W912DY20R0068 0001.pdf
PDF 260 KB Posted
- Attached to
- FRP MATOC Midwest Region W912DY-20-R-0068 Federal contract opportunity
- Solicitation number
- W912DY20R0068
About this file
This document provides details for a solicitation seeking demolition and abatement services. The U.S. Army Corps of Engineers is soliciting proposals for an indefinite-delivery/indefinite-quantity multiple award task order contract to provide facility reduction services, including planning, coordination, abatement, and execution of building and facility removal/demolition at multiple Department of Defense and other Federal agency locations throughout Minnesota, Wisconsin, Illinois, Ohio, Indiana, Michigan, Kentucky, Virginia, West Virginia, Missouri, and Iowa. Services may also include emergency response to disasters. The North American Industry Classification Code for this contract is 238910. Offerors are required to submit proposals in accordance with preparation instructions by August 17, 2020. The Government intends to make multiple awards under this solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
FRP MATOC Midwest Region W912DY-20-R-0068 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Add the follow ing instructions to section L.3.1: Offerors are instructed to forw ard the email confirmation that f iles have been uploaded successfully to the CEHNC-MW-FRP@usace.army.mil mailbox. If you do not receive an email confirmation from DOD Safe Site please contact the DoD Safe site Help Desk.
2. Update Attachments 1-18
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DY20R0068
X 9B. DATED (SEE ITEM 11)
15-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2020
CODE
US ARMY ENGINEERING & SUPPORT CENTER
475 QUALITY CIRCLE NW
HUNTSVILLE AL 35806
W912DY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DY20R0068
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS
L.1 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of this solicitation are available by INTERNET ACCESS ONLY. The Government will post all solicitation documents on the betaSAM.GOV website (replaces FedBizOpps) at https://beta.sam.gov/search?index=opp. The Government will post all amendments on betaSAM.GOV. The Offeror is responsible for checking the website for amendments or additional information. The Offeror shall submit in its proposal all requested information specified in the Request for Proposal (RFP) solicitation.
L.2 GENERAL INSTRUCTIONS
L.2.1 The Government will conduct full and open competition with small business reserves after exclusion of sources in this solicitation to foster an adequate number of viable Contractors to reduce any risk to the stability of the administration of the Facilities Reduction Program
(FRP), and to ensure the continuous availability of abatement and demolition services for the
Government in the Northeast region (geographical area for contract performance).
L.2.2 Awards are made to responsible offerors whose proposals conform to the solicitation and are determined the most advantageous to the Government, considering price and other non-price factors. Offerors are cautioned that the Government may not award to the highest technically evaluated or the lowest priced Offeror.
L.2.3 The Government reserves the right to award without discussions. The Government intends to make staggered awards if there are offerors’ proposal that can be awarded without discussions. Later awarded contracts will have an initial period of performance that will be less than full two-year base period in duration and will end on the same date as all others contractor that receive a base IDIQ award. If exercised, option periods will be same for all awardees.
L.2.4 CEHNC anticipates making up to 10 awards in this region. CEHNC anticipates that five will be awarded under the small business reserve. CEHNC reserves the right to award more or less, based on actual qualified responses to the solicitation.
L.2.5 The Government will, subject to FAR 9.604 Contractor Team Arrangements -
Limitations, recognize the integrity and validity of Contractor team arrangements provided the arrangements are identified and company relationships are fully disclosed in an offer. For purposes of exclusion of sources under this solicitation, a company or business entity identified https://beta.sam.gov/search?index=opp in an offer as a potential prime Contractor shall be considered to include the named company or business entity, its parent or subsidiary, or a company or business entity directly related to the company or business entity through common (regardless of the percentage) ownership, control, or management (whether by a parent company or otherwise). Under this solicitation, no company or business entity may be awarded more than one contract as a prime Contractor. In addition, if a contract is awarded to a prime Contractor in which a company or business entity has formed a business arrangement (e.g., partnership, joint venture, LLC) to act as a prime
Contractor, any offeror which includes that company or business entity in a business arrangement to act as a potential prime Contractor, shall be excluded from award of the other one contract under this solicitation. “Offeror” refers to the proposed prime Contractor and its proposed key subcontractors.
L.2.6 Offerors are instructed to follow the instructions provided in this section carefully to assure the Government receives consistent information in a form that will facilitate proposal evaluation. Proposals that take exception to inclusion of specific requirements in the resultant contract shall not be considered.
L.2.7 The Offeror’s proposal must also include all data and information requested in this solicitation and be submitted in accordance with all instructions. The offer shall comply with the requirements stated in the solicitation and applicable attachments. Non-conformance with the instructions provided in the solicitation and this section may result in an unfavorable proposal evaluation or rejection of the proposal. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
L.2.8 The proposal should be prepared clearly and concisely to demonstrate that the Offeror has a complete and thorough understanding of the requirements of the PWS. Offerors shall prepare proposals on the presumption the Government has no previous knowledge of the
Offeror’s capabilities. The Government will evaluate proposals solely on the information specifically presented in respective submittals, with the exception of evaluation of Past
Performance. FAR 52.215-1, Instructions to Offerors, outlines the requirements for submission of offers and late proposals. Proposals will not be returned (except for timely withdrawals), but will be retained by the Government for official record purposes. When applicable, the Offeror should cross reference to the solicitation by annotating solicitation reference in parenthesis, (e.g., Sec C, para 4.0).
L.2.9 The offeror’s initial offer should contain the offeror’s best terms from a technical and price standpoint, as the Government intends to make awards without discussions (except clarifications, as described in FAR 15.306(a)). The Government reserves the right to seek information clarifying any element of an offer or other information submitted in Volumes 0-IV prior to awarding without discussions. This request for information serves to clarify certain aspects of proposals (e.g. the relevance of an offeror’s past performance information and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors. This exchange shall not be used to cure weaknesses or material omissions of the offer, or materially alter the technical or pricing information in the proposal. Under no circumstances will the offeror revise its offer in response to clarification questions; any such revision will not be considered. If the Government determines that it is necessary to conduct discussions, the Contracting Officer will establish the competitive range. If the Contracting Officer decides that an offeror’s proposal should no longer be included in the competitive range, the proposal will be excluded from consideration for award; and written notice of this decision will be provided to unsuccessful offerors in accordance with FAR 15.503. If it is determined necessary, the Contracting Officer will notify offerors remaining within the competitive range to schedule discussions.
L.2.10 The proposal shall not simply rephrase or restate the Government's requirements, but rather should provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities, capabilities, and experience. The Government will base its evaluation on the information presented, plus any additional past performance information obtained by the
Government from other sources.
L.3 SUBMISSION INSTRUCTIONS
L.3.1 Offerors shall submit proposals in electronic format only to the FY20 FRP MW Region
MATOC Inbox, CEHNC-MW-FRP@usace.army.mil.
Offerors shall deliver electronic proposals using DoD SAFE (https://safe.apps.mil/), a secure access file exchange. All submissions shall be in Adobe PDF format, with the exception of
Volume IV-Price submitted in excel format. You are limited to 25 maximum files per upload, and the total package size of each upload cannot exceed 8GB. There is no file size limitation for the overall proposal. Offerors may upload as many packages as needed to submit the information required by the solicitation. It is the responsibility of the Offeror to ensure that all files are contained therein are readable, complete, and accessible without password.
Offerors are instructed to forward the email confirmation that files have been uploaded successfully to the CEHNC-MW-FRP@usace.army.mil mailbox. If you do not receive an email confirmation from DOD Safe Site please contact the DoD Safe site Help Desk.
L.3.2 REQUEST FOR DoD SAFE UPLOAD LINK: Offerors must email the FY20 FRP MW
Region MATOC Inbox, CEHNC-MW-FRP@usace.army.mil, no later than five (5) working days prior to the proposal due date to receive a “Request Link” which will allow Offerors to upload their proposals via the SAFE site. Offerors that fail to request “Request Link” five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission.
Offerors will be required to enter email addresses for all recipients. For this solicitation, the recipient is FY20 FRP NE Region MATOC Inbox at the address provided above. DoD SAFE will automatically add the email address of the Government Employee who initiated the request code. Offeror may enter additional email addresses for distribution of its proposal. However, the Government cautions Offerors that proposals sent to any other Government employee will invalidate entire submission. DoD SAFE will send a system-generated email to all recipients once submission is complete
NOTE: Do NOT send the SAFE site packages to group email accounts.
To complete the “Drop-Off” process, Offeror must verify its email address. Entering an incorrect email may result in the rejection of your submission for lateness. Offerors can confirm proper submission by the ‘Drop-Off Completed” confirmation screen generated when file submission is completed.
For the purposes of establishing timely proposal submission, the Government will use the date and time an Offeror’s entire submission is successfully uploaded in DoD SAFE. The
Government cautions Offerors that electronic submissions are not instantaneous and file uploads are subject to system connectivity. Submissions may take several minutes or hours, and Offerors should print confirmation information for their files.
L.3.3 If any portion of a proposal received by the contracting officer electronically is unreadable, the contracting officer shall immediately notify the offeror and permit the offeror to resubmit the unreadable portion of the proposal. The method and time for resubmission shall be prescribed by the contracting officer after consultation with the offeror, and documented in the file. The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness under 15.208(a), provided the offeror complies with the time and format requirements for resubmission prescribed by the contracting officer
L.3.4 Proposal is due 17 August 2020 at 10:00 AM CST
L.3.5 The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted and reach the designated recipient of proposals prior to proposal due date/time. Offerors are responsible for allowing sufficient time for the receipt of proposal in accordance with solicitation instructions.
L.3.6 Submittals received after the closing date are considered non-responsive and will he handled in accordance with Federal Acquisition Regulation (FAR) Subpart 52.215-1(c)(3), "“Submission, modification, revision, and withdrawal of proposals””.
L.3.7 FACSIMILE TRANSMISSIONS WILL NOT BE ACCEPTED.
L.4 SOLICITATION QUESTIONS
L.4.1 Questions regarding this solicitation shall be submitted in writing. The Government will answer all questions prior to the deadline for proposal submittal provided those questions are received no later than 03 August 2020 to ensure that the Government has adequate time to form appropriate responses and amend the solicitation as necessary. Offerors shall post questions and/or comments using ProjNet and the following bidder key:
Website: http://www.projnet.org/projnet
Key: 523956-BR325U
Contract Specialist – Primary POC
Ms. Valerie Murphy
Contracting Officer – Secondary POC
Ms. Kendra Taylor
L.4.2 At no time will the government answer questions regarding the solicitation to a single potential offeror without providing the answer to all potential offerors. The Government reserves the right not to respond to any questions received concerning this solicitation after the question receipt date and time above. Accordingly, offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal cycle.
It is not anticipated that the closing date for receipt of proposals will be extended.
L.5 PROPOSAL PREPARATION
L.5.1 Electronic Copies: As stated above, Offerors shall submit electronic proposals via DoD
SAFE in Adobe PDF (PDF) format, except with the exception of Volume IV-Price submitted in
Microsoft Excel (Excel) format. Do not use compressed file formats. Self-extracting files are not acceptable, Use separate files to permit rapid location of all portions, including exhibits, annexes, and attachments, if any.
Volume IV-Price workbooks shall be in Excel format. Offeror shall not password protect the workbooks. Offeror shall include shall include all formulas, functions, macros, computations, or equations used to compute the proposed amounts in the workbook. Electronic links are only permissible within the Price Volume. If files contain links, the links must be intact and maintained through all revisions. The offeror shall not include pivot tables in the Excel spreadsheets and shall not include cell references to data or files that are not included in the Price
Volume. For each workbook, all rows, columns, cells, and worksheets are to be visible. Do not included zero height/zero width rows/columns in worksheets.
Proposal Volumes
VOLUME 0 – ACKNOWLEDGMENTS/AGREEMENTS/CERTIFICATIONS
Page Count
(single-side)
Table of Contents N/A
List of Tables and Figures N/A
Tab (A) – Offeror Acknowledgment Letter (signed) N/A
Tab (B) – Letters of Commitment (Key Subcontractors), Joint Venture/Mentor
Protégé/Team Agreements and approvals (if applicable) N/A
Tab (C) – Representations and Certifications N/A
VOLUME I – FACTOR 1: TECHNICAL EXPERIENCE/CAPABILITY
Page Count
(single-side)
Table of Contents N/A
L.5.2 Title the electronic file(s) in the following format:
W912DY18R0063_COMPANY NAME_VOLUME 0
W912DY18R0063_COMPANY NAME_VOLUME I
W912DY18R0063_COMPANY NAME_VOLUME II
W912DY18R0063_COMPANY NAME_VOLUME III
W912DY18R0063_COMPANY NAME_VOLUME IV
L.5.3 Adobe PDF files shall be separated by Volume and identified with offeror’s name, volume number and title, proposal date, and solicitation number. When printed, Offeror’s proposal narrative material shall fit on white 8 ½” x 11” paper with one inch (1") margins on all sides, using Time New Roman 12 point or larger font size, single-spaced. Spreadsheets, tables, List of Tables and Figures N/A
Tab (A) – Experience in Facilities Reduction [Experience Reporting Forms (ERF)] 2 ea/max 10
Tab (B) – Technical Approach 10
Tab (C) – Management Approach 10
VOLUME II – FACTOR 2: PAST PERFORMANCE
(single-side)
Table of Contents N/A
List of Tables and Figures N/A
Tab (A) – CPARS/Past Performance Questionnaires (PPQ) N/A
Tab (B) – Experience Reporting Forms (ERF) (Must be the same as Volume I ) 2 ea/max 10
VOLUME III – FACTOR 3: SMALL BUSINESS PARTICIPATION
(single-side)
Table of Contents N/A
List of Tables and Figures N/A
Tab (A) – Small Business Participation Commitment Document N/A
Tab (B) – Small Business Subcontracting Plan (Other Than Small Businesses Only) N/A
VOLUME IV – FACTOR 4: PRICE
(single-side)
Table of Contents N/A
List of Tables and Figures N/A
Tab (A) – Professional Labor Rates and G&A N/A
Tab (B) – Sample Task Order Attachment B N/A charts, etc. may be 11” x 17” but count as two pages. Smaller fonts are permitted on areas of the proposal that will not easily accommodate 12 point font and limited to illustrations, organization charts, and supporting data exhibits.
Legibility, clarity, coherence, and content are more important than appearance. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments shall not be submitted. Footnotes on text pages shall also be in 12-point font.
L.5.4 Page Limitations: Page limitations shall be treated as maximums and are indicated in the Proposal Volume table above. Proposal Cover, Table of Contents, Title Page, Lists of
Tables, Figures, or Acronyms, Separator Tabs, subcontractor commitment letters, past performance questionnaires and supporting past performance documents, and Small Business
Participation Commitment Document supporting documentation, to include teaming arrangement documentation, are excluded from page count.
If an offer exceeds a page limit, the pages that exceed the limit will not be considered. The excess pages excluded from consideration will be counted from front to back of the Tab.
L.5.5 Proposals will be reviewed for completeness and compliance with the solicitation and preparation instructions. If an offeror (1) fails or refuses to assent to any of the terms and conditions of the RFP, (2) proposes additional terms and conditions of this RFP (beyond the List of Offered elements exceeding minimum standards/requirements permitted in L.5.3 and L.5.4, or
(3) fails to submit any of the information required by this RFP, the Government may consider the offer to be unacceptable, which could make the offer ineligible for contract award. Offerors shall not include price information anywhere in the proposal package other than in the Price volume IV, and prices in completed Attachment B. All pages of each proposal shall be appropriately numbered and identified with the solicitation number.
L.5.6 Offerors shall place information within the appropriate volume. The offeror should confine submissions to essential matters, sufficient to define the proposal and provide adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal. Proposals without the specified content may be determined unacceptable and removed from the competition. The
Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the offeror. The Government reserves the right to reject incomplete proposals after initial evaluation without further consideration.
L.5.7 If final proposal revisions are required (if requested by the Contracting Officer), the offeror shall follow the final proposal revision instructions provided by the Contracting Officer.
L.6 PROPOSAL CONTENT
Proposals shall be organized and tabbed as follows:
L.6.1 VOLUME 0 – ACKNOWLEDGMENTS/AGREEMENTS/CERTIFICATIONS
L.6.1.1 Volume 0, Tab A: Offeror Acknowledgment Letter
Offerors must submit a letter acknowledging receipt of the Combined Synopsis Solicitation, Attachments, and Amendments, and include signed SF33 and any/all signed SF30’s as backup documentation.
L.6.1.2 Volume 0, Tab B: Letters of Commitment (Key Subcontractors), Joint Venture/Mentor
Protégé/Team Agreements and approvals
L.6.1.2.1 Letters of Commitment (Key Subcontractors) (if applicable)
L.6.1.2.2 Joint Venture/Mentor Protégé Agreements and approvals (if applicable). The joint venture agreement must be signed by both parties and will be subject to review to determine compliance with Small Business Administration Regulations. See Section L.2 above for further information.
L.6.1.2.3 Contractor Team Arrangement (if applicable). Provide a letter/agreement for contractor team arrangements identifying who will be acting as a potential prime contractor and who will be acting as its subcontractor(s). Letter/agreement must be signed by all parties. The letter/agreement shall clearly identify the prime contractors NAICS and size standards.
L.6.1.3 Volume 0, Tab C: Representations and Certifications
Representations and Certifications and other Statements of Offerors are not considered for evaluation, but are required as part of the Offeror’s proposal of this solicitation. Offeror shall complete the information requested in this Section in its entirety, and also complete
“Representations and Certifications” in System for Award Management (SAM) per FAR 52.204-
8, Annual Representations and Certifications. The submitted information will be reviewed for completeness.
Financial Capability. IAW FAR 9.103(a) “…contracts shall be awarded to, responsible prospective contractors only”. To be determined responsible, a prospective Contractor must meet the standards at FAR 9.104. FAR 9.104-1(a) requires that a prospective Contractor must have adequate financial resources to perform the contract, or the ability to obtain them.
Upon the request of the Contracting Officer (not to be submitted with initial proposal), the
Offeror may be required to provide the following:
A list of present commitments, including the dollar value thereof, and name the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective Contractor’s performance.
A certified statement listing: (1) each contract awarded within the preceding three month period exceeding $1,000,000.00 in value with a brief description of the contract, and (2) each contract awarded within the preceding three year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract.
A copy of the firm’s annual financial statement(s) for the past three years.
Number of years the firm has been in business
A copy of the firm’s current credit report(s).
Name, address, and telephone numbers of two credit/trade references.
An explanation of the firm’s capability to obtain sufficient financial resources to perform work required under any resulting contract from this solicitation.
Name, address, and telephone number of firm’s bonding company.
The Government may evaluate the Offeror’s annual financial statements, current credit report(s), and ability to obtain sufficient financial resources to perform the contract requirements in order to determine if the prospective Contractor has either adequate financial resources to perform the contract or the ability to obtain them.
L.6.2 VOLUME I, FACTOR 1 – TECHNICAL EXPERIENCE/CAPABILITY
L.6.2.1 Volume I, Tab A: Experience in Facilities Reduction/Demolition
The Proposal should clearly address relevant experience as described below. The Proposal will be evaluated in accordance with the technical evaluation criteria in Section M. Project description should be presented in as much detail as practical subject to the specified maximum page number and minimum font limits.
Offerors shall submit project experience in the format presented in Attachment 3, Experience
Reporting Form (ERF), for a minimum of three (3) projects, and up to a maximum of five (5) projects, that demonstrate the Offeror’s experience in abatement and demolition of facilities.
Projects should be recent and relevant to the scope of this solicitation. A project is a single discrete job or undertaking (i.e. a project would be a single task order under an ID/IQ contract, not the ID/IQ contract as a whole). The Government will only review up to the first five (5) projects presented and will not consider any projects over this limit. In order to be considered recent, the experience should either have been completed or be within 50% of completion within three (3) years from the initial issuance date of this Solicitation. The Offeror shall submit not less than sixty percent (60%) of the projects as those substantially performed by the Prime and
NOT key subcontractors. The Offeror should document any criteria or experience that qualifies the Offeror as successfully fulfilling the solicitation requirements described in Section C (i.e., maintaining compliance with relevant codes and standards, such as EM385-1-1, National
Institute for Occupational Safety and Health [NIOSH], Occupational Safety and Health
Administration [OSHA], Toxic Substance Control Act [TSCA], and Asbestos Hazard
Emergency Response Act [AHERA]). The Offeror should demonstrate its experience in performing multiple concurrent abatement and demolition projects in various locations.
Contracts with any organization, Government or commercial entity, may be included if the work was relevant to this Solicitation as defined in Section M. The Offeror should demonstrate the principal type of work performed by providing the information requested in the Experience
Reporting Form. Key Subcontractor experience will only be considered if a Letter of
Commitment is included in Volume 0 for the respective Key Subcontractor.
Offerors shall demonstrate experience as it relates to the scope of work. Offeror should address the range of performance of tasks, as well as the magnitude of Offeror’s experience in performing tasks to include experience specialized in demolition. Offeror should demonstrate experience with respect to identifying, assessing, understanding and abating and or removing environmental issues (asbestos, PCB’s, lead, mercury, explosives) and performing environmental coordination. Offeror should demonstrate the diversity of differing approaches to multiple situations. The Offeror should detail corporate experience and not individual experience.
Experience can include private as well as government experience of a similar size and scope.
The Offeror should show work experience in a regional area consisting of multiple states to include those states in the geographic region specified for this contract. The Offeror should demonstrate projects on Government facilities or projects that involve secure sites and how
Offeror maintained security.
The Offeror should demonstrate its capability to execute each phase of the project in its entirety, including design and implementation of a facility reduction/demolition plan, contaminant abatement and or removal, facility demolition/removal, and site restoration. The Offeror should demonstrate its capability to perform material processing such as reuse, recycling recovery, waste stream reduction and any other means of reducing and removing a facility. The Offeror should also demonstrate capabilities with respect to identifying, assessing, understanding, and abating or otherwise addressing environmental issues (e.g., asbestos, PCB’s, lead, mercury, explosives) and performing environmental coordination(s). The Offeror should demonstrate capabilities to determine waste stream requirements and execute appropriate disposal of the waste stream. The Offeror should demonstrate capability to operate three independent projects, in different geographic locations, at once, without overlapping project level resources.
L.6.2.2 Volume I, Tab B: Technical Approach
L.6.2.2.1 Offeror shall describe its technical approach for facility reduction/demolition services in narrative form. At a minimum, Offeror should demonstrate their capability to execute each phase of the project in its entirety, including design and implementation of a plan for the abatement of regulated materials, facility reduction/demolition, and site restoration. Offeror should discuss material processing such as reuse, recycling recovery, waste stream reduction, other means of reducing and removing a facility. Offeror should also discuss capabilities with respect to assessing, understanding and remediating environmental issues (asbestos, PCB’s, lead, mercury, explosives) and performing environmental coordination. Offeror should list any equipment and other material, hardware, property, or resources that enable the Offeror to perform the services detailed in this proposal. Offeror should demonstrate its capacity to operate three independent projects, in different geographic locations at once, without overlapping project-level resources.
At a minimum, Offeror should discuss the following in its narrative response.
• ACM and ORM Abatement plan;
• Facility Demolition/Removal
• Waste Stream Management plan to include regulated material removal and disposal;
• Site safety and health plan;
• Site quality control plan;
• Compliance with codes and standards (EM385-1-1, NIOSH, OSHA, TSCA, AHERA, etc.);
• Computerized Project Management Tools; such as, but not limited to, Resident
Management System (RMS).
L.6.2.2.2 A sample task order is enclosed in Section J, Attachment 16 to determine Offerors’ understanding of the scope of services required. Offeror should include a complete discussion of each phase of work, abatement of regulated materials, facility reduction/demolition, and site restoration. Offeror should discuss background, management approach, schedule, site accessibility, and security issues. Offeror should identify the environmental compliance and regulated material abatement regulations pertaining to noise, dust control, or other relevant restrictions/issues. Offeror should discuss technology and innovation, equipment, recycling, etc.
Offeror should show what alternatives they considered and include their rationale in eliminating these other options and the benefits of the selected option. The sample task order is for evaluation purposes only and will not be awarded.
L.6.2.3 Volume I, Tab C, Management Approach
L.6.2.3.1 Organizational Structure - The organizational structure of the Offeror’s proposed team (all key subcontractors should be included in this organizational structure) for this requirement shall be outlined in a narrative and a diagrammed organizational chart indicating the working arrangement of the team and also how this organization fits into the Offeror’s overall corporate structure. The Offeror should provide a resource chart with the number of personnel onboard by labor category that will be committed to the contract. It is important that the Offeror clearly define the organizational roles and responsibilities, the authority and degree of autonomy at each level, and the contractual responsibilities of the team or joint venture units and briefly describe how it will accomplish projects under the proposed organizational structure. The
Offeror's organization should show supervision during all phases of work. The Offeror should also describe how it will effectively and efficiently resolve various types of issues/problems within the organization.
L.6.2.3.2 Management Structure: Offeror shall discuss the project organization, administration and team composition. The management approach that will be used to meet the scope of work requirements should be detailed. Describe the company's cost-management and reporting system and the ability to identify critical cost and schedule impacts and management of multiple subcontracts. Offeror should describe the plan for working away from its home base, to include the logistical support required to sustain field operations. Offeror should provide team members locations and their roles and responsibilities.
L.6.2.3.3 Key Personnel: Offeror should describe in narrative form for each key personnel their areas of responsibility, and relationship with the management structure in performing abatement and demolition/removal services.
It is the responsibility of the contractor to provide personnel that meet the requirements of this contract. Resumes will be required for key personnel in the advent of an award at the task order level for Government review and evaluation. Changes in personnel at the task order level must be requested in writing to the Contracting Officer and are subject to Government review. Key personnel are identified below:
• Program Manager (Key Personnel). The Program Manager (PgM) is directly responsible for the Contractor’s entire facility reduction program. The PgM shall serve as the single point of contact and liaison between the Contractor and CEHNC’s KO. The PgM shall have a Bachelor’s degree from an accredited college or university in a relevant field, six (6) years of relevant experience and/or training, or an equivalent combination of relevant education and experience, and a minimum of four (4) years in a supervisory position. In order to qualify without a college degree, PgM shall have a minimum of 12 years relevant experience. PgM shall understand and be fully conversant in environmental and safety laws, regulations, and requirements applicable to performance of project tasks covered in the Performance Work Statement (PWS). The PgM shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. PgM shall be an employee of the prime Contractor.
• Corporate Safety Manager (Key Personnel). The Corporate Safety Manager (CSM) has direct responsibility for the Contractor’s entire safety program. The Safety Manager represents the Contractor and shall serve as the single point of contact and liaison between the Contractor and SO. CSM shall have a Bachelor’s or other 4-year degree from an accredited college or university in safety management, safety and occupational health, industrial hygiene, environmental science, or a relevant field, ten (10) years of relevant experience in general and construction industry, or an equivalent combination of relevant education and experience in
OSHA, ANSI, NFPA, EPA, and DOSH regulations, Worker’s Compensation Regulations, and
Accident Investigation Protocols. In order to qualify without a college degree, CSM shall have a minimum of 15 years relevant experience. CSM shall understand and be fully conversant in all environmental and safety laws, regulations, and requirements applicable to performance of project tasks covered in the Performance Work Statement (PWS). Professional credentials requested, but not required, include Certified Safety Professional (CSP), Construction Health and
Safety Technician (CHST), Certified Industrial Hygienist (CIH), Certified Safety and Health
Official (CSHO), Safety and Health Leadership (SHL), or other Institute for Safety and Health
Management (ISHM) recognized safety certification programs. CSM shall be an employee of the prime Contractor.
• Contractor Quality Control Manager (Key Personnel). The Contractor Quality Control
Manager (CQCM) has direct responsibility for Contractor Quality Control (CQC) to ensure compliance with the requirements identified in the PWS and the Contractor Quality Control Plan.
CQCM shall have authority to act in all CQC matters. CQCM shall have a minimum of three (3) years relevant experience in quality assurance and quality control (QA/QC). The CQCM shall have full authority to act for the contractor on all contract matters relating to CQC. CQCM shall be an employee of the prime Contractor.
• Regulatory Specialist (Key Personnel). The Regulatory Specialist is responsible for assuring that the Contractor achieves regulatory compliance during all environmental related activities in the task order. The Regulatory Specialist must have professional knowledge, thorough understanding, and applied practical experience dealing with environmental regulations including, but not limited to, RCRA, CERCLA, Superfund Amendments & Reauthorization Act
(SARA), Toxic Substances Control Act (TSCA), Clean Air Act, Clean Water Act, and implementing Federal, State, and local regulations and their application to projects. Regulatory
Specialist shall have a Bachelor’s degree from an accredited college or university in a relevant field, four (4) years of relevant experience and/or training, or an equivalent combination of relevant education and experience. In order to qualify without a college degree, Regulatory
Specialist shall have a minimum of 12 years relevant experience. Regulatory Specialist shall be an employee of the prime Contractor.
Regulatory Specialist shall document professional registration in their respective field of expertise (e.g. Certified Hazardous Materials Manager (CHMM), Registered Environmental
Manager (REM), etc.) and have a minimum of three (3) years specialized experience in the accumulation, manifesting, and shipment of wastes. In addition, Regulatory Specialist shall demonstrate the completion of the following training and will be required to maintain/refresh training during the life of the contract IAW the following regulations.
‒ Training and current certification under 49 CFR 172, Subpart H.
‒ Hazardous waste management procedures (40 CFR 262)
‒ Contingency plan implementation (40 CFR 265.16).
L.6.2.3.4 Management Controls: Offeror shall provide in narrative form the management techniques and controls that will be implemented to manage and control the work. Offeror should discuss its approach for meeting the performance based contracting requirements of FAR
Subpart 37.6 with respect to how it will perform the work with the emphasis on required results.
Offeror should include the following information:
• Work management system
• Document control
• Field and home office reporting
• Field implementation of safety and quality control plans
• Approach for managing subcontractors
• Allocating responsibility between joint venture members
L.6.3 VOLUME II, FACTOR 2 – PAST PERFORMANCE
L.6.3.1 Volume II, Tab A, CPARS/Past Performance Questionnaires (PPQs)
L.6.3.1.1 Offerors should provide Contractor Performance Assessment Reporting System
(CPARS) or PPQs for only the projects submitted in Volume I. Offerors shall submit CPARS ratings for projects with CPARS and NOT submit PPQs for those projects. The PPQ included in the solicitation, see Section J, Attachment 4, is provided for the Offeror to submit to the client for each project (that does not have a CPARS) the Offeror submitted in Volume I. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed
PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed
PPQ from a client for a project(s) before the solicitation closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the FY20 FRP NE Region MATOC Inbox, CEHNC-NE-
FRP@usace.army.mil, prior to the solicitation closing date. The solicitation number and
Offeror’s name shall be clearly indicated on the PPQ. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
L.6.3.1.2 In addition to submitted CPARS and PPQs, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, CPARS (Past Performance Information Retrieval System [PPIRS] merged with
CPARS as of 5 May 2019), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate, key subcontractors) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting
System (eSRS), and any other known sources not provided by the Offeror.
L.6.3.1.3 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the
Offeror.
L.6.3.2 Volume II, Tab B, Experience Reporting Forms (ERF) Offerors should submit the same
ERFs as submitted in Volume I.
L.6.4 VOLUME III, FACTOR 3, SMALL BUSINESS PARTICIPATION
L.6.4.1 Volume III, Tab A, Small Business Participation Commitment Document: All
Offerors, both other than small businesses and small businesses, shall submit a Small Business
Participation Commitment Document, see Section J, Attachment 5, in accordance with Defense
Federal Acquisition Regulation Supplement (DFARS) subpart 215.304. The Small Business
Participation Commitment Document will be incorporated into any resultant Prime Contract.
L.6.4.2 Volume III, Tab B, Small Business Subcontracting Plan (Other Than Small Businesses
Only) (Additional Requirement for Other than Small Business Concerns Only)
For award eligibility, separate from the Small Business Participation Commitment Document, all
Offerors except small businesses will also submit an acceptable small business subcontracting plan meeting the requirements of FAR Subpart 52.219-9 and DFARS Subpart 252.219-7003 (or
DFARS Subpart 252.219-7004 if Offeror has a comprehensive subcontracting plan).
Government will evaluate SBSPs as acceptable or unacceptable, based on two criteria:
• SBSP adequately responds to each of the required elements of FAR 52.219-9(d) paragraphs (1) through (15)
• Commitments in SBSP are consistent with the commitments in the Small Business
Participation Commitment Document.
L.6.5 VOLUME IV, FACTOR 4 – PRICE
L.6.5.1 Volume IV, Tab A, Professional Labor and G&A
Offeror shall submit a price proposal for the base period (24 months) and three one-year option periods. Proposal shall include, for the purpose of evaluations, the breakout of the professional labor rates and G&A rate. The rates proposed in the price proposal worksheets will be binding price elements and will become the maximum allowable rates for task orders issued during the ordering period of any contract awarded as a result of this solicitation, unless Davis Bacon Wage
Rates require a higher rate. See Attachment 18 - Estimated Quantities.
Offeror shall submit a proposal narrative describing the basis of estimate (BOE) of proposed pricing presented in Attachment 18. Offeror shall submit Price Volume proposal narratives, including any BOE sheets, in PDF or Excel format. Do not submit BOEs as pictures.
IAW FAR subparts 15.402 and 15.403-1, certified cost or pricing data is not required as the KO has determined adequate competition is expected for this procurement. If after receipt of proposals the KO determines that there is insufficient information available to determine price reasonableness and none of the exceptions at FAR 15.403-1 apply, the offeror may be required to submit cost or pricing data. Information submitted shall be prepared following the instruction in
FAR 15.403-5. Additionally, in the event that adequate competition is not obtained, the KO may incorporate FAR 52.215-20 entitled, “Requirements for Cost or Pricing Data or Information
Other Than Cost or Pricing Data,” into the solicitation and request a Certificate of Current Cost or Pricing Data.
All prices and costs must be in U.S. dollars only, including the amounts for the prime offeror and any potential subcontractors.
There are no page limitations for this volume. Any information included in this volume not directly related to Price will be disregarded. In addition to the information requested below, the
Government reserves the right to request additional or more detailed information to support an evaluation of reasonableness.
L.6.5.2 Volume IV, Tab B, Sample Task Order Attachment B:
In addition to the base/option years’ proposal, Offeror shall also submit a separate price proposal for the sample task order using prices proposed for the base period above. See Attachment 17, Sample Task Order Attachment B.
Price is not an adjectivally rated criterion, but is evaluated for providing the best value to the
Government, IAW FAR Subpart 15.404. In addition, price proposal will be evaluated to determine whether the proposed price reflects a clear understanding of the requirements and is consistent with the methods of performance described in the offeror’s proposal. The
Government may consider offers found unreasonable unacceptable and may reject on that basis.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .