01 10 10_Att. 3 - Architectural Drawings.pdf
PDF 3 MB Posted
- Attached to
- Stare IIMC Barracks Renovation Ukraine
- Solicitation number
- W912GB20R0045
- Issued by
-
Department of the Army European Command
About this file
This document contains architectural drawings and specifications for the renovation of a barracks building located at the International Interagency Multifunctional Training Center near Stare, Ukraine. The project involves interior work and systems for a three-story barracks, including foundations, structural elements, utilities, finishes, and site work. The drawings provide floor plans, sections, elevations, schedules and details for the scope of work. Specifications describe requirements for materials, systems and construction. The Army European Command is the agency procuring the design-build project.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
List of working drawings of main set of AB mark
Sheet Name Note
General data of working drawings (beginning)
List of working drawings of main set of AB mark (continued)
Sheet Name Note
General data of working drawings (continued)
General data of working drawings (continued)2
General data of working drawings (continued)3
General data of working drawings (list of rooms finishing)5
Foundation plan at elev.-2.160; -2.460; -3.060; -3.6606
Sections 1-1 ... 6-67
Sections 7-7 ... 12-128
Sections 13-13 ... 18-189
Sections 19-19 ... 22-2210
Sections 23-23 ... 25-2511
Specification of foundation elements
Brickwork plan at elev. -3.040. View A. View B. Part of partition support. Unit A
Plan at elev. -3.040
Brickwork plan at elev. 0.000. Part of partition fixing to reinforced concrete flooring. Part of partition support. View A. Insulation part of airlock
Plan at elev. 0.000
Brickwork plan at elev. +3.300. Unit A
Plan at elev. +3.300
Brickwork plan of garret. Extract of brickwork plan of garret on axes 1-2 and V-Ye at elev. +6.590
Garret plan. Garret plan extract on axes 1-2 and V-Ye at elev. +6.590
Elements schemes of window closing parts. Elements schemes of door closing parts
22 Elements specifications of window and door closing parts
Size A4x4
I n v
N o o f o r i g
S i g n a t u r e a n d d a t e
I n s t o f
I n v
N o
SheetStage Sheets
Rev. Q-ty Signature Date
WD
Checked by
Controlled by
Chief designer
Developed by
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Barrack building with administration offices
52-18-01-AB
General data of working drawings
(beginning)
23 Section 1-1. Unit A. Unit B
24 Section 2-2
25 Section 3-3
26 Facade 1-12
27 Facade K-A
28 Facade 12-1
29 Facade A-K
30 Flooring schedule
31 Roofing plan. Sect. A-A, B-B. Stp-1. Unit A. Arrangement part of ventilation channel
32 Stairs LS-1. Schematic diagram of LS-1. Sect. 1-1, 2-2, 3-3. Units 1, 2
33 Reinforcing of brick pier. Plan. Sect. 1-1. Unit A
34 Schematic diagram of basement spandrel beams
35 Schematic diagram of elements of the ground floor spandrel beams
36 Metal beam MB-1. Sect. 1-1, sect. 2-2. Metal beam MB-2. Sect. 3-3, Sect. 4-4
37 Metal beam MB-3. Sect. 1-1, sect. 2-2. Metal beam MB-4. Sect. 3-3, Sect. 4-4
38 Metal beam MB-5. Sect. 1-1, sect. 2-2
39 Schematic diagram of elements of the first floor spandrel beams
40 Metal beam MB-1. Sect. 1-1, sect. 2-2
41 Metal beam MB-2. Sect. 1-1, sect. 2-2
42 Metal beam MB-3. Sect. 1-1, sect. 2-2. Metal beam MB-4. Sect. 3-3, Sect. 4-4
43 Metal beam MB-5. Sect. 1-1, sect. 2-2
44 Schematic diagram of garret spandrel beams. Schematic diagram spandrel beams elements on axes 1-2 and V-Ye
45 Schematic diagram of flooring elements on axes 2-7 and B-Zh at elev. -0.340.
Md-1, sect. 1-1, sect. 2-2. Md-2, sect. 3-3. Md-3, sect. 4-4. Md-4, sect. 5-5.
46 Schematic diagram of flooring elements at elev.+3.000. Md-1, sect. 1-1, List of working drawings of main set of AB mark (continued)
Sheet Name Note
List of working drawings of main set of AB mark (continued)
Sheet Name Note
12.19
Md-5, sect. 6-6
Md-2, sect. 1-1. Md-2, sect. 2-2. Md-3, sect. 3-3. Md-4, sect. 4-4. Md-5, sect. 5-5
Sect. 6-6. Md-6, sect. 7-7. Md-7, sect. 8-8, Kr1, sect. 9-9. Md-8, sect. 10-10.
Md-9, sect. 11-11. Md-10, sect. 12-12
47 Specification of flooring elements
12.19
12.19
12.19
48 Schematic diagram of flooring elements at elev. +6.330. Md-1, sect. 1-1.
Arrangement part of subfloor boards. Section A-A. Anchor 2. Anchor A3
49 Schematic diagram of roof timber elements. Sect. 1-1, 2-2, 3-3
50 Sect. 4-4, 5-5, 6-6, 7-7. Units 1, 2, 3, 4, 5, 6. Part of roof timbers jointing lengthwise, sect. A-A
51 Roof window RW-1. Sect. 1-1, 2-2
52 Schematic diagram of roof timber elements on axis 6-7 and A-B. Sect. 1-1. Unit 1
53 Schematic diagram of cast-in-situ strip at elev.+2.780. Scheme
Schematic diagram of cast-in-situ strip on axis 3-7 and Zh-K at elev. +2.280.
Sect. 1-1, 2-2. Pos. 2, 3. Part of cast-in-situ strip on sections of of ventilation channels
