01 10 10_Att. 10 - Conceptual Ventilation Electrical & Controls Design.pdf
PDF 4 MB Posted
- Attached to
- Stare IIMC Barracks Renovation Ukraine
- Solicitation number
- W912GB20R0045
- Issued by
-
Department of the Army European Command
About this file
This package contains conceptual design documents and specifications for the renovation of barracks and administration buildings at an International Interagency Multifunctional Training Center in Ukraine. The documents include plans showing layouts of rooms and buildings at different elevations, with markings of proposed ventilation systems. There are also wiring diagrams, equipment specifications, and lists of reference materials. The conceptual design documents provide details of the proposed ventilation, electrical work and grounding systems for the renovation of a three-story barracks building and associated administration offices on the training center campus near Stare, Ukraine. Equipment to be supplied includes distribution cabinets, switches, starters and exhaust fans, along with specifications for cables and wires.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown of rooms
Name
Vegetable storeroom01
03 37.69
8 93 3
G
Zh
I
А
K
B
V
Е -2,670
-2.700
01 02 03 04
29.03
Vegetable storeroom 34.10
Vegetable storeroom
63.81Auxiliary room
7.15Spare parts storeroom
39.85Corridor
29.54
Equipment and maintenance accessories room
Cooling chamber
Corridor
3.79
38.89Corridor
25.96
Packing storeroom11 23.78
12 Auxiliary room 63.81
13 Hoistwell 1.49
63,000
2,500
6, 5, 2, 2,800 18,600 9,400 2,400
2, ,2
3,400
Cat..
of room Area, m²
Number of room
5,300 18,600
2 3 71 2,500
Rev. Q-ty Sheet Doc.No. Signature Date
Stage Sheet Sheets
WDDeveloped by
Controlled by
Checked by
Chief Designer 05.19Trokhymenko Tostanovska Trokhymenko
05.19 05.19
05.19Berdnyk
“Kredo Bud Proekt” Ltd Power equipment network plan at elev. -2.670 -2.670 with marking of ventilation systems
Size A3x4
5,2004,100
3, Plan at elev. -2.670 with ventilation systems marking
14 Switchboard room 3.9
;N=190 W Fan VENTS VKM 300ES
N=190 W Fan VENTS VKM 300ES
Air intake grid
P1
В1 0.190
12+0.19
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region in metal hose behind false ceiling.
1. Sheet to be read together with sheet ETP.B-1.
4. Wiring to fans is arranged with cable VVGng, laid concealed in plaster layer in walls and
3. Switchboard to be installed at height 1.6 m (bottom) above the floor.
2. Switches for exhaust fans activation to install at height
5. In order to ground fans cases separate cable core is laid from the board.
0.8 m above the floor.
6. Installation of ventilation systems equipment to fulfill according to data sheet and manufacturer guidance. Electrical equipment is supplied as set.
7. Electrical works to execute according to the requirements of SNiP 3.05.06-85
“Electric devices”.
8. Design provides for ventilation systems switching off in case of fire.
9. Ventilation equipment control is provided at place by means of control buttons, switches and from control panels supplied as set with
ISB-V, PP11D-
ISD
CP-P8
CB-P8
М
М
CP-P1
CB-P1
В1 on the ground floor Gr.1 (ISB-V) on the ground floor
Gr.3,2(ISB-V) the equipment.
Gr.1...5
ISB-V
Gr.4
ISB-V
Gr.1...3
ISB-V
52-18-ЕТР.B
Size A3x4
7 8 10 121 3 9
G
B
2 3 5 7
Zh
D
Ye
I
0.000
0,000
-0.030
6 11
А
Zh
K K
B
-0.660
-0.030 -0.030
V
E 0.000
-0.900
-0.930
105 106 107
6, 5, 2, 27,3005,2004,1002,50018,6002,800
2,800 18,600 9,400 2,400
2, 60,500
,2
6, 3, 6, 3,5008,4009,3002,7003,400
WD05.19
05.19 05.19
05.19
Power equipment network plan at elev. +0.000 with marking of ventilation systemIn v.
N o.
o f o rig
Si gn at ur e an d d at e
In st
. o f I nv . N o.
Plan at elev. +0.000 with ventilation systems marking
0.000
-0.030
-0.030
137 138
Breakdown of rooms (end)Breakdown of rooms (beginning)
Airlock 5.76
Corridor
Staircase 20.72
Corridor
105 Combat training room
107 14.29
108 WC for women
109 Personal hygiene room 4.43
37.27110
111 97.41
113 2.52
7.65
73.06
25.16
Office
25.16
6.76
WC for men
Airlock
Dining hall for 150 seats 156.14
115 19.12Claockroom
116 17.36Flour shop
71.10Hot shop118
Room for equipment and maintenance accessories 2.39
7.56
Room for dry products storage120
Airlock 3.84
Washroom for kitchen and tableware121 21.96
21.28Meat and fish shop122
Personnel cloakroom124 9.23
WC125 1.08
Shower room126
Dining-facility manager office127
Room for cooks rest128
Personnel WC129
Room for cleaning devices storage130
Loading room131
132 Airlock
Airlock
Boiler room No. 2
Cloakroom for boiler firemen
WC 1.08
Corridor
2.18
8.21
7.77
2.42
3.23
4.08
1.68
1.63
21.58
2.01
33.39
Airlock 3.00
Staircase No. 2 11.60
Combat training room
112 55.97Combat training room
Sleeping room for military personnel
Cabinet for tableware
Cabinet for dinner ware
1.55
Linen press 1.55
1.55
Corridor 1.63
Boiler room No. 1 13.93
Shower room 1.21
24.33Vegetable shop123
135 136134
870 1, 25 persons
+115
3, ,4
5, L=175 (Lmax=270); N=73 W Fan VENTS VKM 100
L=375 (Lmax=555); N=98 W Fan VENTS VKM 150
L=350 (Lmax=555); N=98 W Fan VENTS VKM 150 pp
N=154 W Fan VENTS VKM 200
N=154 W Fan VENTS VKM 200
L=1,950 (Lmax=2,210); N=350 W Fan VENTS VKM 355B
L=4,250 (Lmax=5,260); N=665 W Fan VENTS VKM 450
L=3,500 (Lmax=5,260); N=665 W Fan VENTS VKM 450
0.665
N=154 W Fan VENTS VKM 200
N=350 W Fan VENTS VKM 355B
L=475 (Lmax=555); N=98 W Fan VENTS VKM 150
N=98 W Fan VENTS VKM 150
N=98 W Fan VENTS VKM 150
N=665 W Fan VENTS VKM 450
N=665 W Fan VENTS VKM 450
L=4,500 (Lmax=5,260); N=665 W Fan VENTS VKM 450
N=350 W Fan VENTS VKM 355B
N=665 W Fan VENTS VKM 450
N =9
W
Fa n
V E
N
TS
V K
M
N=190 W Fan VENTS VKM 300ES
P2 P3
P4 P5
0.154
P8
P9
L=1,200 (Lmax=1,400); N=190 W Fan VENTS VKM 300ES
L=1,160+545=1,705 (Lmax=2,210); N=350 W Fan VENTS VKM 355B
L=1,200 (Lmax=1,400); N=190 W Fan VENTS VKM 300ES
P10
L=1,160 (Lmax=1,400); N=190 W Fan VENTS VKM 300ES
0.098 V3
V4
V6
V9
V10 V11
V12
V13 V14
V16
V8
18+0.665
18+0.665
18+0.665 18kW+0.35
12kW+0.19
18+0.35 12+0.19
М М
М
V2 0.098
М
М М 0.665
V15 0.098
М
0.35 М
0.098 М
0.35
М
М
V5 0.154
P5
М
P6
М
P7
М0.154
0.665
М М М
V7 0.19
0.19
М
М
М М
М0.073
0.098 0.098
9,400
V15V16
Ventilation
CP-P9
CB-P9
1CB-P10
CP-P10
2CB-P103CB-P10
4CB-P10
5CB-P10
V6 V6
V9 V10 V11
ММ
CB-P2
CP-P3 CB-P4
CB-P5
CP-P2
CB-P3CB-P4
2КУ-П5
V5
V4
2CB-P6
1CB-P6
P7 P8
CP-P6
CP-P5
CP-P4
Pinst.=88.4 kW V2
V16 V15
V8V7
CB-P3
from basement Gr.1(ISB-V) from basement Gr.2,3(ISB-V) at elev.+3.300 Gr.3(ISB-V)
Gr.2(ISB-V) in metal hose behind false ceiling.
1. Sheet to be read together with sheet ETP.B-1.
4. Wiring to fans is arranged with cable VVGng, laid concealed in in plaster layer in walls and
3. Switchboard to be installed at height 1.6 m (bottom) above the floor.
2. Switches for exhaust fans activation to install at height
5. In order to ground fans cases separate cable core is laid from the board.
0.8 m above the floor.
6. Installation of ventilation systems equipment to fulfill according to data sheet and manufacturer guidance. Electrical equipment is supplied as set.
7. Electrical works to execute according to the requirements of SNiP 3.05.06-85
“Electric devices”.
8. Design provides for ventilation systems switching off in case of fire.
9. Ventilation equipment control is provided at place by means of control buttons, switches and from control panels supplied as set with the equipment.
Gr.2(SB-V2)
Gr.3(SB-V2)
Gr.4(SB-V2)Gr.1(SB-V2)
Gr.3,2(SB-V2)
Gr.1,4(SB-V2)
Gr.1,4(SB-V2)
*Length of cables and pipes to fans is specified during laying.
