Amend_0005_Atch2_100Percent_Specification_Revision_20Feb13.pdf

PDF 18 MB Posted

Attached to
SATCOM-WSOC Landstuhl USAG
Solicitation number
W912GB-13-R-0009
Issued by

About this file

Amend 0005 Attachment 2 - Revised 100 Design Specification

View the file

Other files

File Type Posted
SATCOM_13-R-0009_SF30_Amendment_0016_11Oct13.pdf PDF
Amendment_0015_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch3_Revised_Demolition_Drawing_ROB_Bunkers_SATCOM-WSOC_Only_26Sep13.pdf PDF
W912GB-13-R-0009_Amendment_0014_SF_30_27Sep13.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch2_Revised_100__Technical_Specification_-_3_Page_Changes.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch4_Reivised_Proposal_Pricing_Worksheet_26Sep13.xlsx XLSX spreadsheet
SATCOM_13-R-0009_Amend_0014_Atch1_Revised_Price_Schedule_26Sep2013.pdf PDF
SATCOM_13-R-0009_Amendment_0013_SF30_21Sep13.pdf PDF
SATCOM_13-R-0009_Amend_0013_Atch2_Proposal_Pricing_Worksheet.xlsx XLSX spreadsheet
SATCOM_13-R-0009_Amend_0013_Atch1_Revised_Price_Schedule_6Sep2013.pdf PDF
SATCOM_13-R-0009_Amend_0013_Atch3_Driving_Restriction_Drawing-TES.pdf PDF
Amendment_0012_-_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0010_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0009_Atch1_W912GB-13-R-0009_Bldg3373_As-built_Dwgs.pdf PDF
Amend_0009_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0008_SF30_W912GB-13-R-0009.pdf PDF
Amend_0008_Atch1_W912GB-13-R-0009_As-built_Drawings_B3373.zip ZIP file
Amend_0006_Atch1_20kVA_Crossover_Drawings.pdf PDF
Amend_0006_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_1thru55.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_56thru110.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part1_61thru137.pdf PDF
Amend_0005_Atch5_100Percent_Drawings_31Jan13_Part5_Site_Prep_1thru40.pdf PDF
Amend_0005_SF30_W912GB-13-R-0009_20Feb13.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_1thru80.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_161thru240.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part1_1thru60.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_167thru222.pdf PDF
Amend_0005_Atch5_100Percent_Drawings_31Jan13_Part5_Site_Prep_41thru85.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part2.pdf PDF
Amend_0005_Atch6_Door_Schedule.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_81thru160.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_223thru274.pdf PDF
Amend_0005_Atch1_Revised_Price_Schedule_22_Feb13.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_111thru166.pdf PDF
Amend_0005_Atch3_100Percent_Specification_Revision_20Feb13_GAEB_Interface.D81 —
Amend_0004_W912GB-13-R-0009_SATCOM-WSOC_13Feb13.pdf PDF
Amend_0003_Atch4_SATCOM_100percent_Drawings_Part2_301to348.pdf PDF
Amend_0003_Atch3_SATCOM_100percent_Drawings_Part1_211to260.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_140to184.zip ZIP file
Amend_0003_Atch3_SATCOM_100percent_Drawings_Part1_261to300.pdf PDF
Amend_0003_Atch7_Cable_Distro_Sys_Standards_1Mar2008_V7.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_185to223.zip ZIP file
Amend_0003_Atch4_SATCOM_100percent_Drawings_Part2_271to300.pdf PDF
Amend_0003_SF30_SATCOM_24Jan13.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_76to139.zip ZIP file
Amend_0003_Atch2_SATCOM_100percent_Specification_24Jan13.pdf PDF
Amend_0003_Atch6_Geo_Tech_Report_16Jan13.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_1to31.zip ZIP file
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_224to267.zip ZIP file
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers Europe District

APO AE 09049

100% Technical Specification Solicitation

New Construction Wideband SATCOM Facility (WSOC)