54 Schematic diagram of cast-in-situ strip at elev. +6.110. Sect. 1-1, 2-2.
Pos. 2, 3. Part of cast-in-situ strip on sections of ventilation channels
55 Schematic diagram of cast-in-situ strip at elev. +3.185; +6.330;
+6.580; +6.740. Sect. 1-1, 2-2. Pos. 2, 3
56 Staircase No.1. Section 1-1. Unit A
57 Section A-A. Section B-B
58 Staircase No. 2. Section 1-1. Unit A
59 Section A-A. Section B-B
60 Porch No.1. Plan. Sect. 1-1. Foundation plan at elev. -2.160. Sect. 2-2, 3-3, 4-4
61 Fencing OG-1. Stand Sp-1. Pos. 8. Fencing OG-2 . Fencing
OG-3. Fencing OG-4. Embedded part Zd-1. Sect. 1-1
62 Porch No.1 elements specification
63 Erection diagram of metal stairs SM-1. Sect. 1-1, 2-2, 3-3, 4-4. Stand St1
64 Unit A, sect. 1-1. Embedded part Zd-2, sect. 2-2. Unit B, sect. 3-3.
Unit V, sect. 4-4. Unit G, sect. 5-5. Frame Rm-1, sect. 6-6
65 Specification of stairs SM-1 elements
66 Fencing scheme of metal stairs SM-1. Sect. 1-1, 2-2, 3-3.
Fencing OG-1. Fencing OG-2 . Fencing OG-3
67 Fencing OG-4. Unit A
68 Porch No. 2. Plan. Sect. 1-1, 2-2, 3-3, 4-4, 5-5
69 Porch No. 2. Schematic diagram of roofing elements.Unit A. Mp-1, sect. 1-1.
Fencing OG-1. Stand Sp-1, pos. 14. Fencing OG-2 . Fencing
OG-3
70 Porch No. 2 elements specification
71 Porch No. 3. Plan. Sect. 1-1, 2-2 (reverse-reading), 3-3, 4-4. Fencing OG-1
Stand Sp-1, pos. 9. Monolithic slab MS-1, sect. 5-5
72 Plan of canopy No. 3. Schematic diagram of canopy metal elements.
Sect. 1-1. Frames RM-1, RM-2 (reverse-reading)
73 Porch No.4. Plan. Section 1-1
74 Canopy plan of porch No.4. Schematic diagram of metal elements of canopy. Sect. 1-1. Frame RM-1, RM-2 (reverse-reading)
75 Porch No.5. Plan. Sect. 1-1, 2-2, 3-3, 4-4. Monolithic slab MS-1, sect. 5-5
76 Fencing OG-1. Stand Sp-1. Pos. 10, pos. 11. Fencing OG-2 .
Unit A
77 Porch No.5 elements specification
78 Porch No.6. Plan. Sect. 1-1, 2-2, 3-3, 4-4. Fencing OG-1. Stand Sp-1, Pos. 8, pos. 9. Fencing OG-2 . Fencing OG-3. Unit A
79 Porch No.6 elements specification
80 Entrance to basement No.1. Plan. Roofing plan of entrance to basement No.1.
Sect. 1-1, 2-2, 3-3
81 Sect. 4-4, 5-5. Rm-1, Rm-2. Og-1, Og-2
82 Window well No.1. Window wells No. 2, No. 3. Sect. 1-1, 2-2, 3-3, 4-4
83 Schematic diagram of metal parts of window wells canopies. RM-1
84 Wall elevation with channels on axis 11. Sect. 1-1, 2-2, 3-3, 4-4, 5-5. Part of reinforcement of walls with channels
List of main sets of working drawings
Designation Name
AB Architectural and civil solutions
HV Heating and ventilation
WSS Water supply and sewage
EL Lighting and power equipment
GL General layout
ZVK External networks of water supply and sewage
TX Technological solutions
ZEO
External electric lighting
FA Fire alarm
Note
SheetStage Sheets
Rev. Q-ty Signature Date
WD
Checked by
Controlled by
Chief designer
Developed by
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Barrack building with administration offices
52-18-01-AB
General data of working drawings
(continued)
List of specifications
Sheet Name Note
I n v
N o o f o r i g
S i g n a t u r e a n d d a t e I n s t o f
I n v
N o
List of reference and attached documents (continued)
Name Note
REFERENCE DOCUMENTS
Designation
DBN V.1.2-2:2006 Reliability assurance system of construction objects. Loads and effects.
Design standards
DBN A.3.2-2-2009 Occupational safety standards system. Labour pro-tection and industrial security in construction. Main provisions
DSTU-N B.2.6-203:2015 Working guidelines for manufacturing and erection of building structures
DSTU B V.2.7-282:2011 Ceramic tiles. Technical conditions
DSTU B V.2.6-169:2011 Welded joints of reinforcement and embedded parts of reinforced structures. Types, structures and dimensions
DSTU-N B.2.1-28:2013 Guidance for earthworks execution and supports arrangement and foundations building
DSTU B V.2.6-109:2010 Structures of buildings and facilities. Reinforced concrete plates of girder foundations. Technical conditions
DSTU B V.2.6-109:2010 Structures of buildings and facilities. Reinforced concrete plates of girder foundations. Technical conditions
DSTU B V.2.6-108:2010 Structures of buildings and facilities. Concrete wall blocks of basement. Technical conditions
DSTU 3760:2019 Reinforcing bars for reinforced concrete structures. General technical specifications
DSTU B V.2.7-43-96 Heavy concrete. Technical conditions
DBN V.2.6-36:2018 Structures of external walls with facade heat insula-tion. Requirements to design
DSTU B V.2.7-45:2010 Cellular concrete. General technical requirements
DSTU B V.2.7-61:2008 Construction materials. Brick and ceramic stone banded and facingTechnical conditions
DSTU B V.2.6-11:2011 Shockproof metal door untis for entrance to appartments. General technical specifications
DSTU B V.2.6-77:2009 Structures of buildings and facilities. Metal doors, fire-proof. General technical specifications
DSTU B V.2.6-55:2008 Structures of buildings and facilities. Reinforced concrete spandrel beams for buildings with brick walls.
Technical conditions
DSTU 8769:2018 Steel hot-rolled nonequilateral angles.
Assortment
DSTU 8539:2015 Rolled products for steel building structures.
General technical specifications
DSTU 4747:2007 Steel hot-rolled strip bars.
Assortment
DSTU 2251:2018 Steel hot-rolled equal leg angles.
Assortment
DSTU 3436-96 Steel hot-rolled U-sections. Assortment
List of working drawings of main set of AB mark (end)
Sheet Name Note
85 Schematic diagram of openings in basement
86 Schematic diagram of openings on the ground floor. Plan 1 extract, Sect. A-A. Sect. 1-1, 2-2
87 Schematic diagram of openings on the first floor. Reinforcing part
88 Schematic diagram of openings in garret
PZO Passport of facade external finishing
List of reference and attached documents
Name NoteDesignation
DBN V.1.1-7:2016 Fire safety of construction objects. General requirements
List of reference and attached documents (end)
Name NoteDesignation
DSTU 8540:2015 Hot-rolled flat products
Specification of foundation elements
22 Elements specifications of window and door closing parts
31 Specification of roofing fencing elements
32 Specification of stairs LS-1 elements
33 Specification of elements
34 Specification of spandrel beams elements
35 Specification of spandrel beams elements
36 Beams elements specification
37 Beams elements specification
38 Beams elements specification
39 Specification of spandrel beams elements
40 Beams elements specification
41 Beams elements specification
42 Beams elements specification
43 Beams elements specification
Specification of spandrel beams elements44
Specification of flooring elements45
Specification of flooring elements47
List of specification (end)
Sheet Name Note
48 Specification of elements of reinforced concrete flooring
48 Specification of elements of wooden flooring
49 Specification of roof timber elements
52 Specification of roof timber elements
53 Specification of elements of cast-in-situ strip
54 Specification of elements of cast-in-situ strip
55 Specification of elements of cast-in-situ strip
56 Specification of elements of staircase No.1
58 Specification of elements of staircase No. 2
62 Porch No.1 elements specification
65 Specification of stairs SM-1 elements
67 Specification of stairs SM-1 fencing elements
70 Porch No. 2 elements specification
72 Specification of canopy elements of porch No. 3
73 Porch No.4 elements specification
Specification of canopy elements of porch No.474
77 Porch No.5 elements specification
79 Porch No.6 elements specification
81 Specification of entrance elements of basement No.1
83 Window wells elements specification
86 Specification of flooring elements
87 Specification of spandrel beams elements
12.19
12.19
12.19
12.19
Porch No. 3 elements specification71 reinforcing of cast-in-situ strip on underpinning area
S i g n a t u r e a n d t e
I n s t o f
I n v
N o
I n v
N o o f o r i g
Size A4x3
1. This project section is done in accordance with current on the territory of Ukraine norms and regulations as of 01.12.2019. It provides solutions that ensure explosion and fire safety in compliance with the relevant rules of works execution and operation regulations, approved according to the procedures.
