PWS - DIA Region IV FSS Appendix D Required Submittals 20230201.docx

DOCX document 45 KB Posted

Attached to
Amend 02 Facilities Support Services in support of DIA, Region IV, Natl Capital Region
Solicitation number
W912DY-23-R-0015
Issued by

About this file

This document outlines performance work statement requirements and deliverables for facility support services at Defense Intelligence Agency locations in the National Capital Region. Key requirements include providing facility management and maintenance services, hazardous material handling, safety and environmental compliance programs, and quality control inspections. The contractor must submit various management, training, and safety plans within two weeks of award, along with daily/weekly/monthly performance reports and activity schedules. Deliverables require electronic submission to the contracting officer or contracting officer's representative on specified timelines. This competitive 8(a) set-aside opportunity is valued at an estimated $150M for a one year base period and four one-year options, to be awarded by the U.S. Army Corps of Engineers to provide support at DIA headquarters, Joint Base Anacostia-Bolling, Fort Detrick, the Pentagon, and other National Capital Region locations.

View the file

Other files

File Type Posted
B.08_Response To Questions Amend 02 KO_2_03_23.pdf PDF
Copy of PWS - DIA Region IV FSS TE-2 Equipment Lists Rev 1_20230202.xlsx XLSX spreadsheet
CBA JUIAF 2022-2027_Charlottesville_Redacted Fully Executed.pdf PDF
CBA 2022-2027_Navy RBOS- C-5_Redacted.pdf PDF
Amendment 02_Solicitation W912DY23R0015 DIA FSSC.pdf PDF
AMENDMENT 01_SOLICITATION W912DY23R0015 DIA FSSC.pdf PDF
PWS - DIA Region IV FSS_Rev 1_20230201.pdf PDF
B.08_Response To Questions RFP W912DY-23-R-0015 Amend 01 KO_2_01_23.pdf PDF
Copy of PWS - DIA Lobby Windows and Lights.xlsx XLSX spreadsheet
SCA WAGE Determination Amend 01.docx DOCX document
Copy of Pricing Workbook DIA Facility Support Services Region IV Pricing Workbook 20230201.xlsx XLSX spreadsheet
Copy of PWS - DIA Region IV FSS TE-2 Equipment Lists Rev1 20230201.xlsx XLSX spreadsheet
Attachment 15 PWS - DIA Region IV FSS TE-5 Acronyms and Definitions 20221208.docx DOCX document
Attachment 2 PWS - DIA Region IV FSS 20230119.pdf PDF
Solicitation W912DY23R0015 DIA FSSC.pdf PDF
Attachment 12 Copy of PWS - DIA Region IV FSS TE-2 Equipment Lists 20221209.xlsx XLSX spreadsheet
Attachment 8 PWS - DIA Region IV FSS Appendix F Applicable Codes 20220715.docx DOCX document
Attachment 20 SCA WAGE Determination FSSC DIA.pdf PDF
Attachment 14 PWS - DIA Region IV FSS TE-4 DIA Security Requirements 20221208.pdf PDF
Attachment 7 PWS - DIA Region IV FSS Appendix E Resident Management System 20220715.docx DOCX document
Attachment 17 PWS - DIA Region IV FSS TE-7 Eng_Form_3394_2021Aug.pdf PDF
Attachment 6 PWS - DIA Region IV FSS Appendix D Required Submittals 20230106.docx DOCX document
Attachment 1 Copy of Pricing Workbook DIA Facility Support Services Region IV.xlsx XLSX spreadsheet
Attachment 16 PWS - DIA Region IV FSS TE-6 Service Order Forms 20221208.pdf PDF
Attachment 19 PWS - DIA Region IV FSS TE-9 NSF Color Rating Assessment Codes 20221208.pdf PDF
Attachment 11 PWS - DIA Region IV FSS TE-1 List of Facilities 20221209.docx DOCX document
Attachment 4 PWS - DIA Region IV FSS Appendix B Safety Variance 20220715.pdf PDF
Attachment 18 PWS - DIA Region IV FSS TE-8 Meter Group Descriptions Direct Rating Guidance 20220829.pdf PDF
Attachment 13 PWS - DIA Region IV FSS TE-3 Inventory Management Required Data Fields 20221208.docx DOCX document
Attachment 3 PWS - DIA Region IV FSS Appendix A Technical Exhibits 20221209.docx DOCX document
Attachment 5 PWS - DIA Region IV FSS Appendix C PRS 20220715.docx DOCX document
Attachment 21 Prime DD-254 April 2018.pdf PDF
Attachment 10 PWS - DIA Region IV FSS Appendix H Service Order Process 20230109.docx DOCX document
Attachment 9 PWS - DIA Region IV FSS Appendix G Government Points of Contact 20221205.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWSAppendix DDIA Region IV FSS
Required Submittals, Reports, and Meetings
D.1Required Submittals, Reports, And Meetings

The Contractor shall provide documentation and reporting requirements defined in the PWS and Appendices. All deliverables shall be computerized.

D.2 Plans.

D.2.1 Phase-In Plan.