PN 57594

20 February 2013

W912GB-13-R-0009 Amendment 0005 Attachment 2

100% Technical Specification Solicitation Table of Contents

Project: 57594 Wideband Satcom Facility

Title Description Page

General project description General prefaces

2. WSOC

2.1. CG 300 Earth work

2.2. CG 300 Dewatering work

2.3. CG 300 Sewer work

2.4. CG 300 Drainage and and infiltration systems

2.5. CG 300 Masonry work

2.6. CG 300 Concrete work

2.7. CG 300 Steel construction work

2.8. CG 300 Sealing work

2.9. CG 300 Roofing and roof sealing work

2.10. CG 300 Tinsmith work

2.11. CG 300 Dry construction work

2.12. CG 300 Plaster and stucco work

2.13. KG 300 Curtain walls, ventilated

2.14. CG 300 Tile and slab work

2.15. CG 300 Screed work

2.16. CG 300 Window and door work

2.17. CG 300 Joinery work

2.18. CG 300 Hardware work

2.19. CG 300 Shutter work

2.20. CG 300 Metal construction work

2.21. CG 300 Painting and enameling work - coatings

2.22. KG 300 Corrosion protection work on steel structures

2.23. CG 300 Floor covering work

2.24. CG 300 Wall papering work

2.25. CG 300 Mobile shelving system

2.26. CG 300 Scaffold work

2.27. CG 300 Building cleaning work

2.28. CG 300 Blower-door-test

2.35. CG 410 Sewage, water, gas systems

2.36. CG 422 Heat distribution networks

2.37. CG 423 Heating surfaces

2.38. CG 429 Heat supply systems; miscellaneous

2.39. CG 431 Ventilation systems

2.40. CG 433 Air conditioning systems

2.41. CG 434 Refrigerating systems

2.42. CG 439 Air handling systems, miscellaneous

2.43. CG 475 Fire extinguishing systems

2.44. CG 475 Gas extinguishing system

2.51. CG 443 Low voltage switchgear

2.52. CG 444 Low voltage wiring systems

2.53. CG 445 Lighting systems

2.54. CG 446 Lightning protection and grounding systems

2.55. CG 449 Power systems, miscellaneous

2.56. CG 452 Detection and signaling systems

2.57. CG 454 MNS/PA system

2.58. CG 455 TV and antenna systems

2.60. CG 456 Fire alarm system

2.61. CG 456 Access control

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 1

Project: 57594 Wideband Satcom Facility

Title Description Page

2.62. CG 456 Intrusion detection system

2.63. CG 456 Monitoring system

2.64. CG 456 CCTV

2.66. CG 457 Transmission networks

2.67. CG 451 Telecommunication systems

2.70. CG 481 Automation systems

2.71. CG 482 Control cabinets

2.72. CG 483 Management and control systems

2.74. CG 485 Transmission networks

2.80. CG 511 Earth work, exterior facilities

2.82. CG 521 Traffic way construction work - Paved surfaces

2.83. CG 521 Traffic way construction work - Superstructure made

2.85. CG 541 Sewer work, exterior facilities

2.86. CG 542 Sprinkler line and water supply, exterior facilities

2.87. CG 546 Power systems, exterior facilities

2.88. CG 547 Concrete work, exterior facilities

2.89. CG 547 Communication Outdoor

2.90. CG 591 Traffic way construction work - Crushed stone surfa

3. Technical building

3.1. CG 300 Earth work

3.2. CG 300 Dewatering work

3.3. CG 300 Sewer work

3.4. CG 300 Drainage and and infiltration systems

3.5. CG 300 Masonry work

3.6. CG 300 Concrete work

3.7. CG 300 Steel construction work

3.8. CG 300 Sealing work

3.9. CG 300 Roofing and roof sealing work

3.10. CG 300 Tinsmith work

3.11. CG 300 Dry construction work

3.12. CG 300 Plaster and stucco work

3.13. KG 300 Curtain walls, rear-ventilated

3.14. CG 300 Tile and slab work

3.15. CG 300 Screed work

3.16. CG 300 Window and door work

3.18. CG 300 Hardware work

3.20. CG 300 Metal construction work

3.21. CG 300 Painting and enameling work - coatings

3.22. KG 300 Corrosion protection work on steel structures

3.23. CG 300 Floor covering work

3.26. CG 300 Scaffold work

3.27. CG 300 Building cleaning work

3.35. CG 410 Sewage, water, gas systems

3.39. CG 431 Ventilation systems

3.41. CG 434 Refrigerating systems

3.42. CG 439 Air handling systems, miscellaneous

3.43. CG 475 Fire extinguishing systems

3.48. CG 441 High and medium voltage systems

3.49. CG 442 Induced power supply systems

3.50. CG 442 Induced power supply

3.51. CG 443 Low voltage switchgear

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 2

Project: 57594 Wideband Satcom Facility

Title Description Page

3.52. CG 444 Low voltage wiring systems

3.53. CG 445 Lighting systems

3.54. CG 446 Lightning protection and grounding systems

3.57. CG 454 PA system

3.60. CG 456 Fire alarm system

3.61. CG 456 Access control

3.67. CG 451 Telecommunication systems

3.70. CG 481 Automation systems

3.71. CG 482 Control cabinets

3.72. CG 483 Management and control systems

3.74. CG 485 Transmission networks

4. Exterior facilities / Site work

4.80. CG 511 Earth work

4.81. CG 511 Landscaping work

4.82. CG 521 Traffic way construction work - Paved surfaces

4.83. CG 521 Traffic way construction work - Superstructure made

4.84. CG 522 Traffic way construction work - Superstructure made

4.85. CG 541 Sewer work

4.86. CG 542 Hydrant line and water supply, exterior facilities

4.87. CG 543 Liquid gas system

4.88. CG 546 Medium voltage cable 20 kV, exterior facilities

4.89. CG 546 Road lighting

4.90. CG 546 Building and antenna grounding

4.91. CG 591 Temporary power

4.92. CG 547 Concrete work, exterior facilities

4.95. CG 591 Traffic way construction work - Crushed stone surfa

4.96. CG 591 Worksite mobilization

4.97. CG 594 Demolition and dismantling work

5. Site preparation

5.1. Worksite mobilization

5.2. Clearing

5.3. Safety perimeter fence

5.4. Earth work

5.5. Temporary fence

5.6. Traffic way construction work - crushed stone areas

5.7. Demolition and dismantling work

5.8. Relocation of the medium voltage cable of the Hauptstuhl

5.9. Power supply

5.10. Grounding

5.11. Fence lighting

5.12. Camera surveillance

5.13. Dismantling of fence grounding

5.14. Cable installation work, electrical

6. Demolishing work

6.1. Bulilding 3373

6.2. Bunkers ROB

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 3

Project: 57594 Wideband Satcom Facility

General project description This is a lump sum contract.

The requirements of the USACE Specification included as attachments to the solicitation are applicable to this project. In the case of any conflict in the requirements of this specification or any standards referenced herein, resolution will be based on the order of precedence established in the USACE Specification Section 00 73 15 General Conditions, paragraph 1.1 Referenced Standards and the applicable contract clauses included in the solicitation.

General DIN references:

General project description

SATCOM (WSOC) facility Projectnumber: PN 57594

There will be two facilities constructed on the site, SATCOM (WSOC) and NETCOM. This project only includes the SATCOM (WSOC) facility as well as the technical building complex which will serve the SATCOM (WSOC) and NETCOM facilities.

Structure BT1 SATCOM (WSOC) includes operations rooms, equipment rooms, training and conference rooms, private offices, general administrative areas, storage and supply rooms, an equipment maintenance area, and personnel and security support areas as well as exterior antenna pads. Interconnection to NETCOM and to antenna pads; building information systems; Intrusion Detection System (IDS) installation, Energy Monitoring and Control System (EMCS) connection; fire, smoke, enunciation, and suppression systems will be included.

Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be a part of the project.

Structure BT3 to BT5 the technical building complex consists of mechanical building, sprinkler building and power plant.

Supporting facilities included site development, utilities and connections, lighting, access road, parking, walks, curbs and gutters, storm drainage, information systems, relocation of fencing, landscaping and signage.

Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be included. Access for individuals with disabilities will be included. Comprehensive building and furnishings related interior design services will be included.

This Technical Package was prepared in coordination with the adjacent NETCOM building. The contractor shall consider that it is anticipated that the NETCOM building will be constructed simultaneously to this project.

Careful coordination between the SATCOM (WSOC) and NETCOM contracts will be required due to the shared technical building complex.

General:

The selection of the construction is based on the idea to realize a fast construction progress by the use of as many prefabricated construction elements as possible such as prefab supports, prefab wall elements and against the background of a preferably weather-independent construction e.g. by using no exterior plaster

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 4

W912GB-13-R-0009 Amendment 0005 Attachment 2 e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text The DINs referenced in these specifications are incorporated only to the extent that they describe a technical standard to which the contractor has to perform the work described in the specifications. Any language that does not describe a technical standard, such as, for example, payment procedures, how specifications are to be drafted, or references to parts of the VOB, are not included in these specifications. Neither the VOB A nor B are included in this contract either explicitly or by reference with the exception of references to the VOB in contract clauses. All work required to complete this project is included in the contract price. No distinction will be made between associated tasks (Nebenleistungen) and special tasks (Besondere Leistungen). The contractor is solely responsible to determine quantities and work needed based on the specifications.

e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text e7ctbjab Typewritten Text systems. A high quality standard shall also be ensured here by the selection of many prefabricated construction elements.

Reference height The ground zero is at 358.75 m above sea level. Thus, the ground level of the finished floor of WSOC and the technical buildings is at -1.00 m = 357.75 m above sea level.

Location:

The building to be constructed is located in the western part of the installation Heliport Landstuhl. The installation will be expanded in this area and the construction site for buildings and fences will be gained by clearing the forest areas. The new buildings will adjoin to the heliport approach path in the north. The areas for installation of the ASCT antennas are located in the south.

The installation can be accessed via the country road L 471 from Landstuhl (Pfalz).

Force Protection The design was prepared in accordance with the design standards for force protection of buildings as per UFC 4-010-01, dated Feb. 2012 and the USEUCOM AT OPORD 11-05, dated Mai 2011. The design has been approved by US Army Corps of Engineers and meets these requirements.

General prefaces

GENERAL PREFACES

0.1. INFORMATION REGARDING THE WORKSITE

0.1.1 Location of worksite, ambient conditions, access possibilities and condition of access road as well as potential use-related restrictions.

The worksite is located in the north-east area of the US installation Heliport Landstuhl in the military-controlled and fenced-in area, at a distance of approx. 6 km to the city center of Landstuhl.

Access to the installation is only permissible with special US passes. The costs arising for the corresponding passes, certificates of good conduct, etc. have to be paid by the contractor.

Special safety regulations which will be announced by the military authorities apply for the installation. These regulations have to be obeyed stringently by the contractor and his/her employees. The employees may only stay on the construction site and have to use the shortest approved route to get to the site. After the work day has ended, the area has to be left immediately and on the shortest approved way. The contractor must stop immediately to employ personnel who do not observe the safety regulations and have therefore been subject to complaint in the above-mentioned area.

0.1.2 Special contaminations of immission as well as special climatic or operational conditions.

n/a

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 5

0.1.3 Type and location of the structural facility.

The project concerns the construction of operational buildings for satellite communication, as well as the corresponding technical buildings Mechanical, Sprinkler and Power Plant.

A more detailed description of the construction measures is included in the respective title of these specifications.

0.1.4 Traffic situation on site, in particular traffic restrictions.

The installation is accessible via excellent roads. The worksite will be accessed via paved forest roads and/or in the individual case via traffic ways of the installation. The areas assigned for storage purposes of the contractor shall be strictly observed.

All assigned areas and access roads shall be kept clean and cleaned every day if necessary.

Military security regulations apply to the entire area and shall be strictly followed.

0.1.5 Areas to be kept clear for the traffic.

The public roads shall be kept free for the traffic at any time.

0.1.6 Type, location, size and usability of transport facilities and transport ways.

See also item "Delivery/transport from site of materials and components".

0.1.7 Location, type, connection factor and conditions for the provision of connections for water, power and sewage.

Site electricity and water aswell as sewage will be provided free of charge.

The provision of connections to existing utilities will be coordinated througt the COR periode. These connections shall be performed in such a manner that the operation is only minor interrupted or disturbed in the remaining buildings.

Required interruptions of supply and drain lines shall be coordinated with the US authorities prior to the measure and have to be approved.

0.1.8 Location and extent of areas or spaces made available to the contractor for use or joint use for the performance of services.

Storage areas for the contractor are basically only possible within the fenced construction area.

Stored construction materials and devices etc. may not protrude beyond the temporary fence in the area of worksite and storage area.

0.1.9 Soil conditions, subsoil and bearing capacity, results of soil investigations.

The document "Geotechnical report regarding subsoil conditions" is attached to the bidding documents.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 6

0.1.10 Hydrological values of groundwater and water bodies. Type, location, discharge, discharge capacity and flood conditions of receiving bodies. Results of water analyses.

The document "Geotechnical report regarding subsoil conditions" is attached to the bidding documents.

0.1.11 Special environmental provisions.

n/a

0.1.12 Special disposal requirements, e.g. restrictions for the disposal of sewage and waste.

Materials, waste and sewage of any type to be removed shall be disposed of in accordance with the updated edition of the waste law of the district and/or community and the federal Ordinance on Waste Recovery and Disposal Records.

The accumulating construction rubbish shall also be disposed of separately in accordance with the German regulations. The responsible U.S. authority shall be informed about this.

Color and solvent residues accumulating when cleaning paint brushes and/or paint rolls must not be disposed through the wastewater system or waste containers on site.

Demolition material, waste, construction rubbish, packing material and similar waste shall be transported to an approved landfill outside the installation.

No waste may be thrown into road drains, toilets or garbage cans.

The contractor must take care that no contamination of groundwater and/or soil will be caused by improper storage of liquid combustibles, chemical agents and paints.

The disposal shall be accomplished in accordance with the valid legal provisions. The contractor shall prepare a waste recycling plan and provide all disposal certificates from the beginning prior to start of the construction measure.

0.1.13 Sanctuaries or preservation times in the area of the worksite, e. g. as required for waters, soil, nature, landscape preservation or for pollution control; expert reports etc. on hand.

n/a

0.1.14 Type and scope of the protection of trees, existing plants, vegetation areas, traffic areas, structural elements, structures, boundary stones etc. in the area of the worksite.

The areas used as storage areas as well as the areas and roads surrounding the building shall be protected against soiling and put into the original condition after end of work.

0.1.15 Systems existing within the construction site, particularly sewage and supply lines.

The systems particularly intact sewage and supply lines which are known until now in the construction area shall be protected against damage during the performance of earth and cable installation work. Individual lines

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 7 shall be relocated in accordance with the design.

0.1.16 Known or suspected obstacles in the area of the worksite, e.g. lines, cables, drains, sewers, remaining building parts and their owners as far as known.

The lines, cables, drains, sewers and remaining building parts shall be protected against damage during the construction work of the building and appropriate exterior facilities.

0.1.17 Suspected explosive ordnance in the area of the worksite, results of exploration or dedudding measures.

n/a

0.1.18 Measures possibly taken in accordance with the worksite ordinance.

See NAU 01 35 26 10

0.1.19 Type and scope of contamination, e.g. of soil, waters, air, materials and components; expert reports etc.

on hand.

The documents "Geotechnical report regarding subsoil conditions" is attached to the bidding documents.

0.1.20 Site preparatory work

The project includes clearing work, safety fence, earth work, construction fence, traffic way construction work, relocation of medium voltage cables, power supply of containers, grounding work, fence lighting, camera monitoring, dismantling and cabling work.

0.1.21 Work of other contractors within the worksite.

It can be expected that also other contractors will work in the area of the security area SATCOM.

0.2 Information on performance

0.2.1 Planned working phases, working interruptions and work limitations according to type, location and time as well as dependence on the services of others.

The project comprises the following structural facilities:

- operational building WSOC

- technical building Mechanical

- technical building Sprinkler

- technical building Power Plant

- provision of antenna pads

- cable piping and shafts in the existing antenna field

- roads and ways

- supply lines within the security area SATCOM

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 8

Outside the fenced-in construction area it is planned to perform also services within the used SATCOM area (security area). This particularly includes infrastructural services for the connection of supply and drain lines, water, sewage, energy, IT and network connections, telephone, lighting etc.

These services will be performed under escort conditions, i.e. the access to the security area and the work will be accompanied by a military escort. The contractor must coordinate escort with the COR and give a minimum of five working days notice.

The construction sequence is divided into 2 essential construction sections.

The first construction section contains the construction and completion of the following parts:

- technical building Power Plant

- technical building Sprinkler

- technical building Mechanical

- operational building WSOC

- provision of antenna pads WSOC

- roads and ways in the WSOC area

The second construction section contains the construction and completion of the following parts:

- cable piping and shafts in the existing antenna field

- completion of ways and roads

0.2.2 Special difficulties during performance, e. g. work in rooms with ongoing operations, work in the area of traffic routes or in case of unusual external effects.

In the course of the construction of diverse security systems, connection work becomes necessary also in existing and used buildings of the security area SATCOM. This work shall be announced timely to the respective user and will be performed under increased security requirements (military escort, more difficult building access, limited working time etc.).

Further difficulties have to be expected during the work in the antenna field since a considerable number of new cable routes will be led into existing shafts which, however, remain in operation. Furthermore, many crossings of routes are required between existing cable runs and the cable routes to be provided newly. This work has to be performed with the utmost care in order to prevent the existing cable runs from being damaged during excavation work.

0.2.3 Special requirements for work in contaminated areas, possibly special requirements for protection and safety measures.

n/a

0.2.4 Special requirements for worksite mobilization and disposal facilities, e.g. containers for separate collection.

See NAU 00 73 15

0.2.5 Specifics of traffic regulation and protection, possibly also to what extent the Government will accept the performance of required measures.

In general, adjacent roads, driveways and parking lots shall be kept clear.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 9

0.2.6 Special requirements for the installation and dismantling as well as provision of scaffolds.

n/a

0.2.7 Joint use of foreign scaffolds, lifting equipment, elevators, common and storage rooms, facilities etc. by the contractor.

n/a

0.2.8 How long, for what kind of work and possibly for what kind of demands the contractor shall make his scaffolds, lifting equipment, elevators, common and storage rooms, facilities etc. available to other contractors.

n/a

0.2.9 Use or shared use of recycled materials.

A prior approval of the Contracting Officer or designated representative is mandatory for the installation of recycled materials, e. g. installation of demolished material.

0.2.10 Requirements for recycled materials and non-standard materials and components.

n/a

0.2.11 Special requirements for type, quality and environmental compatibility of the materials and components, also e.g. for rapid biodegradability of auxiliary materials.

All wood products used shall be classified in accordance with FSC, PEFC or equal and fulfill individually the criteria of FSC or PEFC valid for the respective country of origin.

0.2.12 Type and scope of the suitability and quality proofs requested by the Contracting Officer or designated representative.

Where important reasons are existing, e.g. user directions / existing and/or especially adjusted systems, certain materials of the manufacturers are partly taken as basis for the performance. If a system is selected for a respective discipline, no materials of other manufacturers may be used so that these construction services are obtained from one manufacturer and installed in accordance with his installation regulations and valid standards.

0.2.13 Under which conditions the material gained at the worksite may be reused or shall be reused or recycled.

n/a

0.2.14 Type, composition and quantity of soils, materials and components to be disposed of from the area of the project construction site; type of recycling or the disposal yard in case of waste; requirements to be met by

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 10 proofs regarding transport, disposal and disposal costs to be paid by the US Government.

n/a

0.2.15 Type, number, quantity or weight of materials and components provided by the US Government as well as type, exact description of location and time of their hand-over.

n/a

0.2.16 Extent to which the Contracting Officer or designated representative accepts unloading, storage and transport of materials and components or provides the contractor with equipment or labor.

n/a

0.2.17 Services of other contractors

n/a

0.2.18 Assistance during adjustment of system parts and during commissioning of systems in cooperation with other parties involved, e.g. with the building automation contractor.

n/a

0.2.19 Use of parts of the service prior to commissioning.

n/a

0.2.20 Transfer of maintenance during the duration of the limitation period for the warranty entitlements for mechanical and electrical as well as electronic systems or parts of it, where the maintenance has an influence on the security and functionality by a special maintenance contract.

The maintenance of the completed work will be the responsibility of the contractor until the project is completed and formally accepted by the US Government.

0.2.21 Billing on basis of certain drawings or tables.

n/a

0.3 Technical contract conditions:

- Reference Documents

The drawings and documents listed in the enclosure will be submitted to the contractor as basis for performance of his services. The contractor shall check the documents handed over to him as well as the conditions on site prior to start of work.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 11

0.4 SECONDARY SERVICES

n/a

0.5 BILLING

n/a

0.6 ADDITIONAL PREFACES

The following items shall be included in the price!

0.6.1 Worksite mobilization

The worksite mobilization will not be separately reimbursed.

The following services shall be included:

Worksite mobilization of services of the contractor.

The storage and working spaces required for the performance of the contractual services are included.

The resulting costs and the preparation of a worksite mobilization plan shall be apportioned accordingly and have to be included in the offer amount.

The original condition of the ground surface which was used for placing the worksite equipment shall be accordingly restored upon completion of the project.

The worksite mobilization also includes paving the unpaved surfaces (lawn, etc.) to be suitable for vehicular construction traffic.

The worksite equipment shall be protected by the contractor.

All waste, stone rests and materials to be dismantled will become the contractor's property and shall be disposed of.

Removing the contractor's worksite equipment from the construction site upon completion of the contractual services shall be included. The original condition of the ground surfaces which were used for placing the worksite equipment shall be restored accordingly.

The contractor shall submit a detailed worksite mobilization plan in 3 copies as well as on CD-ROM in .pdf format prior to start of the construction measure. This plan shall be coordinated with the supervision and the safety manager and followed bindingly.

0.6.2 Construction schedule

See NAU 01 32 01.00 10

0.6.3 Worksite mobilization plan

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 12

See NAU 00 73 15

0.6.4 Sampling

See also special contract conditions "Sampling".

The contractor shall coordinate all colors, finishes, textures, surfaces and signs with the Contracting Officer's Representative (COR) even if details are already given in the specifications.

0.6.5 Regular working hours

See NAU specs.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 13

Ref.No. Specification

2. WSOC

Construction description WSOC Description of the construction services In the case of conflict between the general provision and the detailed provisions in this specification, the more specific provision will be binding

1. General The following description of the structures serves as introduction of the reader in the design of the structure. The complete and detailed information can be found in the static calculations which will be included as a part of the solilicitation The complete and detailed information can be found in the static calculations which will be included as a part of the solicitation.

1.1 Location

The building to be constructed is located in the western part of the installation Heliport Landstuhl.

The three technical buildings, mechanic, sprinkler and power plant, and also an other building (the other building is not part of this contract) will adjoin to the building in the east.

1.2 Building concept

Primarily, the design on hand is based on the basic ideas listed below:

- Separation of the technical area and the major occupancy area for reasons of reduced sound transmission and easier subsequent extension of the mechanical centers or the main building.

- Common technical area for the use of synergy effects by saving building structure and area consumption.

- Combination of useful areas to achieve better utilization of spaces and compact building shape without restrictions in functionality and consequently reduction of the required clearing areas and countervailing duties.

- Creation of an urban and creative unit of the building areas by means of the primary connecting roof edge.

- Circumferential development of the buildings to ease deliveries is ensured. Roads and ways are on all sides of the main building which has a lowered loading ramp on the east side to ease rear unloading.

1.3 Building structure

The WSOC building comprises an independent, compact structure.

BT1 (Building part 1) Operation building with all required occupancy units of the Wideband Satcom Facility, gross floor space approx. 2,318 m²

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 14

Ref.No. Specification

1.4 Building parameters

Dimensions of BT1: approx. 60.7 m x 38.2 m, approx. 2,318 m²

2. Structural concept

2.1 Structural bases:

The single-story building with dimensions of approx. 60.7 m x

38.2 m and a roof height of up to approx. 7.0 m will be provided as follows:

2.2 Building bracing:

The building will be braced by means of reinforced concrete sections in the exterior and interior axes as well as by roofing bonds.

2.3 Roof structure:

Steel supporting structure consisting of two-span trusses with span widths of 25 m and 12.5 m, which are installed at spacings of 6.0 m and supported by reinforced concrete supports. The top chords run bent with a radius of 128 m. The roofing will be performed with trapezoidal sheets with thermal insulation and standing seam plate lining. The roof slope will be ensured by bent top chords of the trusses.

2.4 Design of the roof structure:

Thermal insulation with vapor barrier and standing seam plate, Reinforced concrete supports (30 cm/25 cm) will be installed in the number axes at spaces of approx. 6.0 m for transferring the roof loads. The connections in the foundation and roof level will be provided as articulated connections. Only for the building construction in progress, a structural restraint will be provided in the foundation.

Precast concrete slabs, T = 25 cm, will be installed between the supports and in the area of bracing sections.

The enclosing walls of the Open Storage Requirements area will be performed as reinforced concrete walls as well up to below the roof shell.

2.6 Floor slab:

The floor slab will be provided as 25 cm thick non-load bearing element.

2.6 Foundation:

The foundation will be realized by means of pad foundations. The foundation base is located in the bunter sandstone rock layer.

The bunter sandstone rock layer is located starting from an embedment depth of approx. 1.50 m. Based on the soil investigation report, the frost-free depth lies 1.0 m below ground surface.

2.7 Facades:

The exterior walls made of reinforced concrete will be provided with thermal insulation according to the provisions of EnEV 2009

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 15

Ref.No. Specification

(EnEV verification is on hand). The exterior shell of the facade will be created by a non-load bearing and ventilated aluminum lining.

2.8 Building materials:

Concrete: C25/30 (in-situ concrete), C30/37 (precast elements) Reinforcing steel: BSt 500 S(B)+M(A) Structural steel: S235, S355

2.9 Fire rating of load bearing building components:

The fire rating of load bearing building components is subject to the requirements of the District Building Ordinance of Rhineland- Palatinate and the fire protection expert.

Roof structure F0 Reinforced concrete supports F30 – F90 Reinforced concrete walls F30 - F90

3. Construction description

CG 310 Construction pit CG 311 Provision of construction pit A large part of the WSOC building is located in the backfill site of the terrain. Based on the present soil investigation report, excavation will mostly be performed in soil class 6-7. Small amounts of the excavated material are not suitable for reinstallation and will be disposed of.

Due to the soil classes, special measures for stabilization of the construction pits are not necessary.

CG 313 Dewatering in accordance with the soil investigation report, groundwater is only to be expected starting from a depth of -2.50 m below ground surface. Thus, dewatering is only required to a little extent, preferably at foundation work for the cable vaults, shafts and pits for the underground tank system.

CG 320 Foundation CG 322 Flat foundations Based on the recommendations of the soil investigation report, flat foundations with pad and strip foundations as well as reinforced floor slabs will be performed.

CG 324 Subsoils and floor slabs Partial areas of the WSOC building and the power plant will be performed with a floor slab to be provided deeper for the installation of the raised floors. A raised floor with a support distance of 600 x 600 mm and a height of 1.0 m will be provided in the WSOC building. Dimensioning of the raised floor will be performed based on SRP dated 02/10/2012, item 2.3.4.5 IAW DIN EN 12825 in element class 6 with a concentrated load of

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 16

Ref.No. Specification

8,000 N/A, a breaking load larger than 16,000 N and a safety factor of 2.

The floor slabs in the WSOC building will be made of reinforced concrete. Thereby, the substructure consists of a base course of crushed stones, a layer made of sand with a thickness of approx.

5 cm and an insulation layer with a thickness of 10 cm made of extruded polystyrene based on the determinations of the EvEV verification. The floor slabs in the equipment rooms of the raised floor area will be equipped with floor inlets and pump sumps.

Outside the raised floor areas, cement screeds as floating screed will be planned.

CG 325 Floorings:

Oil-resistant floor coverings on 2-component epoxy resin basis are planned on the concrete floor slab in the raised floor areas.

The upright wall components will also be provided with a wall covering up to the bottom edge of the raised floor.

The other building areas will be provided with a cement screed on separating layer.

Office rooms and the conference room will be equipped with carpet floorings. The corridors, the entrance area and the sanitary rooms will be equipped with a tile covering made of vitrified clay. The recreation room (121), the supply office (110) , the NBC (114) and the armsroom (113) as well as the PLL storage (141) will be equipped with a linoleum flooring. In the vestibule, a doormat will be recessed in the screed as well as at all corridor exits. The fitness room will be equipped with a rubber flooring. The technical rooms without raised floor within the WSOC building will only be equipped with a floor paint.

For reasons of sound insulation, all areas with raised floor slabs will be equipped with a rubber flooring. The cooling of the control systems in the equipment room is ensured by cold air intake via the raised floor. The raised floor will be provided with ventilation panels of the system manufacturer in partial areas according to the requirements of the technical equipment. For compensation of the increased sound pressure level due to the equipment, mineral fiber panels based on the noise control report will be recessed in the raised floor area.

CG 326 Structure sealing:

The exterior components located in the ground will be provided with a seal against temporarily impound seepage water IAW DIN 18195, Part 6, Section 9. Especially the cable vaults located deeper in the technical building and the cable duct connected with the WSOC building will also be provided with water-impermeable concrete with an additional bitumen sheet waterproofing construction to be on the safe side.

As additional protection against penetration of humidity into the structure via the floor slab, a cold-glued bituminous roof sheet

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 17

Ref.No. Specification layer IAW DIN 18195 will be applied onto the perimeter insulation. Joints in the area of penetrations will be sealed.

CG 327 Drainages:

A drainage is not required due to the fact that groundwater is expected starting from a depth of -2.50 m. IAW NFPA 75, an underground line system will be provided below the floor slab of raised floor areas by connecting the floor inlets recessed in the floor slab and directing collecting lines in a pump sump via these.

Drainage of the raised floor in case of average of a sprinkler admission will be performed via this system in connection with the use of waste water pumps of the responsible fire department.

CG 329 Foundation, miscellaneous:

A cable duct, which will connect both building parts with each other, will be provided in a depth of approx. 2.5 m between the WSOC building and the power plant due to the large cable cross-sections and for maintaining a good subsequent assignment.

This cable duct will be performed as crawl space with a clear height of approx. 1.20 m. The fireproof separation will be in the area of the exterior wall WSOC Axis C. This cable duct can be accessed on WSOC side by means of a ladder from the raised floor of the WSOC equipment room.

CG 330 Exterior walls CG 332 Non-load bearing exterior walls:

The WSOC building will be constructed as reinforced concrete skeleton structure.

Therefore, the exterior walls of the WSOC building will be performed as non-load bearing prefab concrete elements, which will be installed between the reinforced concrete supports, to be flush with the inner edge of the support towards the inside of the building.

CG 333 Exterior supports The WSOC will be performed with reinforced concrete supports and molded foundation. Thereby, the supports are in the letter axes in a grid of 6 m and in the number axes in a grid of 5 m.

CG 334 Exterior doors and windows The entrance area in the northwest will be provided as glazed metal frame construction.

The main entrance door will be performed as 2-wing metal frame door with transom window and glass infill. All other entrance doors in the south, west and north will be performed as one-wing metal frame doors with glass infill and transom window as well.

The clear passage width for the entrance doors is 92 cm according to the determinations of the fire protection report.

All other exterior doors are planned as sheet steel doors with overhead door closer and heavy hardware.

An electrically operated rolling gate with a size of 3.01 x 3.01 m

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 18

Ref.No. Specification is planned in addition to the exterior doors in the receiving area.

The window areas are planned as row of windows in the west and north with fixed glazings and insulated panel sections.

Also, all window elements will be provided as metal frame construction with thermal insulating glass. All window elements are planned with fixed glazing and can therefore not be opened.

Spider alarms for the intrusion detection system will be inserted in the glazings.

All glass areas will be provided with a shatter protection in form of a corresponding foil in the thermal insulating glass elements .

The glazing of the dormer will also be performed as row of windows with fixed glazing.

CG 335 Exterior wall treatment, outside A non-load bearing and ventilated construction consisting of aluminum composite panels is chosen for the facade construction due to the exposed location of the building on a hill within a forested area and the resulting severe weather effects. The performance of an insulated plaster facade is not considered anymore for reasons of a quick and almost weather-independent type of installation.

The exterior wall treatment consists of large-format facade elements on a light-metal substructure with rivet fastening adjusted in color. The joint pattern will result from the horizontally arranged aluminum composite panels. The color design will be determined after on-site sampling.

The supporting construction of the curtain wall and the thermal insulation made of mineral fibers will be installed on the exterior walls consisting of prefab reinforced concrete elements according to the provisions of the EnEV 2009 (Energy Conservation Ordinance). The back ventilation is approx. 50 mm.

The exterior wall treatment in the west will be characterized by metal roof elements which consist of a standing seam roofing severely bent downwards.

CG 336 Exterior wall treatment, inside In the WSOC building, the exterior wall treatment inside consists of a dispersion paint coat on glassfiber wallpaper and/or plasterboard siding.

CG 338 Sun protection An outside sun protection consisting of venetian blinds is planned on the window elements oriented to the west and noth. These will be operated by means of an electric drive and controlled roomwise.

CG 339 Exterior walls, miscellaneous Railings:

A lowered ramp for rear unloading at ground level is planned in the area of the receiving area, Axis C / 5-7. The ramp will be

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 19

Ref.No. Specification provided with a hot-dip galvanized steel railing. This will be performed removable on the docking site. The railings with handrails inside and outside the ramp must be in accordance to NFPA 101, chapter 7.2.2.4 Guards and Handrails.

An impact protection consisting of galvanized guardrails is planned along the driving lane.

CG 340 Interior walls CG 341 Load Bearing interior walls In the WSOC building, only the bracing walls will be performed made of reinforced concrete, load-bearing.