General instructions
This set of drawings is developed under contract No.52-18, task for design, architectural conditions and restrictions on land plot construction and technical conditions.
Design is developed for region with the following climatic conditions:
- design winter temperature - 22 °C;
- design wind load for the region 420 Pa;
construction and this type of building
- design snow load for the region 1,480 Pa;
construction and this type of building
- standard depth of soil freezing 108 cm;
- aggressive effect on building structures is absent;
Consequence class CC2;
Fire resistance rating III;
Humidity area III
Loads assumed per DBN V.1.2-2:2006 “System of reliability assurance and safety of construction objects. Loads and effects. Design standards”.
Finished floor elevation of the ground floor is accepted as elev . 0.000 that corresponds to elev. 98.10 on general layout.
Design provides for reconstruction of two-storied barrack building with administration rooms.
Storage rooms for vegetables, spare parts, household equipment, packing, cooling chamber, switchboard room, auxiliary rooms are designed to be located on basement floor of the building.
Combat training rooms, administration offices, sleeping area for military personnel, dining hall and corresponding auxiliary shops, store rooms and sanitary facilities are located on the ground floor. Two boiler rooms with auxiliary rooms and sanitary facilities for personnel are provided.
Sleeping area for military personnel, training room, weapon store room, weapon cleaning room, special means store room, executive office, commander ’s room, room for officers and sergeants preparation for training, auxiliary rooms for military personnel, utility and sanitary facilities are located on the first floor.
Design solutions
Building structural scheme is frameless with longitudinal and transverse bearing walls. Spatial rigidity is provided by combined reinforced concrete and wooden flooring.
1. Foundations are girder, precast reinforced concrete.
2. External andinternal walls are of autoclaved aerated concrete blocks on special glue and partially of ceramic bricks per DSTU on cement mixture M50
3. Partitions to make of ceramic bricks per DSTU B V.2.7-61:2008 on cement mixture M50.
4. Spandrel beams are bar-shaped precast reinforced concrete and metal.
5. Flooring is precast reinforced concrete multiple cavity panels on wooden bearing beams.
6. Roofing is double-pitch, made of metal tile roofing on wooden beams and roof timber.
7. Windows are reinforced plastic with double glazing.
8. Doors are metal of reinforced profile, fire-proof and reinforced plastic.
9. Internal finishing is per “List of rooms finishing”.
10. External finishing is per section 52-18-01-PZO.
Perimeter pavement shall fit tight to sole plate and has slope not less than 1 % and not over 10 %.
Base for pavement to compact till movement of compacting material stop. See series 2.110-3p, issue 1 for detailed information about pavement arrangement.
All inputs and outputs of utility networks shall be properly insulated according to the requirements of sections of regulatory design documents of corresponding networks and typical drawings on penetration sealing (set 7373-3).
Fire-fighting measures
Fire safety is provided by use of structures and materials with necessary fire resistance level according to the requirements of DBN V.1.1-7:2016 “Fire safety of construction objects. Genral requirements”.
1. Fire proof doors and hatch of the 2nd type L1 are to have conformity certificate issued by State certification authority of fire fighting products.
2. Fire extinguishers BB-5 shall be installed in building rooms assumed as one piece per floor.
Besides, in switchboard room rooms to install by one gas fire extinguisher BBK-1,4.
These fire extinguishers should be certified by State certification authority of The State Emergency
Service of Ukraine.
3. Escape exit doors shall not have any locking devices preventing their free opening from inside without any key and shall be equipped by devices for self-locking and sealing in side jambs.
4. On escape routes it is prohibited to use building materials with fire hazard over:
- G1, V1, D2, T2 - for walls and ceiling finishing;
- G2, RP1, D2, T2 - for floors covering.
Guidance for works execution
During works execution requirements of DBN A.3.2-2-2009 “Occupational safety standards system.
Labour protection and industrial security in construction. Main provisions ” shall be observed
Design is developed for works execution in summer period. During works execution in winter period requirements of DSTU-N B V.2.6-203:2015 “Working guidelines for manufacturing and erection of building structures” shall be observed.
Material quality shall be systematically controlled.
Technical and economic features
Number of stories - 2 stories
Building area - 1,064.31 m² Total area - 2,089.47 m²
Usable area - 2,021.05 m²
Total structural volume, including: - 9,985.22 m³
- over elevation ± 0,000 - 8,529.49 m³
- below elevation ± 0,000 - 1,455.73 m³
Conventional height of the building - 12.23 m
SheetStage Sheets
Rev.
Q-ty
Signature Date
WD
Checked by
Controlled by
Chief designer
Developed by
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Barrack building with administration offices
52-18-01-AB
General data of working drawings
(continued)
12.19
12.19
12.19
List of certificates for completion of concealed works
Name
Pos.
Note
Size A3
S i g n a t u t e
I n s t o f
I n v
N o
I n v
N o o f o r i g
List of certificates for completion of concealed works (end)
Name
Pos.
Note
SheetStage Sheets
Rev.
Q-ty
Signature Date
WD
Checked by
Controlled by
Chief designer
Developed by
KREDO BUD-PROEKT LTD
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Barrack building with administration offices
52-18-01-AB
General data of working drawings
(continued)
Documentation of underground phase
Documentation of over ground part
12.19
12.19
List of rooms finishing
Ceiling Area
Walls or
Partitions
Notes
Area
01, 02, 03, 04, 05, 06, 07, 08, 09, 11, 12,14
Name or number of room
Type of interior finishing
374.95 682.92
10 25.96 51.18 Same
See unit A, sheet13
1.49 28.20
101, 102, 104,105,106, 107, 111, 112
555.06
Same 59.16
304.46
108, 109, 110 155.72 48.46
Same
6.36 24.59
AreaPanel
114, 115, 116, 118, 119, 120,121,122, 123, 124, 125, 129, 130, 131, 132, 133, 141, 143
397.44 230.69 505.00
3.39 Same 27.88
127, 128, 134, 135, 136 Same 20.63 109.22
137, 138, 139, 140 38.77 17.75 76.40
13.55
33.81
Same
201, 202, 203, 204, 206, 207,208, 209, 210, 211, 215, 216, 217, 218, 219, 220,221
735.96 1,114.62
See unit A, sheet17
212, 213, 214 Same - -
62.91 188.29
15.27
I n v
N o o f o r i g
S i g n a t u t e
I n s t o f
I n v
N o
SheetStage Sheets
Rev. Q-ty Signature Date
WD
Checked by
Controlled by
Chief designer
Developed by
KREDO BUD-PROEKT LTD
General data of working drawings
(list of rooms finishing)
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Barrack building with administration offices
52-18-01-AB
12.19
12.19
12.19
1. See sheet 15 for general instructions.
Size A3x4
I n v
N o o f o r i g
S i g n a t u r e a n d d a t e
I n s t o f
I n v
N o
Sheet Stage
Rev.
Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Plan at elev. -3.040
Breakdown of rooms
Name
Number of room
Area, m²
Cat.
of room
Vegetable storeroom01
37.69
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
- room number per design
- floor type per design
I
1. See sheet 15 for general instructions.
2. See sheet 22 for specification of closing parts.
3. Flooring schedule is given on sheet 30.
I
I I
II
I
II
I
II
III
I
II
Corridor
29.03
Vegetable storeroom
34.10
Vegetable storeroom
63.81 Auxiliary room
7.15 Spare parts storeroom
39.85 Corridor
29.54
Equipment and maintenance accessories room
Cooling chamber
3.79
38.50
Corridor
25.96
Packing storeroom11
23.78
12 Auxiliary room
63.81
13 Hoistwell 1.49
II
1 (23)
A
-3.040
-3,070
G
B
V
E
Zh
I
K
7 83 9
3,400 2,700 9,300
2,4009,40018,600
2(24) 3(25)
10 1211
8,400 3,500
2,800
3 4 5 7 12
2,800 18,600 2,500 4,100 5,200 27,300
B
D
Ye
Zh
K
60,500
14 Switchboard room 3.90
IV
II
52-18-01-AB
12.19
12.19
111112
I n v
N o o f o r i g
S i g n a t u r e a n d d a t e
I n s t o f
I n v
N o
8 10 122 3 9
G
B
2 3 7
Zh
3,400 2,700
9,300 8,400
3,500
D
Ye
I
0.000
-0.030
6 11
A
Zh
K
B
-0.470
-0.030
2,4009,40018,6002,800
18,600 2,500 27,300
V
E
0.000
-0.900
-0.930
0.000
2(24) 3(25)
-0.030
K
Name
2,800
Personnel cloakroom
Room for cleaning devices storage
0.000
-0.030
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
-0.030
Breakdown of rooms (end)
Name
Number of room
Area, m²
Cat.
of room
Breakdown of rooms (beginning)
Signature
Number of room
Area, m²
Cat.
of room
Airlock 5.76
Corridor
Staircase
20.72
Corridor
105 Combat training room
14.29
108 WC for women
109 Personal hygiene room 4.43
37.27
97.41
2.52
7.65
73.06
25.16
Office
25.16
6.76
WC for men
Airlock
Dining hall for 150 seats
156.14
19.12
Gowning room
17.36 Flour shop
71.10 Hot shop118
Room for equipment and maintenance accessories 2.39
7.56 Room for dry products storage120
Airlock 3.84
Washroom for kitchen and tableware121
21.96
21.28
Meat and fish shop122
9.23
WC
1.08
Shower room126
Dining-facility manager office127
Room for cooks rest128
Personnel WC129
Loading room131
132 Airlock
Airlock
Boiler room No. 2
Cloakroom for boiler firemen
WC
1.08
Corridor
2.18
8.21
7.77
2.42
3.23
4.08
1.68
1.63
21.58
2.01
33.39
Airlock 3.00
Staircase No. 2 11.71
Combat training room
55.97
Combat training room
Sleeping room for military personnel
Cabinet for tableware
Cabinet for dinner ware
1.55
Sheet Stage
Rev.
Q-ty Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Plan at elev. 0.000
Barrack building with administration offices
1. See sheet 15 for general instructions.
2. See sheet 22 for specification of closing parts.
3. Flooring schedule is given on sheet 30.
- room number per design
- floor type per design
II
Size A3x4
60,500
4,100 5,200
105 106
135 136134
Linen press 1.55
1.55
Corridor 1.63
139 140
Boiler room No. 1 13.93
Shower room 1.21
24.33
Vegetable shop123
1 (23)
V
V
V
V
V
V
V
V
V
VI VI
VI
VI VI
V
VII
VII
VII
VIIVII VII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII
VIII VIII VIII
IX
IX
X X
VIII
VIII
52-18-01-AB
12.19
12.19 n v
N o o f o r i g S i g n a t u r e a n d d a t e
I n s t o f
I n v
N o
Sheet Stage
Rev.
Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Plan at elev. +3.300
Breakdown of rooms
Name
Number of room
Area, m²
Cat.
of room
Sleeping area for military personnel, 100 persons.201
Training room202
203 Corridor
72.59
204 Staircase No.1
205 Weapon store room
16.98
20.72
25.81
Special means store room 27.01
WC
Washing room
Shower room
37.15
13.11
12.65
Weapon cleaning room
335.06
86.45
22.68
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Utility room
16.81
Drying room for uniform and shoes drying
Commander's room
19.32
23.67
Room for officers preparation for training
Executive office 17.61
Room for sergeants preparation for training
25.59
17.27
218 Staircase No. 2 15.27
219 Place for exercises and sports
15.28
220 Place for equipment and maintenance accessories
2.19
221 Place for shoes cleaning
1.46
+3.300
+1.650
201202 203
215216
+1.650
+3.300
208 209
- room number per design
- floor type per design
IX
1. See sheet 15 for general instructions.
2. See sheet 22 for specification of closing parts.
3. Flooring schedule is given on sheet 30.
4.Stair flights and stair landings are produced at manufacturer with finished stairs and surfaces.
5. Walls of weapon store room (pos. 205) to reinforce by metal mesh of reinforcement
Ø10A240C, cell 100x100 along the whole walls area (see unit A, sheet 17). Mesh to wire to fitted into brickwork at depth 80 mm steel anchors Ø12 A400C and steel strip
100x50x6, fixed by four expansion anchors with pace 500x500.
Joints are welded.Welding of metal elements to fulfill per GOST 5264 by means electrodes E42 per GOST 9467-75. Height of welded joints to be accepted by the minimum elements thickness to be welded. After mesh installation to put plaster layer on walls surface.
Materials consumption: fittings Ø10A240C DSTU 3760:2019 - 712.02 kg; fittings
Ø12 A400C - 12.79 kg; strip 100x50x6 DSTU 4747:2007 - 42.39 kg.
-0.470
+3.270
X
X
XX
X
X X
X
X X
X
X
X
XI XI
XI
XI
X
IX
IX
IX
Zh
I
A
B
V
E
K
7 8 10 122 9
3,400 2,700 9,300 8,400 3,500
6 111
2,4002,800
2(24) 3(25)
60,500
21 3 74
18,600 2,500
2,800
B
D
Ye
Zh
K
9,300
1 (23)
52-18-01-AB
12.19
12.19 n v
N o o f o r i g S i g n a t u r e a n d d a t e
I n s t o f
I n v
N o
Sheet Stage
Rev.
Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
1. See sheet 15 for general instructions.
2. Ladder Dr1 is taken per series 1.100.2-5 issue 1, grade LV-6.27- 1 pcs., weight 27.38 kg.
3. See sheet 22 for specification of closing parts.
Garret plan. Garret plan extract on axis 1-2 and V-Ye at elev. +6.630
Garret plan
Garret plan extract on axes 1-2 and V-Ye at el. +6,590
V
E
2,800
D
Ye
Ye
+6.610
Ladder Dr1
Hatch L1
+6.630
+6.750 +6.630
1 (23)
52-18-01-AB
+6.630
+6.630
B
Zh
3,400 2,700 9,300 8,400 3,500
D
Ye
I
A
Zh
B
2,400
V
E
2(24) 3(25)
2,800
7 8 10 122 96 111
3 74
18,600 2,500 9,300 27,300
2,800
60,500
K K
12.19
12.19
WP1
605 605
1,210
1. See this sheet together with sheets 14, 16, 18, 20.
2. See sheet 22 for general instructions.
WP2
750 750
1,500
730 640 730
2,100
WP3 WP4
WP5 WP6
750 750
1,500
WP7
WP8
WP11
825 825
1,650
Elements schemes of window closing parts
Elements schemes of door closing parts
1,010
Size A4x5
I n v
N o o f o r i g
S i g n a t u t e
I n s t o f
I n v
N o
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Elements schemes of window closing parts. Elements schemes of doors closing parts
650 650
1,300
WP9
750 750
1,500
1,070
1,520
455200
450 900
1,350
200 370
200 520
1,240
1,010
1,070
1,520
Two internal locks
1,240
1,070
1,520
1,070
1,510
1,010
1,010
Solid filling
450 900
1,350
1,240
1,240
1,200
1,200
2,240
1,120 1,120
1,000
1,070
1,520
Lock case
WP10
770 430
1,200
52-18-01-AB
Air intake grid
WP12
1,500
780 720
Air intake grids
WP13
Air intake grid
1,500
720 780
1,500
820 680
Air intake grid
WP14
Air intake grid
WP15
1,500
1,780
12.19
12.19
Pos. Designation Name
Elements specifications of window and door closing parts
WP1
WP1 (reinforced plastic)
Q-ty per floor
1 2
Weight un., kg
Note*
Windows
WP2 (reinforced plastic)
WP3 (reinforced plastic)
WP4 (reinforced plastic)
WP5 (reinforced plastic) -
1,770
DSTU B V.2.6-15:2011
3 - - - 3
13 -
1,770
1,770
2 2
WP6 (reinforced plastic) -- 9502 3
WP7 (reinforced plastic) 950- - - 2 2
WP8 (reinforced plastic)
1,900
- - - 1 1
WP9 (reinforced plastic)
Door assemblies
D-1 2,100 1 1- - -
WP2
WP3
WP4
WP5
WP6
WP7
WP8
WP9
Customized
1. All dimensions of the closing part elements are reference and are to be specified by their actual dimensions after completion of construction and errection works.
2. Detailed development and installation of closing part elements is done by designated manufacturer.
3. Entrance doors and fixing and closing should be of strengthened design with sealing in frame ledges per
DSTU B V.2.6-11:2011.
4. Fire proof doors should correspond to the requirements of
DSTU B V.2.6-77:2009.
5. In doors D-7, D-8, D-9, D-10 to install one-chamber glass.
6. Doorways to weapon store room (pos. 205) should be equipped with:
- solid metal doors, thickness over 3 mm, reinforced along perimeter and diagonally (doors D-15);
- mesh doors of fittings Ø16A240C, cell
150x150 mm with steel frame, walls thickness over 5 mm
(doors D-16).
Entrance doors should be equipped by inner locks, reinforced by fixtures and steel hinges for additional padlock. Window should be provided for passing weapon and ammunition, it shall be equipped by inner door and lock.
I n v
N o o f o r i g S i g n a t u r e a t e
I n s t o f
I n v
N o
Size A4x3
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Elements specifications of window and door closing parts
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
Pos. Designation Name
Elements specifications of window and door closing parts (end)
Q-ty per floor
1 2
Weight un., kg
Note*
* Height of opening is given in the column
WP10 (reinforced plastic)WP10
DSTU B V.2.6-15:2011
2,100
2 2- - -
D-2
DSTU B V.2.6-77:2009
Hatches
L1 1,000
- - - 2 2
Customized
2,200 2 2- -
2,200
2 2- -
2,200
1 1- -
2,100 1 1-
2,100
DVM 21-15 (metal shock proof) 2 2
DVGr 21-15 (metal meshed) 2,100
- -1 1
2 2- - -
2,100
DSTU B V.2.6-77:2009
DSTU B V.2.6-11:2011
DSTU B V.2.6-11:2011
DSTU B V.2.6-11:2011
DSTU B V.2.6-11:2011
DSTU B V.2.6-11:2011
DSTU B V.2.6-11:2011 - -1 1
2,200
DSTU B V.2.6-15:2011
DVG 21-15 (reinforced concrete)
- 2 - -
DSTU B V.2.6-15:2011
DVG 21-10L (reinforced concrete)
- 3 - -
2,100
DSTU B V.2.6-15:2011
DVG 21-10 (reinforced concrete)
- 1 - -
2,100
DSTU B V.2.6-15:2011
DVG 21-9L (reinforced concrete)
- 12 - 2,100
DVG 21-8L (reinforced concrete) - 2 - -
2,100
DSTU B V.2.6-15:2011
D-3
Customized 2,100
2 2- - -
D-5 Customized
2,100 1 1- - -
D-6 Customized
2,100 5 5
D-7
D-8
D-21 - 2 - - 2,100
DSTU B V.2.6-15:2011 DVZ 21-13.5 (reinforced concrete)
D-24
DVG 21-7L (reinforced concrete) - 2 - - 2,100
DSTU B V.2.6-15:2011
D-25 DVG 21-7 (reinforced concrete) - 4 -
2,100
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DVZ 21-12L (reinforced concrete) - - -1
2,100
D-26
D-27 DVG 21-8 (reinforced concrete)
2,100
DSTU B V.2.6-15:2011
- - -1
D-10
D-11
D-12
D-14
D-15
D-16
D-17
D-18
D-19
D-20
D-22 DVG 21-9 (reinforced concrete) - 6 -5 11
D-23
- 1 - - 2,100
DSTU B V.2.6-15:2011
DVZ 21-12 (reinforced concrete) 1
Customized
CustomizedD-28 - 3 - -
3,000
D-4
Customized
2,100 2 2- - -
D-9
DSTU B V.2.6-15:2011
DVZ 21-15 (reinforced concrete)
- 2 -
2,100 1 3
D-13
2,100
DSTU B V.2.6-15:2011
2,100
WP11
DSTU B V.2.6-15:2011
8256 6WP11 (reinforced plastic) - - -
1 1
52-18-01-AB
-- 9501 1
DSTU B V.2.6-15:2011
WP12
WP13
WP14
WP15
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
DSTU B V.2.6-15:2011
WP12 (reinforced plastic)
WP13 (reinforced plastic)
WP14 (reinforced plastic)
WP15 (reinforced plastic)
-- 9501 1
-- 9501 1
-- 9501 1
12.19
12.19
Sheet
Size A4x3
Stage
Rev. Q-ty DateSignature
Controlled by
Checked by
KREDO BUD-PROEKT LTD
Chief designer
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Section 1-1. Unit A. Unit B
52-18-01-AB
12.19
12.19
12.19
12.19
Zh
B
YeD
15,000
6,000 3,000 6,000
Section 1-1
Counter batten 50x50 on roof timber
Waterproofing membrane
Beams 100x34 mm, pace 300 mm
Roof timbers 2 (50x180)
Metal tile roofing
+10.800
+6.785
+5.820
+4.100
+2.520
+1.770
Gr. lev.
