Attachment 11 PWS - DIA Region IV FSS TE-1 List of Facilities 20221209.docx
DOCX document 5 MB Posted
- Solicitation number
- W912DY-23-R-0015
About this file
This document outlines facility support services requirements for Defense Intelligence Agency locations in the National Capital Region. The performance work statement attachment lists Defense Intelligence Agency facilities in Maryland, Virginia, and Washington D.C. that require services including DIA Headquarters, Defense Logistics Operations Center, Fort Detrick, the Pentagon, and others within a 50-mile radius. The solicitation seeks a contractor to provide facility support services at these locations, including building maintenance, custodial services, mail services, equipment maintenance, and snow and ice removal according to specified service levels. The acquisition is set aside for small businesses through the 8(a) program with the Small Business Administration. Responses are due under solicitation number W912DY-23-R-0015.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| PWS | Technical Exhibit 1 | DIA Region IV FSS |
| List of Facilities | ||
| A.1 | Facilities. |
The following sites are included in this task order.
A.1.1 Joint Base Anacostia-Bolling
· DIA Headquarters (DIAC) (1,462,000 SF Admin)
· Building 6000
· Building 6000A
A.1.2. Maryland Sites
· Defense Logistic Operations Center (DLOC), Landover, MD (180,000 SF Warehouse, 86,000 SF Admin)
· Maryland Square (MS-2), College Park, MD (123,500 SF Admin)
· Indian Head, MD (6,000 SF Admin)
· National Center for Medical Intelligence (NCMI) Building 1607, Fort Detrick, MD (45,000 SF Admin)
A.1.3 Virginia Sites
· Rivanna Station (RVSTA) Charlottesville
· 2010, Rowe Building (Formerly JUIAF) (170,500 SF)
· 2078, Remote Delivery Facility (RDF) (9,700 SF)
· Boulders 1 (22,300 SF)
· Reston (three building campus)
· Reston 1 (RS-1) (267,351 SF Admin)
· Reston 2 (RS-2) (255,951 SF Admin)
· Reston 3 (RS-3) (17,700 SF Warehouse)
· Pentagon
· Various office areas (110,000 SF Admin)
· Quantico
· Russel Knox Building (RKB) (123,000 SF Admin)
A.2 Other sites.
Work may occur in other DIA facilities not listed above in the National Capital Region (within 50-mile radius of DIAC) and the following States: Maryland, Massachusetts, Virginia, and West Virginia. The approximate 50-mile radius of DIAC is shown in Map 1 below.
Map 1. Approximate 50-mile radius centered on DIAC, Joint Base Anacostia Bolling
A.3 NCMI Snow and Ice Removal Limits, Service Levels, and Snow Push Areas.
| Service Level |
| Type of Surface |
| De-Icing / Pre-treatment |
| Snow / Ice Removal |
| De-Icing / Post Treatment |
| SL-1 |
| Primary Road |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Structures |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Sidewalks / Walkways |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Building Entrances |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Lots |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Secondary Roads |
| at least One (1) hour prior to snow event |
| Within Two (2) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
Non-Paved (gate Swings)
Within Two (2) Hours of snow event
| Service Level |
| Type of Surface |
| De-Icing / Pre-treatment |
| Snow / Ice Removal |
| De-Icing / Post Treatment |
| SL-2 |
| Primary Road |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Structures |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Sidewalks / Walkways |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Building Entrances |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Lots |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Secondary Roads |
| at least One (1) hour prior to snow event |
| Within Four (4) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
Non-Paved (gate Swings)
Within Four (4) Hours of snow event
| SL-3 |
| Primary Road |
| at least One (1) hour prior to snow event |
| Within Twelve (12) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Structures |
| at least One (1) hour prior to snow event |
| Within Twelve (12) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Sidewalks / Walkways |
| at least One (1) hour prior to snow event |
| Within Twelve (12) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Building Entrances |
| at least One (1) hour prior to snow event |
| Within Twelve (12) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Parking Lots |
| at least One (1) hour prior to snow event |
| Within Twelve (12) Hours of snow event |
| Within One (1) hour after a snow clearing or event |
| Secondary Roads |
| at least One (1) hour prior to snow event |
| Within 24 Hours of snow event |
| Within One (1) hour after a snow clearing or event |
Non-Paved (gate Swings)
Within Twelve (12) Hours of snow event
The NCMI snow and ice removal limits, service levels, and snow push areas are shown below in Map 2.
Map 2. NCMI Snow and Ice Removal Limits, Service Levels, and Snow Push Areas.
Page 1 of 3 09 December 2022 image1.png image2.png
File details come from the government source that posted it. Updated .