Amendment 0008 SF30 W912GB-R-0009 SATCOM-WSOC Landstuhl Germany. NOTE Due to a system error Amendment 0007 has been skipped and is not used for this Solicitation. Amendment 0008 is the correct effective Amendment.
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W2SDXXXXXXXXXX 057594
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page:
The submission date and time for the Price Proposal has been extended to no later than Friday, 22 March 2013 at 1400 CET.
POC: Glenn Adams Email: glenn.adams@usace.army.mil Phone: +49 (0)611 9744 2723
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-13-R-0009
X 9B. DATED (SEE ITEM 11)
26-Nov-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2013
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
E7CT9G2A
Typewritten Text
E7CT9G2A
Typewritten Text Note: Due to System error Amendment 0007 is not used and 0008 is applicable.
E7CT9G2A
Typewritten Text
W912GB-13-R-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
The purpose of this Amendment is to: 1) Answer offerors questions and 2) provide additional drawings pertaining to building 3373 at Landstuhl.
The submission date and time of the Price Proposal has changed. See Block 14 of this SF30 Amendment. NOTE: Offerors are reminded to read carefully the submission requirements provided with the Solicitation and as amended for the Volume II Price Proposals.
QUESTIONS AND RESPONSES
Amendment 0001 provided responses to questions 1 through 44, Amendment 0002 provided responses to questions 45 through 113, Amendment 0003 provided responses to questions 114 through 116, Amendment 0005 provided responses to questions 117 through 176 and Amendment 0006 provided responses to questions 177 through 182. Any additional questions received after the receipt of this Amendment may or may not be answered at the discretion of the Contracting Officer. The responses to some questions provided through previous Amendments may have been superseded by responses to questions provided through follow-on Amendments. Offerors are cautioned to review all questions and responses to determine the most current and effective response.
183. The following questions arise by reviewing the specs for subject project provided with Amendment
0005. Are the three Emergency Diesel Generators which are shown on plan E 211A part of the Base Bid or do we have to include only two of them in the Base Bid and the third one will be the one from the option? The same applies to the Sealed Oil Transformer.
Response: Two of the three emergency generators are part of the base bid. One emergency generator is addressed under Item 0006 of the revised Price Schedule provided with Amendment 0005. The same applies to the Sealed Oil Transformers, however, one Sealed Oil Transformer is addressed an optional item under Item 0007 of the Price Schedule.
184. The item 6.1.10 of the SPECS (Amendment 0005) describes the demolition of the existing building no 3373. Unfortunately we have no drawings of this building. For to work out a proper offer to you we need more information about this building, for example as-built.
Response: Refer to the as-built drawings for building 3373 provided with this Amendment.
185. Due to the amount of changes/answers in Amendment 0006, we respectfully request a two week extension.
W912GB-13-R-0009
Response: See block 14 of the SF30 for the new date and time for the Price Proposal submission.
Amendment 0008 Attachment:
1. As-built drawings Building 3373 - .dgn format (4 files)
APPLICABLE SUPPORTING DOCUMENTS FOR THIS SOLICITATION
The following supporting documents are the most current documents pertaining to this solicitation. Each document listed identifies either the Solicitation or the Amendment number in which the document was incorporated into the solicitation.
1. As-built drawings Building 3373 - .dgn format (Amendment 0008)
2. 20kVA Crossover Drawings - .pdf file (Amendment 0006)
3. Revised Price Schedule dated 20 Feb 2013 (Amendment 0005)
4. Revised 100% Design Specification, dated 20 Feb 13 (Amendment 0005)
5. GAEB Interface file (.da81) for Revised 100% Design Specification dated 20Feb13 (Amendment
0005)
6. Revised 100% Design Drawings Parts 1-4 24 Jan 13 (Amendment 0005)
7. Site Preparation Drawings Part 5 – 31 Jan 13 (Amendment 0005)
8. Revised Door Schedule (Amendment 0005)
9. Geo Tech Report (Amendment 0003)
10. Cable Distribution Systems Standards (Amendment 0003)
11. AR 190-11 Physical Security Requirements (Amendment 0003)
12. Representative Rhine Ordnance Barracks As-Built Bunker Drawings (Amendment 0002)
13. Bunker Location Drawing Rhine Ordnance Barracks (Amendment 0002)
14. Final Record of Environmental Consideration Review and Report (Amendment 0002)
15. Building Automation & Control Documents (Amendment 0002)
16. Fire Protection Report and Design – Part 1 (Amendment 0002)
17. Fire Protection Report and Design – Part 2 (Amendment 0002)
18. Revised Experience Information Sheet (Amendment 0002)
19. Revised Experience Overview Sheet (Amendment 0001)
20. Revised Sample Bank Letter of Assurance (Amendment 0001)
21. USACE Past Performance Questionnaire (Solicitation – SF 1442)
22. USACE PPQ to be Completed by Client (Solicitation – SF 1442)
23. Sample Bank Letter of Guarantee (Solicitation – SF 1442)