0.000
+3.300
+3.000
-3.040
-0.340
+6.300
+6.090
+2.670
+6.890
+6.630
Insulant - mineral wool plates - 150 mm
Planking for walking 150x40
Diffusion membrane
Vapor barrier sheet y= 50 kg/m³
Gypsum boards
Finishing layer
-0.580
+2.520
A
Plaster by sand-lime mixture
Autoclaved aerated concrete blocks
PSB-S-25 y=25 kg/m³
Facade acrylic plaster on reinforced grid of fiberglass
A
Disk-shaped dowel
20 300
+6.785
+5.820
+4.100
+1.610
B
B
Plaster by sand-lime mixture
Autoclaved aerated concrete blocks
Insulant- polystyrene foam plates
PSB-S-25 y=25 kg/m³
Facade acrylic plaster on reinforced grid of fiberglass
40020 20
20 20
0.000
-0.340
-0.940
-0.500
-1.490
+2.100
Subfloor board b=50 mm
Insulant- polystyrene foam plates
-3.660
-0.940
+7.630
Plaster by sand-lime
Concrete blocks of basement walls
Vertical waterproofing
Insulant - extruded polystyrene foam plates
Facade acrylic plaster on reinforced grid of fiberglass mixture v
N o o f o r i g
S i g n a t u t e
I n s t o f
I n v
N o
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Section 2-2
Barrack building with administration offices
Size A3
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village, Boryspil district, Kyiv region
Section 2-2
K Zh Ye D
B A
6,000 3,000 6,000
Section 2-2
See section 1-1
0.000
+3.300
+3.000
-3.040
-0.340
+6.300
+6.630
+9.600
+6.785
+11.130
+5.820
+4.100
+2.880
-0.030
Gr. lev.
+2.200+2.100
+2.500
-0.940
+6.890 +6.890
0.000
+2.500
See section 1-1
+2.570
-3.060
+2.670
+6.090
5,400
21,300
Diffusion membrane
Insulant - mineral wool - 120 mm plates y= 50 kg/m³
Vapor barrier sheet
Cement sand float - 10 mm
Precast reinforced plates - 220 mm
+6.785
+5.820
+4.100
+4.050
+2.790
+2.220
+1.310
-2.160
Gr. lev.
52-18-01-AB
+6.110
12.19
12.19 v
N o o f o r i g
S i g n a t u t e
I n s t o f
I n v
N o
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Section 3-3
Barrack building with administration offices
Size A3
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village, Boryspil district, Kyiv region
Zh Ye D
B A
6,000 3,000
Section 3-3
See section 1-1
0.000
+3.300
+3.000
+6.330
+6.750
+9.600
+6.365
+11.130
+4.100
+2.520
-0.030
+2.200
See section 1-1
G
3,300 2,700
15,900
+10.800
+9.600
+6.785
+2.520
+0.800
+0.200
+6.300
+5.400
+2.100 +2.100
+5.820
Diffusion membrane
Insulant - mineral wool - 200 mm plates y= 50 kg/m³
Vapor barrier sheet
Cement sand float - 10 mm
Precast reinforced plates - 220 mm
Gr. lev.
Floor structure
Precast reinforced flooring - 220 mm
Wet plaster on mesh with painting
Insulant - polystyrene foam - 160 mm plates PSB-S-35 y= 35 kg/m³ by weather proof paint
-3.060
-2.460
+6.110
52-18-01-AB
+6.890
+6.890
+6.480
+6.670
+6.630
12.19
12.19
Size A2 n s t o f
I n v
N o
S i g n a t u r e a n d d a t e
I n v
N o o f o r i g
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Flooring schedule
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Flooring schedule
Number of room
Type of floor
01, 02, 03, 05, 08,11
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 3 mm
Surface cast - cement sand mixture - 20 mm
M150
Waterproofing - two layers of asbestos felt on bitumen mastic
Surface cast of cement sand mixture - 20 mm mixture M150
Underlayer - concrete, gr.C12/15 - 100 mm
(see note 6)
Soil compacted by broken stone - 80 mm fraction 40-60 mm
Compacted base soil
1. Works on floor arrangement to execute according to the requirements of
SNiP 2.03.13-88 and desing for works execution.
2. To consider laying of utility lines during floor arrangement.
3. To complete floor only after laying of utility lines.
4. Clean floor to complete after internal finishing of rooms
5. Base soils for floor to compact by layers till dry bulk density over 16.4 kN/m³.
6. Concrete bedding to make with reinforcement by welded mesh Ø5Vr-I 100/100.
7. In points of partitions installation to provide thickening of bedding layer up to
150 mm by 200 mm to each side.
135.54
04, 06, 07, 09, 12, 13
Coating - concrete, gr.C18/22.5 - 50 mm
Waterproofing - two layers of asbestos felt on bitumen mastic
Surface cast - cement sand mixture - 60 mm m150
Underlayer - concrete, gr.C12/15 - 100 mm
(see note 6)
Soil compacted by broken stone - 80 mm fraction 40-60 mm
Compacted base soil
237.00
10 25.96
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 3 mm
Surface cast - cement sand mixture - 20 mm
M150
Reinforced concrete blinding, concrete grade C12/15 - 50 mm
(mesh 100/100/5/5 DSTU B V.2.6-167:2011)
Insulant - polystyrene foam PSB-35 - 100 mm
Waterproofing - Technoelast EPP 4.95 - 5 mm
Underlayer - concrete, gr.12/15 - 100 mm
(see note 6) with heating cable, fixed to mesh)
Soil compacted by broken stone - 80 mm fraction 40-60 mm
Compacted base soil
I
II
III
101,102, 103, 104,113, 117, 137,138, 144, V
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 3 mm
Surface cast - cement sand mixture - 20 mm
M150
Preparation - expanded clay aggregate - 70 mm
Gasket - polyethylene - 3 mm
Base - concrete, gr. C10/12.5 - 100 mm reinforced by mesh Ø8A240C 200x200
Polyethylene, industrial 200 µm
Insulant- extruded - 100 mm
Polystyrene foam
Polyethylene, industrial 200 µm
Water proofing - Technoelast EPP 4.95 - 5 mm
Coating - concrete, gr.C18/10 - 100 mm
Bulk nonfrost-susceptible soil
Compacted by broken stone base soil
131.52
105, 106, 107, 111, 112
Coating -industrial linoleum - 4 mm
Surface cast of cement sand mixture - 20 mm
M150
Preparation - expanded clay aggregate - 70 mm
Gasket - polyethylene - 3 mm
Base - concrete, gr. C10/12.5 - 100 mm reinforced by mesh Ø8A240C 200x200
Insulant- extruded - 100 mm
Polystyrene foam
Polyethylene, industrial 200 µm
Water proofing - Technoelast EPP 4.95 - 5 mm
Coating - concrete, gr.C18/10 - 100 mm
Bulk nonfrost-susceptible soil
Compacted by broken stone base soil
217.99
108, 109, 110, 141, 142, 143
VI
VII
52.76
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 3 mm
Surface cast of cement sand mixture - 20 mm
M150
Preparation - expanded clay aggregate - 70 mm
Water proofing - Technoelast EPP 4.95 - 5 mm
Base - concrete, gr. C10/12.5 - 100 mm reinforced by mesh Ø8A240C 200x200
Polyethylene, industrial 200 µm
Insulant- extruded - 100 mm
Polystyrene foam
Polyethylene, industrial 200 µm
Water proofing - Technoelast EPP 4.95 - 5 mm
Coating - concrete, gr.C18/10 - 100 mm
Bulk nonfrost-susceptible soil
Compacted by broken stone base soil
Flooring schedule (continued)
Scheme of floor or floor type per series
Floor elements data
(name, thickness, basis etc.)
mm
Area, m²
113, 114, 115, 116, 118, 119, 120, 121, 122, 123, 124, 125, 126, 129, 130, 131, 132, 133, 134, 135, 136
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 7 mm
Surface cast of cement sand mixture - 20 mm
M150
Waterproofing film
Insulant - plates PSB-S-50 - 80 mm
Vapor barrier sheet
Precast reinforced flooring - 220 mm
VIII 404.44
127, 128 IX 15.98
Coating -industrial linoleum - 4 mm
Surface cast of cement sand mixture - 35 mm
M150
Insulant - plates PSB-S-50 - 80 mm
Vapor barrier sheet
Precast reinforced flooring - 220 mm
137, 143 X
Coating - concrete, gr. C18/22.5 - 50 mm
Waterproofing - two layers of bikroelast
Surface cast of cement sand mixture - 60 mm m150
Concrete bedding, gr. C18/22.5 - 100 mm
Bulk nonfrost-susceptible soil
Compacted by broken stone base soil
35.51
201, 203, 212, 213, 214,220, XI
Coating - ceramic tiles for floor - 13 mm
Glue for tiles - 7 mm
Surface cast of cement sand mixture - 55 mm
M150
Water proofing - Technoelast EPP 4.95 - 4 mm
Precast reinforced flooring - 220 mm
201.98
201, 202, 205, 206, 207, 208, 209, 210, 211, 215, 216, 217, Industrial linoleum - 4 mm
Surface cast of cement sand mixture - 20 mm
M150
Preparation - expanded clay aggregate - 50 mm
Polyethylene - 3 mm
Precast reinforced flooring - 220 mm
586.71
XII
Coating - polished concrete, gr. C12/15 - 20 mm
Surface cast - cement sand mixture - 20 mm m150
Water proofing - Technoelast EPP 3.0 - 5 mm
Surface cast - cement sand mixture - 20 mm
Underlayer - concrete, gr.C12/15 - 100 mm
(see note 6)
Soil compacted by broken stone - 80 mm fraction 40-60 mm
Compacted base soil
3.90IV
52-18-01-AB
12.19
12.19
12.19
12.19
Type of floor
Number of room
Area, m²
Scheme of floor or floor type per series
Floor elements data
(name, thickness, basis etc.)
mm
Size A3 n s t o f
I n v
N o
S i g n a t u t e
I n v
N o o f o r i g
Pos. Designation Name Q-ty
Weight un., kg
Note
Specification of elements of staircase No.1
Staircase No. 1
Staircase No.1
Section 1-1
Assembly units
1. To install stair flight elements along walls brickworks.
2. To lay stair elements on cement mixture M50.
3. To execute elements welding with use of electrodes type E-42 GOST 9467-75*. Height of welded joints to be accepted by the minimum elements thickness to be welded.
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Staircase No.1. Section 1-1.
Unit A
D A
6,900
+6.365
+5.820
+4.910
+3.890
+2.980
-0.0300.000
A
+6.300
+3.300
0.000
+3.000
+5.400
+1.650
1 1.251.1-4, issue 1 Stair flight 2LMF.39.15.17-5
1,540
2 1.252.1-4, issue 1 Staircase landing LPF 31.13-5
1,320
3 1.252.1-4, issue 1 Same, LPF 31.13v-5 1 1,290
Step plate 1LN15.3
20 431.251.1-4, issue 1
5 Same, 1LN15.2 2 291.251.1-4, issue 1
6 Same, 2LN16.2 1 321.251.1-4, issue 1
7 Same, 2LN15.2v 1 321.251.1-4, issue 1
Fences
8 1.256.2-2, iss.1 Fencing of landings MV30.17-30.9R 2 39.27
9 1.256.2-2, iss.1 Fencing of top landing PV-17.9R
1 20.09
Support pads
SP-1
1.869.1-1
Support pad SP2,5-4 8 33
30 30
A
Pos. Drawing
List of parts
0,000
Sand bedding
300150 150
Floor structure
Concrete class C12/15 pace 200
DSTU 3760:2019
4 0.3312 Fittings Ø6A400C, L=1500 mm
DSTU 3760:2019
9 0.1313 Fittings Ø6A240C, L= 580 mm materials
Concrete class C12/15, m³
0,05
1,5303,0002,070
Spandrels
2DSTU B V.2.6-55:2008 500
Reinforced concrete spandrel beam 5PB36-20-p
1 222 Same, 3PB34-4-p
DSTU B V.2.6-55:2008
Gr. lev.
52-18-01-AB
12.19
12.19
12.19
12.19
B(57)
B
A(57)
A n s t o f
I n v
N o
S i g n a t u t e
I n v
N o o f o r i g
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Section A-A. Section B-B
B
A
D D
B
G
7 8
3,400
Section A-A
7 8
3,400
B
A
D
Section B-B
+3.300
+1.650+1.650
0.000
1. This sheet to be read together with sheet 56.
2. Fencing is not shown on sections conventionally.
1,500
1,500
170 130
20 20 20
20 20
4 4
6 6
130 170
52-18-01-AB
12.19
12.19 n s t o f
I n v
N o
S i g n a t u t e
I n v
N o o f o r i g
Pos. Designation Name Q-ty
Weight un., kg
Note
Specification of elements of staircase No. 2
Staircase No. 2
Assembly units
1. To install stair flight elements along walls brickworks.
2. To lay stair elements on cement mixture M50.
3. To execute elements welding with use of electrodes type E-42 GOST 9467-75*. Height of welded joints to be accepted by the minimum elements thickness to be welded.
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Staircase No. 2. Section 1-1.
Unit A
1 1.251.1-4, issue 1 Stair flight 2LMF.39.12.17-5 2 1,290
+6.740
E V
1,530
3,000
6,300
0.000
+3.300
+1.650
-0.900
Staircase No. 2
Section 1-1
+5.820
+4.910
+3.890
+2.980
+1.940
-0.930
+1.300
+8.600
Gr. lev.
Gr. lev.
A
Pos. Drawing
List of parts
100200100
30140
-1.050
Floor structure
Sand bedding
Concrete class C12/15 pace 200
A
1,600
2 1.252.1-4, issue 1 Staircase landing LPF 25.13-5 2 1,080
3 1.252.1-4, issue 1 Same, LPF 25.13v-5-p 1 1,220
Step plate 1LN12.3
20 341.251.1-4, issue 1
5 Same, 1LN12.2 2 231.251.1-4, issue 1
6 Same, 2LN13.2 1 281.251.1-4, issue 1
7 Same, 2LN12.2v 1 261.251.1-4, issue 1
GOST 8717.0-84 Stairs LS12
5 128
GOST 8717.0-84
1 99 Step LSV12
Fences
10 1.256.2-2, iss.1 Fencing of landings MV30.17-30.9R 2 39.27
11 1.256.2-2, iss.1 Fencing of top landing PV-14.9R 1 18.90
Support pads
SP-1
DSTU 3760:2019
DSTU 3760:2019
materials
Concrete class C12/15, m³
4 0.27Fittings Ø6A400C, L=1,200 mm
7 0.13Fittings Ø6A240C, L= 580 mm
0.04
1.869.1-1
Support pad SP2,5-4 8 33
LS12
52-18-01-AB
+6.610
+6.300
12.19
12.19
12.19
12.19
B(58)
A
A(58)
A n s t o f
I n v
N o
S i g n a t u t e
I n v
N o o f o r i g
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Section A-A. Section B-B
1. This sheet to be read together with sheet 58.
2. Fencing is not shown on sections conventionally.
B
V
E
2,800
B
V
D
Ye
E
B
V
E
2,800
B
V
D
Ye
E
Section A-A Section B-B
-0.900
-0.930
0.000
+1.650
+3.300
120180
160 140
180 120
160 140
1,200
52-18-01-AB
12.19
12.19 n s t o f
I n v
N o
S i g n a t u t e
I n v
N o o f o r i g
SheetStage
Rev. Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
Specification of stairs SM-1 elements
Pos. Designation Name
Weight un., kg
Note
Stairs SM-1
2St1 sheet63
97.65 Stand St1
2B1 61.46
20 DSTU 3436-96
C245 DSTU 8539:2015
U-section L=3,340
1B2 52.62
20 DSTU 3436-96
C245 DSTU 8539:2015
U-section L=2,860
B3
38.41
16 DSTU 3436-96
C245 DSTU 8539:2015
U-section
L=2,705
Ks1
92.10
18 DSTU 3436-96
C245 DSTU 8539:2015
U-section
L=5,650
Ks2
18 DSTU 3436-96
C245 DSTU 8539:2015
U-section
L=5,650
92.10
Zd-2 Embedded part Zd-2
2 15.69
RM-1
Frame Rm-1 16 10.63
NC1 3 72.62Diamond shape sheet V-K-PU-5.0x1,000x2,940
16 8.89NC2
St3Cp DSTU 8783:2018
Diamond shape sheet V-K-PU-5.0x300x1,200
St3Cp DSTU 8783:2018
Strip 150x10, L=300
7.07
DSTU 8540:2015
Fittings Ø12A500C, L=290DSTU 3760:2019
0.266
Stand St1 St1
Square 160x6, L=3,425
96.89
DSTU B V.2.6-8-95
Strip 200x10, L=200
0.31
DSTU 8540:2015
Frame Rm-1
RM-1
50x5 DSTU 2251-93
C245 DSTU 8539:2015
Angle
10.63
Strip 240x10, L=240
0.45
DSTU 8540:2015
Embedded part Zd-2
3.53 Zd-2
Specification of stairs SM-1 elements (end)
Pos. Designation Name
Weight un., kg
Note materials
Concrete class C12/15, m³
1,73
Fittings Ø12A500C, 118.64
Stairs SM-1 foundation
75x6 DSTU 2251-93
C245 DSTU 8539:2015
Angle
0.83 L=120
Strip 75x8, L=120
0.57
DSTU 8540:2015
75x6 DSTU 2251-93
C245 DSTU 8539:2015
Angle
2.62 L=380
80x6 DSTU 2251-93
C245 DSTU 8539:2015
Angle
1.03 L=140
1. See this sheet together with sheets 63, 64.
2. To execute welding with use of electrodes type E-42 per GOST 9467-75.
3. All welded joints per GOST 5264-80.
4. Height of welded joints to be accepted by the minimum elements thickness to be welded.
Joints lenght to accept by line of parts abutting.
5. To use bolts M16 for fixingOpenings for bolts diameter is 18 mm. Number of sets of bolts with nuts and washers - 16 pcs.
6. Bolts of strength grade 4.6, accuracy class B per GOST 7798-70 are made according to the technology with additional testing per items 6.1 and 6.5, table 5 GOST 1759.4-87.
7. Nuts, accuracy class B per GOST 5915-70, strenght gr. 4 per table4 GOST 1759.5-87.
8. Plain washers per GOST1371-78 made of steel grade VCt3kp2 per DSTU 2651-94.
9. Metal stairs SM-1 fencing is not shown conventionally. Stairs fencing is given on sheet
10. Metal structures to coat by varnish-and-paint materials of the following composition:
- primer GF-021 - two layers (one layer - at manufacturing plant, the other layer - at construction site);
- enamel PF-115 - one layer.
Enamel colour is defined according to the passport of facades finishing.
Specification of stairs SM-1 elements
GOST 8706-78
GOST 8706-78
52-18-01-AB
sheet64 sheet64
DSTU 3760:2019
12.19
12.19
7 8 10 122 3 9
G
B
2 3 7
Zh
3,400
2,700 9,300
8,400
3,500
D
Ye
I
0.000
-0.030
6 11
A
Zh
K
B
-0.470
-0.030
2,400
9,400
18,6002,800
18,600 2,500 27,300
V
E
0.000
-0.900
-0.930
0.000
-0.030
K
2,800
0.000
-0.030
-0.030
60,500
4,100 5,200
Schematic diagram of openings on the ground floor. Plan 1 extract, sect. A-A.
Sect. 1-1, 2-2
Size A3x4
I n v
N o o f o r i g
S i g n a t u t e
I n s t o f
I n v
N o
Sheet Stage
Rev.
Q-ty Signature Date
Checked by
Controlled by
Chief designer
KREDO BUD-PROEKT LTD
WD
Sheets
Developed by
Barrack building with administration offices
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in
Stare village Boryspil district, Kyiv region
52-18-01-AB
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
P
P
Dimensions, mm
Type
Opening V N
Elev.
of bottom, m
DESIGNATION
1 400 400
WSS
- 2.650
Breakdown of openings
2 200 200
WSS
- 0.650
WSS, niche 270x360(h)x250 - 0.3503
4 100 100
WSS
- 0.200
WSS, in the floor
200x340(h)x300 - 0.340
6 200 300
WSS
+ 0.550
7 150 200
WSS, in the floor and ceiling
Pos. Designation Name Q-ty
Weight un., kg
Note
Specification of flooring elements
Precast reinforced elements
1.243.1-4
P-1
Flat slab PT12.5-8.6
Schematic diagram of openings on the ground floor
Md-1
Md-2
Md-3
Md-1 Md-1 1
Parts
DSTU 3760:2019
1.66 materials
Concrete class V10/12,5, m³ - 0.03
Md-2 Md-2 1
Parts
DSTU 3760:2019
1.26 materials
Concrete class V10/12,5, m³ -
0.02
Md-3 Md-3 1
Parts
DSTU 3760:2019
1.04 materials
Concrete class V10/12 .5, m³ - 0.02
Ye
45400
1-1
To coat by hot…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .