Amend 0003 Atch 4 - 100 Design Drawings (Part 2 of 2 - Drawings 301 to 348 of 348)

View the file

Other files

File Type Posted
SATCOM_13-R-0009_SF30_Amendment_0016_11Oct13.pdf PDF
Amendment_0015_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch3_Revised_Demolition_Drawing_ROB_Bunkers_SATCOM-WSOC_Only_26Sep13.pdf PDF
W912GB-13-R-0009_Amendment_0014_SF_30_27Sep13.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch2_Revised_100__Technical_Specification_-_3_Page_Changes.pdf PDF
SATCOM_13-R-0009_Amend_0014_Atch4_Reivised_Proposal_Pricing_Worksheet_26Sep13.xlsx XLSX spreadsheet
SATCOM_13-R-0009_Amend_0014_Atch1_Revised_Price_Schedule_26Sep2013.pdf PDF
SATCOM_13-R-0009_Amendment_0013_SF30_21Sep13.pdf PDF
SATCOM_13-R-0009_Amend_0013_Atch2_Proposal_Pricing_Worksheet.xlsx XLSX spreadsheet
SATCOM_13-R-0009_Amend_0013_Atch1_Revised_Price_Schedule_6Sep2013.pdf PDF
SATCOM_13-R-0009_Amend_0013_Atch3_Driving_Restriction_Drawing-TES.pdf PDF
Amendment_0012_-_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0010_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0009_Atch1_W912GB-13-R-0009_Bldg3373_As-built_Dwgs.pdf PDF
Amend_0009_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0008_SF30_W912GB-13-R-0009.pdf PDF
Amend_0008_Atch1_W912GB-13-R-0009_As-built_Drawings_B3373.zip ZIP file
Amend_0006_Atch1_20kVA_Crossover_Drawings.pdf PDF
Amend_0006_SF30_W912GB-13-R-0009_SATCOM-WSOC.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_1thru55.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_56thru110.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part1_61thru137.pdf PDF
Amend_0005_Atch5_100Percent_Drawings_31Jan13_Part5_Site_Prep_1thru40.pdf PDF
Amend_0005_SF30_W912GB-13-R-0009_20Feb13.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_1thru80.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_161thru240.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part1_1thru60.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_167thru222.pdf PDF
Amend_0005_Atch5_100Percent_Drawings_31Jan13_Part5_Site_Prep_41thru85.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part2.pdf PDF
Amend_0005_Atch6_Door_Schedule.pdf PDF
Amend_0005_Atch2_100Percent_Specification_Revision_20Feb13.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part3_81thru160.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_223thru274.pdf PDF
Amend_0005_Atch1_Revised_Price_Schedule_22_Feb13.pdf PDF
Amend_0005_Atch4_100Percent_Drawings_Rev_24Jan13_Part4_111thru166.pdf PDF
Amend_0005_Atch3_100Percent_Specification_Revision_20Feb13_GAEB_Interface.D81 —
Amend_0004_W912GB-13-R-0009_SATCOM-WSOC_13Feb13.pdf PDF
Amend_0003_Atch3_SATCOM_100percent_Drawings_Part1_211to260.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_140to184.zip ZIP file
Amend_0003_Atch3_SATCOM_100percent_Drawings_Part1_261to300.pdf PDF
Amend_0003_Atch7_Cable_Distro_Sys_Standards_1Mar2008_V7.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_185to223.zip ZIP file
Amend_0003_Atch4_SATCOM_100percent_Drawings_Part2_271to300.pdf PDF
Amend_0003_SF30_SATCOM_24Jan13.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_76to139.zip ZIP file
Amend_0003_Atch2_SATCOM_100percent_Specification_24Jan13.pdf PDF
Amend_0003_Atch6_Geo_Tech_Report_16Jan13.pdf PDF
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_1to31.zip ZIP file
Amend_0003_Atch5_100percent_Drawings_DwgFormat_Drawings_224to267.zip ZIP file
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bei der Begrenzung der Rissbreite für die Bauteile wurde ein Beton angenommen, dessen Betonzugfestigkeit f nach 5 Tagen höchstens

50% der mittleren Zugfestigkeit f erreicht (max f = 0,5 f ).

Dies ist bei der Festlegung des Betons und der Bauausführung zu berücksichtigen.

For the limit of the crack width we supposed a concrete which tensile strength f will reach after 5 days mean/medium tensile strength f (max f = 0,5 f ).

You have to pay attention to this at the building construction an when concrete!

at most 50% of the you define the

-1.00

+3.50

+3.80 +4.00

+3.70

+3.60 +3.70

+3.50

U.S. Army Corps of Engineers

APO AE 09096

Europe District

CONTRACT NO.: W912GB-13-R-0009

FILE NO.:

Wideband Satcom Facility Landstuhl Heliport

PN: 57594

S-162

Technikgebaeude BT4 Sprinkler/ plant 4 Fire Protection Schalung, Erdgeschoss

VFO

T. Stammerjohann

Formwork Drawing, Floor Plan ct,eff ctm ct,eff,5d ctm,28d ct,eff ctm ct,eff,5d ctm,28d

1:50

Chief, Engineering Division

Submitted

Designed

Community Commander

Approved

Approval Recommended

Checked

Drawn

Scale As Shown drawings in this set as Indexed on sheet Signatures affixed below indicate official recommendation and approval of all

Deputy Engineer, PPM

Date

Approved

DateRevision

Sheet

Date.

ByDescription

100% design

UEBERSICHT

KEY PLAN

+-0.00 OKFF / TFL

358.75m ue NN =

BT / BLDG 3

PLANT

0 2.5 5 7.5

0 52.5 7.5 10 15 20 25

MASSSTAB / SCALE 1:50

SCALE: FT

MASSSTAB: M

0.5 1

50% der mittleren Zugfestigkeit f erreicht (max f = 0,5 f ).

Dies ist bei der Festlegung des Betons und der Bauausführung zu berücksichtigen.

For the limit of the crack width we supposed a concrete which tensile strength f will reach after 5 days mean/medium tensile strength f (max f = 0,5 f ).

You have to pay attention to this at the building construction an when concrete!

at most 50% of the you define the

-1.02

-0.42

-0.02

U.S. Army Corps of Engineers

APO AE 09096

Europe District

CONTRACT NO.: W912GB-13-R-0009

FILE NO.:

Wideband Satcom Facility Landstuhl Heliport

PN: 57594

S-163

Technikgebaeude BT4/ plant 4 Fire Protection Bewehrung Gründung Ebene -1.00

VFO

T. Stammerjohann

Reinforcement Foundation Level -1.00 ct,eff ctm ct,eff,5d ctm,28d ct,eff ctm ct,eff,5d ctm,28d

1:50 , 1:25

Chief, Engineering Division

Submitted

Designed

Community Commander

Approved

Approval Recommended

Checked

Drawn

Scale As Shown drawings in this set as Indexed on sheet Signatures affixed below indicate official recommendation and approval of all

Deputy Engineer, PPM

Date

Approved

DateRevision

Sheet

Date.

ByDescription

100% design

UEBERSICHT

KEY PLAN

+-0.00 OKFF / TFL

358.75m ue NN =

BT / BLDG 3

PLANT

0 2.5 5 7.5

0 52.5 7.5 10 15 20 25

MASSSTAB / SCALE 1:50

SCALE: FT

MASSSTAB: M

0 1 2.5

0 2.5 5 7.5 10 12.5

MASSSTAB / SCALE 1:25

SCALE: FT

0.5 2

50% der mittleren Zugfestigkeit f erreicht (max f = 0,5 f ).

Dies ist bei der Festlegung des Betons und der Bauausführung zu berücksichtigen.

For the limit of the crack width we supposed a concrete which tensile strength f will reach after 5 days mean/medium tensile strength f (max f = 0,5 f ).

You have to pay attention to this at the building construction an when concrete!

at most 50% of the you define the

U.S. Army Corps of Engineers

APO AE 09096

Europe District

CONTRACT NO.: W912GB-13-R-0009

FILE NO.:

Wideband Satcom Facility Landstuhl Heliport

PN: 57594

S-164

Technikgebaeude BT4/ plant 4 Fire Protection Bewehrung Schacht Ebene -2.00

VFO

T. Stammerjohann

Reinforcement Man Hole Level -2.00 ct,eff ctm ct,eff,5d ctm,28d ct,eff ctm ct,eff,5d ctm,28d

1:25

Chief, Engineering Division

Submitted

Designed

Community Commander

Approved

Approval Recommended

Checked

Drawn

Scale As Shown drawings in this set as Indexed on sheet Signatures affixed below indicate official recommendation and approval of all

Deputy Engineer, PPM

Date

Approved

DateRevision

Sheet

Date.

ByDescription

100% design

UEBERSICHT

KEY PLAN

+-0.00 OKFF / TFL

358.75m ue NN =

BT / BLDG 3

PLANT

0 1 2.5

0 2.5 5 7.5 10 12.5

MASSSTAB / SCALE 1:25

SCALE: FT

50% der mittleren Zugfestigkeit f erreicht (max f = 0,5 f ).

Dies ist bei der Festlegung des Betons und der Bauausführung zu berücksichtigen.

For the limit of the crack width we supposed a concrete which tensile strength f will reach after 5 days mean/medium tensile strength f (max f = 0,5 f ).

You have to pay attention to this at the building construction an when concrete!

at most 50% of the you define the

U.S. Army Corps of Engineers

APO AE 09096

Europe District

CONTRACT NO.: W912GB-13-R-0009

FILE NO.:

Wideband Satcom Facility Landstuhl Heliport

PN: 57594

S-165

Technikgebaeude BT4/ plant 4 Fire Protection Bewehrung Wände

VFO

T. Stammerjohann

Reinforcement Walls ct,eff ctm ct,eff,5d ctm,28d ct,eff ctm ct,eff,5d ctm,28d

1:50 , 1:25

Chief, Engineering Division

Submitted

Designed

Community Commander

Approved

Approval Recommended

Checked

Drawn

Scale As Shown drawings in this set as Indexed on sheet Signatures affixed below indicate official recommendation and approval of all

Deputy Engineer, PPM

Date

Approved

DateRevision

Sheet

Date.

ByDescription

100% design

UEBERSICHT

KEY PLAN

+-0.00 OKFF / TFL

358.75m ue NN =

BT / BLDG 3

PLANT

0 2.5 5 7.5

0 52.5 7.5 10 15 20 25

MASSSTAB / SCALE 1:50

SCALE: FT

MASSSTAB: M

0 1 2.5

0 2.5 5 7.5 10 12.5

MASSSTAB / SCALE 1:25

SCALE: FT