Gr.6(SB-V1)
Gr.5(SB-V1)
Gr.1(SB-V1)
Gr.7(SB-V1)
Gr.1,8,9(SB-V1) Gr.8(SB-V1)
CP-P4
Gr.7(SB-V1)
Gr.9(SB-V1)
Gr.9(SB-V1)
Gr.2(SB-B1) Gr.2(SB-V1)
Gr.3(SB-V1)
Gr.4(SB-V1)
52-18-ЕТР.B
Name Cat..
of room Area, m²
Number of room
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv regionRev. Q-ty Sheet Doc.No. Signature Date
Developed by
Controlled by
Checked by
Chief DesignerTrokhymenko Tostanovska Trokhymenko
Berdnyk
Ventilation
Size A3x3
Breakdown of rooms
Sleeping room for military personnel, 100 persons.201
Training room202
203 Corridor 72.59
204 Staircase No. 1
205 Weapon store room
211 16.98
20.72
25.81
Special means store room 27.01
WC
Washing room
Shower room
37.15
13.11
12.65
Weapon cleaning room
335.06
86.45
22.68
Utility room
16.81Drying room for uniform and shoes drying
Commander’s room 19.32
23.67Room for officers preparation for training
Executive office 17.61
Room for sergeants preparation for training 25.59
17.27
218 Staircase No. 2 20.72
219 Place for exercises and sports 15.28
220 Place for equipment and maintenance accessories 2.19
221 Place for shoes cleaning 1.46
+3.300 +3.250
+1.650
212213214215
217+1.650
+3.300
7 8 102 9
B
3 7
Zh
D
Ye
I
6 11
А
Zh
K K
B
V
Е
208 209 210
27,800
21,100 27,300
6, 6, 2, 2,800
2,800 2,400
2, ,2
6, 3, 6, 3,5008,4009,30027003,400
Store room for belongings and personal items of soldiers
In v.
N o.
o f o rig .S ig na tu re a nd d at e In st . o f I nv
. N o.
WD05.19
05.19 05.19
05.19
Power equipment network plan at elev. +3.300 with marking of ventilation system
Plan at elev. +3.300 with ventilation systems marking
100 persons
15 persons 643000
L=250 (Lmax=270); N=73 W Fan VENTS VKM 100
Air intake grid
L=2,800 (Lmax=3,050); N=460 W Fan VENTS VKM 400
3 54 5,2004,1002,500
9,400
60,500
3, 5, ,4
L=425 (Lmax=555); N=98 W Fan VENTS VKM 150
L=375 (Lmax=555); N=98 W Fan VENTS VKM 150
N =9
W
Fa n
V E
N
TS
V K
M p p
N=98 W Fan VENTS VKM 150
L=1,280 (Lmax=1,400); N=190 W Fan VENTS VKM 300ES
500х350(h)Air intake grid
P12-1
1 1 1 11
N=98 W Fan VENTS VKM 150
N=460 W Fan VENTS VKM 400
N=154 W Fan VENTS VKM 200
L=250 (Lmax=270); N=73 W n=2,830 rpm, h=250 Ра
Fan VENTS VKM 100
1 1 V7 V8
V11V12
L=1,300 (Lmax=1,400); N=190 W Fan VENTS VKM 300ES
P11 P12
P13
500х350(h)Air intake grid P13-1
P14
V18
V19
0.098 V20
0.073
V22
V23
V24
18+0.46 12+0.19
4+0.073V17
12+0.19
0.46
0.098 V21
0.154
0.098
0.098
0.098
CP-P14
CB-P14
V17V17
V17 V22 V23 V24
CB-P13
CB-P12CB-P11CB-P11CB-P12
CB-P12
CB-P12
V18
CP-P11 CP-P12
V18
V21
V21
V18
CP-P13
Pinst.=48.2 kW at elev. 0.000 Gr.3 (ISB-V)
Gr.1 Gr.1(SB-V3)(SB-V3)
Gr.2(SB-V3)
Gr.2(SB-V3)
Gr.3(SB-V3) Gr.4(SB-V3)
Gr.1(SB-V3) Gr.1.2.5(SB-V3)
Gr.5(SB-V3)
Gr.1,3,4..6(SB-V3) Gr.2(SB-V3)
Gr.5(SB-V3)
Gr.4(SB-V3)Gr.3(SB-V3)
Gr.6(SB-V3)
Gr.6(SB-V3)
52-18-ЕТР.B
Name Cat..
of room Area, m²
Number of room in metal hose behind false ceiling.
1. Sheet to be read together with sheet ETP.B-1.
4. Wiring to fans is arranged with cable VVGng, laid concealed in in plaster layer in walls and
3. Switchboard to be installed at height 1.6 m (bottom) above the floor.
2. Switches for exhaust fans activation to install at height
5. In order to ground fans cases separate cable core is laid from the board.
0.8 m above the floor.
6. Installation of ventilation systems equipment to fulfill according to data sheet and manufacturer guidance.
7. Electrical works to execute according to the requirements of SNiP 3.05.06-85
“Electric devices”.
8. Design provides for ventilation systems switching off in case of fire.
9. Ventilation equipment control is provided at place by means of control buttons, switches and from control panels supplied as set with the equipment.
Electrical equipment is supplied as set.
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv regionRev. Q-ty Sheet Doc.No. Signature Date
Developed by
Controlled by
Checked by
Chief DesignerTrokhymenko Tostanovska Trokhymenko
Berdnyk
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
In v.
N o.
o f or ig .D at e an d si gn at ur eIn st of
I nv
No
Rev. Q-ty SheetDoc.No.Signature Date
Checked by Controlled by Chief Designer Trokhymenko WD
Developed by
Berdnyk Trokhymenko
206.19
Tostanovska
Gr.2
VVG-4х95 from ISD
Gr.1
ВА-88-33
Gr.6
Gr.3
ВА-47-29/3
ВА-47-100
Gr.4
VVGng 5х16-52m
VVGng 5х10-45m
VVGng 5х16-15m
ВА-47-29/3
ВА-47-29/3
Gr.5 ВА-47-29/1
SB-V1
RР-24
SB-V2
RР-12
SB-V3
RР-12
PML710004 UKhL4
To d ev ice o f f ire ala rm F
AD
--3
8 m
VV
Gn g 2 х1 .5;
PVC.32-3m
PVC.32-3m
CB-P1
CP-P1
set М
CB-P1
12+0.19 20+0.36
VVGng 5х6 -5m VVGng 4х4-26m
VVGng4х1.5-2m.26m
VVGng 3х1.5 -5m V1
0.86 0.19
(ВА-88-35)
PVC.25
PVC.25
Power wiring diagram of ventilation. SB-V.
Input unit P-1
Exhaust fan V1 at elev.-2.67 at elev.-2.67
52-18-ЕТР.B
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Ventilation Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
AutoCAD SHX Text 1 2 3 4 5 6
AutoCAD SHX Text 7 8
Gr.2
VVG-4х95 from ISD
Gr.1
ВА-88-33
Gr.6
Gr.3
ВА-47-29/3
ВА-47-100
Gr.4
VVGng 5х16-52m
VVGng 5х10-45m
VVGng 5х16-15m
ВА-47-29/3
ВА-47-29/3
Gr.5 ВА-47-29/1
SB-V1
RР-24
SB-V2
RР-12
SB-V3
RР-12
PML710004 UKhL4
To d ev ice o f f ire ala rm F
AD
g 2
PVC.32-3m
Size A4
Barrack building with administration offices 204.19
CB-P1
CP-P1
set М
CB-P1
12+0.19 20+0.36
VVGng 5х6 -5m VVGng 4х4-26m
VVGng4х1.5-2m.26m
VVGng 3х1.5 -5m V1
0.86 0.19
(ВА-88-35)
PVC.25
PVC.25
52-18-ЕТР.B
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Input unit P-1 at elev.-2.67 Exhaust fan V1 at elev.-2.67
WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko Tostanovska
In v.
N o.
o f or ig .D at e an d si gn at ur e In st of
I nv
No
Rev. Q-ty SheetDoc.No.Signature Date
Gr.2
VVG-4х95 from ISD
Gr.1
ВА-88-33
Gr.6
Gr.3
ВА-47-29/3
ВА-47-100
Gr.4
VVGng 5х16-52m
VVGng 5х10-45m
VVGng 5х16-15m
ВА-47-29/3
ВА-47-29/3
Gr.5 ВА-47-29/1
SB-V1
RР-24
SB-V2
RР-12
SB-V3
RР-12
PML710004 UKhL4
To d ev ice o f f ire ala rm F
AD
g 2
PVC.32-3m
Size A4
204.19
CB-P1
CP-P1
set М
CB-P1
12+0.19 20+0.36
VVGng 5х6 -5m VVGng 4х4-26m
VVGng4х1.5-2m.26m
VVGng 3х1.5 -5m V1
0.86 0.19
(ВА-88-35)
PVC.25
PVC.25
52-18-ЕТР.B
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Input unit P-1 at elev.-2.67 Exhaust fan V1 at elev.-2.67
WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
Barrack building with administration offices
In v.
N o.
o f or ig
D at e an d si gn at ur e In st of
I nv
No
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko Tostanovska
Rev. Q-ty SheetDoc.No.Signature Date
Approved grounding system - TN-S.
Sheet to be read together with sheet ETP.B-1,3,4.
N.PE
Input unit P-3
CP-P3
set М
CB-P3
VVGng 5х6 -6m Gr.5
Gr.6
Gr.7
Мр.25 18+0.35
Input unit P-2
ВА-47-29/3
ВА-47-29/3
ВА-47-29/1
30+0.678
CP-P2
set М
CB-P2
12+0.19 20+0.36
Gr.8
ВА-47-29/3
VVGng 5х6 -10m Мр.25
VVGng 4х6-11m
VVGng4х1.5-11.2m
VVGng 4х4-6m
VVGng4х1.5-6.2m
Input unit P-4
Input unit P-5
18+0.35 30+0.678
18+0.35 30+0.678
CP-P4
set М
VVGng 4х6-5m
VVGng4х1.5-10.2m
CP-P5
set М
VVGng 4х6-5m
VVGng4х1.5-4.2m
CB-P4
CB-P5
VVGng 5х6 -10m
VVGng 5х6 -22m
Gr.9
ВА-47-29/3
Input unit P-618+0.35
30+0.678
CP-P6
set М
VVGng 4х6-5m
VVGng4х1.5-6.2m
CB-P6
VVGng 5х6 -26m
V V G ng х5
0-
Gr.1
SB-v1
Pinst.=88.4 kW Pcacl.=61.6 kW Icalc.=102.75 A
RР-24
Power wiring diagram of ventilation ~380/220 V. SB-V1.
Gr.2
N.PE
VVGng 3х1.5 -9m
Exhaust fanVVGng 3х1.5 -5m
V-3
VVGng 3х1.5 -17m
V-2
Input unit P-7
Exhaust fan
Exhaust fan V-4
0.44 0.098
М V2
V3
V4
М
М
К О Р -7
VVGng 4х1.5 -18m Gr.3
Мр.25
Мр.25
Мр.25
Gr.4 Мр.25
0.44 0,098
1.6 0.35
Input unit P-8
ВА-47-29/1
ВА-47-29/1
ВА-88-33
Icalc.=125 A fr om
I S B -V
ВА-47-29/1
ВА-47-29/1
63 VVGng 4х1.5 -15m
Мр.25
Size A3
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko
306.19
0.7 0.154М
V5
М
М
0,44 0.665
3.0 0.665
VVGng 3х1.5 -12m
VVGng 3х1.5 -5m
К О Р -7
Мр.25
Мр.25
VVGng 3х1.5 -6m Exhaust fan V-5
Exhaust fan V-16
Exhaust fan V-15
М
М
0,44 0,098
1.6 0.35
VVGng 3х1.5 -7m
VVGng 3х1.5 -5m
К О Р -7
Мр.25
Мр.25 Exhaust fan V-14
Exhaust fan V-13
V16
V15
V14
V13
Ventilation
0.7 0.154М
P7
0.7 0.154М
P8 continued
Tostanovska
Мр.25
Exhaust fan V-12
М 0.44 0.098
V12 VVGng 3х1.5 -5m
Мр.25
52-18-ЕТР.B
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv regionRev. Q-ty SheetDoc.No.Signature Date
AutoCAD SHX Text 1 2 3 4 5 6
AutoCAD SHX Text 7 8
AutoCAD SHX Text 1 2 3 4 5 6
7 8
V
G ng х1
0-
Gr.1
SB-V2
Pinst.=31.84 kW Pcacl.=23.8 kW Icalc=40.0 A
RР-12
Power wiring diagram of ventilation ~380/220 V. SB-V2.
Система заземлення прийнята TN-S.
Аркуш читати pазом з аркушем ЕТР.В-1,3,4.
Gr.2
N.PE
VVGng 3х1.5 -15m
Exhaust fanVVGng 3х1.5 -16m
V-7
VVGng 3х1.5 -2m
V-6
Input unit P-10
Exhaust fan
Exhaust fan V-8
3.0 0.665
V6(2)
V7
V8
CO
R -7
CP-P10set
5CB-P10
VVGng 5х6 -15m Gr.3
Мр.25
Мр.25
Мр.25
Gr.4
Gr.5
Мр.25
0,86 0,19
0.86 0.19
18+0.35 reserve
Input unit P-9
ВА-47-29/1
ВА-47-29/1
ВА-47-29/3
Icalc.=50 A fr om
I S B -V
ВА-47-29/3
ВА-47-29/3
ВА-47-29/1
30+0.678
CP-P9
set
CB-P9
12+0.19 20+0.36
Gr.6
ВА-47-29/3
VVGng 5х6 -20m Мр.25
VVGng 4х6-5m
VVGng4х1.5-27m,5m VVGng 4х4-5m
VVGng4х1.5-2m,5m
Size A4
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko
406.19
0,33 0.073
V9
V10
V11 0,44 0,098
0.45 0.098
VVGng 3х1.5 -3m
VVGng 3х1.5 -4m
CO
R -7
Мр.25
Мр.25
VVGng 3х1.5 -17m Exhaust fan V-9
Exhaust fan V-10
Exhaust fan V-11 reserve
1CB-P10
Tostanovska
52-18-ЕТР.B
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Ventilation WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv regionRev. Q-ty SheetDoc.No.Signature Date
AutoCAD SHX Text 1 2 3 4 5 6
AutoCAD SHX Text 7 8
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
G ng х1
6-
Gr.1
SB-V3
Pinst.=48.2 kW Pcacl.=33.7 kW
RР-24
Power wiring diagram of ventilation ~380/220 V. SB-V3.
Approved grounding system - TN-S.Sheet to be read together with sheet ETP.B-1,3,4.
Gr.2
N.PE
VVGng 3х1.5 -5m
Exhaust fanVVGng 3х1.5 -7m
V-18
VVGng 3х1.5 -16m
V-17
Input unit P-11
Exhaust fan
Exhaust fan V-19
2.0 0.46
V17
V18
V19
CO
R -7
CP-P11
set
CB-P11(2)
VVGng 5х6 -12m Gr.3
Мр.25
Мр.25
Мр.25
Gr.4
Gr.5
Мр.25
0,86 0,19
0.86 0.098
18+0.46
Input unit P-12
ВА-47-29/1
ВА-47-29/1
ВА-47-100
Icalc.=63 A fr om
I S B -V
ВА-47-29/3
ВА-47-29/3
ВА-47-29/3
30+0.88
CP-P12
set
12+0.19 20+0.36
VVGng 5х6 -12m Мр.25
VVGng 4х6-10m
VVGng4х1.5-10.20m VVGng 4х4-10m
VVGng4х1.5-10.20m
Size A4
506.19
0,33 0.073
V20
V21
V22
0,44 0,154
0.45 0.098
VVGng 3х1.5 -13m
VVGng 3х1.5 -15m CO R -7
Мр.25
Мр.25
VVGng 3х1.5 -18m Exhaust fan V-20
Exhaust fan V-21
Exhaust fan V-22
Exhaust fan V-23
Exhaust fan V-24
V23
V24 0,45 0.98
0.45 0.098
VVGng 3х1.5 -18m Мр.25
VVGng 3х1.5 -20m
Icalc.=56.2 kW
Мр.25
Мр.25
Input unit P-13
CB-P12(4)
CP-P13
set
CB-P13
12+0.19 20+0.36
VVGng 5х6 -7m Мр.25
VVGng 4х4-10m
VVGng4х1.5-10.2m
Input unit P-14
4+0.073 6.7+0.33
Gr.6
ВА-47-29/3
63 CP-P14
set VVGng 5х6 -20m
Мр.25
VVGng 4х4-6m
VVGng4х1.5-6.2m
CB-P14
52-18-ЕТР.B
Distribution board
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, Starter device, signs, type, Inom.(A) Iisnt, In.e.(A)
Power consumer
Name
D ev ic e of o ut co m in g lin es
N g ro up si gn ty pe In om
Iin st .(A
S ig ns nu m be r P no m (k W
In om
(A length, m.
Cable, wire grade, number core section.
Way of laying, length, m.
Pipe, sign, length, m.
Ventilation WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko Tostanovska
In v.
N o.
o f or ig
D at e an d si gn at ur eIn st of
I nv
No
Rev. Q-ty SheetDoc.No.Signature Date
AutoCAD SHX Text 1 2 3 4 5 6
AutoCAD SHX Text 7 8
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
AutoCAD SHX Text М
EXTERNAL CONNECTIONS DIAGRAM
To d ev ice o f f ire al ar m
F
AD
живленням вентагpегатiв
ISB-V
To distribution cabinet fro m
IS
B-
V bo ar d
To c on su m er s
From device scheme of fire alarm
ELECTRIC SCHEMATIC DIAGRAM OF VENTILATION SWITCHING OFF IN CASE OF FIRE.
Кеpування
Size A3
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko
906.19
Schematic diagram of shutoff ventilation in case of fire.Tostanovska
52-18-ЕТР.B
Ventilation WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv regionRev. Q-ty SheetDoc.No.Signature Date
In v.
N o.
o f or ig .D at e an d si gn at ur e In st of
I nv
No
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text А
AutoCAD SHX Text
PM1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
1PM
AutoCAD SHX Text
AutoCAD SHX Text
HLR1
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SB1
AutoCAD SHX Text
AutoCAD SHX Text
HLR2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SB2
AutoCAD SHX Text
PM1
AutoCAD SHX Text
SB2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text A1
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text A1
AutoCAD SHX Text
SB1
AutoCAD SHX Text С1
AutoCAD SHX Text
PM1
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text С1
AutoCAD SHX Text V1
AutoCAD SHX Text
PM1
AutoCAD SHX Text V1
AutoCAD SHX Text А1
AutoCAD SHX Text
PM1
А1
LIST OF REFERENCE AND ATTACHED DOCUMENTS
Design is developed according to norms, rules, instructions and state standards and provides for safe buildings operation by keeping to provided by the design actions.
