 350 665(5,260) 1,265 1,265
P7
P8
P9
P10 P11
Dining hall for 150 seats VKM450 4,500 (5,260) 350 6651,265 1,265
Filter G3 Filter F7
V6
1,235 350 190(1,460) 2,780 2,780
V7
V8
V9
V10
P6 1 VKM450 4,970
(5,260) 350 6651,265 1,265
P12
(+12) (+22) -10 +161
18 (2x9)
VKM315ES
VKM200
1,200
2,375(950)
(1,460)
VKM200 625
(950) 250 2,375
2,780
Boiler room No. 2
Sleeping area for 50
Classrooms, corridors
VKM355Á
2,000 350(2,210) 1,375
Sleeping area
VKM400 2,800
(3,050) 350 1,370 Training rooms VKM315ES 1,280
(1,460) 350 2,780
2,375154
154 2,375
2,780
233 1,375
460 1,370
190 2,780
(+12) (+22) -10 +161
(+12) (+22) -10 +161
(+12) (+22) -10 +161
(+12) (+22) -10 +161
18 (2x9) Filter G3 Filter F7 1 Filter G3 Filter F7 Filter G3 Filter F7 Filter G3 Filter F7
(270) 73250 2,830 2,830
Technical room (basement)
Vegetable shop VKM150 310
(555) 250 2,705 2,70598
Flour shop
1,375233
190 2,780Sleeping area
VKM315-ES 1,160
350 190(1,460) 2,780 2,780Rooms (for training)
VKM100 175 250 73(270)
2,830 2,830 Personal hygiene room
WC for man (gr. floor) VKM150 350
(555) 250 2,705 2,70598
2WD
52-18-OB
“Kredo Bud-Proekt” Ltd
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
05.19 05.19 05.19
05.19Berdnyk balance
Corridor (ground floor) per balance, cloakroom Room shop, vegetable shop
Washing room 18 (2x9)
Dining hall for 150 seats
Boiler room No. 1
18 (2x9)
18 (2x9) men (for personnel)
Cloakroom for 100 persons (for personnel) 18 (2x9)
18 (2x9)
Training room 12 (2x6)
P13
Drying room, utility room VKM100 (+12) (+22)
-10 +161 4
Filter G3 Filter F7
Filter G3 Filter F7
Corridor (first floor) per balance VKM315ES 1,300
(1,460) 350 2,780 190 2,780 (+12) (+22) -10 +161 12 (2x6)
Meat and fish shop VKM150 310
(555) 250 2,705 2,70598
VKM355-B 1,500
350(2,210) 1,375
VKM200
250 2,375(950) 2,375154
Washing room
Dining hall for 150 seats 4,500
(5,260) 350 6651,265 1,265VKM450
for personnel for 50 persons
VKM315-ES 1,200
350(1,400) 2,780
WC for women (gr. floor)
V11 1 WC for men (gr. floor) VKM150 375
(555) 250 2,705 2,70598
(per balance)
(gr. floor) unit
Rev. Q-ty Sheet Doc. No. Signature Date
Controlled by
Checked by
Chief designerTrokhymenko Tostanovska Trokhymenko
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
General data (continued)
Heating and ventilation Stage Sheet Sheets
Parameters of ventilation and heating systems
Fan Electric motor Heat exchanger Air cooler Filter NoteAir heater Symbol system
Q-ty system
Room name, (process equipment) under service
Type of unit of assembly
Type of fulfilment per explosion proof
N
Scheme of ful-filment Position L, P, n, m/year3 Pa rpm
N, kW n, rpm
Type, of fulfilment per explosion proofing TypeQ-ty N
Temperature of heating C from till
Temperature of heating C from till
Q-ty
Consump-
Q kW tion of heat m, Pa
P
Pa
P Consump-
Q kW tion of cold
Temperature of cooling C from till
Type Q-ty
Pa
P x, 1V12
V13
V16
VKM150
VKM355B1
1,950
1,375 1,375233
(2,210)
(555)
VKM150
V14
(555) 98250 2,705 2,705
2,705 2,705
V24
V15
Washing room
Hot shop s.v.
VKM450 4,250 350 665(5,260) 1,265 1,265
V18
V19
V20
V21 V22
665 1,265
V17 1 Sleeping area for 150 VKM400 2,800 (3,050) 350 4601,370 1,370
V23
VKM150
2,705(555)
(270)
VKM150 520
(555) 250 2,705
2,830
Training room
Rooms (technical purpose)
VKM200 760
250(950) 2,375
Drying room VKM100
(555) 250 2,705
Training rooms
VKM150 375
(555) 250 2,705
2,70598
98 2,705
2,830
154 2,375
98 2,705
98 2,705
WC VKM150 425
(555) 98250 2,705 2,705
3WD
52-18-OB
“Kredo Bud-Proekt” Ltd
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
05.19 05.19 05.19
05.19Berdnyk
Hot shop (general exch.)
Hot shop s.v.
VKM450Hot shop s.v.
3,500 350(5,260) 1,265 beds for personnel
Washing room
WC
and shower rooms VKM150 310 unit
Controlled by
Checked by
Chief designerTrokhymenko Tostanovska Trokhymenko
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc. No. Signature Date
General data (end)
Heating and ventilation 4WD
Stage Sheet Sheets
Designed system is rated for provision of internal air parameters according to the requirements of
GOST 12.1.005-88.
Rated parameters of outside air for cold period: to. = -°22C, internal ti. = +15–22 °C for heating of room according to DBN V.2.2-9-99 and DBN V.2.2-3-97.
Supply source existing external heat network Heating medium of network water is with parameters 95–70 °C. (after heating unit, see section TM).
Heating medium of heating system is water under 95–70 °C.
Heating of basement, ground and first floor rooms of barracks is provided from designed building internal networks. Installation of heating unit and heat distribution manifold is provided in boiler room No. 1. Heating system two-pipes with bottom distribution. (basement separate branch).
On supply pipelines on distribution manifold (see TM) installation of network is provided
Radiators of type RADIK, type 22 are used as heating devices “KORADO”. for heating systems polypropylene PN 20 pipes are used.Adjusting of heating systems is done at place by stop valves.
Pipelines slope is not less 0.002.
Pipelines laid in under floor channels of the ground floor should be heat insulated. Pipelines passways through fencing structures to arrange in protective cases.
Heating unit to arrange by metal pipes per GOST 10704-91. Water drainage from heating systems is fulfilled into pit located in heating unit room. Then from pit by means of hand pupm to perimeter pavement. Certificates of concealed works should be drawn after erection works completion:
1. Niches readiness for radiators installation,
2. Correctness of slopes, pipes bending, installation of sanitary ware.
3. Correctness of installation and non-faulty of fittings operation, safety devices.
4. Certificate of heating system acceptance.
of pump Wilo-TOP-S50/15DM PN10/6 , N=1,100 W, p=2,800 rpm
Heating.
General data
DSTU-N B.1.1-27:2011;
2. Design is developed according to the current regulatory documents on the territory of Ukraine:
- DBN V. 2.5-67:2013 - “Heating, ventilation and air conditioning”;
-DSTU-N B V.1.1-27:2010 - “Building climatology”;
- DBN V.1.2-7-2008 - “Safety and reliability assurance system for contstruction objects. Main
- DBN V.1.2-10-2008 - “Noise protection”;
-DBN V.1.1-7-2016 - “Fire safety of construction objects” requirements to buildings and structures.”
- “Buildings and structures. Residential buildings”- DBN V.2.2-15-2005
- DBN V.2.2-9-2009 - “Public facilities”
- DBN V.2.2-20-2008 - “Buildings and structures. Dormitories”;
Section OB of the design due to major repairs provides for heating and ventilation of the basement, ground and first floors of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine "International interdepartmental multipurpose training center of subunits”.
for rooms of basement, ground and first floor of the building design provides the supply ventilation systems with mechanical air draft P1P14 and exhaust ventilation systems with mechanical air draft V1–V44. Exhsaust systems are also designed with natural air draft VP1–VP11. In supply systems P1, P2, P9, P12 and P13 fans VENTS VKM315ES with electric motors 190 W are used, in supply systems P3 and P10 fan VENTS VKM355-B with electric motor 233 W is used, in supply systems P4, P5 and P6 fan VENTS VKM 450 with electric motor 665 W is used, in supply system P11fan VENTS VKM400 with electric motor 460 W is used, in supply system P14 fan VENTS VKM100 with electric motor 73 W is used. Supply to boiler rooms is provided by systems P7 and P8 with electric motors VENTS 200VKM with electric motors 154 W.
Exhaust system V1 from technical room to basement provides elimination of air by means of fan VENTS VKM315ES with electric motor 190 W. Exhaust systems V2 and v3-z of vegetable, meat and fish shops eliminate air by means of fans VENTS VKM150 with electric motors 98 W.
Air is eliminated from hot shop, flour shop and washing room by system V4 by means of fan VENTS 450VKM with electric motor 665 W.
Air is eliminated from dining hall by systems V5 and V6 by means of fans VENTS 450VKM with electric motors 665 W. Besides, used by equipment air elimination from hot shop is provided by (local pumps) systems V13, V15, V15 by means of fans VENTS VKM355B (V13) and fans VENTS VKM 450 with electric motors 665 W. From WC of the ground and first floors V9, V10, V11, V22, V23 and V24: air elimination is provided by means of fan VENTS VKM 100 with electric motor 73 W (V9) and by means of fans VENTS VKM150 with electric motor 98 W.
Exhaust systems V7 and V17 pump out air from sleeping rooms by means of fans VENTS VKM315ES and VENTS VKM400 with ekectric motors 190 W and 460 W. Air is pumped out from classrooms and offices by systems V8 (fan VKM315), V18 (fan VKM150) and V21 (fan VKM200) with motors 190, 98 and 154 W correspondingly.
Air is pumped our from drying room by system V20 by means of fan VKM100 with electric motor 73 W.
Air elimination is also provided by exhaust systems VP1–VP11 with natural draft. For exhaust systems with mechanical and natural draft ventilation ducts are provided made of insulated metal pipes and by means of branch channels 150x150 mm, 200x200 mm, 200x400 mm, 200x450, 250x600 and 250x650 mm. Air ducts of ventilation system are made of galvamized steel class “sch” per GOST 14918-80.
Natural air supply systems due to airing. Calculation of ventilation systems are given in balance tables (air exhange rate per hour). Steel thickness for air ducts is according to DBN V.2.5-67:2013 depending on air duct size.
Fixing of air ducts to be done by means of typical structures, series 5.904-1.
Ventilation.
Design provides for planning of ventilation systems of rooms in the basement, on the ground and first floors of the barracks according to construction drawings, technological equipment and task for design.
Designed ventilation systems are rated for provision of inside air parameters according to the requirements of GOST 12.1.005-88.
To provide air exchange in the rooms: offices, sleeping areas, dining facility, shops, WC and other special rooms design provides for the following supply-exhaust units:
Air supply and exhaust are fulfilled by means of nonregulated air grids MVM250, MVM200, MVM150, MVM200x100, MVM 150x100, MVM 100x100 and MVM100. All air ducts out of rooms are insulated by material BestIsol for prevention of condensate accumulation on their surface. (or Technonikol, thickness 30 mm) Ventilation systems shutoff automatically in case of fire.
52-18-OB
“Kredo Bud-Proekt” Ltd
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
05.19 05.19 05.19
05.19Berdnyk
1. Climatic data are accepted according to the requirements of DBN V.2.5-67:2013 and
Breakdown of rooms
Name
Vegetable storeroom01
03 37.69
7 8 10 122 3 9
G
B
Zh
D
Ye
I
6 11
A
K
B
V
E
K
Zh
-2.670
-2.700
01 02 03
05 06 07
09 10 11 12
29.03
Vegetable storeroom 34.10
Vegetable storeroom
63.81Auxiliary room
7.15Spare parts storeroom
39.85Corridor
29.54
Equipment and maintenance accessories room
Cooling chamber
Corridor
3.79
Corridor
25.96
Packing storeroom11 23.78
12 Auxiliary room 63.81
13 Hoistwell 1.49
63,000
2,500
6, 5, 2, 2,800 18,600 9,400 2,400
2, ,2
3,400
4, Cat..
of room Area, m²
Number of room
5,300
2, ,3
6, 3, 6, 8,4009,3002,700
2 3 5 7 111 27,3002,500
3,500
Rev. Q-ty Sheet Doc. No. Signature Date
Stage Sheet Sheets WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Heating
Plan at elev. -2.640 with marking of heating system
Size A3x4
T2 T1
T2 T1
50x8.3 Ø From the ground floor
50x8.3 Ø
50x8.3 Ø
50x8.3 Ø
50x8.3 Ø
0.003
0.003
T2 T1
0.
0.
Plan at elev. -2.640 with heating system marking
52-18-OB
5,2004,100
14 Switchboard room 3.9
38.89
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
AutoCAD SHX Text 18,600
Size A3x4
7 8 10 121 3 9
G
B
2 3 5 7
Zh
D
Ye
I
0.000
0.000
-0.030
6 11
A
Zh
K K
B
-0.660
-0.030 -0.030
V
E 0.000
-0.900
-0.930
105 106 107
111112
122123
6, 5, 2, 27,3005,2004,1002,50018,6002,800
2,800 18,600 9,400 2,400
3, 2, 60,500
,3
,4
5, 6, 3, 6, 3,5008,4009,3002,7003,400
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Heating
Plan at elev. +0.000 with marking of heating system
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Plan at elev. +0.000 with heating system marking
KORADO RADIK Klasik type 22 500x400
S.p.1
S.p.2 S.p.3 S.p.4 S.p.5
S.p.6
S.p.7 S.p.8 S.p.9 S.p.10
S.p.11
S.p.12
S.p.13S.p.14S.p.15S.p.16
S.p.17S.p.18S.p.19S.p.20S.p.21S.p.22
S.p.24
S.p.24
S.p.23
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x800 KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x1000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x600 KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x400
KORADO RADIK Klasik type 22 500x400
T2 T1
T2 T1 T2T1
T2 T1
T2 T1
2Ø50x8.3 transfer zØ50/40
0.003 2Ø40x6.70.003 2Ø50x8.3 2Ø40x6.7 transfer zØ50/40
In under floor channel 150x150 (h) 75x12.5 Ø
63x10.5 Ø
63x10.5 Ø
0.
0.003
0.
0.
0.003 transfer zØ50/40 2Ø50x8.3 2Ø40x6.7 2Ø50x8.3 2Ø40x6,7 transfer zØ50/40 T2 T1
In under floor channel 150x150 (h)
52-18-OB
0.000
-0.030
-0.030
137 138
8701, “KT-2E”
Boiler 95 kW “Altep DUO PLUS”
Heating unit (indicative only)
Downdrop to basement 50x8.3 Ø
Breakdown of rooms (end)
Name
Breakdown of rooms (beginning)
Name
Airlock 5.76
Corridor
Staircase 20.72
Corridor
105 Combat training room
107 14.29
108 WC for women
109 Personal hygiene room 4.43
37.27110
111 97.41
113 2.52
7.65
73.06
25.16
Office
25.16
6.76
WC for men
Airlock
Dining hall for 150 seats 156.14
115 19.12Cloakroom
116 17.36Flour shop
71.10Hot shop118
Room for equipment and maintenance accessories 2.39
7.56
Room for dry products storage120
Airlock 3.84
Washroom for kitchen and tableware121 21.96
21.28Meat and fish shop122
Personnel cloakroom124 9.23
WC125 1.08
Shower room126
Dining-facility manager office127
Room for cooks rest128
Personnel WC129
Room for cleaning devices storage130
Loading room131
132 Airlock
Airlock
Boiler room No. 2
Cloakroom for boiler firemen
WC 1.08
Corridor
2.18
8.21
7.77
2.42
3.23
4.08
1.68
1.63
21.58
2.01
33.39
Airlock 3.00
Staircase No. 2 11.60
Combat training room
112 55.97Combat training room
Sleeping area for military personnel
Cabinet for tableware
Cabinet for dinner ware
1.55
Linen press 1.55
1.55
Corridor 1.63
Boiler room No. 1 13.93
Shower room 1.21
24.33Vegetable shop123
Cat.
of room
Area, m²
Number of room
Cat.
of room
Area, m²
Number of room
135 136134
8701, “KT-2E”
Boiler 95 kW “Altep DUO PLUS”
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
Name
Sleeping area for military personnel, 100 persons.201
Training room202
203 Corridor 72.59
204 Staircase No. 1
205 Weapon store room
211 16.98
20.72
25.81
Special means store room 27.01
WC
Washing room
Shower room
37.15
13.11
12.65
Weapon cleaning room
335.06
86.45
22.68
Utility room
16.81Drying room for uniform and shoes drying
Commander’s room 19.32
23.67Room for officers preparation for training
Executive office 17.61
Room for sergeants preparation for training 25.59 of soldiers 17.27
218 Staircase No. 2 20.72
219 Place for exercises and sports 15.28
220 Place for equipment and maintenance accessories 2.19
221 Place for shoes cleaning 1.46
+3.300 +3.250
+1.650
201202 203
212213
214215216217+1.650
+3.300
7 8 102 9
B
3 5 7
Zh
D
Ye
I
6 11
A
Zh
K K
B
V
E
205 207 208 209 210 211
21,100 27,300
6, 6, 2, 5,2004,1002,800
2,800 2,400
3, 2, ,3
,4
5, 6, 3, 6, 3,5008,4009,3002,7003,400
Cat..