The Contractor’s Phase-In Plan shall include comprehensive procedures for attaining full PWS performance within the time allowed herein. The Phase-In Plan shall establish procedures by which the Contractor shall prepare to assume full responsibility for all areas outlined in the PWS seven (7) fourteen (14) calendar days after award. The Phase-In Plan shall include, at a minimum, procedures to accomplish the following:

· Establish a Contractor project management office

· Recruit and hire necessary Contractor personnel

· Obtain all required Contractor personnel licenses, certifications, clearances, and background checks

· Obtain Contractor and Government Issued Identification Media

· Obtain required Email accounts

· Joint Contractor-Government inventories

· Develop and submit all required Contractor deliverables

· Ensure Contractor participation in post-award meetings, as required

· Complete all necessary training requirements of Contractor personnel

· Establish procedures for Contractor personnel to sign for Government Property

D.2.2 Phase-Out Plan.

The Contractor shall develop a Transition Phase-Out Plan to affect a smooth and orderly transfer of responsibility to a successor Contractor and provide to the Contracting Officer no less than 120 calendar days prior to contract completion date. The Transition Phase-Out Plan shall, at a minimum, establish procedures to implement the Phase-Out Plan. During the succeeding Contractor’s phase-in period an observation period shall occur at which time Contractor personnel of the incoming workforce may observe operations and performance methods of the incumbent Contractor. The incumbent Contractor shall not defer any requirements for the purpose of avoiding responsibility or of transferring such responsibility to the succeeding Contractor. The incumbent Contractor shall fully cooperate with the succeeding Contractor and the Government so as not to interfere with their work or duties. The Government anticipates that the last 30 days of the contract will be the phase-in period under the successor contract.

D.2.3 Work Instructions.

The Contractor shall establish, document, implement, and maintain work instructions for each functional area covered under this contract. Each work instruction shall reference the applicable PWS paragraph. Work instructions shall describe the procedures for each area and cover the following topics at a minimum: control of quality, hours of operation, work assignments, regulatory compliance, approval authorities, work flow, functional relationships between the Government and the Contractor and between the Contractor’s organizational elements, and any other information needed for efficient and uniform performance.

D.2.4 Management Plan.

The Contractor shall submit a Management Plan upon contract award plus 14 days, the Government will have 7 days to provide comments, and a final will be due 7 days from Government comments. The Management Plan shall be consistent with the information submitted in the proposal and shall demonstrate a thorough knowledge and a full understanding of the complexity and functions detailed in the PWS. It shall provide a sound management approach for responding to changing priorities, enhancing customer service, and ensuring adequate levels of performance are maintained. The Contractor shall implement the plan NLT the performance start date. Any changes to the Contractor’s Management Plan shall be submitted to the COR/ACOR and Contracting Officer for review and approval prior to incorporation into the contract. The Contractor’s plan shall include, but not be limited to the following:

· The management techniques or procedures to be used to accomplish the basic functions of planning, organizing, and controlling for each function depicted on the organizational structure, to include the proposed interface and relationships between major functional areas for project management and administration

· A line and block chart portraying the organization from top level management to all functional area positions

· Labor classifications (exempt, Service Contract Act, Collective Bargaining Agreement) to be used in each area including the number of labor hours, the number of full time equivalents (FTEs), and qualification requirements for each position proposed

· What assumptions were relied upon in developing the structure (i.e. workload data, frequency, etc.); and identification of collateral personnel appointments (including but not limited to, Safety Coordinator, Environmental Coordinator)

· The approach for tracking, scheduling and documenting initial/ recurring/ refresher training

· Plans for replacement staffing, recruiting and maintaining adequately experienced and trained personnel

· Verification that Project Manager (PM) shall be authorized to act on behalf of the Contractor for all matters relating to this contract to include the authority to bind the Contractor for matters pertaining to this contract

D.3 Reports.

D.3.1 Project Manager Monthly Reporting.

The PM shall submit a signed monthly progress report to the COR/ACOR no later than ten (10) calendar days after the reporting month. See PWS paragraph 3.4.1.

D.3.2 Monthly Safety Report.

The Contractor shall submit a monthly report consolidating safety statistics for the previous month. This monthly report is in addition to required reports due at the time of an accident.

D.3.3 Weekly Work Status Report The PM shall submit a weekly report detailing work performed the previous week and work scheduled for the upcoming week. See PWS paragraph 3.4.1.

D.3.4. Daily Quality Control Report.

Prepare and maintain a daily record of all QC activities (Daily Quality Control Report) each day work is performed. Daily Quality Control Reports shall include a description of trades working on the project, number of personnel working, weather conditions encountered, any delays encountered, and acknowledgment of deficiencies noted along with the corrective actions taken on current and previous deficiencies. Reports shall also include factual evidence that required activities or tests have been performed, including, but not limited to, the following items: (1) Type and number of QC inspections and tests accomplished. (2) Results of QC inspections and tests. (3) Nature of defects, causes for rejection, etc. (4) Proposed remedial action. (5) Corrective actions taken. Submit Daily Quality Control Reports via RMS.