In st.
o f I nv . N o.
Inv
. N o.
of or ig.
Da te a nd s ig na tu re
5.407-11
PUE
5.407-91
4.407-177
Designation
Attached documents
Equipment specification
Reference documents.
Installation of boards and control panels
Installation of single magnetic starters
Electrical installation code installations on 2 pages
* for reference
Name Note designed grounding device resistance of which should not be over 4 Ohm.
Design provides for grounding of designed cabinets connected to
For connection of ventilation equipment to use electric equipment, control panels and control blocks supplied as set with equipment.
switchboard ISB-V and ISD of building and is performed by cable VVG 4x95 sq.mm.
- test reports of power cables after erection works completion;
- certificate for grounding arrangement and its resistance.
way are to be certified by concealed works certificates:
Arrangement of grounding and zeroing of power supply networks laid by concealed
Electrical works to execute according to the requirements of SNiP 3.05.06-85 current loads, admissible voltage loss, protective devices shutoff Cable grade and its cross section (see sheet ETP.B-2...5, are chosen with account of ceiling and on walls in reinforced plastic pipes.
Power networks are of cables laid concealed in structure with automatic switch on input and automatic switches Distribution cabinet, composed type, is used for power distribution
Object relates to II category by power supply reliability.
Power supply of building ventilation systems is provided from
“Electric devices”.
on branch lines. Energy distribution is performed at ISB-V board to
GENERAL INSTRUCTIONS
against single-phase fault and conditions of electric motors start.
switchboards SB-V1...SB-V3- exhaust fans and supply systems.
installed next to control panels and in utility rooms of the building.
Design provides for ventilation systems P1...13 switching on by means of control buttons (CB), GENERAL INSTRUCTIONS.
Power supply voltage~380/220 V.
Installed power - 176.43 kW
Calculated power - 123.5 kW
Calculated current - 205.8 kW
Schematic diagram of ventilation power supply network. ISB-V.
LIST OF WORKING DRAWINGS OF MAIN SET OF EM.B MARK
Sheet Name Notes
General data.
WC fans switching on is done by means of switches installed nearby.
Route length to motors of installed equipment is shown on sheet ETP.B-2...5.
Schematic diagram of ventilation power supply 380/220 V. SB-V1.
Schematic diagram of ventilation power supply 380/220 V. SB-V2.
Schematic diagram of ventilation shutoff in case of fire.
Design provides for ventilation systems shutoff in case of fire.
- ЕТР.В.CO
Size A3
106.19
General data.
Schematic diagram of ventilation power supply 380/220 V. SB-V3.
52-18-ЕТР.B
Power equipment networks plan at elev. +3.300 with ventilation systems marking.
Power equipment networks plan at elevation 0,000 with ventilation systems marking.
Power equipment networks plan at elev. -2.670 with ventilation systems marking.
Grounding and earthing of electrical
Ventilation WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko Tostanovska
Rev. Q-ty SheetDoc.No.Signature Date pcs
Electrical equipment pcs sheet code of product, material
Q ua nt it y
M ea su ri ng u ni t
Notes kg units, Weight
Manufacturing plant Equipment, document, data Type, grade, symbol
NamePosition
GO “Kontaktor”
Kyiv pcs automatic switch on input 1 wall mounted cabinet, composed type /IP30/
/54/ as set:
Distribution cabinet, composed type, customized automatic switch for current Icalc.=125 A (IP20) 1 for current Icalc.=250 A, (IP54) automatic switch for current Icalc.=80 A (IP20) 1pcs automatic switch for current Icalc.=63 A (IP20) 1pcs
ISB-V;
PP11D-3060-54UZ.1
ВА-47-29/3
ВА-47-100
8pcs
1pcs pcs 1
13pcs pcs 1
ВА-5135
pcs pcsGO “Kontaktor”
Kyiv pcs automatic switch on input 1 wall mounted cabinet, composed type /IP30/
/54/ as set:
Distribution cabinet, composed type, customized automatic switch for current Icalc.=10 A (IP20) 4 for current Icalc.=125 A, (IP54) automatic switch for current Icalc.=25 A (IP20) 1pcs automatic switch for current Icalc.=32 A (IP20) 4pcsВА-47-29/3
ВА-47-29/3
ВА-47-29/1
RP-24 pcs 1
Формат А3
Barrack building with administration offices 105.19
Equipment specification
52-18-ЕТР.B. CO
(ВА-88-35)
automatic switch for current Icalc.=25 A (IP20) automatic switch for current Icalc.=16 A (IP20)
ВА-88-33
ВА-47-29/1
ВА-47-29/3
SB-V1
automatic switch for current Icalc.=16 A (IP20) ВА-47-29/3
ВА-88-33
SB-V2
automatic switch on input wall mounted cabinet, composed type /IP30/ виготовлення /54/ в комплекті:
Distribution cabinet, composed type, customized for current Icalc.=50 A, (IP54)
RP-12
ВА-47-29/3
1pcs
1pcs
WD
Stage Sheet Sheets
“Kredo Bud Proekt” Ltd
Reconstruction of barrack building with administration buildings of combined arms training area of military unit No. 3070 of National Guard of Ukraine in Stare village, Boryspil district, Kyiv region
Checked by Controlled by Chief Designer Trokhymenko
Developed by
Berdnyk Trokhymenko Tostanovska
Rev. Q-ty SheetDoc.No.Signature Date
In st.
o f I nv . N o.
Inv
. N o.
of or ig.
Da te a nd s ig na tu re
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Same, 4x1.5 sq. mm
Cable with copper core in PVC insulation and shell cross section 3x1.5 sq.mm
Same, 4x4.0 sq. mm
Same, 4x6.0 sq. mm m 270
260m
80m m 70
Same, 5x6.0 sq. mm
VVGng
VVGng
VVGng
VVGng
VVGng 110m
Size A3
M_001
SB-V.3;
Sheet
Cable with copper core in PVC insulation and shell
VVGng 70m automatic switch for current Icalc.=10 A (IP20) automatic switch for current Icalc.=25 A (IP20) automatic switch for current Icalc.=32 A (IP20) ВА-47-29/3
ВА-47-29/3
ВА-47-29/1 3pcs
1pcs
1pcs
1pcsautomatic switch for current Icalc.=10 A (IP20) ВА-47-29/3 automatic switch on input wall mounted cabinet, composed type /IP30/
/54/ as set:
Distribution cabinet, composed type, customized for current Icalc.=63 A, (IP54)
RP-24
ВА-47-100
1pcs
1pcs automatic switch for current Icalc.=10 A (IP20) ВА-47-29/1 automatic switch for current Icalc.=25 A (IP20) automatic switch for current Icalc.=32 A (IP20) ВА-47-29/3
ВА-47-29/3
2pcs
2pcs
1pcs
Cables and wires.
Same, 5x16.0 sq. mm
Same, 5x10.0 sq. mm
VVGng
VVGng
Same, 4x95.0 sq. mm VVGng
70m
50m
7m
52-18-ЕТР.B. CO
In st.
o f I nv . N o.
Inv
. N o.
of or ig.
Da te a nd s ig na tu re sheet code of product, material
Q ua nt it y
M ea su ri ng u ni t
Notes kg units, Weight
Manufacturing plant Equipment, document, data Type, grade, symbol
NamePosition cross section 5x50 sq. mm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Magnetic starter without relay PML7100UKhL
Two-pins control button IP54. PKE-222-2
Single button switch for concealed wiring ~220, 6 A (IP20) РОLO
Size A3
M_001 m m
13m
Metal hose dn=25 mm Rz-c-h
PVC pipe Dn=32 mm TU6-19-213-87
Metalware, fasteners.
SK-4
Sheet
Electric bulk materials.
pcs 1 pcs 30 pcs 30
Distribution box
2.5kg
Junction box pcs 25
52-18-ЕТР.B. CO
In st.
o f I nv . N o.
Inv
. N o.
of or ig.
Da te a nd s ig na tu re sheet code of product, material
Q ua nt it y
M ea su ri ng u ni t
Notes kg units, Weight
Manufacturing plant Equipment, document, data Type, grade, symbol
NamePosition
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
52-18-ETR.B Electrotechnical – Power Equipment Network Plan at Elev. -2.670 -2.670 with Marking of Ventilation Systems 52-18-ETR.B Electrotechnical – Power Equipment Network Plan at Elev. +0.000 with Marking of Ventilation System 52-18-ETR.B Electrotechnical – Power Equipment Network Plan at Elev. +3.300 with Marking of Ventilation System 52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation. SB-V. Sheet 1 52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation. SB-V. Sheet 2 52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation. SB-V. Sheet 3 52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation ~380/220 V. SB-V1.
52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation ~380/220 V. SB-V2.
52-18-ETR.B Electrotechnical – Power Wiring Diagram of Ventilation ~380/220 V. SB-V3.
| 52-18-ETR.B Electrotechnical – Schematic Diagram of Shutoff Ventilation in Case of Fire |
| 52-18-ETR.B Electrotechnical – General Data |
| 52-18-ETR.B.SO Electrotechnical – Equipment Specification 1/3 |
| 52-18-ETR.B.SO Electrotechnical – Equipment Specification 2/3 |
| 52-18-ETR.B.SO Electrotechnical – Equipment Specification 3/3 |
File details come from the government source that posted it. Updated .