Escape tunnel The essential corridor will be performed as so-called escape tunnel to comply with the fire-protection requirements for the structural escape way with fire-retardant surrounding areas (see fire protection concept). The tunnel will be performed as solid construction due to missing building authority approved dry construction systems for free-standing and self-supporting dry constructions. Thereby, the wall surfaces will be provided made of masonry consisting of sand-lime bricks/ elements unless these are not performed using solid partition walls with reinforced concrete prefab parts.

Armsroom:

The performance of the armsroom is based on the American regulation AR 19011 of November 15, 2006; compliance is mandatory.

The walls will be performed with precast concrete elements with a thickness of 25 cm. For security reasons, a reinforcement mat with reinforcing rods of type 4 in a centerline distance of 22 cm in each direction shall be installed to the structurally-related reinforcement on each side of the wall. This reinforcement in both wall sides will be arranged offset so that a grid with an opening size of approx. 30 cm² develops. The reinforcement in the wall will be anchored in the floor and the ceiling IAW the provisions of the American Concrete Institute.

CG 342 Non-load bearing interior walls Non-load bearing interior walls will be partially provided as solid wall structures in reinforced concrete and/or with precast concrete parts. Furthermore, solid wall structures with sand-lime bricks/elements and double-paneled plasterboard metal stud walls in dry construction and surfaces ready for painting are planned.

CG 343 Interior supports Reinforced concrete supports with a molded foundation, in the planned grid at spacings of 6.0 m, will be installed in the WSOC building according to the structural concept.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 20

W912GB-13-R-0009 Amendment 0005 Attachment 2 jjanoschka Hervorheben jjanoschka Hervorheben

Ref.No. Specification

CG 344 Interior doors and interior windows Wooden doors with aluminum frames will be installed in the office areas. The office areas will be equipped with one-wing doors of the size 1.01 x 2.135 m. Wet room doors are planned in the sanitary rooms. The corridors will be divided into smoke compartments by smoke-rated doors consisting of metal frame doors with glass infill and transom window of the size 1.55 x

2.135 m. It is planned to equip these doors with sliding door closers and integrated electromechanical arrester for keeping open the escape ways permanently.

It is planned in the technical areas to perform the interior doors as sheet steel doors with overhead door closer and heavy hardware.

The two-wing door between the PLL Storage and the WSOC equipment room will also be provided with an arrester.

CG 345 Interior wall treatment Since installation will be performed flush-mounted, the precast concrete parts shall be correspondingly equipped with conduits and junction boxes. The contractor is responsible for the design of these conduits in all prefab construction systems such as precast concrete walls and ceilings. Otherwise, the solid wall constructions will be provided with a glassfiber wallpaper and a dispersion paint coat. The same applies to the interior walls of the office areas.

The interior walls of the sanitary rooms will be provided over entire room height with a tiling made of vitrified clay. A wall covering consisting of a 20 mm thick wooden board with fireproof coat will be installed on three sides in the Red-Black Com Room and in the Com Room. Acoustic elements are planned on the walls of Room No. 123 and 138.

The interior walls of the technical buildings will be provided with a dispersion paint coat.

CG 346 Prefabricated interior walls Toilet partitions will be used in the restrooms.

CG 350 Ceilings CG 351 Ceiling constructions No ceilings are planned in the WSOC building. For reasons of fire security, the arms room (113), the corridors (111, 115, 122), the storage (126) and the gas extinguishing system room (137b) will be performed with a reinforced concrete ceiling.

Further ceiling constructions made of reinforced concrete are planned in a partial area of the Open Storage Requirement area, Room No. 151 security lighting and Room No. 152 PA/MNS.

Moreover it is planned to perform the required tunnel construction for ensuring the escape routes and rescue ways as solid construction with prefab walls and precast concrete elements.

US Army Corps of Engineers Europe District

APO AE 09049

New Construction Wideband Satcom Facility (WSOC)

20.02.2013 21

Ref.No. Specification

The ceiling surfaces of the escape tunnel will be constructed of precast concrete elements.

Additionally, a steel platform for maintenance purposes is planned in the area of the OPS room (123).

Armsroom:

The ceiling of the armsroom will be performed in reinforced concrete construction method in a thickness of 20 cm. For security reasons, a grid in longitudinal and transverse direction with reinforcing rods of type 4 shall be installed on the top and the bottom side of the ceiling to the structurally-related reinforcement so that an unreinforced area (opening area) of maximum 620 cm² develops.

The ceiling reinforcement will be connected with the wall reinforcement.

CG 353 Ceiling treatment Reinforced concrete ceilings will be provided on underside with a paint coat of dispersion paint.

The suspended ceilings will be fastened on the steel construction of the mezzanine level at a height of approx. 4.30 m above finished floor.

Mineral fiber ceilings with the grid dimensions 600 x 1,200 mm with exposed supporting profiles are planned in the office and social areas. A grid ceiling with a grid size of 600 x 1,200 mm is planned in the area of the equipment and control rooms for the integration of the suspended supporting system for the cable routes above the control systems. The mineral fiber inlay panels are designed based on the determinations in the noise control report with an additional covering of 50 mm mineral fiber panels.

In order to allow for a view to Room 123, the suspended ceiling structure in the area of the dormer located within Room 123 was recessed and replaced by a inclined and bent plasterboard construction pointing towards the window surfaces.

Furthermore, only vent openings for the drainage lines are planned in the roof area.

Luminous ceiling in corridors The corridors will be equipped with a luminous ceiling construction as substructure consisting of extruded aluminum profiles to be suspended approx. 400 mm from the reinforced concrete ceiling of the corridor. The grid size is approx. 600 x 1,500 mm. Glazing will be performed using satined laminated security glass to be inserted in the substructure.