D.3.4 Data Criteria.

The Contractor shall submit programmed and un-programed information subject to Government review for adequacy, using the following criteria:

· Complete: includes all required information.

· Accurate: factual and correctly tabulated data.

· Timely: provided within the specified time frames.

· Properly prepared: IAW applicable publication or other specified format.

· Properly distributed: provided to the specified Government personnel.

· Includes name and signature of Project Manager certifying completeness and accuracy of submitted data.

· Submission will be made electronically unless otherwise agreed upon.

· Electronic submission shall be in a format readable by standard Government PC software (e.g. Microsoft Office Products / Adobe Products).

D.4 Meetings.

D.4.1 Post Award Conference/Periodic Progress Meetings.

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office.

D.4.2 Performance Evaluation Meetings.

The KO, COR, ACOR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

Deliverables The chart below is not a complete listing of contract deliverables. The Contractor shall ensure that all required submittals are provided in accordance with the PWS, including Appendices, and with the schedule provided. All documents provided to COR shall be submitted via RMS, unless otherwise noted. All invoicing shall be forwarded electronically to the PM and submitted via RMS. All emails shall include the associated contract number in the subject line.

DESCRIPTION
REF PAR
WHEN REQUIRED
SUBMITTED TO
List of Personnel Requiring CMMS accounts
2.9.2.2
NTP +15
ACOR via email, cc COR
Key Personnel Resumes
3.4
With Proposal. Prior to replacement personnel starting work on the contract
KO. Replacement resumes submitted to COR via RMS
Key Personnel Contact Roster
3.4
NTP +10 calendar days
COR via RMS
Monthly Progress Report
3.4.1
No later than 10 calendar days after the reporting month
COR via RMS
Weekly Work Status Report
3.4.1
No later than 1000 each Monday; Tuesday if Monday is a holiday
ACOR via email
L1, L2, and L3 Appointment Memos
3.5.1
Included with Accident Prevention Plan and within 3 days of new L1, L2, or L3 start date
COR via RMS
List of Employees
3.5.7
NTP +7 +14 and within 1 day of changes
COR via RMS
Annual Training Plan
3.7.1
NTP +30 & annually; updates due the 5th calendar day of each month
COR via RMS
Contractor Wage Rates
3.10
With proposal for subsequent optional performance periods
COR via RMS
Monthly Direct Condition Rating Report
4.2.1.2
The first of each month. The first Monday of each month if the 1st is on a Saturday or Sunday
DIA FMB
Lifecycle Painting Work Schedule
4.3.3
Within 30 days of award and 30 days prior to start of each option period; 60-day schedule due 5 business days prior to start of each month
Annual Schedule to COR via RMS and ACOR via email; 60-day schedule to ACOR via email
Key Control Plan
4.4.3
NTP +15
COR via RMS
Service Order Packages
4.9 and Appendix H
IAW table in Appendix H
SOA or COR via email depending on authority limits
Accident Prevention Plan (APP)
5.3
NTP +15 calendar days, must be accepted by the Government prior to initiating work
COR via RMS
Activity Hazard Analysis (AHA)
5.3.2
As part of the APP. For work not covered by an accepted AHA, a new AHA is required with submission of the Project Work Order Package
COR via RMS & ACOR via email
Monthly Work-Related Injuries/Illnesses and Exposure Report
5.4
NLT the 7th calendar day of each month
COR via RMS and BASEOPS Exposure Hours email
ENG 3394
5.4
Initial report within 24 hours of reportable accident or near miss; final report within 7 days of accident
COR via RMS
Safety Data Sheets (SDS)
5.5.2
Prior to bringing a hazardous material onto an installation.
COR via RMS & ACOR via email
Hazardous Materials Inventory
5.5.4
Must be approved prior to bringing hazardous materials on government property
COR via RMS and ACOR via email
Notification of Environmental Spill
5.5.6
Immediately upon incident
COR & ACOR via phone and email
Quality Control Plan (QCP)
6.1.1
NTP +15 calendar days, must be accepted by the Government prior to initiating work
COR via RMS
Quality Control Inspection Schedules
6.1.2
NLT 5 workdays prior to the start of the month covered by the schedule
COR via RMS & ACOR via email
Weekly QC Report
6.1.3
NLT 1000 every Monday; Tuesday if Monday is a Holiday
COR via RMS
Phase-In Plan
D.2.1
Due within 7 14 calendar days after award
COR via RMS
Phase-Out Plan
D.2.2
120 days from end of contract
COR via RMS
Management Plan
D.2.4
Draft, award +14, Final 7 days after comments
COR via RMS
AT Level I Training
8.5.1
NTP +7 calendar days/Annually
COR via RMS
Annual OPSEC Training
8.5.2
NTP +7 calendar days/Annually
COR via RMS
Cyber Awareness Training
8.5.3
NTP +7 calendar days/Annually
COR via RMS
Counterintelligence Awareness and Reporting (CIAR)
8.5.4
NTP +7 calendar days/Annually
COR via RMS

Page 1 of 6 01 February 2023