of room Area, m²
Number of room
Store room for belongings and personal items
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Heating
Plan at elev. +3.300 with marking of heating system
Plan at elev. +3.300 with heating system marking
S.p.1
S.p.2 S.p.3 S.p.4 S.p.5 S.p.7 S.p. 8 S.p.9 S.p.10
S.p.11
S.p.12
S.p.13S.p.14S.p.15S.p.16
S.p.17S.p.18 S.p.19S.p.20S.p.21S.p.22
S.p.25
S.p.23
S.p.6
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x600 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600 KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800 KORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
52-18-OB
2,500
18,600 9,400
60,500
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
AutoCAD SHX Text D-1
D-1
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Heating
Heating system diagram
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Heating system diagram (main)
S.p.2 S.p.3 S.p.4 S.p.5 S.p.6 S.p.7
S.p.8 S.p.9 S.p.10
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000 ÊORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600
S.p.11 KORADO RADIK Klasik type 22 500x800
T2 0.003
T1
S.p.21S.p.22
S.p.23
S.p.1
KORADO RADIK Klasik type 22 500x400
KORADO RADIK Klasik type 22 500x400
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
S.p.24
S.p.20 S.p.19 S.p.18 S.p.17
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
S.p.16 S.p.15
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
S.p.14 S.p.13
S.p.12
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
0.003
0.003
0.003
0.0
0.0
0.0
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000 KORADO RADIK Klasik type 22 500x1,000
Unit “A”
Globe radiator cock Dn 15 Thermostatic control valve Dn15 Thermostatic control valve Dn15
Coupling 16x1/2''Coupling 16x1/2'' Globe radiator cock Dn 15Globe radiator cock Dn 15
Coupling 16x1/2''Coupling 16x1/2''
Globe radiator cock Dn 15
S.p.19
T2 T1
Coupling 20x3/4''
T-joint 32x32x20
Ø50x8.3
Ø50x8.3 Ø50x8.3
Ø50x8.3
2Ø63x10.5
541,00
2Ø63x10.5
2Ø75x12.5
2Ø50x8.3 2Ø50x8.3
2Ø50x8.3 2Ø50x8.3
Unit “A”
2Ø40x6.7 2Ø40x6.7
2Ø40x6.7 2Ø40x6.7
To distribution manifold
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x600 KORADO RADIK Klasik type 22 500x800 KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x800
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x1,000
KORADO RADIK Klasik type 22 500x600 transfer zØ50/40 transfer zØ50/40 transfer zØ50/40 transfer zØ50/40
T2 T1
T2 T1T2 T1
In under floor channel 150x150 (h)
In under floor channel 150x150 (h)
In under floor channel 150x150 (h)
75x12.5 Ø
52-18-OB
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine “International interdepartmental
Position Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty Weight units, kg
Notes
1.
2.
SheetsSheet
Stage
WD
Doc.No.Rev. SheetQ-ty DateSignature
Equipment specification and materials
Developed by
Controlled by
Checked by
Chief designer
3.
Trokhymenko Tostanovska
Heating system (main)
32x5.4
25x4.2
Ø
Ø
50x8.3
5.
6.
4.
40x6.7
7.
Ø
Ø rm rm rm rm
224.0
202.0/10.0
92.0/16.0
152.0+20%=
Polypropylene pipe PN20 PN2090x15.0 Ø
75x12.5 Ø
63x10.5 Ø
26.0/12.0rm
34.0/-rm
PN20
PN20
PN20
PN20
PN20
PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
Polypropylene pipe PN20
/including insulated
/including insulated
/including insulated
/including insulated
Heating devices
1. Radiators RADIK, type 22 KORADO Klasik 500x1,000 RADIK type 22 KORADO
Radiators RADIK, type 22 KORADO Klasik 500x800 RADIK type 22 KORADO
Radiators RADIK, type 22 KORADO Klasik 500x600 RADIK type 22 KORADO pcs 33 pcs 21 pcs 16
4.
3.
Radiators RADIK, type 22 KORADO Klasik 500x400 RADIK type 22 KORADO
2.
Thermostatic control valve Dn15 RTD-N-15 pcs 76
1.
Dn40
11s42p
Coupler-joint ball cock, brass
Fittings pcs 82.
Dn15 Globe radiator cock pcs 1523.
Dn65Flanged ball valve, brass pcs 2
4.
11b27p
-rm
Network pump Wilo-TOP-S50/15DM PN10/6, N=1,100 W, p=2,800 rpm 2set Wilo-TOP-S50/15DM PN10/68. from distribution manifold stand pipes supply=180.0 pcs 3 before and after pumps
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
52-18-OB. CO
“Kredo Bud-Proekt” Ltd
05.19 05.19 05.19
05.19
Trokhymenko
Berdnyk
A pp ro ve d installation on the main branch on distribution manifold
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental
(considered)
Sheet
Position
SheetRev. Q-ty Doc.No.Signature Date
2pcs1. Transfer steel/polypropylene
T-joint 63x50x504.
10.
pcs 2
Coupling 20x3/4”'7.
pcs 4
Coupling 16x1/2”' pcs 18
76x3.0/ 75x12.5 Ø Ø
8.
5.
pcs other system elements
6.
2.
3.
transfer Ø50/40
9.
11.
T-joint 75x63x63
T-joint 32x32x20
Flushing and testing of pipelines rm 758.0
T-joint 25x25x20 pcs 24
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
Arrangement of under floor channel 150x150 (h) rm 10.0
Heating system (basement)
52-18-OB. CO
pcs 50 pcs 152
Bleed screw pcs 28
50x8.3 Ø rm 152.0/-PN20Polypropylene pipe PN20 /including insulated1.
Fittings
Dn40Coupler-joint ball cock, brass pcs 411n27p1.
other system elements
2pcsTransfer steel/polypropylene 76x3.0/ 75x12.5 Ø Ø1.
Bleed screw pcs 42.
Flushing and testing of pipelines rm 758.0
3. T-joint 32x32x32 pcs 2
4.
Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty Weight units, kg
Notes
SheetRev. Q-ty Doc.No. Signature Date pcs pcs pcs -
-rm
2pcs
-pcs
1.
Transfer steel/polypropylene transfer
T-joint 63x50x50
4.
10.
pcs 4
Coupling 20x3/4”'
7.
pcs 4
Coupling 16x1/2”'
12.
pcs 28
57x3.0/ 75x12.5 Ø Ø
Ø90/75 transfer Ø75/63
8.
5.
transfer Ø63/50 pcs other system elements
Transfer steel/polypropylene 76x3.0/ 90x15.0 Ø Ø
6.
Transfer steel/steel Ø65/ Ø50
2.
3.
transfer Ø50/40
9.
11.
13.
14.
T-joint 75x63x63
T-joint 32x32x20
T-joint 90x75x75 pcs -pcs 56 pcs 258
Air collectors Ø159x3.5; L=355 mm
Flushing and testing of pipelines
15.
pcs 4 rm 1,028.0
T-joint 25x25x20
Coupling 25x1”' pcs 10 pcs -
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
A pp ro ve d
16.
17.
18. Arrangement of under floor channel 150x150 (h) rm 2.0
52-18-OB. CO
Position Name and technical parameters
Type, grade document mark, of data sheet
Code of equipment, of products of material
Manufacturing plant
Measuring unit
Q-ty Weight units, Name
Vegetable storeroom01
03 37.69
8 9 11 133 3 10
G
B
Zh
D
Ye
I
7 12
A
K
B
V
E
K
Zh
-2.670
-2.700
01 02 03 04
29.03
Vegetable storeroom 34.10
Vegetable storeroom
63.81Auxiliary room
7.15Spare parts storeroom
39.85Corridor
29.54
Equipment and maintenance accessories room
Cooling chamber
Corridor
3.79
38.89Corridor
25.96
Packing storeroom11 23.78
12 Auxiliary room 63.81
13 Hoistwell 1.49
63,000
2,500
6, 5, 2, 2,800 18,600 9,400 2,400
2, ,2
3,400
Cat..
of -room
Area , m²
Number of -room
5,300
6, 3, 6, 8,4009,3002,700
2 3 7 121 27,3002,500
3,500
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Ventilation
Plan at elev. -2.670 with marking of ventilation systems
Size A3x4
5,2004,100
3, ,4
5, Plan at elev. -2.670 with ventilation systems marking
-/2 -/2 -/2
-/1
-/2
-/2
-/2
-/2
-135 -160 -175
-300
-30
-10
-300 -125
14 Switchboard room 3.9
-/1 -15
L=1,250 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
L=1,235 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
VP1
V1
P1-5
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
52-18-OB
Air intake grid 500x250(h) P1-1
200x400
P1 12 kW (2x6)
150x150
300x300(h)
300x300(h)
200x200(h)200x200(h)
200x400
150x150(h)
150x150(h)
100x150(h)100x150(h)
4MVM150x100 L=160
4MVM150x100 L=175
4MVM200x100 L=300
4MVM200x100 L=300
MVM100x100 L=10
MVM100x100 L=30
3MVM150x100 L=135
MVM150x100 L=15
16MVM200x150 L=1,250
P1-4
P1-2 P1-3
P1-6
2MVM150
L=1,250
L=125
100x150(h) L=135
100x150(h) L=175
200x200(h) L=600
250x200(h) L=725
250x250(h) L=1,060
9 16
18,600
7 8 10 121 3 9
G
B
2 3 5 7
Zh
D
Ye
I
0.000
0.000
-0.030
6 11
A
Zh
K K
B
-0.660
-0.030 -0.030
V
E 0.000
-0.900
-0.930
6, 5, 2, 27,3005,2004,1002,50018,6002,800
2,800 18,600 9,400 2,400
2, 60,500
,2
6, 3, 6, 3,5008,4009,3002,7003,400
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WDDeveloped by
Controlled by
Checked by
Chief designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud-Proekt” Ltd
Ventilation
Plan at elev. +0.000 with marking of ventilation systems
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
Plan at elev. +0.000 with ventilation systems marking.
S.p.25
52-18-OB
0.000
-0.030
-0.030
137 138
8701, Breakdown of rooms (end)
Name
Breakdown of rooms (beginning)
Name
Airlock 5.76
Corridor
Staircase 20.72
Corridor
105 Combat training room
107 14.29
108 WC for women
109 Personal hygiene room 4.43
37.27110
111 97.41
113 2.52
7.65
73.06
25.16
Office
25.16
6.76
WC for men
Airlock
Dining hall for 150 seats 156.14
115 19.12Cloakroom
116 17.36Flour shop
71.10Hot shop118
Room for equipment and maintenance accessories 2.39
7.56
Room for dry products storage120
Airlock 3.84
Washroom for kitchen and tableware121 21.96
21.28Meat and fish shop122
Personnel cloakroom124 9.23
WC125 1.08
Shower room126
Dining-facility manager office127
Room for cooks rest128
Personnel WC129
Room for cleaning devices storage130
Loading room131
132 Airlock
Airlock
Boiler room No. 2
Cloakroom for boiler firemen
WC 1.08
Corridor
2.18
8.21
7.77
2.42
3.23
4.08
1.68
1.63
21.58
2.01
33.39
Airlock 3.00
Staircase No. 2 11.60
Combat training room
112 55.97Combat training room
Sleeping room for military personnel
Cabinet for tableware
Cabinet for dinner ware
1.55
Linen press 1.55
1.55
Corridor 1.63
Boiler room No. 1 13.93
Shower room 1.21
24.33Vegetable shop123
Cat.
of room Area, m²
Number of room
Cat.
of room Area, m²
Number of room
136134
870 1, +1200 -1200
50 persons
25 persons
+500 -500
-375 -350
-75
-10015 persons
15 persons 3 persons+300
-300 +300 -300 +60
-60
150 persons
+4500 -4500
+115
2/-
V=35.1 H=2.5
V=52.2 H=2.5
-/5 -45
-50
5/-from cor. 1/1 4/6
3/4
3/4
+230 -310+230
-310
+315 -475
+140 2/2
+90 -90
-/2
-/2
-50
-/2
3, ,4
5, L=175 (Lmax=270); N=73 W n=2,830 rpm h=250 Pa
Fan VENTS VKM 100
L=375 (Lmax=555); N=98 W n=2,705 rpm, h=250 Pa
Fan VENTS VKM 150
L=350 (Lmax=555); N=98 W n=2,705 rpm, h=250 Pa
Fan VENTS VKM 150 pp
Reconstruction of adminstrative building for barracks with administration buildings of combined arms training area of military unit 3070 of National Guard of Ukraine
“International interdepartmental multipurpose training center of subunits”
+675 -155
+625 -105
L=675 (Lmax=950); N=154 W n=2,375 rpm, h=250 Pa
Fan VENTS VKM 200
L=625 (Lmax=950); N=154 W n=2,375 rpm, h=250 Pa
Fan VENTS VKM 200 not <60 % of exh./2-v/zone
-750-750-750
-1,000 -1,000 -1,000 -1,000
-1,200
-750 -750
-1,500
-750 tot. exch.-470
-750 +6,100 -10,170
+4070
L=1,950 (Lmax=2,210); N=233 W n=1,375 rpm, h=350 Pa
Fan VENTS VKM 355B
200x450 Ø200
L=4,250 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
L=3,500 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
250x600
Ø250
250x650from cor. 1/1
-25
-20
L=750 (Lmax=950); N=154 W n=2,375 rpm, h=250 Pa
Fan VENTS VKM 200
L=1,500 (Lmax=2,210); N=350 W n=1,375 rpm, h=350 Pa
Fan VENTS VKM 355B
L=475 (Lmax=555); N=98 W n=2,705 rpm, h=250 Pa
Fan VENTS VKM 150
150x150
L=310 (Lmax=555); N=98 W n=2,705 rpm, h=250 Pa
Fan VENTS VKM 150
150x150 150x150 200x450
200x200
V1 200x400
L=470 (Lmax=555); N=98 W n=2,705 rpm, h=250 Pa
Fan VENTS VKM 150
L=4,070 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
L=4,500 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
L=4,500 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
L=2,060 (Lmax=2,210); N=350 W n=1,375 rpm, h=350 Pa
Fan VENTS VKM 355B
L=4,905 (Lmax=5,260); N=665 W n=1,265 rpm, h=350 Pa
Fan VENTS VKM 450
L=310 (Lmax=555); N=98 W n=2,705 rpm, h=250 Ðà
Fan VENTS VKM 150
-50
-15
-75+30 -15
150x150
L=1,300 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
P2 P3 P4 P5
P6
P7
P8
P9
L=1,200 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
L=1,160+725+115=2,000 (Lmax=2,210); N=233 W n=1,375 rpm, h=350 Pa
Fan VENTS VKM 355B
L=1,200 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
P10
L=1,160 (Lmax=1,460); N=190 W n=2,780 rpm, h=350 Pa
Fan VENTS VKM 315ES
200x400 200x400250x650VP2
VP3
VP4
VP5
V2 V3
V4
V5
VP6
VP7 VP8
VP9
V6
V7 V8
V9
V10
V11
V12
V12
V13
V14
V15V16
150x150
150x150 150x150
150x150 V2 V3
150x150 V14
V15
V16 150x150
VP10
V4
200x200 V5
V13
V6
V8
V7
18 kW (2x9)
18 kW (2x9)
18 kW (2x9) 18 kW (2x9)
12 kW (2x6)
18kW (2x9) 12kW (2x6)
450x250(h)
400x300(h)
450x250(h)
400x300(h)
VP1
150x150
-25
300x300(h) L=1,300
10MVM200
L=1,300
200x250(h)
3MVM150
L=230
10MVM200
L=1,600
3MVM150
L=230
Air intake grid 600x250(h) P3-1
Air intake grid 500x250(h) P2-1
350x350(h) L=2,060
350x350(h) L=1,600
5MVM150
L=315
MVM150
L=90
150x200(h)
150x200(h)
450x450(h) L=4,905
L=315
150x200(h) L=90
L=405
250x300(h)
5MVM250
L=1,500
5MVM250
L=1,500
5MVM250
L=1,500
450x450(h) L=4,500
12MVM250
L=2,250
12MVM250
L=2,250
400x300(h) L=2,250
450x450(h) L=4,500
Air intake grid 700x350(h) P4-1
Air intake grid 700x350(h) P5-1
5MVM200x150 L=625
5MVM200x150 L=625 Air intake grid
350x250(h) P8-1
Air intake grid 350x250(h) P8-1
MVM150
L=75
300x300(h) L=1,200
150x250(h) L=600
150x250(h) L=600
10MVM200
L=1,200
12MVM250
L=2,070
12MVM250
L=2,000
350x350(h) L=2,000
5MVM200
L=500 350x350(h)
MVM200x100 L=60
100x150(h)
300x300(h) L=1,140
150x150(h)
4MVM200x100 L=300
200x200(h) L=500
6MVM150
L=500
2MVM150
L=…