SATCOM_13-R-0009_Amend_0014_Atch2_Revised_100__Technical_Specification_-_3_Page_Changes.pdf
PDF 553 KB Posted
- Attached to
- SATCOM-WSOC Landstuhl USAG
- Solicitation number
- W912GB-13-R-0009
About this file
Attachment 2 - Amendment 00014 (Page Changes 100 Technical Specification)
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% Technical Specification Solicitation Table of Contents
Project: 57594 Wideband Satcom Facility
Title Description Page
3.52. CG 444 Low voltage wiring systems
3.53. CG 445 Lighting systems
3.54. CG 446 Lightning protection and grounding systems
3.57. CG 454 PA system
3.60. CG 456 Fire alarm system
3.61. CG 456 Access control
3.67. CG 451 Telecommunication systems
3.70. CG 481 Automation systems
3.71. CG 482 Control cabinets
3.72. CG 483 Management and control systems
3.74. CG 485 Transmission networks
4. Exterior facilities / Site work
4.80. CG 511 Earth work
4.81. CG 511 Landscaping work
4.82. CG 521 Traffic way construction work - Paved surfaces
4.83. CG 521 Traffic way construction work - Superstructure made
4.84. CG 522 Traffic way construction work - Superstructure made
4.85. CG 541 Sewer work
4.86. CG 542 Hydrant line and water supply, exterior facilities
4.87. CG 543 Liquid gas system
4.88. CG 546 Medium voltage cable 20 kV, exterior facilities
4.89. CG 546 Road lighting
4.90. CG 546 Building and antenna grounding
4.91. CG 591 Temporary power
4.92. CG 547 Concrete work, exterior facilities
4.95. CG 591 Traffic way construction work - Crushed stone surfa
4.96. CG 591 Worksite mobilization
4.97. CG 594 Demolition and dismantling work
5. Site preparation
5.1. Worksite mobilization
5.2. Clearing
5.3. Safety perimeter fence
5.4. Earth work
5.5. Temporary fence
5.6. Traffic way construction work - crushed stone areas
5.7. Demolition and dismantling work
5.8. Relocation of the medium voltage cable of the Hauptstuhl
5.9. Power supply
5.10. Grounding
5.11. Fence lighting
5.12. Camera surveillance
5.13. Dismantling of fence grounding
5.14. Cable installation work, electrical
6. Demolishing work
6.1. Bulilding 3373 .(Deleted)
6.2. Bunkers ROB
US Army Corps of Engineers Europe District
APO AE 09049
New Construction Wideband Satcom Facility (WSOC)
20.02.2013 3
W912GB-13-R-0009 Amendment 0014 Attachment 2
E7CT9G2A
Highlight
Project: 57594 Wideband Satcom Facility
Ref.No. Specification
6. Demolishing work
6.1. Bulilding 3373 (6.1 & 6.1.10 - Deleted)
6.1.10. Demolishing of building No 3373
Complete demolition of existing SATCOM building 3373, ASCT and Eagle Sentry antenna foundations.
The dismantling will be started after a successful commissioning of the new WSOC building and complete operation of this.
US Army Corps of Engineers Europe District
APO AE 09049
New Construction Wideband Satcom Facility (WSOC)
20.02.2013 1838
W912GB-13-R-0009 Amendment 0014 Attachment 2
E7CT9G2A
Highlight
E7CT9G2A
Highlight
Project: 57594 Wideband Satcom Facility
Ref.No. Specification
6.2. Bunkers ROB
6.2.10. Demolishing of bunkers ROB
Demolishing of bunkers at ROB.
complete demolishing of buildings No.
0792A, 0792B, 0792C, 0792D, 0793A, 0793B, 0793C, 0793D, 0794A, 0794B, 0794C, 0794D, 0799A, 0824D, 0825A, 0825B, 0825C, 0825D, 0826A, 0826B, 0826C, 0826D.
US Army Corps of Engineers Europe District
APO AE 09049
New Construction Wideband Satcom Facility (WSOC)
20.02.2013 1839
W912GB-13-R-0009 Amendment 0014 Attachment 2
E7CT9G2A
Typewritten Text
XXXX
E7CT9G2A
Typewritten Text (Bunker 0799A is deleted)